ML20049J755
| ML20049J755 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/24/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrington W BOSTON EDISON CO. |
| Shared Package | |
| ML20049J756 | List: |
| References | |
| NUDOCS 8203190392 | |
| Download: ML20049J755 (2) | |
See also: IR 05000293/1981027
Text
m
-
I
C a v4 -JA
7 T)1h h
_ Tf
V'
ft9'
T
'
'l
3
3
A f ELA
_ Jt
es ju
A
-
-
24 FEB 1982
Docket No. 50-293
sa
,
%
9
Boston Edison Company M/C Nuclear
RECEjVED
ATTN: Mr. William D. Harrington
g
3ISRJ 3 7 O N
-1
-
l
Senior, Vice President, Nuclear
-
-
mana,n,
800 Boylston Street
%gp
Boston, Massachusetts
02199
c)
4)
Gentlemen:
c,
G
a
Subject:
Inspection 50-293/81-27
This refers to the routine safeguards inspection conducted by Mr. R. J. Bailey
of this office on October 13-16, 1981 at the Pilgrim Nuclear Power Station,
Plymouth, Massachusetts of activities authorized by NRC License No. DPR-35 and
to 'he discussions of our findings held by Mr. Bailey with Mr. Mathis at the
co..clusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Rep rt which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the items of
noncompliance brought to your attention in the enclosure to our letters dated
June 1 and July 24, 1981. We have no further questions regarding your action at
this time.
Within the scope of this inspection, no items of noncompliance were observed.
In accordance with 10 CFR 73.21 of the NRC's regulations, documentation of
security measures for the physical protection of special nuclear materials and
certain plant equipment vital to the safety of production or utilization facilitGes
are deemed to be Safeguards Information.
Each person who produces, receives or
acquires Safeguards Information is required to ensure that it is protected
against unauthorized disclosure. Therefore, except for the report cover sheet.
the enclosure to this letter will not be placed in the Public Document Room and
will be distributed pursuant to 10 CFR 73.21(c).
(
-b
M
I:DETI
Ufraile
pja
-
i
Jo
2/18/
k
&[
k
ENCLOSlES C0 mins
0FFICIAL RECORD COPY
g c3
SEGU 033 IN r" MIO"I.
hi
1
UPON SE'MMTIC'J THIS
q
s
c--
1
p
'}!
@
i li
'
FAGE IS DECONIROLI.D
r
'
a n D Q
Q ,n
'
1 u.i0 . u !i g o 1'
)
-
V
8203190392 820224
a
.
I
j
" ](
.
l
PDR ADOCK 05000293
d6r
o
C
f E 3f
.
.
I E JL b ,O[
'T"DT
"?T
kA
.ib
L
,
A
,
_
. 31
Boston Edison Company M/C Nuclear
2
24 FEB W
-
.
No reply to this letter is required; however, should you have any questions
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
N
/
.
p homas T. Ma in, Director,
,
Division of Engineering and
I
. Technical Inspection
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-293/81-27 (Contains Safeguards Information)
cc w/ report cover sheet only:
A. V. Morist, Manager, Nuclear Operations Support
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector (w/ enclosure)
Commonwealth of Massachusetts (2)
bec:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
Director, DRPI (w/ report cover sheet only)
y,3ct,osun coNTAINS
SAFZGUARDS INPynTION.
OFFICIAL RECORD COPY
' UFON SEPAR.\\ TION DIIS
TAGEIS DECO 2EOLLD
hb
k
.O M
T
@bdf sLbMub@b
. L a a LL -
,o
f
<