Forwards IE Mgt Meeting Rept 50-293/81-28 on 810723.No Noncompliance Noted
ML20038B565
Person / Time
Site: Pilgrim
Issue date: 11/23/1981
From: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Howard J
BOSTON EDISON CO.
Shared Package
ML20038B566 List:
References
NUDOCS 8112080405
Download: ML20038B565 (2)


See also: IR 05000293/1981028

Text

t2-02-Y/

j

1

NOV 2 3 1981

,

l

e

s

s

k

h

M - ' Docket No. 50-293

    1. VS3/ /

?!

v s

g

,

, , ,

,

Bosto6. Edison Company

as-

O

ATTN:

Mr., J. E. Howard

s'

-

d

V ,

Vice-President Nuclear

c'

c

Boston, Massachusetts 02199

-

(pO

d

!800 Boylston Street

-8

2

-

,-

y-

'

3

s

-

0, d '$],

i

Gentlemen:

1

"

-

'

Q.

-

Subject: Management Meeting

f/)

.. i \\ [

,

This refers to the management meeting between you and members of your staff

and Mr. T. T. Martin and other members of the Region I staff at the-Pilgrim

Nuclear Power Station, Plymouth, Massachusetts, on July 23, 1981. The

'

meeting was held at our request to discuss your implementation of certain

TMI-2 Lessons Learned Category "A" items.

The subjects discussed during this meeting are described in the Office of

Inspection and Enforcement Meeting Report which is enclosed with this

letter. Our understanding of your actions to be taken as a result of this

meeting have been documented in our July 27, 1981 lettor to you.

I'

ur opinion that this meeting was beneficial and provided additional

tion concerning your implementation of certain of the TMI-2 Lessons

.ned items.

.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed meeting report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten

(10) days from the date of this. letter of your intention to file a request

for withholding; and (b) submit within 25 days from the date of this letter

a written application to this office to withhold such information. Consistent

with section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement

of the reasons on the basis which it is claimed that the information should

be withheld from public disclosure. This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified periods noted above, the

report will be placed in the Public Document Room.

The telephone notification

R1:DETI

R1: EI

ETI

ETI

1DN

RA

R

Nimitz/wb

Kna p

Joyner M Martin

Brunner

Allan

Hiynes

t11/17/81

al[l)

' **//P/5/ -

WM///

pg

p) n)U

80

h g\\

'

-

0FFICIAL RECORD COPY

'

N Es112090405 811123

S

'

05000293

PDR ADOOK'

PDR

\\

G.4

'

/[

-

t-i.

i

-

.

_

,

.

Boston Edison Company

2

NOV 2 3 1981

of your intent to request withholding, or any request for an extension of

the 10-day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

No reply to this letter is required; however, should you have any questions

concerning this letter, we will be pleased to discuss them with you.

Sincerely,

Original Signed By

Ronald C. Haynes

Regional Administrator

Enclosure:

Inspection and Enforcement Meeting

Report No. 50-293/81-28

cc w/ encl:

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/ encl:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

0FFICIAL RECORD COPY

w

-

.