IR 05000275/1981028
| ML16341B746 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 11/13/1981 |
| From: | Andrea Johnson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Crane P PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16340C173 | List: |
| References | |
| NUDOCS 8112290491 | |
| Download: ML16341B746 (4) | |
Text
Docket go.
zC<
50-291/323 NOV 13 1981 Q HQZLLECOPS, Attention:
Nr. Philip A. Crane, Jr.
Assitant General Counsel Pacific Gas and Electric Company P. 0. Box 7442 San Francisco, California 94106 Wcevizy
~~@6 ~881~
D~~
Gentlemen:
Subject:
NRC Special Inspection - Diablo Canyon Units 1 and
This refers to the Special Inspection conducted by Nessrs.
James H.
Eckhardt, Reactor Inspector and Owen C. Shackleton Jr., Senior Investi-gator of this office on Nay 27; June 2, 3, 1981 of activities authorized by NRC License Nos.
CPPR-39/CPPR-69, and to the discussion of our find-ings held by Messrs.
Eckhardt and Shackleton with Richard D. Etzler, Project Superintendent and other members of your staff at the conclusion of the inspection.
The inspection was an examination of allegations made by Nr. Richard G.
Peterson, a former Pipe Support Designer for the N.
M. Kellogg Company.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector and investigator.
No items of'oncompliance with NRC requirements were identified within the scope of this inspection.
(gal In accordance with 10 CFR 2.790 of the Commission's regulations, a 'copy
'f this letter and the enclosed special inspection report will be placed in the NRC's Public Document Room. If this report contains any informa-tion that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.
- If your receipt of-this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be establi-shed.
Cons<~tent. with section 2.790(b)(l), any such application must be Sli229049i Biiii3 PDR ADOCK 05000275,,
'FFICEI SURNAME/
OAVEf>
~ ~ ~
~
~
~ ~ ~ ~ ~ ~ ~ ~
~ ~
dt A. ohnson O.Sh eto
- dh J.Eckha 1/ ~Z /81 11/l~ /81 11/(M/81
~1 <<I ~ ~
~
~ ~ ~
~
~ ~ ~ ~ ~ ~ I ~ ~ ~ ~ 0 ~ W ~
~
~ 0 ~ ~
~
~ ~
~ ~
~ ~ ~ ~
0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
NRC FORM 318 RO/801 NRCM 0240 OFFICIAL RECORD COPY
- USGPO; 1980-329 824
~
l
'E Qg)j'PgQQg
'tee ss~'-
~~gg y..a&A~~~@
+i~ <<~'
I l
I I
l
)
lI
~
'
'I II F
I l
l F
II
NOY l~ 1983 accompanied by an affidavit executed by the owne} of the information which identifies the document or part sought to be withheld, and which contains a full statement of the basis on which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the consi-derations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad to discuss them with you.
Sincerely, Enclosure:
IE Inspection Report No, 50-275/81-28 50-323/81-17 Allen D. Johnson, Director Investigations and Enforcement cc w/o enclosure:
W. A. Raymond, PGRE R.
C. Thornberry, PGSE (Diablo Canyon)
bcc:
DMB/Document Control Desk (RIDS)
Distributed by RV:
State of CA (Hahn/johnson)
Sandra Silver (Report only)
Resident Inspector RHE (w/o enc)
P I
4.
C F-p F