HL-5045, Forwards Inservice Inspection Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2

From kanterella
Jump to navigation Jump to search
Forwards Inservice Inspection Program Third 10-Year Interval for Ei Hatch Nuclear Plant Units 1 & 2
ML20093G930
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/17/1995
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20093G931 List:
References
HL-5045, NUDOCS 9510190290
Download: ML20093G930 (2)


Text

{% o Georgia Pow:r Company 40 invern:ss Center Parkway Post Office Box 1295 -

Birmingham. Alabama 35201 Telephone 205 877 7279 m

hldr *IIe'nt$cioar GeorgiaPower Hatch Project tre souhxndruc systan October 17, 1995 Docket Nos. 50-321 HL-5045 50-366 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant Third 10-Year Interval Inservice Inspection Program Gentlemen:

In accordance with 10 CFR 50.55a(g)(5)(i), Georgia Power Company (GPC) hereby submits the Third 10-Year Interval Inservice Inspection (ISI) Program for the Edwin 1. Ilatch Nuclear Plant Units 1 and 2. The enclosed 10-year ISI program, which will be implemented January 1,1996, was developed using the criteria defined in American Society of Mechanical Engineers (ASME) Code Section XI,1989 Edition.

As part of the update to the current ASME Code, GPC identified certain Code-required inspectionsjudged to be impractical. Consequently, GPC requests that the Nuclear

' Regulatory Commission (NRC) grant the enclosed relief requests. The requested relief does not adversely affect public health and safety.

Georgia Power Company personnel are prepared to meet with NRC staff to provide additional information if required.

Sincerely, Q HL/Z_9, hJ. T. Beckham, Jr. (/

IFl./eb

Enclosure:

Edwin I. Hatch Nuclear Plant Units 1 and 2 Third 10-Year Interval Inservice Inspection Program cc: (See next page.)

9510190290 951017 I

l- /N I l PDR ADOCK 05000321 - l l 0 - - .PDR t 1

r, , s .

' lGeorgiaPowerd

, -U.S; Nuclear Regulatory Commission' Page 2 October 17, 1995 t cc: Georgia Power Company

. Mr. It L. Sumner, Nuclear Plant General Manager NORMS US. Nuclear Regulatorv Commission. Washington. D.C Mr. K. Jabbour, Licensing Project Manager - Hatch

- U.S.' Nuclear Regulatory Commission. Washington. D.C.

Mr. S. D. Ebneter, Regional Administrator

' Mr. B. L. Holbrook, Senior Resident Inspector - Hatch  ;

I l

l l

l l

IIL-5045'

>-  ;