HL-5023, Forwards Ei Hatch Nuclear Plant IST Program, for Third Interval

From kanterella
Jump to navigation Jump to search
Forwards Ei Hatch Nuclear Plant IST Program, for Third Interval
ML20092H639
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/15/1995
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092H641 List:
References
HL-5023, NUDOCS 9509210122
Download: ML20092H639 (2)


Text

y e b  !

Ggprela Power Company 1 40 inverness Contir Parkway Post Office Box 1205 Birmingham, Alabama 35201 Telephone 205 877-7279 V Pres d n $ clear Hatch Project te saurryn skrinc systarn September 15, 1995 Docket Nos. 50-321 HL-5023 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Edwin I. Hatch Nuclear Plant 7hirdIntervalISTProgram Umlate Submittal Gentlemen:

Pursuant to the requirements of 10CFR50.55a(f)(5)(i), Georgia Power Company (GPC) submits herein an updated ten-year inservice testing (IST) program for Hatch Nuclear Plant Units 1 and 2. The updated ten-year IST program was written to the requirements of the ASME OM Code 1990 Edition for pump and valve testing, with the exception of safety relief valves. Safety relief valve testing is written to the requirements of the ASME OM Code 1995 Edition (See Relief Request RR-G-1).

GPC requests that NRC grant the relief requests included in the attached updated IST program document for Hatch Units 1 & 2 in accordance with 10 CFR 50.55a(f)(6)(i).

Relief requested does not adversely affect public health and safety.

GPC also requests by this letter that interim relief be granted for the IST program update for Hatch Units 1 & 2 in the event that final review and approval of the enclosed document is not provided by the effective date of the update (i.e., January 1,1996).

Should the NRC staff desire additional information, GPC personnel are prepared to meet with NRC personnelif needed.

Should you have any questions in this regard, please contact this office.

Sincerely, i

I ,.

C" J. T. Beckham, Jr.

1 IFR/eb .

Enclosure:

Hatch Units I and 2 IST Program Update Document )

cc: (See next page.) 4 I  !

-c 9509210122 950915 i A AL h$g PDR ADOCK 05000321 u _ _ _ fDa 1

1

\

I

,: .- i*f LGeorgiaPowerI U.S. Nuclear Regulatory Commission Page 2 September'15, 1995' cc: Georgia Power Commmy Mr. H. L. Sumner, Jr., Nuclear Plant General Manager. ,

NORMS U. S. Nuclear Regulatory Commission. Washineton. D. C.

Mr. K. Jabbour, Licensing Project Manager - Hatch  ;

U. S. N' uclear Regulatorv Commission. Region H Mr. S. D. Ebneter, Regional Administrator [

Mr. B. L. Holbrook, Senior Resident Inspector - Hatch i i

I l

-