January 24, 2020

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT - INTEGRATED INSPECTION REPORT 05000263/2019004

Dear Mr. Church:

On December 31, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Monticello Nuclear Generating Plant. On January 14, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief Branch 3 Division of Reactor Projects

Docket No. 05000263 License No. DPR-22

Enclosure:

As stated

Inspection Report

Docket Number:

05000263

License Number:

DPR-22

Report Number:

05000263/2019004

Enterprise Identifier: I-2019-004-0061

Licensee:

Northern States Power Company, Minnesota

Facility:

Monticello Nuclear Generating Plant

Location:

Monticello, MN

Inspection Dates:

October 01, 2019 to December 31, 2019

Inspectors:

R. Baker, Senior Operations Engineer

S. Bell, Health Physicist

B. Bergeon, Operations Engineer

T. Go, Health Physicist

G. Hansen, Sr. Emergency Preparedness Inspector

D. Krause, Resident Inspector

P. Zurawski, Senior Resident Inspector

Approved By:

Hironori Peterson, Chief

Branch 3

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Monticello Nuclear Generating Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Monticello began the inspection period operating at approximately 100 percent power and, with the following exceptions, remained at that level throughout the inspection period. On December 14, 2019, the unit was down-powered to 74 percent for control rod sequence exchange and quarterly turbine valve testing. Upon completion, the unit was returned to 100 percent power.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to and during the onset of seasonal winter storms on November 26-27, 2019 for the following systems:
  • Station Transformers 1R, 2R and 1AR

71111.04Q - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)11 Core Spray - post maintenance on October 15, 2019

(2) Lower 4 Kv Room - Protected on October 28, 2019
(3) Upper 4 Kv Room - post maintenance on November 4, 2019
(4) Reactor Core Isolation Cooling (RCIC) - post maintenance on December 9, 2019
(5) High Pressure Coolant Injection (HPCI) protected during Reactor Core Isolation Cooling (RCIC) Maintenance on November 13, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (5 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Fire Zone FZ 02-G East Shutdown Cooling Area on December 2, 2019
(2) Fire Zone FZ 02-H West Shutdown Cooling Area on December 3, 2019
(3) Fire Zone FZ 13-A Lube Oil Storage Tank on December 21, 2019
(4) Fire Zone FZ 07-A 125V Division 1 Battery on December 30, 2019
(5) Fire Zone FZ 07-B 250V Division 1 Battery on December 31, 2019

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification biennial written examination and the annual operating exam administered from September 16 through November 1, 2019.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1) Biennial Requalification Written Examinations

The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered on October 17, 2019.

Annual Requalification Operating Tests

The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test

The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security

The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations

The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions

The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator

The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution

The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during review of licensed operator actions during Control Room maintenance activities on November 4, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) Resident Inspector Quarterly Review of Licensed Operator Requalifcation on November 4, 2019

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (1 Sample)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) Reactor Core Isolation Cooling failing to start during comp testing on December 2, 2019

Quality Control (IP Section 02.02) (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:

(1) MO-2034, High Pressure Coolant Injection Inboard Steam Isolation Valve, Actuator Grease Discrepancy on December 18, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) GSA-32-3 leaking by, 12 Emergency Diesel Generator (EDG) K-9A air start compressor #1 check valve; Work Order (WO) 700065326 on October 28, 2019 (2)152-602, 12 EDG [Emergency Diesel Generator] output breaker PMT failure; WO 700065520 on October 28, 2019
(3) Reactor Core Isolation Cooling (RCIC) failed to start during comp testing; WO 700066424 on November 15, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (3 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Fire Pump FP-109 Strainer leakby system function challenge; Corrective Action Program (CAP) 501000033751 on October 23, 2019
(2) Alternate Nitrogen System B31.1 Code Compliance; CAP 501000033821, 33881 on October 24, 2019
(3) Reactor Core Isolation Cooling (RCIC) Failed to start during comp testing; CAP 501000034676 on November 15, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Install Gag on RV-1113 on October 21, 2019
(2) Reactor Core Isolation Cooling replace DC overloads in EQ Buckets on November 15, 2019

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post maintenance tests:

(1) 11 Emergency Diesel Generator (EDG) Air Compressor K-88 PMT; Work Order

===700058449 on October 16, 2019 (2)152-602, 12 EDG output breaker replacement PMT; WO 700063801, 65520 on October 24, 2019 (3)0255-08-III-1, Reactor Core Isolation Cooling (RCIC) Comprehensive Pump and Valve Tests; WO 700040118, 58410, CAP 501000034573 on November 18, 2019 (4)11 Reactor Building closed cooling water pump (P-6A) PMT; WO 700060375 on November 26, 2019 (5)11 Core Spray MO1749, Return to Torus PMT; WO 700039925, CAP 501000035704 on December 12, 2019

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1)0098 - Core Spray Header Differential Pressure Test, Work Order (WO) 700056682 on October 15, 2019 (2)0465-01, Division 2 Emergency Filter Treatment (EFT), WO 700057629 on October 23, 2019 (3)0255-05-IA-1-1A RHRSW Quarterly Pump and Valve Test, WO 7000059394 on December 2, 2019

Inservice Testing (IP Section 03.01)===

(1)0255-07-IA-7, MO-2373 Quarterly Exercise Test, WO 700058929 on November 23, 2019

Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)

(1) Reactor Building-Torus Vacuum Breaker OPS-PCT 0141, WO 700056257 on October 16, 2019

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspector completed the evaluation of submitted Emergency Action Level and Emergency Plan changes on November 25, 2019. This evaluation does not constitute NRC approval.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Review of Licensed Operator Requalifcation with DEP on November 25,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Instructions to Workers (IP Section 02.02) (1 Partial)

The inspectors evaluated instructions to workers including radiation work permits used to access high radiation areas.

(1)

(Partial)

The inspectors reviewed the following:

Radiation Work Packages

  • RWP 195117; TORUS Diving Inspection and Cleaning

Electronic Alarming Dosimeter Alarms

  • There were no Electronic Dosimeter alarms that occurred during the period of this inspection.

Labeling of Containers

  • 07-1194 Nag Box Containing Dry-well Shielding
  • 07-0145 Container Box Containing Jet Pump Equipment

This augments the inspection sample documented in inspection report 2019002.

Radiological Hazards Control and Work Coverage (IP Section 02.04) (1 Partial)

The inspectors evaluated in-plant radiological conditions during facility walkdowns and observation of radiological work activities.

(1)

(Partial)

The inspectors also reviewed the following radiological work package for areas with airborne radioactivity:

This augments the inspection sample documented in inspection report 2019002.

High Radiation Area and Very High Radiation Area Controls (IP Section 02.05) (1 Partial)

(1)

(Partial)

The inspectors evaluated risk-significant high radiation area and very high radiation area controls.

This augments the inspection sample documented in inspection report 2019002.

71124.02 - Occupational ALARA Planning and Controls

Radiological Work Planning (IP Section 02.01) (1 Sample)

The inspectors evaluated the licensees radiological work planning.

(1) The inspectors reviewed the following activities:
  • RWP 195117; TORUS Diving Inspection and Cleaning

Verification of Dose Estimates and Exposure Tracking Systems (IP Section 02.02) (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

(1) The inspectors reviewed the following as low as reasonably achievable planning documents:

==1R29 Reactor Water Cleanup (RWCU) Heat Exchanger Pipe Replacement

  • ==

==1R29 Drywell Control Rod Drives Change-out

  • ==

==1R29 Main Steam Isolation Valve (MSIV) Repairs at Steam Chase

  • 1R29 Refuel Floor Activities

==

Additionally, the inspectors reviewed the following radiological outcome evaluations:

==1R29 Reactor Water Cleanup (RWCU) Heat Exchanger Pipe Replacement

  • 1R29 Refuel Floor Activities
  • ==

1R29 Main Steam Isolation Valve (MSIV) Repairs at Steam Chase

Implementation of ALARA and Radiological Work Controls (IP Section 02.03) (1 Partial)

The inspectors reviewed as low as reasonably achievable practices and radiological work controls.

(1)

(Partial)

The inspectors reviewed the following activities:

  • ALARA WIP; RWP 195700; 1R29 Refuel Floor Activities

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Engineering Controls (IP Section 02.01) (1 Sample)

The inspectors evaluated airborne controls and radioactive monitoring.

(1) The inspectors reviewed the following:

Installed Ventilation Systems

Temporary Ventilation System Setups

  • Temporary HEPA system Reactor Building 1001 elevation Portable or Installed Monitoring Systems
  • AMS-4 serial number 7 Reactor Building 762 elevation
  • AMS-4 serial number 8 Reactor Building 762 elevation

Use of Respiratory Protection Devices (IP Section 02.02) (1 Sample)

The inspectors evaluated the licensees use of respiratory protection devices by:

(1) Observing in-field applications; verifying the licensee validated the level of protection provided by the devices; inspecting the material condition of devices, reviewing records and certification of devices issued for use; reviewing the qualifications of workers that use the devices; and observing workers donning, doffing and testing devices.

Self-Contained Breathing Apparatus for Emergency Use (IP Section 02.03) (1 Sample)

The inspectors evaluated self-contained breathing apparatus program implementation.

(1) The inspectors reviewed the following:

Status and Surveillance Records for Self-Contained Breathing Apparatus

  • Serial Number 37886
  • Serial Number 37883
  • Serial Number 37853

Self-Contained Breathing Apparatus Fit for On-Shift Operators

  • Day-shift crew 11/06/2019

Self-Contained Breathing Apparatus Maintenance Check

  • Serial Number 37886
  • Serial Number 37883
  • Serial Number 37853

71124.04 - Occupational Dose Assessment

Source Term Categorization (IP Section 02.01) (1 Sample)

(1) The inspectors evaluated the licensees characterization of the source term and use of scaling factors for the use of hard-to-detect radionuclide activity.

External Dosimetry (IP Section 02.02) (1 Sample)

(1) The inspectors evaluated the external dosimetry program implementation.

Internal Dosimetry (IP Section 02.03) (1 Sample)

The inspectors evaluated the internal dosimetry program implementation.

(1) The inspectors reviewed the following:

Whole Body Counts

  • Termination Count 05/17/2019 1616
  • Investigative Count 05/17/2019 1608
  • Investigative Count 05/15/2019 2010

In-Vitro Internal Monitoring

  • No in-vitro internal monitoring records were available during this inspection.

Dose Assessments Performed Using Air Sampling and Derived Air Concentration-Hour Monitoring

  • No dose assessments were available during this inspection.

Special Dosimetric Situations (IP Section 02.04) (1 Sample)

The inspectors evaluated the following special dosimetric situation:

(1)

  • Declared pregnant worker record dated 05/23/2019
  • Declared pregnant worker record dated 09/18/2018

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS09: Residual Heat Removal Systems (IP Section 02.08)===

(1) Unit 1 (October 1, 2018 - September 30, 2019)

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) Unit 1 (October 1, 2018 - September 30, 2019) on November 20, 2019

71152 - Problem Identification and Resolution

Annual Follow-up of Selected Issues (IP Section 02.03) (2 Samples)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) CAP 501000035197 - Adverse condition monitoring plan not met for differential pressure indicator switch DPIS-2-129A LPCI Loop Select on December 3, 2019
(2) CAP 501000035784 - High Pressure Core Injection (HPCI) ST-2052 orifice size doesn't match print on December 16,

INSPECTION RESULTS

Observation: Adverse condition monitoring plan not met for Low Pressure Coolant Injection (LPCI) loop select differential pressure switch DPIS-2-129A 71152 During operational rounds, the licensee discovered relay 10A-K35A was energized and not cycling. During monitoring over an approximate 10-minute period, operators observed DPSI-2-129A to fluctuate from 0.3 to 3.0 pounds per square inch differential (PSID). In accordance with a previously established adverse condition monitoring plan (QIM 501000030824), the licensee had specified a 0.5 PSID set-point to actuate the switch. The licensee concluded DPIS-2-129A was not performing its intended function and declared it inoperable due to a failed microswitch. Corrective actions were taken through Engineering Change Request 60100001946 and Work Order 700067420 to replace the microswitch.

Operability of DPIS-2-129A was restored after subsequent testing. The licensee determined the issue was not reportable.

The inspectors reviewed licensee corrective actions associated with Corrective Action QIM 501000035197; Adverse Condition Monitoring (ACMP) condition not met (DPIS-2-129A). The inspectors assessed the following performance attributes in their review:

  • Complete and accurate identification of the problem in a timely manner commensurate with its safety significance and ease of discovery;
  • Consideration of the extent of condition, generic implications, common cause, and previous occurrences;
  • Evaluation and disposition of operability/functionality/reportability issues;
  • Classification and prioritization of the resolution of the problem commensurate with safety significance;
  • Identification of corrective actions, which were appropriately focused to correct the problem; and
  • Completion of corrective actions in a timely manner commensurate with the safety significance of the issue.

The inspectors selected this sample due to the operability impact of the associated Emergency Core Cooling system instrumentation channel; a safety significant system.

Inspectors focused review of the above attributes on the licensees corrective actions associated with both QIM 501000035197 and 501000030824. Inspectors did not identify a performance deficiency with this issue.

Observation: High Pressure Coolant Injection (HPCI) exhaust steam trap orifice size not per drawing 71152 Inspectors noted a condition adverse to quality as part of routine corrective action document reviews. As part of performing High Pressure Coolant Injection (HPCI) preventive maintenance on ST-2052 (HPCI Exhaust Steam Trap), the licensee discovered a 1/4" orifice had been installed in exhaust drain line D13-2"HE rather than a 1/2" orifice as specified by drawing NL-36115-2. The ST-2052 operates in parallel with the Exhaust Header Drain to Gland Seal Condenser to keep the HPCI turbine and exhaust line free of water if the turbine steam inlet valves leak by. The licensee conducted extent of condition and a prompt operability determination concluding that the 1/4" orifice was appropriate for performing its intended function of maintaining the HPCI exhaust line free of water thus maintaining HPCI operability. Corrective actions were in progress at the time of inspection and consisted of completing an engineering evaluation to change drawing NL-36115-2 to reflect a 1/4" orifice for the HPCI exhaust steam trap ST-2052.

The inspectors reviewed licensee corrective actions associated with Corrective Action QIM 501000035197; Adverse Condition Monitoring (ACMP) condition not met (DPIS-2-129A). The inspectors assessed the following performance attributes in their review:

  • Complete and accurate identification of the problem in a timely manner commensurate with its safety significance and ease of discovery;
  • Consideration of the extent of condition, generic implications, common cause, and previous occurrences;
  • Evaluation and disposition of operability/functionality/reportability issues;
  • Classification and prioritization of the resolution of the problem commensurate with safety significance;
  • Identification of corrective actions, which were appropriately focused to correct the problem; and
  • Completion of corrective actions in a timely manner commensurate with the safety significance of the issue.

The inspectors determined the licensee satisfactorily implemented its corrective action program and did not identify any issues of significance.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 14, 2020, the inspectors presented the integrated inspection results to Mr. C. Church, Site Vice President, and other members of the licensee staff.
  • On October 17, 2019, the inspectors presented the Licensed Operator Requalification Program inspection results to Mr. P. Albares, Training Manager, and other members of the licensee staff.
  • On October 24, 2019, the inspectors presented the radiation protection baseline inspection results to Mr. C. Church, Site Vice President, and other members of the licensee staff.
  • On November 7, 2019, the inspectors presented the radiation protection baseline inspection results to Mr. D. Barker, Director of Site Performance and Support, and other members of the licensee staff.
  • On November 25, 2019, the inspectors presented the Emergency Action Level and Emergency Plan Changes inspection results to Ms. M. Kelly, Director of Site Performance and Support, and other members of the licensee staff.

THIRD PARTY REVIEWS

Inspectors reviewed Institute on Nuclear Power Operations reports that were issued.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

1444

Pre and Post Severe Weather Inspection Checklist

A.6

Acts of Nature

71111.04Q Drawings

NF-36298

Electrical Load Flow One Line Diagram

117

NH-36248

P&ID Core Spray System

NH-36251

RCIC P&ID (Steam Side)

NH-36252

RCIC P&ID (Water Side)

Procedures

2154-10

High Pressure Coolant Injection System Pre-Start Valve

Checklist

B.09.06-05

Operations Manual 4.16 kV Station Auxiliary System

Operation

Work Orders

70040118-0010

255-08-IA-1 RCIC Comprehensive Pump and Valve Tests

71111.05Q Fire Plans

Fire Zone FZ 02-

G

East Shutdown Cooling Area

Fire Zone FZ 02-

H

West Shutdown Cooling Area

Fire Zone FZ 07-

A

25V Division 1 Battery

Fire Zone FZ 07-

B

250V Div 1 Battery

Fire Zone FZ 13-

A

Lube Oil Tank Room

71111.11B

Corrective Action

Documents

Simulator Work

Request

2018DR036

Unexpected SCRAM while Swapping Pressure Regulators

06/25/2018

Simulator Work

Request

2019DR037

RWCU Pump Does not Trip when RU18 (MO2397 Breaker)

is Open

06/18/2019

Simulator Work

Request

2019DR039

Loss of Power to Simulator

07/01/2019

Simulator Work

Request

Gardel Response on Loss of RPIS

07/23/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2019DR043

Miscellaneous

Simulator

Exercise Guide

ILT-SS-44E

2018 ILT NRC Scenario 1

Simulator

Exercise Guide

RQ-SS-152

Lockout on Bus 15 with LOCA Requiring Drywell Spray

Simulator

Exercise Guide

RQ-SS-177

Unisolable RCIC Steam Leak Requiring Blowdown

Simulator

Performance Test

CP01

Core Stability and Power Distribution Cycle 29

04/24/2017

Simulator

Performance Test

CP02C

Poison Effects Following a Reactor Power Change

04/26/2017

Simulator

Performance Test

CP07

Shutdown Margin Demonstration Cycle 29

05/30/2017

Simulator

Performance Test

CP09

BOC Reactor Critical Verification Cycle 29

05/30/2017

Simulator

Performance Test

N-01

Unit Startup from Cold Shutdown Cycle 29

04/26/2017

Simulator

Performance Test

N-02

Unit Shutdown from Rated Power to Hot Standby and

Cooldown to Cold Shutdown Conditions Cycle 29

04/17/2017

Simulator

Performance Test

SSP-01

Steady State Performance Cycle 29

05/30/2017

Simulator

Performance Test

T-02

Simultaneous Trip of All Feed Water Pumps

04/27/2017

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Simulator

Performance Test

T-04

Dual Recirculation Pump Trip

04/27/2017

Simulator

Performance Test

T-09

Maximum Steam Rupture in Containment

04/28/2017

Simulator

Performance Test

XX-01

Simulator Real Time Measurement

04/27/2017

Simulator

Performance Test

XX-07

Simulator Repeatability

04/26/2017

Procedures

FP-T-SAT-80

Simulator Configuration Management

FP-T-SAT-81

Simulator Testing and Documentation

71111.11Q Miscellaneous

SEG RQ-SS-180

LOCA With Manual Initiation of High Pressure Injection

71111.12

Corrective Action

Documents

501000031593

MO-2034 Actuator Grease Discrepancy

501000034676

RCIC Failed to Start During Comprehensive Testing

Miscellaneous

NX-16932-1

Vendor Technical Manual, Limitorque MOV

Work Orders

700066424

MO2076, RCIC Steam Line Isolation Outboard Times Out of

Specifications

11/12/2019

700019359

PM for Limitorque Motor Operated Valves

05/01/2019

71111.13

Corrective Action

Documents

501000034000

GSA-32-3 As-Found Leak-By During 0187-02

501000034082

2-602 Control Power Light Out

501000034097

Degraded Fuse-Holder in Cubicle 152-602

501000034676

RCIC Failed to Start During Comprehensive Testing

Procedures

B.09.06-05

4.16kV Station Auxiliary System Operations

Work Orders

700065326

EDG #1 Air Dryer Outlet Check Valve Replace Valve

10/28/2019

700065520

Breaker 152-602 Secondary Disconnect Check

10/28/2019

700066424

MO2076, RCIC Steam Line Isolation Outboard Times Out of

Specifications

11/12/2019

71111.15

Corrective Action

Documents

501000033751

FP-109 Diesel Fire Pump Strainer Backwash Stop Leak-by

501000033821

NOS: AN2 System B31.1 Code Compliance

501000033881

NOS Finding AN2 System Non-Compliance; B31.1 ASME

Code for Pressure Piping, 1977 Edition

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

501000034676

RCIC Failed to Start During Comp Testing

501000034731

Incorrect Criteria in 0255-08-III-1, RCIC Comprehensive Test 0

Drawings

NH-36049-10

P&ID Alternate Nitrogen Supply System

NH-36666

P&ID Screen Wash, Fire & Chlorination System Intake

Structure

Procedures

3108

Pump/Valve/Instrument Record of Corrective Action

71111.18

Corrective Action

Documents

501000034602

Wiring Error in D311-04

Engineering

Changes

601000000661

Replace DC Overloads in EQ Buckets

601000001810

Install Gag on RV-1113, E-13B Feedwater Heater Relief

Valve

Work Orders

700035818

RCIC MO2076, Steam Line Outboard Isolation (250V

Supply)

08/08/2019

71111.19

Corrective Action

Documents

501000035704

Core Spray Line Void Found With UT

Work Orders

700039925

Core Spray MO1749, Return to Torus

2/12/2019

700040118

RCIC Comprehensive Pump and Valve Tests

11/15/2019

700058449

Small Oil Leak on K-8B, 11 EDG Electric Air Start

Compressor #2 PMT

10/15/2019

700060375

P-6A, 11 RBCCW Pump PMT

2/02/2019

700065520

Breaker 152-602 Secondary Disconnect Check

10/28/2019

700066424

MO2076, RCIC Steam Line Isolation Outboard Times Out of

Specifications

11/12/2019

71111.22

Corrective Action

Documents

501000035422

MS Line Drain MO-2373 IST Reference Value

Work Orders

7000058929

255-07-IA-7, Main Steam Drain Valve Exercise Tests

11/23/2019

7000059394

255-05-IA-1-1A RHRSW Quarterly Pump and Valve Test

2/02/2019

700056257

OPS-PCT 0141, Reactor Building-Torus Vacuum Breaker

Operations Test

10/15/2019

700056682

0098 - Core Spray Header Differential Pressure Test

10/15/2019

700057629

0465-01, Div 2 Emergency Filtration Treatment System

Monthly Test

10/25/2019

71114.04

Miscellaneous

5790-101-02

EAL Matrix Chart

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

FT-2018-632

CFR 50.54(q) Screening - FP-EP-WI-14, Emergency

Preparedness Drill and Exercise Manual Changes

2/18/2018

FT-2018-637

CFR 50.54(q) Screening - FP-EP-WI-28, Hospital

Emergency Room Staff and Ambulance Crew Training,

Revision from Fleet Guide to Fleet Procedure

10/25/2018

FT-2018-641

CFR 50.54(q) Screening - Editorial Changes - Mission

Mode Calls to Conference Calls

10/19/2018

FT-2018-645

CFR 50.54(q) Screening - FP-EP-WI-19 Editorial

Changes

11/28/2018

FT-2018-649

CFR 50.54(q) Screening and Evaluation -Change to

Everbridge Call Out System

2/06/2018

FT-2019-677

CFR 50.54(q) Screening - Elimination of "Stand Unders"

for Performance of ANS Annual Tests

06/04/2019

MT-2018-614

CFR 50.54(q) Screening - MT-BEP Editorial Change

07/13/2018

MT-2018-615

CFR 50.54(q) Screening - A.2 -807 Revision

07/20/2018

MT-2018-616

CFR 50.54(q) Screening and Evaluation - EAL EU1.1

Change

07/25/2018

MT-2018-618

CFR 50.54(q) Screening - EP STP 1230 Update

09/13/2018

MT-2018-619

CFR 50.54(q) Screening -MNGP OSA Editorial Revisions

08/15/2018

MT-2018-621

CFR 50.54(q) Screening - MT-BEP EAL Quiz Addition

08/22/2018

MT-2018-629

CFR 50.54(q) Screening - Form 5790-001-01 Editorial

Changes

10/24/2018

MT-2018-630

CFR 50.54(q) Screening - STP-1225 Update

10/25/2018

MT-2018-635

CFR 50.54(q) Screening - A.2-301 Update

10/25/2018

MT-2018-636

CFR 50.54(q) Screening - A.2-202 Update

10/25/2018

MT-2018-638

CFR 50.54(q) Screening - IER L1-13-10

Recommendations - Procedure Updates

11/08/2018

MT-2018-639

CFR 50.54(q) Screening - CR NRC Notification / A.2-504

Revisions Associated with LAR No. 196

11/14/2018

MT-2018-640

CFR 50.54(q) Screening - A.2-206 Revisions

11/16/2018

MT-2018-643

CFR 50.54(q) Screening - MT-BEP Editorial Changes

11/28/2018

MT-2018-644

CFR 50.54(q) Screening - Form 5790-803-01 Change

11/28/2018

MT-2018-648

CFR 50.54(q) Screening - Equipment Inventory Forms

Updates

2/03/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

MT-2019-650

CFR 50.54(q) Screening - A.2-402 Editorial Change

01/03/2019

MT-2019-651

CFR 50.54(q) Screening - A.2-401 Revision

05/23/2019

MT-2019-658

CFR 50.54(q) Screening - A.2-407 Revision

2/22/2019

MT-2019-660

CFR 50.54(q) Screening and Evaluation - MNGP

Emergency Plan and MNGP Alert and Notification System

Revisions

03/19/2019

Procedures

Monticello Nuclear Generating Plant On-Shift Staffing

Analysis

5A

E-PLAN

Emergency Plan

E-PLAN

Emergency Plan

FP-EP-PLAN-01

Offsite Emergency Plan

FP-EP-PLAN-01

Off-Site Nuclear Emergency Plan

FP-EP-PLAN-01

Off-Site Nuclear Emergency Plan

FP-R-EP-02

CFR 50.54(q) Review Process

71114.06

Miscellaneous

SEG RQ-SS-180

LOCA With Manual Initiation of High Pressure Injection

71124.01

Procedures

FP-RP-NISP-03

Radiological Air Sampling

Radiation Work

Permits (RWPs)

195118

1R29 Reactor Water Clean-up Heat Exchanger Pipe

Replacement

195509

1R29 Drywell CRD Change-out

Self-Assessments 1R29 Report

Monticello Nuclear Generating Plant 2019 Outage Report

71124.02

ALARA Plans

195118

ALARA Plan of RWCU Heat Exchanger Pipe Replacement

195509

1R29 Drywell CRD Change-out

Corrective Action

Documents

501000025963

RWCU FAC Pipe Replacement Job Exceeded 90% of the

Estimate

04/20/2019

501000025965

RWCU Piping Replacement Project Approaching Site

Administrative Limit for Dose

04/20/2019

501000026978

Dose on 1027' Higher Than Expected

05/07/2019

Miscellaneous

195118

Station ALARA Committee on RWCU Pipe Replacement

04/21/2019

195118

Radiological Work Assessment Form Work in Progress

Review on RWCU Pipe Heat Exchanger Replacement

04/20/2019

195509

Radiological Work Assessment Form Post Job Review

04/25/2019

Procedures

FP-RP-SEN-02

Radiological Work Planning and Controls

Radiation Work

195700

1R29 Refuel Floor Activities

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Permits (RWPs)

71124.03

Calibration

Records

Self Contained Breathing Apparatus Annual Calibrations

10/04/2018

Self Contained Breathing Apparatus Annual Calibration

Records

2/06/2017

Corrective Action

Documents

501000013333

Near Miss with Internal Dose Control

06/16/2018

Corrective Action

Documents

Resulting from

Inspection

501000034436

SCBA Fit Test Potential Non Compliance

11/07/2019

Miscellaneous

Operations On-shift Respirator Qualification Matrix

11/06/2019

Grade D Air Quality Test Reports

2018-2019

2019 Self Contained Breathing Apparatus Cylinder

Hydrostatic Tests

04/05/2019

Third Quarter 2019 Respirator Inspection Records

09/29/2019

Procedures

FP-RP-NISP-03

Radiological Air Sampling

Radiation Work

Permits (RWPs)

180108

Repair Rx 985' RWPR Valves

71124.04

Corrective Action

Documents

501000013358

Improvement Opportunity in Whole Body Counts

06/18/2018

Miscellaneous

Skin Dose Calculation

04/14/2019

Skin Dose Calculation

04/14/2019

Internal Dose Assessment

05/16/2019

Internal Dose Assessment

05/11/2019

18-002

Technical Basis Document Neutron DLR, SRD and Rem Ball

Characterization

Procedures

FP-DR-BP-01

Bioassay Program

FP-RP-AM-01

Alpha Monitoring Program

FP-RP-DR-01

Dosimetry Program

71151

Corrective Action

Documents

501000025624

No MSPI Failure - RHR SDC, R0; CAP 501000027296, No

MSPI Failure - RHR Seal Leak

Miscellaneous

Unavailability Logs for RHR and RHRSW

October

2018 -

September

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2019

UAI and URI MSPI Derivation Reports for RHR and RHRSW

September

2019

NRC

Performance

Indicator Data

MSPI Cooling Water Systems

October

2018 -

September

2019

NRC

Performance

Indicator Data

MSPI Residual Heat Removal

October

2018 -

September

2019

71152

Corrective Action

Documents

501000030824

Performance trend of Barton DPIS

501000035197

ACMP Condition Not Met (DPIS-2-129A)

501000035784

ST-2052 Orifice Size Doesn't Match Print

Drawings

NL-36115-2

Steam Trap Data Sheet

C

Engineering

Changes

601000001946

Use Low Side Switch for DPIS-2-129A

11/30/2019

Work Orders

700059927

HPCI Exhaust Steam Trap Preventive Maintenance

ST-502052

700067420

DPIS-2-129A (Recirc Loops DP-LPCI Select Interlock)

11/30/2019