 Issue dateTitleTopic
HNP-18-050, Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date17 September 2018Request to Extend Reactor Vessel Surveillance Capsule Report Submission Date
HNP-18-004, License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme13 August 2018License Amendment Request to Change Shearon Harris Nuclear Power Plant, Unit 1, Emergency Plan Emergency Action Level Scheme
HNP-18-035, Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year Interval4 June 2018Relief Request I3R-18, Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Lnservice Inspection Program for Containment, Third Ten-Year IntervalNon-Destructive Examination
Incorporated by reference
HNP-18-049, Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 193 May 2018Submittal of 1 0 CFR 50.54(q) Evaluation Form of Changes to Procedure EMP-420, Emergency Program Maintenance, Revision 19Exemption Request
HNP-18-023, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2 May 2018Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment ChangesFuel cladding
Overspeed trip
HNP-18-042, Annual Environmental (Non-radiological) Operating Report30 April 2018Annual Environmental (Non-radiological) Operating ReportZebra Mussel
Biofouling
HNP-18-032, Annual Radiological Environmental Operating Report25 April 2018Annual Radiological Environmental Operating ReportHigh winds
Grab sample
Offsite Dose Calculation Manual
Fukushima Dai-Ichi
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
HNP-18-031, Annual Radioactive Effluent Release Report25 April 2018Annual Radioactive Effluent Release ReportBoric Acid
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
HNP-18-047, Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of Calculation20 April 2018Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval, Non-Proprietary Version of CalculationNon-Destructive Examination
Hydrostatic
Finite Element Analysis
Stress corrosion cracking
HNP-18-045, Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year Interval18 April 2018Submittal of Relief Request I4R-18, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspection Program, Fourth Ten-Year IntervalNondestructive Examination
Stress corrosion cracking
Liquid penetrant
Exclusive Use
Affidavit
HNP-18-044, Cycle 22 Core Operating Limits Report, Revision O16 April 2018Cycle 22 Core Operating Limits Report, Revision OShutdown Margin
HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses13 April 2018Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality AnalysesTime to boil
Incorporated by reference
FLEX
Fuel cladding
Affidavit
Water rod
HNP-18-021, Annual Report in Accordance with Technical Specification 6.9.1.219 February 2018Annual Report in Accordance with Technical Specification 6.9.1.2
HNP-18-020, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses16 February 2018Supplement to Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses
HNP-18-019, Cycle 21 Core Operating Limits Report, Revision 114 February 2018Cycle 21 Core Operating Limits Report, Revision 1Shutdown Margin
HNP-18-017, CFR 50.54(q) Evaluations5 February 2018CFR 50.54(q) EvaluationsSafe Shutdown
Cyber Security
Emergency Lighting
FLEX
Severe Accident Management Guideline
Safeguards Contingency Plan
Exemption Request
Earthquake
Minimum staff
Siren
HNP-18-001, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.1 February 2018Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors.Safe Shutdown
High winds
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Thermoset
Large early release frequency
License Renewal
Manual Operator Action
HNP-18-002, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements22 January 2018Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements
HNP-18-003, Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses18 January 2018Response to Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality AnalysesSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Fuel cladding
Affidavit
HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations11 January 2018License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis PenetrationsSafe Shutdown
High winds
Tornado Missile
Probabilistic Risk Assessment
Incorporated by reference
Tornado-Generated Missile
Tornado Missile Protection
Large early release frequency
Tornado Missile Risk Evaluator
HNP-18-006, Submittal of 14-Day Special Report for Accident Radiation Monitors4 January 2018Submittal of 14-Day Special Report for Accident Radiation Monitors
HNP-17-093, Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 329 November 2017Supplement to License Amendment Request Proposing a New Set of Fission Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3
HNP-17-078, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements27 November 2017Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance RequirementsBoric Acid
Stroke time
HNP-17-082, Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In..30 October 2017Response to Request for Additional Information Regarding License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Limit Detailed In..Fuel cladding
HNP-17-084, Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements30 October 2017Response to Request for Additional Information Regarding a License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements
HNP-17-025, Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan23 October 2017Fourth Interval Lnservice Inspection Plan, Third Interval Containment Lnservice Inspection Plan, and Fourth Interval Lnservice Inspection Pressure Test Plan
HNP-17-072, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis19 October 2017License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing BasisSafe Shutdown
High winds
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Large early release frequency
TORMIS
Tornado Missile Risk Evaluator
Earthquake
Turbine Missile
Fire Protection Program
HNP-17-077, License Amendment Request Regarding Rod Control Movable Assemblies Technical Specifications10 October 2017License Amendment Request Regarding Rod Control Movable Assemblies Technical SpecificationsShutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Power change
HNP-17-076, Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements.2 October 2017Supplement to License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Duplicate Reporting Requirements.Surveillance Frequency Control Program
HNP-17-073, Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses14 September 2017Supplemental Information for License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses
HNP-17-062, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal13 September 2017Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary SubmittalInternal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Flood Hazard Mitigation Strategies Assessment
Flooding Focused Evaluation
HNP-17-061, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses20 July 2017Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses
HNP-17-008, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses28 June 2017License Amendment Request Regarding Spent Fuel Storage Pool Criticality AnalysesTime to boil
Fuel cladding
Affidavit
Water rod
HNP-17-003, License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load Rejection5 June 2017License Amendment Request for Emergency Diesel Generator Surveillance Requirements Regarding Voltage and Frequency Limits and the Voltage Limit for Emergency Diesel Generator Load RejectionSafe Shutdown
Boric Acid
Stroke time
Anticipated operational occurrence
Overspeed trip
HNP-17-040, Snubber Program Plan1 June 2017Snubber Program PlanSafe Shutdown
Incorporated by reference
Earthquake
HNP-17-051, 10 CFR 50.54(q) Evaluation24 May 201710 CFR 50.54(q) EvaluationSafe Shutdown
Health Physics Network
High Radiation Area
Grab sample
Met Tower
Cyber Security
Emergency Lighting
Incorporated by reference
Locked High Radiation Area
Severe Accident Management Guideline
Safeguards Contingency Plan
Earthquake
Siren
HNP-17-050, Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information Center24 May 2017Transmittal of 10 CFR 50.54(q) Evaluation for Revision 21 to PEP-250, Activation and Operation of the Joint Information CenterExemption Request
Fuel cladding
HNP-17-041, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete22 May 2017Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106, and Delete Du
HNP-17-033, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 1122 May 2017License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11Power Uprate
Measurement Uncertainty Recapture
HNP-17-049, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations.18 May 2017Transmittal of 10 CFR 50.54(q) Evaluation and Revision 26 to PEP-110, Emergency Classification and Protective Action Recommendations.Earthquake
Siren
HNP-17-047, 10 CFR 50.54(q) Evaluation18 May 201710 CFR 50.54(q) EvaluationHealth Physics Network
Shutdown Margin
Grab sample
FLEX
Severe Accident Management Guideline
Fuel cladding
Siren
HNP-17-048, Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations.18 May 2017Transmittal of 10 CFR 50.54(q) Evaluation and Revision 28 to PEP-230, Control Room Operations.FLEX
Severe Accident Management Guideline
Exemption Request
Fuel cladding
Downpower
Subsequent actuation
HNP-17-046, 10 CFR 50.54(q) Evaluation18 May 201710 CFR 50.54(q) EvaluationSafe Shutdown
Grab sample
FLEX
Fuel cladding
Minimum staff
HNP-17-024, Annual Environmental (Nonradiological) Operating Report28 April 2017Annual Environmental (Nonradiological) Operating ReportZebra Mussel
Biofouling
HNP-17-023, Annual Radioactive Effluent Release Report28 April 2017Annual Radioactive Effluent Release ReportBoric Acid
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
HNP-17-034, Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106..25 April 2017Response to Request for Additional Information Regarding License Amendment Request to Relocate Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report, Delete Reference to Plant Procedure PLP-106..
HNP-17-035, Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk Evaluator12 April 2017Request for Pilot Plant Status and Fee Waiver to Implement Tornado Missile Risk EvaluatorTornado Missile
Tornado Missile Protection
Tornado Missile Risk Evaluator
HNP-17-045, 10 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System Operation30 March 201710 CFR 50.54(q) Evaluation of Change in Emergency Plan Implementation Procedure PEP-241, Revision 7, Technical Support Center (TSC) Emergency Ventilation System OperationEmergency Lighting
Exemption Request
HNP-17-014, Annual Report in Accordance with Technical Specifications, Section 6.9.1.216 February 2017Annual Report in Accordance with Technical Specifications, Section 6.9.1.2
HNP-17-015, Summary of 10 CFR 50.54(q) Evaluation15 February 2017Summary of 10 CFR 50.54(q) Evaluation