U.S. ATOMIC ENERGY COMMISSION
.
DIRECTORATE OF REGUIATORY OPERATIONS
-
REGION I
-
.
-
,
I RO Inspection Report No:
50-289/74-30 Docket No: 50-289
!
e
.
.
Licensee:
Metropolitan Edison Company License No:
.,
'
Three Mile Island - Unit 1 Priority:
i
'
Category:
C
'
'
'
Location:
Middletown, Pennsylvania
,
i
-
,
!
!
Ty[eofLicensee:
PWR, 871 MWe (B&N)
.
l Type of Inspection:
Routine, Unannounced
.
Dates of Inspection:
September 10 thru 12. 1974
'
Dates of Previous Inspection: p gust.13 thru 16, 1974 Reporting Inspector:
M.;
9/.t3[4
-
.
D. M. Sternberg, Spactor Inspector Date
'
None
'
Accompanying Inspectors:
Date
-
'
-
.
Date
.
Date
-
-
.
,
.
Date
-
.
,
Oth'er Accompanying Personnel:
Date (
I 1445 070
-
Reviewed By:
[C.
5 [2.dW l
E. C. McCabe, Jr., Senior Reactor Inspector Date
~
Reactor Operations Branch 7910.18.07M
'
,
,
_ _ _ _ _. _
.
.
.
.
~
'
.
.
SUMHARY OF FINDINGS Enforcement Action A.
Violations
'
~
1.
Contrary to the requirements of the industrial Security Plan's Administrative Procedure 1011.1, a gate in the security area
.
,.
fence was unlocked and uncontrolled, in that the' inspector,
unescorted, entered through the gate and gained access to the
.
Service Building without licensee verification of the propriety of such entrance.
(Details, Paragraph 6)
!
Licensee Action on Previously Identified Enforcement Items A.
Not inspected Unusual Occurrences
-
-
None identified
.
Other Significant Findings A.
Current
_.
1.
Review of Abnormal Occurrences was conducted.
(Details, Para-
'
graph 2)
!
'
"
2.
Review of Safety Related Maintenance was conducted.
(Details,
Paragraph 3)
..
3.
Review of Reporting Requirements (Semi-annual Report - Primary Coolant Chemistry) was conducted.
(Details, Paragraph 4)
4.
Radiation Monitoring Systems (RMS) status was questioned.
0 Details, Paragraph 5)
B.
Status of Previously Reported Unresolved Items
,
Not inspected Management Interview An exit interview was held on September 12, 1974 at the conclusion of the inspection with the following attendees.
~
.
1445 071
.
.
-m,
,.
-
.
==-e-pp
. -..
'
.
-2-
..
"
-
.
,
Metropolitan Edison Company
'
Mr. J. Floyd, Supervisor of Operations Mr. J. Herbein, Station Superintendent The following summarizes items discussed:
1.
Review of Abnormal Occurrences.
(Details, Paragraph 2)
2.
ReviewofSafetyRelatedNaintenance.
(Details, Paragraph 3)
3.
Review of Reporting ~ Requirements.
(Details, Paragraph 4)
4.
Radiation Monitoring System (RMS) Calibration Status.
(Details, P:ragraph 5)
5.
Security Area violation.. (Details, Paragraph 6)
.
O
.
- /
/
.
.
g 1445 072
._
-.
-
..... -
k
.
.-
.
,
-
.
-
,
.
~ *
-.
DETAILS
.
1.
Persons Contacted Metropolitan Edison" Company (Met Ed)
.
Dr. T. Baer, Station Engineer Mr. D. Barry, Instrument Supervisor Mr. E. Bulmer, Mechanical Engineer
,
Mr. J. Colitz, Unit 1, Superintendent Mr. W. Cotter, Mechanical Engineer Mr. N. Derks, Shift Foreman, Unit 2 Mr. J. Floyd, Supervisor of Operations - Unit 1 Mr. K. Frederick, Staff Chemist
.
Mr. C. Gilbert, Supervisor of Operations - Unit 2 Mr. D. Good, Test Coordinator Mr. C. Hartman, Electrical Engineer Mr. J. Herbein, Station Superintendent Mr. G. Miller, Unit 2, Superintendent Mr. W. Potts, Supervisor - Quality Control Mr. P. Valez, Radiation Chemistry Technician
2.
Review of Abnormal Occurrences (A.O. 's)
/
^
Abnormal occurrence review included inspection of plant records and logs, Technical Specifications, Work Requests, Plant Operations and Review Committee minutes and correspondence to the AEC.
The below listed AO's were reviewed to verify that:
a.
the cause was identified and details clearly reported;
,,
b.
the corrective action described was taken to prevent recurrences; c.
each event was reviewed and evaluated by the licensee; and t
!
d.
safety limits, limiting safety settings, and limiting conditions
[
for operation were not exceeded.
e A.O.
System i
74-7 Reactor Coolant System i
74-8 Reactivity and Power Control
74-10 Au:r:iliary System I
74-11 containment System
i
1445
.)73
~
.
t
__
L_
.
-4-
.,
A.O.
System 74-13*
Emergency Power 74-14 Engineered Safety Feature
.
~
- Final corrective action involves procuring new pressure switch Abnormal Occurrence 74-13 remains open pending completion of corrective action.
All others are complete and the inspector has no further questions.
3.
Review of Safety Related Maintenance
'
Maintenance evolutions on safety related systems were reviewed to verify that:
a.
limiting conditions for operation were met while the system or component was removed from service; 9'
b.
administrative approval was obtained prior to initiating the work; c.
maintenance was accomplished with approved procedures;
!
d.
required inspection or hold points were included; e.
necessary functional testing and calibration was performed; f.
quality control records are available for three of the items reviewed; and
,,
'
g.
maintenance was performed by qualified personnel.
'
The maintenance review included inspection of the Work Request Log, appropriate Work Request packages, Technical Specifications and
,
Quality Control Surveillance. Reports. Discussions with the
,
Supervisor of Maintenance and the Unit 1 Mechanical Engineer were held to obtain other required information. Maintenance work reviewed is tabulated below.
System Component Licensee Work Package Number Reactor Coolant RC-V-2 569*
G Reactor Coolant RC-RV-1A & B 549*,**
Reactivity & Power Control NI-7 2127
.
1445 074
"
' _.
L
,
-
.
-5-
- '
.,
,
System Component Licensee Work Package Number Reactivity & Power Control CRDM 10 2274 Power Conversion System MS V29A 1769 Auxiliary System DH-V-13A/B 550/555*
Auxiliary System HU-P-1B 267*
Electrical System DH-V4A & B 3737 Electrical System RC-7L 2
.. 3245 Emergency Power Diesel Generator lA 2609
'
Emergency Power Diesel Generator lA 3254**
ECCS Core Flood Pressure 1700 Switch ESF MS-V-lD 1503**
ESF RM-G1 1945
- Maintenance not performed by licensee personnel
- Quality Control Surve111ance Reports reviewed Within the inspection scope, no maintenance deficiencies were identified.
-
4.
Review of Reporting Recuirements Since the licensee has not yet submitted his start-up report, this inspection was limited to the contents of the Semi-Annual Report submitted on August 29, 1974 and covered the period from June 5 through June 30, 1974. Within this report the area selected for verification was the " Primary Coolant Chemistry".
,
This inspection consisted of a random selection of five days during this period and comparison of the data from these days to the Technical Specifications and the data submitted in the Semi-Annual Report. Additionally, discussions were held with the Site Chemist and a Staff Chemist concerning the meaning of the data.
The days selected for review were June 10, 21, 24, 27, and 30,1974.
No discrepancies were noted between the data in the Semi-Annual
.
Report and the random sample nor was any data outside of the limits in the Technical Specifications.
The inspector had no further questions in this area.
5.
Radiation Monitoring Systems (RMS) Calibration Status During a tour of the Control Room, the inspector observed calibration stickers on the meters associated with the RMS indicated all the
instruments with calibration stickers (approximately 80%) had passed their required quarterly calibration date by one to two months.
.
1445.)75
.
- - - -.
-
-
..
,
_
...
L_
".
-.
-
6-
'
_"
,
.
.
.
-
_
The licensee indicated that difficu.1 ties with the calibration procedure and certain instruments have been encountered. The licensee has also st,ated that his difficulties with the RMS have not resulted in noncompliance with his Technical Specification requirements. The inspector informed the licensee that it appeared that no effective calibration of the majority of the RMS
-
had been accomplished since April, 1974.
In a subsequent phone call on September 17, 1974 between Mr. Herbein of the licensee's staff and Mr. Westerman of the AEC, the licensee stated an Abnormal Occurrence report would be submitted regarding the RMS. This item is unresolved and will be re-examined on a
,i priority basis.
I t
6.
Violation of Security Plan
1 l
On September 12, 1974 the inspector observed that a gate in the security I
perimeter fence was opened to permit the unloading of a delivery
truck. The inspector observed no guard at the opened gate and walked through without escort and unchallenged into the Service Building.
l This is a violation of Section 2.3 of the Security Plans Administrative l
Procedure AP10.ll.1 Revision 0, dated February 13, 1974 which states,
'_ l
"that the individual issued a key for a security area lock is respon-sible for the area under that key's control until the area is again
'
secured and the key is returned."
Upon being informed, the licensee stated he took corrective action to place a guard at the open gate.
Subsequent phone calls between the Station Superintendent and Mr. Davis of the AEC on September 13 and 16 and Mr. Arnold, Vice President of Generation, Metropolitan Edison Company and Mr. O'Reilly of the AEC on September 16, 1974, confirmed the licensee's intent to rpgrade security to meet esta-
~ ' ~
blished requirements and emphasized the importance of adherence to security requirements.
-. - - - - - - -.. -. -. - -.. - -......
~
.
..
I 1445 076
Stock form i t14-w
'
9 88 M.y n#ci'oL
^
- ~ BILL FOR COLLECTION t o -m
-
Bill No.
U. S. Atomic Enerav Corraission Date..11_2[74 (Department or Estabhshment and Bureau or O.Tice)
9-
~
(aaares.
t!atthincton 0 C-205.45 PA YER:
Metropolitan Edison Company P. O. Box 542
^""'**""h'""'""*'"'
payer with his remstlance.
Reading, Pennsylvania 19603 ses txsrnccrioxs setois.
7 '7N k%
d, Unit Price Date DESCR11" TION Quantity 3,u,,,
Civil Penalty imposed by letter dated September 23, 1974 and Order dated November 20,1974 (cp n_.a.m,)
$3,500
.
!
.
Oo
.
A AIOUNT DUE THIS BILL, 53 500~
CO This is not a receipt i
INSTRI*CTIONS
.
Tender of payment of the above bill may be made in cash, United States postal money order, express money order, bank draft. or check.
to the office indicated. Such tender, when in any other form than cash, should be drawn to the order of the Department or Establishm(nt and Bureau or Orfice indicated above.
Receipts will be issued in all cases where " cash" is receised, and only utmn request when remittance is in any other form. Iftender of payment of this bill is other than cash or United States postal monev orcler, the receipt shall not become an acquittance until such tender has been cleared and the amount received by the Departmentor Establishment and Bureau or Office indicated above.
ureau or agency mentionea above.
Failure to receive a recyipt for a cash payment should be prompdy reported by :he payer to the chief administrative o;Ticer of the
....
n...., r.. r.
orr.c a.. o,-s is is e-..
" "
200R ORlGINAL
-
G
.
l. e
-
- --
- -., _,...
,,e
,,,, -
.
t
'
r--
-
L
-
.
,
- 1:t :
[
T HE Ci1ECM AT T ACHE D is IN FULL P AYMENT OF T HE ITEMS LisTE.D E ELOW. lF NOT COR RECT, PL E ASE RETURN PROMPT LY.
,
s
,
MET ROPOLIT AN EDISON COMP ANY G__A - 4 7
,
'
'
- i.
l 12-16-74
,
.
I
'
>
t Civil penalty imposed upon Metropolitan Edison Company by.the U.S. Atomic Energy Commission
- !(/
'
"
-
Order dated November 19, 1974
$3,500.00
.l.
m
.
'
'
'
- i t.
I,'
'li
,e
,
-
re
.
!
c
.
'
.
,. -
,.
r
,
.
PLE ASE DL T ACH TH e s ME M0fl ANDUM 8(FORE DIPOSITise6 CHEC ut.
- )
l,-
(
'
'
,
i neo
,
_ _.. _ _ _
e
=
L 4M 33537 o
' i7. ie7, 4 '-
%
RE ADING, P A.
VOUCH EH NO.
CHECK NO.
,J i
g
'
AMERICAN BANK AND TRUST CO. OF.PA.
so-46
'
,,
HE ADIN G, P A.
- I m
PAY E 5 l
Nkh ([3 $3,'50QA0 i
'I MET ROPOLiT AN EDISON COMPANY
'
^
"
M'
+
bTreasureroftheUnitedStates
.
WF<TGuis2h '.
'
TOine
"(.p33ry=.;,rRi,1C'?c 1'
Ovuea E. rmeuS;..!;usyn:.pum:+
.n..2
,
L
,
'
d ' 6 b b..'.
- .
6 t,f b'5 b.
==sT.
g,jgg;=~.-
or r
,
i
'
'.,
L_
-
- p.
- ~,:en. y __.... :=..
.e :.... -.
.
,.
..
u..
g I
I i:0 3 L 3n'OO t.Gi:
O 3 E a'O L d l.ii'
'
i
-"l.....__
!
4.
_.__
.
'
>
.
~o N
.30