HL-1811, Requests That 890517 Request for Amend to Licenses DPR-57 & NPF-5,incorporating Generic Ltr 87-09 Guidance Re Sections 3.0 & 4.0,be Withdrawn.Existing TS Do Not Unduly Restrict Facility Operation

From kanterella
Jump to navigation Jump to search
Requests That 890517 Request for Amend to Licenses DPR-57 & NPF-5,incorporating Generic Ltr 87-09 Guidance Re Sections 3.0 & 4.0,be Withdrawn.Existing TS Do Not Unduly Restrict Facility Operation
ML20083B464
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/17/1991
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-87-09, GL-87-9, HL-1811, NUDOCS 9109250093
Download: ML20083B464 (2)


Text

_ __ __

cesaIv.w v y.m ei..,m.:s(ev e m ,

nam co,tc ,

  • . /s st e. i

{1< , ,

/ t ,, , m ,o m

a 1 n,.o h.m. ar. GCOIylil POWCf a - e-. , i. ,

6., P In

~

September 17, 1991 U.S. Nuclear Regulatory Commission ,

ATIN: Document Control Desk Washington, D.C. 20555 PLANT HATCH - UN11S 1, 2 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 WITHDRAWAL Of REQUEST TO ELUSE TECHNICAL SPECIf1 Cal 10M Gentlemen:

By letter dated March 17, 1989, Georgia Power Company (GPC) submitted a request to revise the Unit I and Unit 2 Technical Specifications to incorporate the provisions of Generic letter 87-09. The generic letter provided guidance to encourage a voluntary amendment request concerning the general requirements of the applicability of limiting conditions for operation and surveillance requirements in Sections 3.0 and 4.0.

Upon closer examination and discussions with the NRC, it has been concluded the existing Technical Specifications do not unduly restrict facility operation when conformance to the action requirements provides an acceptable level of safety, and unnecessary shutdowns are not caused when surveillance intervals are inadvertently exceeded, further expenditure of GPC and NRC resources in pursuit of this amendment request appears to be of limited benefit.

Based on the above considerations, we respectfully request that our March 17, 1989 submittal be withdrawn.

If you have any questions in this regard, please call this office.

Sincerely, 0 2/$wl/M ,

[J.T.Lockham,Jr.

JK8/cr Enclosure cc: (See next page.)

9109250093 910917 ,t0 PDR ADOCK O$000321 P PDR \

t

f Gei)lgiillbwerkh U.S. Nuclear Regulatory Cuvnission September 17, 1991 Page Two cc: Georaia Power Company Mr. H. L. Sumner, General Manager - Nuclear Plant NORMS V.S. Nuclear ReaqLatory Commission._Washinoton. D.C.

Mr. K. Jabbour, Licensing Project Manager - Hatch U.3. Nuclear Reo latory Commission. Ragion 11 Mr. S. D. Lbnete Regional Administrator Mr. L. D. Wert, t.aior Resident inspector - Hatch S141c_qLGeorgia Mr. J. D. lanner, Commissioner - Department of Natural Resources 7tJO ? ?$