October 2, 2019

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2POST-APPROVAL SITE

INSPECTION FOR LICENSE RENEWAL - PHASE 4 REPORT 05000266/2019010

AND 05000301/2019010

Dear Mr. Craven:

On September 20, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant, Units 1 and 2, and discussed the results of this inspection with Mr. Jim Wilson and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more-than-minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Karla K. Stoedter, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2019010 and 05000301/2019010

Enterprise Identifier: I-2019-010-0055

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant, Units 1 and 2

Location:

Two Rivers, WI

Inspection Dates:

September 16, 2019, to September 20, 2019

Inspectors:

J. Bozga, Senior Reactor Inspector

V. Meghani, Reactor Inspector

V. Petrella, Reactor Inspector

Approved By:

Karla K. Stoedter, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Post-Approval Site Inspection for License Renewal - Phase 4 at Point Beach Nuclear Plant, Units 1 and 2 in accordance with the Reactor Oversight Process.

The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more-than-minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===71003 - Post-Approval Site Inspection for License Renewal

The team selected seven Aging Management Programs (AMPs) for evaluation considering risk insights and programs that were enhanced or new under the renewed operating license.

The team also considered for selection those programs with monitoring results that were performed for the first time or those that identified examination or test results not experienced in the past. For the AMPs selected, the team reviewed records, interviewed plant staff, and conducted plant walk downs to evaluate whether aging management program elements were being implemented in accordance with U.S. Nuclear Regulatory Commission requirements.

The team evaluated the following elements of the selected AMPs: scope, preventive actions, parameters monitored or inspected, detection of aging effects, monitoring and trending, acceptance criteria, corrective actions, confirmation process, administrative controls, and operating experience.

The following AMPs were evaluated by the team:

Post-Approval Site Inspection for License Renewal===

(1) ASME Section XI, Subsections IWB, IWC, and IWD
(2) Cable Condition Monitoring
(3) Closed-Cycle Cooling Water System Surveillance
(4) Buried Service Monitoring
(5) Open-Cycle Cooling (Service) Water System Surveillance
(6) Steam Generator Integrity
(7) Structures Monitoring

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 20, 2019, the inspectors presented the Post-Approval Site Inspection for License Renewal - Phase 4 results to Mr. Jim Wilson, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71003

Corrective Action

Documents

AR 01372922

Buried Fire Protection Piping Inspection Results

09/28/2009

AR 01386114

License Renewal Inspection of Opportunity: Concrete Core

03/25/2010

AR 02161633

SGMP-IL-16-02 Aging Management Guidance for SGs

10/11/2016

AR 02209391

Z-065A Cable Supports Degradation Increasing

06/08/2017

AR 02220709

Potential Impact to Cables in Manhole Z-65; Support Degrad

08/16/2017

AR 02220951

Recordable Indications on Containment Spray Pump 1P-14A

Pump

08/17/2017

AR 02224989

Piping JB-02 - NDE Inspections of SW Piping for HX-028A1-

09/14/2017

AR 02228762

Piping JB-01 - SW ISI Results SW Piping From 1HX-023A

10/06/2017

AR 02229345

1N-32/1N-36 1R37 Detector Replacement Issues

10/10/2017

AR 02241723

Effectiveness Reviews of PB License Renewal Programs

2/21/2017

AR 02262609

L1A: License Renewal Program Effectiveness Reviews

05/03/2018

AR 02269823

License Renewal Commitment Verbiage Removed from

Document

06/25/2018

AR 02286065

U2 A Containment Fan Cooler Tubes Need Plugging

10/16/2018

AR 02302058

LR Commitment to Visually Inspect SG Tube Supports not

met

2/14/2019

AR 02303129

LR Commitment to Visually Inspect Upper Tube Bundle not

met

2/22/2019

AR 02307112

Unidentified Liquid on Floor of U1 Keyway

03/24/2019

AR 02307153

Inspect HX-15D Coils & Condensate Drains

03/25/2019

AR 02307702

Slow Weep Exists at 1CC-730D SS Swage Connection

03/27/2019

AR 02309950

Eroded Pipe Inside Condenser

04/10/2019

AR 02323853

LR-AMP Revision Packages not Found in Records

08/09/2019

Corrective Action

Documents

Resulting from

Inspection

AR 02328054

Potential Gap For Buried Piping Fire Protection Inspections

09/16/2019

AR 02328188

(LR 2019 Phase IV) Facilities Monitoring PMRQs

09/17/2019

AR 02328236

2019 LR Phase IV - Missing HX-12B Blowdown Insulation

09/17/2019

AR 02328296

2019 LR INSP-Post Outage 1R38 Poor Housekeeping

Identified

09/18/2019

AR 02328341

LR2019 Phase IV SG Feedring Support Inspections

09/18/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 02328486

NRC Identified - Settlement Monitoring PM

09/19/2019

AR 02328523

Remove Paint from Stanchion and Floor Base Plates on

Support

09/19/2019

Miscellaneous

AR 2158241

PB Asset Management Plan, Underground Piping and Tank

Integrity Program

Q3-2019 Buried

Piping

Program Health Report

09/16/2019

Procedures

50.59 Screening

Revision to PBN Steam Generator LR Aging Management

Plan

05/14/2019

FP-IH-EXC-01

Excavations & Trenching Controls

LR-AMP-003-

SGINT

Steam Generator Integrity Program Basis Document for

License Renewal

LR-AMP-014-

CCMON

Cable Conditioning Monitoring Program Basis Document For

License Renewal

LR-AMP-017-

IWBCD

ASME Section XI, Subsections IWB, IWC, and IWD Inservice

Inspection Program Basis Document for License Renewal

LR-AMP-018-

BSMON

Buried Services Monitoring Program Basis Document for

License Renewal

LR-AMP-021-

OCCW

Open Cycle Cooling (Service) Water System Surveillance

Program Basis Document For License Renewal

LR-AMP-022-

STRMON

Structural Monitoring Program Basis Document

LR-AMP-023-

CCCW

Closed-Cycle Cooling Water System Surveillance Program

Basis Document For License Renewal

NP 3.2.2

Primary Water Chemistry Monitoring Program

NP 7.7.28

Cable Condition Monitoring Program

NP 7.7.9

Facilities Monitoring Program

SEM 8.0

Buried Services Monitoring Program

Self-Assessments 2326310

PBN NRC Aging Management Phase IV Inspection

Readiness Assessment

08/29/2019

NPM 2016-0102

2014 Facilities Monitoring Program Annual Report

07/19/2016

NPM 2018-0025

2017 Facilities Monitoring Program Annual Report

01/30/2018

NPM 2019-0021

2018 Facilities Monitoring Program Annual Report

01/31/2019

Work Orders

00351143

1A-06 to 1X-14 Cable Testing (1R31)

10/21/2008

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

00355300

H52-11 to X-08 Cable Testing

2/03/2008

00372300

1P-15B-M Perform Tan Delta Testing of the 4 KV Supply

Cables

03/10/2010

00380163

Perform OI-151, HX-12C/D C C System HX Data Collection

11/03/2012

00380572-02

VT-1 Exam on 2P-001A Welds

03/18/2011

00387898

Perform OI-152 During U1 Refueling GL 89-13 Requirement

10/07/2011

00388181

1X-04, Perform Tan Delta Testing of 13.8 Cables

2/09/2011

40080735

Z-065A/Manhole #1 Degraded Cable Supports

10/22/2017

40080737

Z-065B/Manhole #2 Degraded Cable Supports

10/17/2018

40151263-02

Piping KC-01 / Excavate 10 FT of Fire Protection Piping

06/27/2012

208193

2X-04-Tan Delta Test 13.8KV Cables (H52-32)

03/30/2014

40313272

2SW-02908/Valve Internal Inspection

04/08/2017

40357209

1HX-015C1-C8 GL 89-13 Clean Heat Exchanger as Req

03/17/2016

40357741-01

Perform Steam Drum Inspections

05/05/2016

40380349

As-found Buried Piping Visual Inspection Report, Valve

FP-00451

11/14/2016

40419973

2HX-015C1-C8 GL 89-13 Clean Heat Exchanger as Req

04/02/2017

40430884-07

2HX-001B VT-2 Exam Steam Generator B Hot Vent Nozzle

05/17/2017

40430884-08

2HX-001B VT-2 Exam of S/G B Safe End to Nozzle Weld

05/17/2017

40430889-01 and

40430889-04

2HX-001A, Perform SG Secondary Inspections

04/21/2017

40430914

2HX-015B1-B8 GL 89-13 Clean Heat Exchanger as Req

10/17/2018

40430995

2HX-015D1-D8 GL 89-13 Clean Heat Exchanger as Req

04/04/2017

40460127-01

Turbine Hall U2R35 ISI Exams

05/23/2017

40460288-02

EB-1-MS-69-A-2 Ctmt. ISI Exams in General Areas

05/23/2017

40460288-05

SG A Support Ring Girder Ctmt. ISI Exams

05/23/2017

40460288-06

VT-1 SG A & B Manway Bolting CTMT. ISI Exams

05/22/2017

40461873

HX-055B GL 89-13 Open/Inspect/Clean/Close G-02 EDG

01/05/2017

40473102

1ICP 4.26 -- NI Power Range Channels - INSP, MNT & CAL

10/15/2017

40473372

1HX-015D1-D8 GL 89-13 Clean Heat Exchanger as Req

10/23/2017

40506918-01

PB0-Inspect Buried Fire Protection System Piping

08/24/2017

40514104-01

Minor Spalled Exterior Concrete on CWPH

07/03/2019

40533638

Yearly (Fall) Electrical Inspection of Manholes

09/15/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

40567232-02

Perform Upper Bundle Inspections

04/19/2019

40567250-01

1HX-001B / Perform Tubesheet Cleaning

04/23/2019

40567250-03

1HX-001B / Perform FOSAR Inspection

04/22/2019

40573164

1A-06, Tan Delta Testing of 1A-06 Supply Cables

04/03/2019

40573454

1ICP 4.26 -- NI Power Range Channels - INSP, MNT & CAL

04/05/2019

40599327

HX-038B Inspect and Maintain AC Unit

05/22/2019

40601350

HX-105A GL 89-13 Remove End Bells and Hydrolance

03/06/2019

40610430

Yearly (Spring) Electrical Manhole Sump Inspections

05/02/2019

40610865

HX-038B Inspect and Maintain AC Unit

11/19/2018

40613663

TS-82, G-02 Emergency Diesel Generator Operability

06/09/2019

40620438

TS-83, G-03 Emergency Diesel Generator Operability

07/28/2019

40623681

G-02 Coolant Sampling