August 17,1998
Docket No.
50-171
License No.
G. R. Rainey, President
PECO Nuclear
4
'
Nuclear Group Headquarters
Correspondence Control Desk
P.O. Box 195
Wayne, PA 19087-0195
SUBJECT:
INSPECTION NO. 50-171/98-001
Dear Mr. Rainey:
)
J
'
'On June 12,1998, Anthony Dimitriadis of this office conducted a safety inspection at Peach
Bottom Atomic Power Station Unit 1, of activities authorized by the above listed NRC license.
The inspection was an examination of your licensed activities as they relate to radiation safety
and to compliance with the Commission's regulations and the license conditions. The
inspection consisted of observations by the inspector, interviews with personnel, cnd a selected
examination of representative records. The findings of the inspection were discussed with Jerry
Phillabaum of your organization at the conclusion of the inspection.
Within the scope of this inspection, no violations were identified.
In accordance with Section 2.790 of the NRC's ' Rules and Practices," Part 2, Title 10, Code of
Federal Regulations, a copy of this letter and the enclosed report will be placed in the Public
Document Room. No reply to this letter is required.
Your cooperation with us is appreciated.
.
Sincerely,
OriginalsignedbyMark Roberts
Mark C. Roberts, Chief
,
Decommissioning and Laboratory Branch
Division of Nuclear Materials Safety
Enclosure:
NRC Inspection Report 50-171/98-001
l
l
\\
\\
gae**1dli. }%I,P
-
-gED6
'
,
4E&7-
,
L
_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
{
,.
!
l
i
l
G. Rainey
2
i
PECO Nuclear
'
t
cc w/ encl:
G. Edwards, Chairman, Nuclear Review Board and Director, Licensing
i
J Doering, Vice president, Peach Bottom Atomic Power Station
l
J. Hagan, Vice President, Nuclear Station Support
j
,
l
R. Boyce, Director, Nuclear Quality Assurance
!
!
M. Warner, Plant Manager, Peach Bottom Atomic Power Station
i
G.J. Lengyel, Manager, Experience Assessmet
j
J. W. Durham, Sr., Senior vice President and General Counsel
'
J. Vannoy, Acting Secretary of Harford County Council
.
R. Ochs, Maryland Safe Energy Coalition
1
J. H. Walter, Chief Engineer, Public Service Commission of Marland
)
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
Mr. & Mrs. Kip Adams
Commonwealth of Pennsylvania
State of Maryland
i
I
i
l
l
!
_
_ _ _ _
. --- __
__-_ _ _-__ __ -_.. __ _ ___ _ _ _ - _ - ____- _
____
.
,
G. Rainey
3
,
PECO Nuclear
!
!
Distribution w/ enc!:
Region i Docket Room (w/ concurrence)
Nuclear Safety information Center (NSIC)
PUBLIC
H. Miller, RA/W. Axelson, DRA
j
C. Anderson, DRP
i
R. Bellamy, DNMS
NRC Resident inspector
Distribution w/ encl:(via E-Mail)
B. McCabe, OEDO
R. Capra, PDI-2, NRR
M. Thadani, NRR
DOCDESK
l
DOCUMENT NAME: G:
MS\\DOCWORK\\lNSPLTR\\LDPR12
21900466
,
l
To receive a copy of this document, indicate in the ben: "C" = Copy w/o et';sch/enci
- E* = Copy w/ ettach/enci
- N* = No copy
l
OFFICE
DNMS/RI
) flC
DNMS/RI
l
l
NAME
- ADimitriadisA
MRoberts MA_
l
DATE
08/17/98
r
08/l7/98
08/ /98 *
08/ /98
OFFICIAL RECORD COPY
I