Progress Energy Serial:

r *'* JAN16 2008 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 90-DAY INSERVICE INSPECTION (ISI)

SUMMARY

REPORT Ladies and Gentlemen:

In accordance with 10 CFR 50.55a, Carolina Power and Light Company, doing business as Progress Energy Carolinas, Inc., submits the attached Inservice Inspection (ISI) Summary Report for the Harris Nuclear Plant (HNP). This report has been prepared in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 2001 Edition with addenda through 2003, and ASME Code Case N-532-4, as approved in Regulatory Guide 1.147. This report is for HNP's Cycle 14 operations and Refueling Outage No. 14 (RFO-14) of the third 10-year ISI interval.

This document contains no new regulatory commitments.

Please refer any question regarding this submittal to me at (919) 362-3137.

Sincerely, D. H. Corlett Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant DHC/kms Attachment cc: Mr. P. B. O'Bryan, NRC Sr. Resident Inspector Mr. J. M. Given, Jr., NC Department of Labor, Boiler Safety Bureau Mr. V. M. McCree, NRC Acting Regional Administrator, Region II Ms. M. G. Vaaler, NRC Project Manager Progress Energy Carolinas, Inc. 4s.u 7 Harris Nuclear Plant P. 0. Box 165 New Hill, NC27562

Attachment for Serial: HNP-07-179 Page 1 of 9 CAROLINA POWER AND LIGHT COMPANY dba PROGRESS ENERGY CAROLINAS, Inc.

SHEARON HARRIS NUCLEAR POWER PLANT Unit One Inservice Inspection Summary Report For RFO-14 Carolina Power and Light PO Box 1551 Raleigh, NC 27602-1551 Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Date of Commercial Service May 2, 1987

Attachment for Serial: IINP-07-179 Page 2 of 9 INDEX Sum m ary ............................................................................................ Section 1 OAR-I Form , Report of Inservice Inspections .................................. Section 2 Table 1................................................................................................ Section 3 Table 2 ............................................................................................... Section 4

Attachment for Serial: HNP-07-179 Page 3 of 9 SECTION 1 (2 Pages)

SUMMARY

Attachment for Serial: HNP-07-179 Page 4 of 9

SUMMARY

The Shearon Harris Nuclear Power Plant, Unit 1, Third Ten-Year Inservice Inspection (ISI) Plan is being developed to comply with 10CFR50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2001 Edition with 2003 Addenda.

The following summary report is being submitted pursuant to the reporting requirements of ASME Section XI as amended by ASME Code Case N-532-4.

This summary report contains the Form OAR-i Owner's Activity Report and Tables 1 and 2 of the Code Case for Harris Nuclear Plant (HNP) during cycle 14 and Refueling Outage No. 14 (RFO-14). This report also covers the Reactor Pressure Vessel 10-year examinations that were completed during RFO-13 but not reported on the NIS-1. No indications were found that required evaluation for continued service. RFO-14 is the first outage of the first period in the third inspection interval, and includes Repair/Replacement Activities from May 17, 2006 (the last submittal) to October 22, 2007.

Attachment for Serial: HNP-07-179 Page 5 of 9 SECTION 2 (2 Pages)

OAR-I FORM OWNER'S ACTIVITY REPORT

Attachment for Serial: HNP-07-179 Page 6 of 9 FORM OAR-I OWNER'S ACTIVITY REPORT Report Number HNP 179 Plant Harris Nuclear Plant, 5413 Shearon Harris Rd, New Hill, NC 27562 Unit No. 1 Commercial Service Date May 2. 1987 Refueling Outage No. RFO-14 Current Inspection Interval Third interval Current Inspection period First period Edition and Addenda of Section XI applicable to the inspection plan 2001 Edition with 2003 Addenda Date and revision of inspection plan October 2007 draft Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan 1989 Edition was used for all R/R Activities planned prior to the RFO-14 outage Code Cases used: N-460. N-532-4. N-740. N-638-1. N-578-1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this Owner's Activity Report are correct; (b) and the examinations and tests met the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RFO-15 conform to the requirements of Section XI.

Signed - z , - ISI Coordinator Date January 16, 2008 Owner or owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by HSBCT of Hartford Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacements activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

( n* Commissions NC 1507 Inspector s S ature National Board, State, Province, and Endorsements Date _ 5), _ _ _ _ _

Attachment for Serial: HNP-07-179 Page 7 of 9 SECTION 3 (1 Page)

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITION THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description None

Attachment for Serial: HNP-07-179 Page 8 of 9 SECTION 4 (2 Pages)

TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE

Attachment for Serial: HNP-07-179 Page 9 of 9 Table 2 Abstract of Repair/ReplacementActivities Requiredfor ContinuedService Repair/Replacement Code Class Item Description Description of Work Date Completed Plan Number 1 1RC-123 Replace valve, studs/nuts 12/18/2007 0413716 3 1SW-E055 Replace flange bolting 10/15/2007 0641748 3 1MS-G replace valve bonnet 12/12/2007 0641852 3 1SW-36 Replace piping and valve 12/18/2007 0687076 3 1SW-22 Replace valve 12/6/2007 0687149 3 3SW2-166SB-1 replace piping 12/12/2007 0815135 3 1EA-52 replace valve disc 10/15/2007 0819435 3 FE-9207B inlet piping Replace piping 12/12/2007 0845002 3 1SW-204 Replace valve disc 10/15/2007 0855661 2 1CS-2 Replace valve trim 12/6/2007 0855703 3 1SW-26 Rebuild valve 10/16/2007 0855704 3 weld 1-SW-214-2-VW-3 weld repair internal surface 10/16/2007 0855704 MC 1CT-E007 replace bolt on valve chamber 12/17/2007 0858118 MC IAB-E026 replace equipment hatch bolting 12/17/2007 0858338 2 1 CS-8 Replace valve trim 12/6/2007 0862593 2 SG-H-313B replace snubber control valves 10/20/2007 0887741 2 SG-H-305B replace snubber control valves 10/20/2007 0887756 1 11C-El 52 replace thimble at core location L14 10/20/2007 0893421 3 3SW4-91SB-1 Replace piping 12/18/2007 0893431 2 1CS-7 replace valve trim 12/6/2007 0893751 2 1CS-9 replace valve trim 10/23/2007 0893754 3 3SW3-1493SB-1 Replace piping 12/18/2007 0896665 3 3SW4-327SB-1 Replace piping 12/18/2007 0896666 1 "B" RCP no. 1 seal Replace "B" RCP no. 1 seal 12/6/2007 0988348 3 1AF-50 replace valve cage 12/17/2007 1130497 2 SG-H-0309B replace snubber control valves 10/12/2007 1136823 2 SG-H-0309B installed new snubber reservoir and valves 10/20/2007 1137605