IR 05000285/2009403

From kanterella
Jump to navigation Jump to search
IR 05000285-09-403, on 08/21/2009, for Fort Calhoun
ML092550090
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/10/2009
From: Shannon M
Plant Support Branch-1
To: Bannister D
Omaha Public Power District
K Brewton
References
IR-09-403
Download: ML092550090 (2)


Text

UNITE D S TATES NUC LEAR RE GULATOR Y C OMMIS SI ON ber 10, 2009

SUBJECT:

FORT CALHOUN NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000285/2009403

Dear Mr. Bannister:

On August 21, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Fort Calhoun Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 21, 2009, with Mr. J. Reinhart, Site Vice President, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. Omaha Public Power District 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-285 License No.: DPR-40 Nonpublic Enclosure:

NRC Inspection Report 05000285/2009403 w/Attachment: Supplemental Information cc w/enclosure:

Jeffrey A. Reinhart Site Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Thomas C. Matthews Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550