Progress Energy Serial: HNP-12-018 10 CFR 50.55a

.APR 11'.2012 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit No. 1 Docket No. 50-400 / Renewed License No. NPF-63

Subject:

90-Day Inservice Inspection (ISI) Summary Report Corrections

Reference:

Letter from J. R. Caves to the U.S. NRC, "90-Day Inservice Inspection (ISI)

Summary," Serial HNP-11-017 dated February 10, 2011, ADAMS Accession No. ML110470014 Ladies and Gentlemen:

By letter dated February 10, 2011, Carolina Power & Light Company (CP&L), doing business as Progress Energy Carolinas, Inc., submitted an Inservice Inspection (ISI) Summary Report for the Shearon Harris Nuclear Power Plant, Unit No. 1 (HNP). This report was prepared in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 2001 Edition with addenda through 2003, and ASME Code Case N-532-4, as approved in Regulatory Guide 1.147. That report was for HNP's Cycle 16 operations and refueling outage number 16 (RFO-16) of the third 10-year ISI interval.

Enclosed are two pages representing corrections to that report. The first corrects the refueling outage number in the Certificate of Conformance signed by the Owner's Designee. The correct refueling outage was provided in the Form OAR-1 Owner's Activity Report, but it was not carried forward to the Certificate of Conformance. The second corrects the description of work on Code Class 3 component 1SW-124, from "Replace 2 [inch] valve" to "Replace 8 [inch]

valve." The errors in the submittal were entered into the Corrective Action Program.

Progress Energy Carolinas, Inc.

Harris Nuclear Plant P. 0. Box 165 New Hill, NC27562 j.

U.S. Nuclear Regulatory Commission Page 2 HNP-12-018 This document contains no new Regulatory Commitment.

Please direct any questions regarding this submittal to me at (919) 362-3137.

Sincerely, David H. Corlett Supervisor, Licensing/Regulatory Programs Harris Nuclear Plant DHC/jrc Enclosed: Corrected Report Pages (2) cc: Mr. J. D. Austin, NRC Sr. Resident Inspector, HNP Mr. J. M. Given, Jr., NC Department of Labor, Boiler Safety Bureau Ms. A. T. Billoch Colon, NRC Project Manager, HNP Mr. V. M. McCree, NRC Regional Administrator, Region II

Enclosure I to SERIAL: HNP- 11-017 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50400IRENEWED LICENSE NO. NPF-63 INSERVICE INSPECTION

SUMMARY

REPORT FOR RFO- 16 FORM OAR-I OWNER'S ACTIVITY REPORT Report Number HNP-I 1-017 Plant Hfrris Nuclear Plant 541.3 Shearon Hartis Rd. New Hill- NC2?7562 Uni No. I Commercial Service Dart %Ilav2 7187 ReFueling Outage No- R.FO-16 Current Inspection Interval Third interval Current Inspection period Sevrd nocriotd Editdin and Addenda of Section X1 applicable tlo hc inspection plan 2001 Edition with 2003 Addenda Date and revision of inspecton plan June 09 2009 Editimn and Addenda of Section Xl applicable to rempAirand replacements. if dilTerent than the inspection plan Code Cases used: N-307-3. N-460, N508-3. N-532-4 N-533-1. N-722, N-729-1 CERTIFICATE OF CONFORMANCE 1ci*r" that (a) the s1a3*teets made in this Owner's Activity Report ar corrmet; (b) and the examinations and tcsts'met the Inspection Plan as required by tha ASMECode, Section .X)a.and (c) the r pair/repIac=mti,-ctivities and evaluations supporting the cormplteion of fei5 con-b. to the o 'cion XtsigymenJ RFO-16

.Signed S. J. Volk IS1 Proram Manager Date F-'ebruarv 0d. _0,11 7- V 9&w a-on', D.4amw7 dt CERTIFICATE OF INSERVICE INSPECTION

1. the undrmigned, holding a v-lid commission issued by Lthe Naonal Board of Boiler and Piessure Vessel Inspectors and the State ur Prnvinceof North Carohna and employed by. tISB(.T of Hiartiord Cuonnecticut have inspected the items described in hiO0wner!s Activity Report, and stal thea. to the bestof my knowlcdge and belieF the OwnLr has pcrthrmcd 211aCLtivitiCs'rpresented by this report in accordance with the requirmnents of Section Xl.

By signing this ccrtificate neither the inspe.tor nor his employer makes anywarranty, expressed or implied, concerning the repair/replaccntents activities and cvaluationd Jscribcd ib this rcport Furthermore. ntcilher the insp'ctoi nor his employer shall be liable inany manner for any p.rSonal injury or prop1'ty danage or a loss ofany ktnd arising from or connected with this inpectiun.

Commissions_.A A e-Z#',/c R 0 Inspector's Siv(li Natiunal Board, State, Province. and Endorscmncts I I"

1. In the "CERTIFICATE OF CONFORMANCE" Section the outage was incorrectly identified as RFO-15. The correct outage is RFO-16. The incorrect outage identification has been one-lined and initialed and dated and the correct outage has been inserted.
2. In "Table 2 Abstract of Repair/Replacement Activities Required for Continued Service", valve 1SW-124 was misidentified as a 2.00" valve. The correct valve size is 8.00". The incorrect valve size has been corrected in Table 2.

e signatures below certify that the corrections above have been validated and are correct (re: NCR 353591).

V Owner or Owner's Designee, Title I .) "_.)

Date Inspector's Signa Date

Enclosure I to SERIAL: HNP-I 1-017 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. I DOCKET NO. 50-400/RENEWED LICENSE NO. NPF-63.

INSERVICE INSPECTION

SUMMARY

REPORT FOR RFO-16 Table 2 Abstract of Repair/ReplacenientActivities Requiredfor CoittihuedService!

Repair/Repilhcenzent Code Class Item Description Description of Work Date Conypleted Pl/an Number 1 RC-904 Replace 1" valve 11/02110 ,0198180' -5 1 IRC-903 Replace 1' valve 11/04/10 01!98182 -5 1CC-216 Replace 2" valve 111/06110 0858035 -5, IRC-900 Replace 1" valve 11/04/10 1139327 -5, 1SW-204 Replace 4" valve 11/06/10 1339456 -1 1CT-39 Replace 2' valve 11,/04/10, 1385077 -9 1CT-36 Replace 2" valve 1 1/09/0 11385077 -10 1 CT-H-457 Replace hanger 11/08/1,0 1385077 -14 1CT-95 Replace 6" valve disc 11/08/10 1444096 -1 181-130 Replace 1" valve 11/10110 1459056 -1 ISI-131 1459057 -1 Replace 1" valve M110/10 1 DFO-i91 Replace 2" globe valve 02/03/10. 1560891 -3 3SC3-19SB-1 Replace 3" piping 11M06/10 1579.435-1 160068*9 -1 3SW4-29SA-1 Replace 4" piping 111/06/10 1 SM- 24 Replace 8" valve 10/28/10 1633765 -1

.3SC3-7SB-1 Replace 3' piping 111/04/10 1:648103 -1 iSC-Bay8 Replace pump packing box cover 02/118/10, 1665913 -1 1CV-E004 Replace air handler coil. 11/11/1:0 1688184, -1 IRC-112 Replace:%" valve 11/05/10 1835396 -1 3SW1 .5-170SB-1 Replace 1.5" piping 11/06/10 1842688 -1 1CS-344 Replace 1.5" valve disc 11/08/10 1844454 -1