IR 05000010/1985012

From kanterella
Jump to navigation Jump to search
Safeguards Insp Repts 50-010/85-12,50-237/85-27 & 50-249/85-22 on 850812-16 & 19-20.No Noncompliance Noted. Major Areas Inspected:Action on Previous Violations & Maint & Records.Details Withheld (Ref 10CFR73.21)
ML20134P991
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/03/1985
From: Belanger J, Christoffer G, Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20134P983 List:
References
50-010-85-12, 50-237-85-27, 50-249-85-22, NUDOCS 8509090122
Download: ML20134P991 (1)


Text

-

- -

-

__

-

--

.--

_,

- _ _.

-.. -

_ _.

.

.

'

U.S. NUCLEAR REGULATORY COMMISSION

.

REGION III

l

Reports No. 50-10/85012(DRSS); No. 50-237/85027(DRSS); No. 50-249/85022(DRSS)

j Docket Nos. 50-10; 50-237; 50-249 Licenses No. DPR-2; No. DPR-19; No. DPR-25

'

!

Licensee:

Commonwealth Edison Company

'

Post Office Box 767 i

Chicago, IL 60690

-

Facility Name:

Dresden Nuclear Power Station, Units 1, 2 and 3 i

Inspection At:

Dresden Site, Morris, IL

!

Inspection Conducted: August 12-16, and 19-20, 1985 Date of Last Physical Protection Inspection:

February 19-22 and 25-26,1985 Type of Inspect,on:

Unannounced Physical Security Inspection Inspectors: 'G C'hrsohfer

'

Physical Security Inspector Date p. Odoy\\

'

i J

L. Belanger

'l 3fi3 i

Physical Security Inspector Date i

Approved By:

nd, Chief

.

feguards Section Date i

!

Inspection Summary f

Inspection on August 12-16 and 19-20, 1985 (Re) orts No. 50-10/85012(DRSS);

No. 50-237/85027(DRSS); and No. 50-249/85022(DRSS))

Areas Inspected:

Included a review of the licensee's action on Previous

,

'j Inspection Findings; Management Effectiveness; Records and Reports; Testing and Maintenance; Locks, Keys and Combinations; Security System Power Supply;

,

Lighting; Access Control-Packages; Access Control-Vehicles; Personnel Training

j and Qualifications-General Requirements; Safeguards Contingency Plan; and

,

i 73.71 reports.

The inspection involved 108 inspector hours by two NRC

,

inspectors.

The inspection began during the day shift.

l Results:

The licensee was found to be in compliance with NRC requirements in the areas examined during this inspection.

DETAILS: UNCLASSIFIED 1

Enclosuro Cor.

.F.

<

SMWJ.t03 li:CTi i 8509090122 850903 l' pan hparation This DR ADOCM O O

Pa0s is Ducontrollod i

,

-

-

-

-

. - ---

-

-