Forwards IE Insp Rept 50-206/79-13 on 790924-28 & Notice of Violation.Encls Withheld (Ref 10CFR2.790)
ML19256F120
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/05/1979
From: Norderhaug L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 7911210450
Download: ML19256F120 (2)


Text

[

Io UNITED STATES g

NUCLEAR REGULATORY COMMISSION e

n

$.'

S

REGION V

o, i U[

.

1900 N. CALIFORNI A BOULEVARD

%,w o

SUITE 202, WALNUT CRE E K PLAZA

,,e WALNUT CR EE K, CALIFORNI A 94596 November 5, 1979 Docket No. 50-206 Southern California Edison Company P. O. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention: A. Arenal, Vice President Advanced Engineering Gentlemen:

Subject:

NRC Inspection - San Onofre Unit 1 This letter refers to the inspection of your activities authorized under NRC License No. DPR-13 conducted by Messrs. W. P. Mortensen and D. W. Schaefer of this office on September 24-28, 1979.

It also refers to the discussion of our inspection findings held by the inspectors with Mr. H. E. Morgan and members of his staff on September 28, 1979.

The inspection included examination of activities related to physical protection against industrial sabotaga and against theft of special nuclear material in accordance with applicable requirements of Title 10, Code of Federal Regulations, Part 73, " Physical Protection of Plants and Materials," your security plan, and license conditions pertaining to physical protection as described in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and records, interviews with facility personnel and ob-servations by the inspectors.

Based on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.

The items of noncompliance are categorized into the level as described in our correspondence to all licensees dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within 20 days of your receipt of this notice, a written statement of explanation in reply, including:

(1) steps which have been or will be taken by you to correct the violations, and the results achieved; (2) steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

15/6 501 7911210 Y O 9

Southern California Edison Company-2-November 5, 1979

.

As noted in the attached inspection report, the inspectors examined the steps you immediately took to correct noncompliance during the inspection; and the steps taken to avoid further violation. The inspectors verified on September 28, 1979 that full compliance had been achieved.

No further response to the items noted in Appendix A will be required.

During this inspection certain commitments were made by you.

These com-mitments are stated in Paragraph 14.

If our understanding is incorrect, please contact this office immediately.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials and your facility security procedures are exempt from disclosure; therefore, Appendix A and the inspection report will not be placed in the Public Document Room and will receive limited distribution.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely,

-

,

-

/y

/m

.

'

'

hl*

L. R. iorder aug,dcc % y f,W hief [

Safeguards Branch Enclosures:

1.

Appendix A - Notice of Violation 2.

Inspection Report

No. 50-206/79-13 (IE-V-333)