IR 05000313/1989035
| ML19332E364 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/29/1989 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8912070134 | |
| Download: ML19332E364 (2) | |
Text
,,..,
.
,-...
_.....
-
.
.. ~.
}
'
y'p
.3
,,4
,
. A
%
UNfTED STATES
>
g 7,c iz - h NUCLEAR REIULATORY COMMISSION '
l
- RE0loN IV-h 3'
M
/'
011 RYAN PLAZA oRIVE. SUITE 1000
'
,
8,
- ARLINGTokiTEXAS 70011
'
i
"
'
'Ot i
Noveinber 29, 1989
-!
d
~
NOTICE OF SIGNIFICANT LICENSEE MEETING
' '
p
'*g
' Name'of. Licensee: ' Arkansas Power & Light Company-
- Name of Facility: Arkansas _ Nuclear One Units 1 and 2
~
'
'
-;
- Dockets
50-313;-50-368
'
' Date and Time; December 8~,31989 of Meeting:L 9.a.m.(CST)
<
+
Location.of Meeting: - NRC Region IV office, 8th Floor Conference Room q
< - Purpose lof Meeting:
Enforcement. Conference to' discuss the findings associated'
.with the special inspection concerning safety-related wiring diagram ' discrepancies-(NRC Inspection w",,
.-Report 50-313/89-35;50-368/89-35), five LERs that are
'F
, apparent violations of NRC requirements (NRC Inspection
'
Report.50-313/89-22;50-368/89-22), and the apparent
"
,
, violation' associated with AFW pump. recirculation flow
y W
adequacy-(NRC'InspectionReport:50-313/89-40;50-368/89-40).
t MCAftendees-S. 'J. Collins,' Director, Division of Reactor Projects,
'
u'
1 Region'IV (RIV)
i
.
- T, P. Gwynn,' Deputy Director, Division of Reactor o
'
D'
Projects,RIV L'.:J. Callan, Director, Division of Reactor Safety, RIV
'
F. J.sNebdon, Director, Project Directorate IV,. NRR
-
.
D. D. Cnamberlain, Chief, Project Section A. RIV i
,
'
C. C. Warren, Senior Resident Inspector, RIV
'
. A. T. Howell, Project Engineer, RIV
+
C. Poslusny, Project Manager, Project Directorate IV, NRR
.
,
C. C. Harbuck, Project Manager, Project Directorate IV. NRR l
J. M.-Sharkey, Regional-Coordinator, ED0/DEDR t
R. C. Haag, Resident Inspector, RIV
- Licensee Attendees:
6.. Campbell, Vice President, Nuclear Operations N. Carns, Director, Nuclear Operations E. Ewing, General Manager, Plant Support L. Humphrey, General' Manager, Quality Assurance L
G. Jones, General Manager, Engineering R. Lane, Manager, AN0 Engineering J. Fisicaro, Manager, Licensing R. Fenech, Plant Manager, Unit 2 J. Vandergrift, Plant Manager, Unit 1 g
A..Wrape, Manager, Electrical /I&C Design
' \\
8912070134 891129 fDR ADOCK 05000313 x;
' '
,
y
- -. +
.c,
-,
.,y_,, -,
,_,,,_.,n,
_.,..,
,, -. _.,
, - -.
ny
.
,
,
L,f
'
'
- ,
,
..
,
j
i s;
' Arkansas Power & Light Company'
-2-
,
'
.
'ote: ' Attendance by NRC personnel at the NRC/ licensee meeting should be made N
,
known by 4 p.m. on December 4,1989, via telephone call to D. Chamberlain (FTS
-
l728-8249).
'
.
't
. Approved By: JWMitbbl/lM
'5.
6. ColTins, DirCctor-l Division of Reactor Projects Distribution:
' J. M. Taylor, A/EDO
H. 'L 3 Thompson, DEDS
' T. E. Murley..D/NRR F. J. Miraglia, ADT/NRR r
J. G. Partlow, ADP/NRR
' J. Lieberman, D/0E-
.
'
'L. J. Chandler, Asst.<GC for Enf.
1 -
- R. D.. Martin, RIV-t
'
G. F. Sanborn, EO
'
C.'A. Hackney, RSLO
,
- J. Gilliland, PAO,.RIV NRC Attendees
-
- -
- DMBTIE45%
,
licensee Address List
.
>
v h
E o
s
.. l 1,'
'
,
. - -,
,
,. -. -, - - - - -....,
-
- -.. -...
-
.. - - -
- - -
-