End of Cycle 23 (H1R23) Inservice Inspection Program Owner'S Activity Report
ML21223A090
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/11/2021
From: Riley K
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-21-0200
Download: ML21223A090 (7)


Text

Kevin P. Riley Nuclear Support Services Manager Harris Nuclear Plant 5413 Shearon Harris Rd New Hill, NC 27562-9300 984.229.2124 August 11, 2021 Serial: RA-21-0200 ATTN: Document Control Desk 10 CFR 50.55a U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 / Renewed License No. NPF-63

Subject:

Shearon Harris Nuclear Power Plant, Unit 1 - End of Cycle 23 (H1R23) Inservice Inspection Program Owners Activity Report Ladies and Gentlemen:

Pursuant to the reporting requirements of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, as amended by ASME Code Case N-532-5, Duke Energy Progress, LLC (Duke Energy), hereby submits the Owners Activity Report for the Shearon Harris Nuclear Power Plant, Unit 1, refueling outage H1R23.

This letter contains no new or revised regulatory commitments.

Should you have any questions concerning this letter, or require additional information, please contact Art Zaremba, Manager - Nuclear Fleet Licensing, at 980-373-2062.

Sincerely, Digitally signed by i22614 i22614 (330130)

Date: 2021.08.10 (330130) 21:43:21 -04'00' Kevin P. Riley

Enclosure:

Cycle 23 Owners Activity Report cc: J. Zeiler, NRC Sr. Resident Inspector, HNP M. Mahoney, NRC Project Manager, HNP L. Dudes, NRC Regional Administrator, Region II

U.S. Nuclear Regulatory Commission Serial: RA-21-0200, Enclosure ENCLOSURE SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 CYCLE 23 OWNERS ACTIVITY REPORT (5 PAGES PLUS COVER)

DUKE ENERGY INSERVICE INSPECTION

SUMMARY

REPORT REFUELING OUTAGE H1R23 (Outage 3)

Location: 5413 Shearon Harris Road, New Hill, NC 27562 NRC Docket No. 50-400 / Renewed License No. NPF-63 Commercial Service Date: May 2, 1987 Owner: Duke Energy 526 South Church St.

Charlotte, NC 28201-1006 Revision 0 Originated By: Date Angela Staller Checked By: Date Austin Keller Approved By: Date Mark Pyne

CASE N-532-5 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number RA-21-0200 Plant Shearon Harris Nuclear Plant, 5413 Shearon Harris Road, New Hill, NC 27562 Unit No. 1 Commercial service date May 2, 1987 Refueling outage no. H1R23 (if applicable)

Current inspection interval Fourth Inspection Interval (ISI), Third Inspection Interval (Containment ISI)

(1st, 2nd, 3rd, 4th, other)

Current inspection period Second Inspection Period (ISI), First Inspection Period (Containment ISI)

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the ASME Section XI 2007 Edition through 2008 Addenda, inspection plans 2017 Edition (See Attachment 1)

Date and revision of inspection plans See Attachment 1 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases Available for Use:

N-513-3, N-532-5, N-586-1, N-600, N-613-1, N-638-6, N-639, N-643-2, N-Code Cases used for inspection 648-1, N-651, N-705, N-706-1, N-716-1, N-722-1, N-729-6, N-731, N-735, and evaluation: N-747, N-765, N-770-5, N-775, N-776, N-798, N-800, N-805, N-845 (if applicable, include cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of H1R23 conform to the requirements of Section XI.

(refueling outage number)

Signed Angela Staller, ISI Program Owner Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of North Carolina and employed by OneCIS Insurance Company of Lynn, MA have inspected e that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Elmostafa Elkouri Commissions NB #13930, NC# 1600 A.N.I.C.

National Board, State, Province, and Endorsements Page 1 of 4

Attachment 1 CASE N-532-5 Shearon Harris Unit 1 Refueling Outage 23, Inservice Inspection Report The Shearon Harris Nuclear Power Plant, Unit 1, Fourth Ten-Year Interval Inservice Inspection (ISI) Plan and Third Ten-Year Containment Inservice Inspection (CISI) Plan complies with 10CFR50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2007 Edition through 2008 Addenda. The 2017 Edition of Section XI is also applicable for IWA-4340, IWA-4540(b),

IWA-5120, IWA-5213, IWA-5241, IWA-5242 and IWA-5250 in accordance with three NRC Safety Evaluations (ADAMS Accession Numbers ML21113A013, ML20300A206 and ML21029A335).

This summary report is submitted pursuant to the reporting requirements of ASME Section XI as Requirements and Inservice Inspection Summary Report Preparation and Submission Section Refueling Outage 23 (H1R23) is the first of three outages of the second period in the fourth inspection interval for the ISI and Pressure Testing programs, and the second of two outages of the first period in the third inspection interval for the Containment ISI program. See the table below for the dates and revisions of the inservice inspection plans.

Document Title Document Number Date of Issue and Revision Fourth Interval Inservice Inspection Plan and HNP-PM4-002, Rev. 2 March 9, 2020 Third Interval Containment Inservice Plan Fourth Interval Inservice Inspection Schedule HNP-PM4-003, Rev. 2 March 9, 2020 and Third Interval Containment Inservice Inspection Schedule Fourth Interval Inservice Inspection Pressure HNP-PM4-005, Rev. 1 April 30, 2020 Test Plan and Schedule Augmented Inservice Inspection (AISI) Plan HNP-PM-4-007, Rev. 4 May 13, 2020 th Inservice Inspection Interval Page 2 of 4

CASE N-532-5 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Concrete Areas of exposed welded wire mesh were noted during containment dome examination. Only cosmetic grout layer was deteriorated above parapet L-A/L1.11 floor 0° to 180° that conditions with exposed welded wire mesh are acceptable.

Concrete Areas of exposed welded wire mesh were noted during containment dome examination. Only cosmetic grout layer was deteriorated above parapet L-A/L1.11 floor 180° to 360° that conditions with exposed welded wire mesh are acceptable.

Page 3 of 4

CASE N-532-5 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Repair /

Code Date Replacement Class Item Description Description of Work Completed Plan Number 3SW3-1499SB-1, Replace 3 3SW3-1499SB-1 Emergency Service Water 12/11/2019 20301071-01 Piping 3SC1-2SA-1 Sock-O-Let 3 3SC1-2SA-1 1/16/2020 20378074-04 replacement 1CS-CSIPA 1CS-CSIPA, Repair 2 12/15/2020 20433121-01 Cracked Weld 3SW1-141SB-1, Replace Piping in Support of Relief 3 3SW1-141SB-1 4/21/2021 20424752-01 Request RA-20-0312 and EC 418338 3SW3-1500SA-1, Replace 3 3SW3-1500SA-1 Emergency Service Water 5/5/2021 20413927-01 Piping Replace 1SW-1060 and Associated Piping with 3 3SW1.5-814SA-1 5/5/2021 20361269-01 Stainless-Steel Ball Valve and Piping 1CH-E005, Replace 3 1CH-E005 Degraded Support in 5/5/2021 20394226-11 Waterbox Page 4 of 4