IR 05000275/1981016
| ML16341B715 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/14/1981 |
| From: | Book H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Crane P PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML16340B995 | List: |
| References | |
| NUDOCS 8109090181 | |
| Download: ML16341B715 (8) | |
Text
~ '=
28ERII~
PUG 14: 198)
Docket No. 50-275 Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Attention; Mr. Phillip A. Crane. Jr.
Assistant General Counsel SEP 08 198)~
L(ega WQ1AR~ger(
COhVA155 }08 Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Unit
This refers to the inspection conducted by Mr. North of this office on July 20-24, 1981 of activities authorized by NRC Construction Permit No. CPPR-39, and to the discussion of our findings hHd by Mr. North with Mr. Thornberry and other members of your staff at the conclusion of. the inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven (7) days are avatlable for your revten, please
/~Pe Se I
~09090~Sf SI.OS<a ADOCK 05000275 PDR Areas examined during this inspection are described in the enclosed inspection report.
lfithin these areas, the inspection consisted of
. -selective examinations of procedures and representative records, interviews.~ith personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within the scope of this inspection.
oFFIGEIb SURNAME/
DATEP Rv NORTH/3 k 8/'jj'/81'""
HENSLA'HSKI
"8'/'g:/Sl"'"'
~
0 ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
NRC FORM 318 (10/80) NRCM 0240 OFFICIAL RECORD COPY
~
~
~ ~ ~ 0 0
~
vv VSGPO: 1980-329-824
~
~
Pacific Gas and Electric Company-2-gUG >4 88$
notify this office promptly so that a ner due date may be established.
Consistent with section 2.790(b)(l), any such application must be accompanied by an affidavit executed by the owner of the infomation which identifies the document or part sought to be vrithheld, and which contains a full statement of the basis on which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in
CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If ere do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
discuss them with you.
Should you have any questions concerning this inspection, we <rill b 1 d e
r ega to
Sincerely, Ongmal signeV @
H. E. Book H
E Book Chief'
Radiological Safety Branch I
Enclosure:
IE Inspection Report t)o. 50-275/81-16
REGION V==
1990 N. CALIFORNIABOULEVARD SUITE 202, WALNUTCREEK PLAZA WALNUTCREEK, CALIFORNIA94596 AUG 14 198)
Docket No. 50-275 Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Attention:
Mr. Phillip A. Crane, Jr.
Assistant General Counsel Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Unit
This refers to the inspection conducted by Nr. North of this office on July 20-24, 1981 of activities authorized by NRC Construction Permit No.
CPPR-39, and to the discussion of our findings held by Nr. North with Nr. Thornberry and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection report.
IAithin these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within the scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure un'der
CFR 9.5(a)(4), it is'necessary that you (a) notify this office by telephone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information. If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please
'Pacific Gas and El.ectric Company AUG 14 1981 notify this office promptly so that a
new due date may be established.
Consistent with section,2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full
'tatement of the basis on which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in
CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad to discuss them with you.
Sincerely, 4 g.A.M H.
E. Book, Chi ef Radiological Safety Branch
~
~
Enclosure:
IE Inspection Report No. 50-275/81-16 cc w/o enclosure:
W. A. Raymond, PG&E E.
B. Langley, Jr.,
PG&E R. Thornberry, PG&E (Diablo Canyon)
0