IR 05000272/1988021

From kanterella
Jump to navigation Jump to search
Exam Repts 50-272/88-21OL & 50-311/88-23OL on 881013.Exam Results:Senior Reactor Operator Candidate Passed All Portions of Operating Exam,
ML18093B250
Person / Time
Site: Salem  
Issue date: 10/21/1988
From: Briggs L, Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18093B249 List:
References
50-272-88-21OL, 50-311-88-23OL, NUDOCS 8811010094
Download: ML18093B250 (2)


Text

...

U.S. NUCLEAR REGULATORY COMMISSION REGION I OPERATOR LICENSING EXAMINATION REPORT EXAMINATION REPORT NO. 50-272/88-21 (OL) and 50-311/88-23 (OL)

FACILITY DOCKET NO. 50-272 and 50-311 FACILITY LICENSE NO. DPR 70 and 75 LICENSEE: Public Service Electric and Gas Company P.O. Box 236 Hancock's Bridge, NJ 08038 FACILITY: Salem Units 1 and 2 EXAMINATION DATE: October 13, 1988 CHIEF EXAMINER: ~

r~

L. Bggs, Sento~tions Engineer APPROVED BY:

Section of Reactor Safety

  1. UP,@B Date

~1cP&-n--

Date SUMMARY:

An operating test was administered to one instant senior reactor operator (SRO).

The senior reactor operator applicant passed all portions of the examinatio ~DR ADOCK 05000272 V

F'DC

..

TYPE OF EXAMINATIONS:

EXAMINATION RESULTS:

Written Operating Overall EXAM DETAILS Replacement (retake)

RO Pass/Fai 1 NA NA NA SRO Pass/Fail waived 1/1 1/1 Chief Examiner at Site:

L. Briggs, Senior Operations Engineer Personnel Present at the Exit Interview:

L. Catalfomo, Assistant Manager, Operations Training Summary of NRC and Licensee Comments Made at the Exit Interview The NRC expressed appreciation to the Training and Operations Departments for providing assistance in expediting the examination proces The examination was discussed with the training department representativ In particular, the examiner noted the apparent improvement made in the control of performance of plant Emergency Operating Procedure No generic strengths or weaknesses were observed due to the very limited scope of the examination.