HNP-01-170, Inservice Inspection Summary Report for Harris Nuclear Plant

From kanterella
Jump to navigation Jump to search
Inservice Inspection Summary Report for Harris Nuclear Plant
ML020580234
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/24/2002
From: Scarola J
Carolina Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-01-170
Download: ML020580234 (4)


Text

rCP&L A Progress Energy Company James Scarola Vice President Harris Nuclear Plant JAN 2 A.?O2 SERIAL: HNP-01-170 10CFR50.55a United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 INSERVICE INSPECTION

SUMMARY

REPORT

Dear Sir or Madam:

In accordance with the reporting requirements of the ASME Boiler and Pressure Vessel Code, 1989 edition,Section XI, Article IWA-6220(c), this letter submits a correction to the Inservice Inspection Summary Report for Carolina Power and Light Company's Harris Nuclear Plant (HNP). By letter dated October 18, 2000, HNP submitted a report that covered the inspections performed at HNP during Cycle 9 operations, including the Refueling Outage No. 9, in the second 10-year inservice inspection interval. The attached enclosure corrects minor discrepancies made in the October 18, 2000 letter. The-corrected values remain within the acceptance criteria for weld inspections.

Questions regarding this matter may be referred to Mr. J. R. Caves at (919) 362-3137.

Since ly, f 1 ,

James Scarola MSE/mse Enclosure c: 1AMr. J. B Brady, NRC Sr. Resident Inspector Mr. J. M. Givens, Jr. North Carolina Department of Labor Mr. J. M. Goshen, NRC Project Manager Mr. -B. S.SMallet, NRC Regional Administrator, .. .*;*.

210Box 165 ... § .K>'~*

New Hill. NC 27562 . - . .

T> 919.362.2502 )1 ." -. Y" F> 919.3622095 " " -. -1 . . "' .i' 1[-. t; jC,.. .

' *. "*-.. 1 : . . - - - . . .

SERIAL: HNP-01-170 10CFR50.55a SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 INSERVICE INSPECTION

SUMMARY

REPORT ENCLOSURE

Completion Percentages for the First Inspection Period of the Second Interval Total Scheduled to be Number % Interval Category Examined Examined Complete Period % Requirement B-A 18 1 5 5 (deferral permitted)

B-B 5 2 40 16 - 34 (A maximum of 34% will be credited)

B-D 30 12 40 25-50 B-F 18 6 33 16-34 B-G-1 174 57 32 16 - 34 (82 of 256 items allowed to be deferred)

B-G-2 236 67 28 16-34 B-H 13 4 30 16-34 B-J 152 44 28 16-34 B-N-1 3 1 33 16-34 C-A 16 3 18 16-34 C-B 15 4 26 16-34 C-C 35 9 25 16-34 C-F-1 164 55 33 16-34 C-F-2 128 37 28 16-34 Pri pared by:

Ven,,edby:-

bc: Mr. R. H. Bazemore Mr. W. F. Conway Mr. G. W. Davis Mr. R. J. Duncan II Mr. K. N. Harris Ms. L. N. Hartz Mr. C. S. Hinnant Mr. Wayne Gurganis Ms. Terry Hardy Mr. R. D. Martin Mr. J. M. Taylor Mr. John Yadusky Mr. W. G. Wendland Licensing File(s) (2 copies)

Nuclear Records