IR 05000237/1985014
| ML17195A830 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 06/14/1985 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17195A831 | List: |
| References | |
| NUDOCS 8506210215 | |
| Download: ML17195A830 (1) | |
Text
JUN 14 1985 Docket No. 50-237 Commonwealth Edison Company ATTN:
Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
Thank you for your letter dated May 28, 1985, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in our letter dated April 29, 198 In regard to Item 2 of your response, this office never maintained that the cable splices made in the locations identified in your March 13, 1985, summary were unacceptabl As was indicated to you by us during several meetings with your staff at the site and in Region Ill, we did not consider splicing the cables in these locations to be nonconformin We were concerned that you did not convey in design documents your commitment to disconnect or isolate other cables sharing the tray carrying the cable splices. Your subsequent plans to relocate the splices and your correction of the false statement in your March 13 summary are considered appropriate to resolve this issu We will examine these matters during a future inspectio We will gladly discuss any questions you may have concerning this matte cc:
D. L. Farrar, Director of Nuclear Licensing D. J. Scott,* Plant Manager cc w/ltr dtd 05/28/85:
DMB/Document Control Desk (RIDS)
Resident Inspector, Riii Phyllis Dunton, Attorney General's Office, Environmental Control Division
~tk 06/11"!"
~
~ams R~
H9r~i ~on
<t>I\\~
I 8506210215 850614 PDR ADOCK 05000237 G
\\
'
Sincerely,
']rJ9i"~i1~s19_n_eCf by~'17J-:_Harr~son J. J. Harrison, Chief Engineering Branch
..
- /