UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD SUITE 202, WAI.NUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94590 June 12, 1981 Docket Nos.
50-275'0-g, IaOIS Pacific Gas and Electric Company P. 0.
Box 7442 San Francisco, California 94106
'IiCEVh
'='
JUN SD 198k
~g45
'Oa>~~~04
Gentlemen:
/~
Subject:
URC Inspection ot Diablo Canyon Units
st
This refers to the routine monthly inspection conducted by Nr. M. Bagaglio and Mr. M. Mendonca of this office on Nay 1 to June 5,
1981, of activities authorized by NRC Construction Permit Nos.
CPPR-39 and CPPR-69, and to the discussion of our findings held by Nr. Bagaglio and Mr. Mendonca with Nr. Backens and other members of your'taff at the conclusion of the inspection.,
Areas examined during this inspection are described in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and obser-vations by the inspectors.
Attention:
Mr. Philip A. Crane, Jr.
Assistant General Counsel No items of noncompliance with NRC requirements were identified within the scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be exempt from disclosure under
CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be established.
Consistent, 4'~~;,
with section 2.790(b)(l),
any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claimed that the information should be withheld copvsENTH,zGION
'~0~0jIO 935
~ ~
[
June 12, 1981 from public disclosure.
This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad to discuss them with you.
Sine el Enclosure:
IE Inspection Report Nos. 50-275/81-12 50-323/81-09 cc w/o enclosure:
J. 0. Schuyler, PGE J.
D. Shiffer, PGE W. A. Raymond, PGE R.
C. Thornberry (Diablo Canyon)
J L.
v)si opec JP/i~~
ey~Kcting Director n 'of Resident Reactor s
and Engineering Inspection
~
(
~