IR 05000259/1980004

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-259/80-04,50-260/80-04 & 50-296/80-04 on 800121.No Noncompliance Noted.Major Areas Inspected: Procedures to Ensure Restoration of Normal Containment Penetration Closure Conditions
ML19312D114
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/12/1980
From: Robert Lewis, Sullivan R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19312D110 List:
References
50-259-80-04, 50-259-80-4, 50-260-80-04, 50-260-80-4, 50-296-80-04, NUDOCS 8003210054
Download: ML19312D114 (3)


Text

_

.

._

_ _ __

- - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _

., _

,

'o,,

UNITED STATES

,1

-- 8 NUCLEAR REGULATORY. COMMISSION o

$*'

I REGION il'

101 MARIETTA ST., N.W., SUITE 3100

\\..%/.

.

ATLANTA, GEORGIA 30303

...

. Report-Nos. 50-259/80-04, SU-260/80-04 and 50-296/80-04 Licensee: Tennessee Valley Authority

<

500A Chestnut Street

Chattanooga, Tennessee 37401

,

?acility:. Browns' Ferry Nuclear Plant 56c et Nos. 50-259, 50-260 and 50-296

?-

-anse Nos. DPR-33, DPR-52 and DPR-68

,tspection at Athens. City Hall, Athens, Alabama Inspector:

dh u 1 / T. V6 v

.R. F. Sullivan I

Date Signed Accompanying Personnel: James P. O'Reilly H. C. Dance K. M. Clark

.

H. L.' Whitener D. S. Price J. W. Chase Approved by: /

AC%

h

/L FC Ri C. Lewis, Acting Chidf, RONS Branch Date Signed

.

SUMMARY Inspection on January 21, 1980 Areas Inspected

' Management meeting to discuss the implementation of requirements directed in the

-

order modifying the licenses of the. Browns Ferry Nuclear Plant, Unit Nos. 1, 2-and'3. -The meeting involved.12 inspector hours by 6 NRC inspectors.

~

Results Within the areas ~ inspected, no items.of noncompliance or aviation were

' dentified.

i

_.-

.__[.JK

4

.

t

.

v

.

.

--

,,

~ ~ ~ ~

9.

.

_

_.

,-

I f '. -

'

,

. \\

c.

. I

.

-

-

DETAILS

.

N

,L1.-

Persons Contacted.

-

a r

Licensee Employees L. M. Hills, Manager, Nuclear Regulation. and Safety

'J. G.~ Dewcase, Assistant Director, Nuclear Power J. A.;Coffey, Assistant Director, Nuclear Power-M.

Butler, Information Officer.

E. G. Beasley,JActing Deputy Chief,' Nuclear Safety Review Staff

.

J. W. Hufham, Assistant to the Director, Nuclear Power A. H. Gutterman, Counsel.to the Licensee

,

H. L. Abercrombie, Plant Superintendent

'

2.

Licensee Action on Previous Inspection Findings Noncompliance items associated with IE Inspection Report No. 50-296/79-45

-

were discussed during the meeting. The NRC Resident Inspector has inspected these items and will close these items during a subsequent inspection.

.

3.

Unresolved Items Unresolved items were not* identified during this inspection.

14.

Meeting with Licensee A meeting with the licensee was held at the Athens City Hall, Athens, Alabama, on January 21, 1980. This meeting was held as required by'the L

order' issued on January 4, 1980.

'

The licensee responded in a letter dated January 10, 1980 to the items of noncompliance listed in'the. Notice of Violation and to the modifications to

.thezBrowns Ferry Nuclear-Plant Unit Nos. 1, 2 and 3 licenses, which were appended to the V. Stello, Jr.

letter to the licensee dated January 4, 1980. Discussion of the corrective actions taken and clarification of i

these-actions were pursued. With regard to the. order, the licensee stated that they had:

Developed. written, detailed procedures requiring independent verifica-

-

-a.

,

. tion to. ensure that the restoration of containment penetration closures

~

.

to their normal condition following~ maintenance or other activities is f7 performed correctly.

Y q

~b.

Reviewed all management and administrative controls governing mainten-ance activities to assure that they do not permit maintenance or other

-

Lactivities to violath-limiting conditions;for operation.

w.x

-

'l

,

w t'

-

_

_

QTu :n

~

.,,

,-

-

.

.

.

x

.

..

.

.

!

}.

-2-Developed and would use in the future, detailed maintenance procedures c.

for: removing and replacing all containment penetration closures, and d.~

Made a detailed review-of reporting procedures to assure full compliance with all-reporting requirements required by the Browns Ferry technical-specifications.

Additionally,' a question and answer session was held with the NRC and the

. licensee responding to questions from the local news media and members of the public.

,

>