ML20049J755

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Rept 50-293/81-27 on 811013-16. No Noncompliance Noted
ML20049J755
Person / Time
Site: Pilgrim
Issue date: 02/24/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20049J756 List:
References
NUDOCS 8203190392
Download: ML20049J755 (2)


See also: IR 05000293/1981027

Text

m

-

I

C a v4 -JA

7 T)1h h

_ Tf

V'

ft9'

QDR

T

'

'l

3

3

A f ELA

_ Jt

es ju

A

-

-

24 FEB 1982

Docket No. 50-293

sa

,

%

9

Boston Edison Company M/C Nuclear

RECEjVED

ATTN: Mr. William D. Harrington

g

3ISRJ 3 7 O N

-1

-

l

Senior, Vice President, Nuclear

-

-

mana,n,

800 Boylston Street

%gp

Boston, Massachusetts

02199

c)

4)

Gentlemen:

c,

G

a

Subject:

Inspection 50-293/81-27

This refers to the routine safeguards inspection conducted by Mr. R. J. Bailey

of this office on October 13-16, 1981 at the Pilgrim Nuclear Power Station,

Plymouth, Massachusetts of activities authorized by NRC License No. DPR-35 and

to 'he discussions of our findings held by Mr. Bailey with Mr. Mathis at the

co..clusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Rep rt which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you have taken to correct the items of

noncompliance brought to your attention in the enclosure to our letters dated

June 1 and July 24, 1981. We have no further questions regarding your action at

this time.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with 10 CFR 73.21 of the NRC's regulations, documentation of

security measures for the physical protection of special nuclear materials and

certain plant equipment vital to the safety of production or utilization facilitGes

are deemed to be Safeguards Information.

Each person who produces, receives or

acquires Safeguards Information is required to ensure that it is protected

against unauthorized disclosure. Therefore, except for the report cover sheet.

the enclosure to this letter will not be placed in the Public Document Room and

will be distributed pursuant to 10 CFR 73.21(c).

(

-b

M

ETI

I:DETI

Ufraile

pja

-

i

Jo

2/18/

k

&[

k

ENCLOSlES C0 mins

0FFICIAL RECORD COPY

g c3

SEGU 033 IN r" MIO"I.

hi

1

UPON SE'MMTIC'J THIS

q

s

c--

1

p

'}!

@

i li

'

FAGE IS DECONIROLI.D

r

'

a n D Q

Q ,n

'

1 u.i0 . u !i g o 1'

)

-

V

8203190392 820224

a

.

I

j

" ](

.

l

PDR ADOCK 05000293

d6r

o

C

PDR

f E 3f

.

.

I E JL b ,O[

'T"DT

"?T

kA

.ib

L

,

A

,

_

. 31

Boston Edison Company M/C Nuclear

2

24 FEB W

-

.

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

N

/

.

p homas T. Ma in, Director,

,

Division of Engineering and

I

. Technical Inspection

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-293/81-27 (Contains Safeguards Information)

cc w/ report cover sheet only:

A. V. Morist, Manager, Nuclear Operations Support

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector (w/ enclosure)

Commonwealth of Massachusetts (2)

bec:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

Director, DRPI (w/ report cover sheet only)

y,3ct,osun coNTAINS

SAFZGUARDS INPynTION.

OFFICIAL RECORD COPY

' UFON SEPAR.\\ TION DIIS

TAGEIS DECO 2EOLLD

hb

k

.O M

T

@bdf sLbMub@b

. L a a LL -

,o

f

<