U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-295/81-07 Docket No. 50-295 License No. DPR-39 Licensee: Commonweslth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name:
Zion Nuclear Power Station, Unit 1 Inspection At:
Zion Site, Zion, IL Inspection Conducted: March 20, 1981 bh* Y 7/7
[
Inspectors:
K. D. Ward t
r h] pd4 g-8 -( /
-
J. H. j eisler Approved By:
D. W. Hayes, Ch k7
[
'/
/
Reactor Projects Sectica IB In_spection Summary Inspection on March 20, 1981 (Report No. 50-295/81-07)
Areas Inspected: Unit 1 Boron Injection Tank replacement program including review of procedures relative to installation and NDE: qualifications of welding procedure specifications, welaer qualifications, and qualification of inspection and NDE personnel. This inspection involved a total of 10 inspector-hours onsite by two h3C inspectors including 0 inspector-hours onsite during off-shifts.
Results: No items of noncompliance or deviations were identified in the area of inspection.
81052105/0
.-
.
.
..
.
-
.
..
_-
,
..
..
--
.
.
DETAILS 1.
Persons Contacted Principal Licensee Employees K. Graesser, Station Superintendent K. Kofron, Maintenance Assistant Superintendent T. Lukins, QC Supervisor P. Graessle, QC Inspector C. Ginu, QC Inspector Contractor and Other Personnel J. Carlson, QC Supervisor, Phillips-Getschow Co.
A. Marconi, NDE Level III, Phillips-Getschow Co.
2.
Frogram or Functional Areas Inspected Boron Injection Tank Replacement Procedures The inspectors reviewed the Boron Injection Tank (BIT) Replacement Repair program, RP-BITR-ISI0O221 dated March 10, 1981. The repair program consisted of replacing the existing Unit I stainless steel
- lad carbon steel boron injection tank with a stainless steel tank from Braidwood Station. The replacement BIT was installed by welding the new tanks pressure retaining connections to the existing inlet and outlet piping and associated instrument connections. The repair program was performed in accordance with ASME Section XI,1974 with 1975 addenda.
In addition the inspectors reviewed:
(1) Phillips-Getschow Welding Procedure Specification (WPS) IA-MA-88 Revision 10, January 2, 1979 (GTAW/SMAW, P-8, Consumable Insert) (2) Ceco maintenance / modification ptTcedure for the PIT replacement W.R. #Z-11683, (3) As-built drawing No bi-4-1 Revision 0, and ASME Code Data Report for the replacement tank built by Southwest Fabricating and Welding Company, and (4)
Certified Material Test Reports for welding materials used in the tank replacement.
3.
NDE Procedures The insppctors reviewed those NDE procedures that are to be usad for examination of pipe welds performed for the boron injection tank replacement.
Specific procedures examined are:
a.
Ceco Procedure NDT-A, Revision 6 dated November 20, 1980, Radio-graphic Examination. Acceptance criteria for this procedure is stated as in accordance with ANSI B.31.1-1973.
,
-2-
_
__
._
_
__
.
i b.
Ceco Procedure NDT-D, Revision 6, dated November 16, 1980, Liquid Penetrant Examination. Acceptance criteria for this procedure is stated as in accordance with ASME Section III, 1971 Edition with Summer 1973 Addenda.
Ceco Procedure NDT-VI, Revision 5, dated January 6,1977, Visual c.
Examination. Acceptance criteria for this procedure is stated as in accordance with ANSI B.31.1-1973.
d.
Superior Industrial X-ray Personnel Qualification and Certifi-cation Program, Revision 2, dated May 1, 1978.
Ceco Procedure I-I-0 Revision 10, dated December. 31, 1980,.
e.
Certification of Inspection and NDE Personnel.
4.
Personnel Qualification / Certification The following velders, assigned to perform the welding on the a.
BIT replacement, were qualified in accordance with AShE Section IX, 1980 edition, Winter 1980 addenda.
Name Stamp Number-G. Rynne 653 E. Mabrito 640 P. Pelkonen 628 J. Harper 150 J. Ellsworth 654 b.
NDE personnel certifications reviewed were in accordance ASNT-TC-1A, 1975 addenda.
Superior Industrial X-ray Name PT RT j
R. Huerter II II M. Hill II II
+
Commonwealth Edison
-
-
Name PT i
C. Ginn II
'
J. Booth II 5.
Exit Interview The inspectors discussed the scope and findings of the inspection with the station superintendent and maintenance assistant superin-tendent at the conclusion of the inspection on March 20, 1981.