CY-09-005, Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.75
ML090830192 | |
Person / Time | |
---|---|
Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
Issue date: | 03/16/2009 |
From: | Pizzella C Connecticut Yankee Atomic Power Co |
To: | Document Control Desk, NRC/FSME |
References | |
CY-09-005 | |
Download: ML090830192 (5) | |
Similar Documents at Haddam Neck | |
---|---|
Category:Decommissioning Funding Plan DKTs 30
MONTHYEARCY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023
[Table view]Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML22350A0962023-01-26026 January 2023 Enclosure Final Ea/Fonsi for 2018 and 2021 Updated Decommissioning Funding Plans Submitted in Accordance with 10 CFR 72.30(c) for Haddam Neck Plant ISFSI CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-16-011, ISFSI - Decommissioning Funding Assurance Status Report2016-03-0909 March 2016 ISFSI - Decommissioning Funding Assurance Status Report CY-15-042, ISFSI - Three-Year Update to the Decommissioning Funding Plan2015-12-14014 December 2015 ISFSI - Three-Year Update to the Decommissioning Funding Plan CY-15-007, Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report2015-03-0303 March 2015 Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report CY-14-011, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2014-03-11011 March 2014 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-13-018, Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2013-03-25025 March 2013 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-12-064, Kces 2012-700, Rev. 0, Decommissioning Study of the Connecticut Yankee Independent Spent Fuel Storage Installation.2012-12-17017 December 2012 Kces 2012-700, Rev. 0, Decommissioning Study of the Connecticut Yankee Independent Spent Fuel Storage Installation. CY-10-005, Decommissioning Funding Assurance Status Report2010-03-0909 March 2010 Decommissioning Funding Assurance Status Report CY-09-005, Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.752009-03-16016 March 2009 Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.75 CY-04-033, Decommissioning Funding Assurance2004-03-31031 March 2004 Decommissioning Funding Assurance CY-03-040, Decommissioning Funding Assurance2003-03-31031 March 2003 Decommissioning Funding Assurance 2023-03-06 Category:40 MONTHYEARCY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023
[Table view]Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML22350A0962023-01-26026 January 2023 Enclosure Final Ea/Fonsi for 2018 and 2021 Updated Decommissioning Funding Plans Submitted in Accordance with 10 CFR 72.30(c) for Haddam Neck Plant ISFSI CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-16-011, ISFSI - Decommissioning Funding Assurance Status Report2016-03-0909 March 2016 ISFSI - Decommissioning Funding Assurance Status Report CY-16-002, ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report2016-01-14014 January 2016 ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report CY-15-042, ISFSI - Three-Year Update to the Decommissioning Funding Plan2015-12-14014 December 2015 ISFSI - Three-Year Update to the Decommissioning Funding Plan CY-15-007, Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report2015-03-0303 March 2015 Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report CY-14-011, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2014-03-11011 March 2014 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-13-018, Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2013-03-25025 March 2013 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-12-064, Kces 2012-700, Rev. 0, Decommissioning Study of the Connecticut Yankee Independent Spent Fuel Storage Installation.2012-12-17017 December 2012 Kces 2012-700, Rev. 0, Decommissioning Study of the Connecticut Yankee Independent Spent Fuel Storage Installation. CY-10-005, Decommissioning Funding Assurance Status Report2010-03-0909 March 2010 Decommissioning Funding Assurance Status Report CY-09-005, Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.752009-03-16016 March 2009 Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML0731205862006-04-21021 April 2006 Orise Confirmatory Survey Plan Date 4/21/06 for Haddam Neck (Cy) CY-04-168, Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.20022004-09-16016 September 2004 Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.2002 CY-04-115, Update of License Termination Plan - Revision 22004-08-30030 August 2004 Update of License Termination Plan - Revision 2 CY-04-033, Decommissioning Funding Assurance2004-03-31031 March 2004 Decommissioning Funding Assurance CY-03-040, Decommissioning Funding Assurance2003-03-31031 March 2003 Decommissioning Funding Assurance 2023-03-06 Category:50 MONTHYEARCY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023
[Table view]Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML22350A0962023-01-26026 January 2023 Enclosure Final Ea/Fonsi for 2018 and 2021 Updated Decommissioning Funding Plans Submitted in Accordance with 10 CFR 72.30(c) for Haddam Neck Plant ISFSI CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-16-011, ISFSI - Decommissioning Funding Assurance Status Report2016-03-0909 March 2016 ISFSI - Decommissioning Funding Assurance Status Report CY-16-002, ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report2016-01-14014 January 2016 ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report CY-15-042, ISFSI - Three-Year Update to the Decommissioning Funding Plan2015-12-14014 December 2015 ISFSI - Three-Year Update to the Decommissioning Funding Plan CY-15-007, Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report2015-03-0303 March 2015 Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report CY-14-011, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2014-03-11011 March 2014 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-13-018, Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2013-03-25025 March 2013 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-12-064, Kces 2012-700, Rev. 0, Decommissioning Study of the Connecticut Yankee Independent Spent Fuel Storage Installation.2012-12-17017 December 2012 Kces 2012-700, Rev. 0, Decommissioning Study of the Connecticut Yankee Independent Spent Fuel Storage Installation. CY-10-005, Decommissioning Funding Assurance Status Report2010-03-0909 March 2010 Decommissioning Funding Assurance Status Report CY-09-005, Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.752009-03-16016 March 2009 Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML0731205862006-04-21021 April 2006 Orise Confirmatory Survey Plan Date 4/21/06 for Haddam Neck (Cy) CY-04-168, Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.20022004-09-16016 September 2004 Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.2002 CY-04-115, Update of License Termination Plan - Revision 22004-08-30030 August 2004 Update of License Termination Plan - Revision 2 CY-04-033, Decommissioning Funding Assurance2004-03-31031 March 2004 Decommissioning Funding Assurance CY-03-040, Decommissioning Funding Assurance2003-03-31031 March 2003 Decommissioning Funding Assurance 2023-03-06 Category:70 MONTHYEARCY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023
[Table view]Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML22350A0962023-01-26026 January 2023 Enclosure Final Ea/Fonsi for 2018 and 2021 Updated Decommissioning Funding Plans Submitted in Accordance with 10 CFR 72.30(c) for Haddam Neck Plant ISFSI CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-16-011, ISFSI - Decommissioning Funding Assurance Status Report2016-03-0909 March 2016 ISFSI - Decommissioning Funding Assurance Status Report CY-16-002, ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report2016-01-14014 January 2016 ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report CY-15-042, ISFSI - Three-Year Update to the Decommissioning Funding Plan2015-12-14014 December 2015 ISFSI - Three-Year Update to the Decommissioning Funding Plan CY-15-007, Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report2015-03-0303 March 2015 Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report CY-14-011, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2014-03-11011 March 2014 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-13-018, Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2013-03-25025 March 2013 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-12-064, Kces 2012-700, Rev. 0, Decommissioning Study of the Connecticut Yankee Independent Spent Fuel Storage Installation.2012-12-17017 December 2012 Kces 2012-700, Rev. 0, Decommissioning Study of the Connecticut Yankee Independent Spent Fuel Storage Installation. CY-10-005, Decommissioning Funding Assurance Status Report2010-03-0909 March 2010 Decommissioning Funding Assurance Status Report CY-09-005, Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.752009-03-16016 March 2009 Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML0731205862006-04-21021 April 2006 Orise Confirmatory Survey Plan Date 4/21/06 for Haddam Neck (Cy) CY-04-168, Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.20022004-09-16016 September 2004 Request for Approval of Proposed Procedures in Accordance with 10 CFR 20.2002 CY-04-115, Update of License Termination Plan - Revision 22004-08-30030 August 2004 Update of License Termination Plan - Revision 2 CY-04-033, Decommissioning Funding Assurance2004-03-31031 March 2004 Decommissioning Funding Assurance CY-03-040, Decommissioning Funding Assurance2003-03-31031 March 2003 Decommissioning Funding Assurance 2023-03-06 Category:Letter type:CY MONTHYEARCY-23-014, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2023-12-0404 December 2023
[Table view]Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-23-003, Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Nuclear Liability Insurance Coverage CY-23-004, Independent Spent Fuel Storage Installation, Property Insurance Coverage2023-01-17017 January 2023 Independent Spent Fuel Storage Installation, Property Insurance Coverage CY-23-001, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments CY-23-002, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2023-01-0505 January 2023 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments CY-22-012, Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2022-08-0303 August 2022 Independent Spent Fuel Storage Installation, Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-22-010, Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager2022-05-25025 May 2022 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation, Formal Announcement of New ISFSI Manager CY-22-006, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 20212022-04-25025 April 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Offsite Dose Calculation Manual for 2021 CY-22-003, and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2022-03-14014 March 2022 and Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-22-002, Independent Spent Fuel Storage Installation - Property Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-22-001, Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage2022-01-20020 January 2022 Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage CY-21-015, Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-10010 December 2021 Independent Spent Fuel Storage Installation, Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-21-013, Biennial Update to the Haddam Neck Plant License Termination Plan2021-12-0101 December 2021 Biennial Update to the Haddam Neck Plant License Termination Plan CY-21-011, Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI2021-12-0101 December 2021 Biennial Update of the CYAPCO Quality Assurance Program for the Haddam Neck ISFSI CY-21-014, Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration2021-11-18018 November 2021 Independent Spent Fuel Storage Installation - Adoption of Amendment 8 of NAC-MPC Certificate of Compliance No. 72-1025 and Canister Registration CY-21-005, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-004, Independent Spent Fuel Storage Installation - Property Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-21-003, Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage2021-01-27027 January 2021 Independent Spent Fuel Storage Installation Nuclear Liability Insurance Coverage CY-20-011, Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement2020-05-14014 May 2020 Independent Spent Fuel Storage Installation - Request for a Temporary Exemption from 10 CFR 73, Appendix B, Section Le and 10 CFR 73.55(r) Annual Physical Requalification Requirement CY-20-007, Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager2020-03-31031 March 2020 Independent Spent Fuel Storage Installation - Formal Announcement of New Tsfst Manager CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-20-002, Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 20202020-01-22022 January 2020 Independent Spent Fuel Storage Installation, Letter Notifying NRC the Amount of Property Insurance Coverage in Force for 2020 CY-19-014, Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return2019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of ISFSI Manager'S Return CY-19-012, Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report2019-04-23023 April 2019 Independent Spent Fuel Storage Installation - 2018 Individual Monitoring NRC Form 5 Report CY-18-021, Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-12-10010 December 2018 Connecticut Yankee Atomic Power Company Haddam Neck Plant Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan CY-18-005, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-17-021, Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager2017-09-0505 September 2017 Independent Spent Fuel Storage Installation Formal Announcement of Change in HNP ISFSI Manager CY-17-010, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2017-03-0909 March 2017 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-17-005, Independent Spent Fuel Storage Installation - Property Insurance Coverage2017-02-28028 February 2017 Independent Spent Fuel Storage Installation - Property Insurance Coverage CY-17-004, ISFSI - Nuclear Liability Insurance Coverage2017-02-28028 February 2017 ISFSI - Nuclear Liability Insurance Coverage CY-17-007, Independent Spent Fuel Storage Installation - Revision 6 to Haddam Neck Plant Post-Shutdown Decommissioning Activities Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Revision 6 to Haddam Neck Plant Post-Shutdown Decommissioning Activities Report CY-17-001, ISFSI - Notification of Changes to the Decommissioning Schedule, Per 10 CFR 50.82(a)(7)2017-01-0505 January 2017 ISFSI - Notification of Changes to the Decommissioning Schedule, Per 10 CFR 50.82(a)(7) CY-17-002, Independent Spent Fuel Storage Installation2017-01-0505 January 2017 Independent Spent Fuel Storage Installation CY-17-003, ISFSI - Report of 10 CFR 50.59 Changes, Tests, and Experiments for 01/01/1995 - 12/31/20162017-01-0505 January 2017 ISFSI - Report of 10 CFR 50.59 Changes, Tests, and Experiments for 01/01/1995 - 12/31/2016 CY-16-035, Independent Spent Fuel Storage Installation - Formal Announcement of Change in HNP ISFSI Manager2016-12-15015 December 2016 Independent Spent Fuel Storage Installation - Formal Announcement of Change in HNP ISFSI Manager CY-16-012, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2016-03-23023 March 2016 ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-16-011, ISFSI - Decommissioning Funding Assurance Status Report2016-03-0909 March 2016 ISFSI - Decommissioning Funding Assurance Status Report CY-16-004, Independent Spent Fuel Storage Installation, Submittal of Property Insurance Coverage2016-02-29029 February 2016 Independent Spent Fuel Storage Installation, Submittal of Property Insurance Coverage CY-16-006, ISFSI - Annual Notification of Foreign Ownership, Control, or Influence (FOCI) Status2016-02-0202 February 2016 ISFSI - Annual Notification of Foreign Ownership, Control, or Influence (FOCI) Status CY-16-002, ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report2016-01-14014 January 2016 ISFSI - Revision 5 of the Post-Shutdown Decommissioning Activities Report CY-15-042, ISFSI - Three-Year Update to the Decommissioning Funding Plan2015-12-14014 December 2015 ISFSI - Three-Year Update to the Decommissioning Funding Plan CY-15-035, Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report2015-12-0101 December 2015 Redacted Haddam Neck ISFSI - Biennial Update to the Updated Final Safety Analysis Report CY-15-043, ISFSI - Revision 13 to the Emergency Plan2015-12-0101 December 2015 ISFSI - Revision 13 to the Emergency Plan CY-15-037, ISFSI - Biennial Update of the Quality Assurance Program2015-12-0101 December 2015 ISFSI - Biennial Update of the Quality Assurance Program 2023-03-06 Category:Status Report MONTHYEARCY-23-006, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2023-03-0606 March 2023
[Table view]Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-23-007, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2023-03-0606 March 2023 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-22-004, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2022-03-14014 March 2022 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-21-006, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2021-03-0202 March 2021 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-20-004, Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste2020-03-17017 March 2020 Independent Spent Fuel Storage Installation - Funding Report for Managing Irradiated Fuel and GTCC Waste CY-20-003, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2020-03-12012 March 2020 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-18-004, Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report CY-18-005, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2018-03-0505 March 2018 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-17-010, Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2017-03-0909 March 2017 Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-16-012, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2016-03-23023 March 2016 ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-15-008, ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste2015-02-10010 February 2015 ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-14-012, Connecticut Yankee Atomic Power Company - Haddam Neck Plant Independent Spent Fuel Storage Installation2014-03-11011 March 2014 Connecticut Yankee Atomic Power Company - Haddam Neck Plant Independent Spent Fuel Storage Installation CY-13-047, of the Haddam Neck Plant Post-Shutdown Decommissioning Activities Report2013-12-0202 December 2013 of the Haddam Neck Plant Post-Shutdown Decommissioning Activities Report CY-13-018, Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report2013-03-25025 March 2013 Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report CY-13-017, Connecticut Yankee, Haddam Neck Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste2013-03-20020 March 2013 Connecticut Yankee, Haddam Neck Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste CY-09-005, Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.752009-03-16016 March 2009 Submittal of Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML0720803912007-07-12012 July 2007 Revision 2 to Final Status Survey Final Report Phase V, Book 1 of 13 CY-07-106, Revision 0 to Final Status Survey, Final Report Phase V, Appendix A12, Survey Unit Release Record, Book 13 of 13; Including Covers for Books 3 - 12 of 132007-07-12012 July 2007 Revision 0 to Final Status Survey, Final Report Phase V, Appendix A12, Survey Unit Release Record, Book 13 of 13; Including Covers for Books 3 - 12 of 13 ML0720803962007-07-0202 July 2007 Revision 0 to Final Status Survey, Final Report Phase V, Appendix A1 Survey Unit Release Record, 9520-0001, Southwest Site Storage Area, Book 2 of 13 ML0731303912007-06-30030 June 2007 Phase VI and VII Final Status Survey Instruction for Removal/Insertion of Pages CY-07-104, Revision 1 to the Final Status Survey Reports for Phase VI and VII2007-06-28028 June 2007 Revision 1 to the Final Status Survey Reports for Phase VI and VII ML0717304472007-05-31031 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 9 of 19 - Appendix A8, Survey Unit Release Record 9312-0006, Primary Auxiliary Building (Pab) (Former Radiologically Controlled Area) CY-07-089, Final Status Survey Final Report - Phase VII - Chapter 102007-05-29029 May 2007 Final Status Survey Final Report - Phase VII - Chapter 10 CY-07-077, Final Status Survey (FSS) Final Report - Phase VII2007-05-17017 May 2007 Final Status Survey (FSS) Final Report - Phase VII ML0717304312007-05-10010 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 1 of 19 ML0717304642007-05-0202 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 17 of 19 - Appendix A16, Survey Unit Release Record 9801-0000, Subsurface Soils in the Radiologically Controlled Area ML0717304712007-05-0202 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 18 of 19 - Appendix A17, Survey Unit Release Record 9802-0000, Subsurface Area Associated with the West Industrial Site Grounds (Non-Protected Area) ML0717304782007-05-0101 May 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 19 of 19 - Appendix A18, Survey Unit Release Record 9803-0000, Subsurface Area Associated with North Grounds (Non-Protected Area) ML0717304902007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 15 of 19 - Appendix A14, Survey Unit Release Record 9514-0000, West Primary Parking Lot ML0717304812007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 12 of 19 - Appendix A11, Survey Unit Release Record 9312-0009, Former Radiologically Controlled Area East Trench North ML0717304852007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 13 of 19 - Appendix A12, Survey Unit Release Record 9312-0010, Radiologically Controlled Area East Trench South / Mwst A&B ML0717304492007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 4 of 19 - Appendix A3, Survey Unit Release Record 9312-0001, Containment (Former Radiologically Controlled Area) ML0717304362007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 2 of 19 - Appendix A1, Survey Unit Release Record 93 02-0000, Northwest Protected Area Grounds ML0717304402007-04-27027 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 6 of 19 - Appendix A5, Survey Unit Release Record 9312-0003, Southwest 115Kv Switchyard (Former Radiologically Controlled Area) ML0717304412007-04-15015 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 3 of 19 - Appendix A2, Survey Unit Release Record 9312-0005, Former Radiologically Controlled Area Tank Farm ML0717304522007-04-15015 April 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 5 of 19 - Appendix A4, Survey Unit Release Record 9312-0003, Southwest 115k V Switchyard (Radiologically Controlled Area) ML0717304442007-03-30030 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 8 of 19 - Appendix A7, Survey Unit Release Record 9312-0005, Former Radiologically Controlled Area Tank Farm ML0717304562007-03-23023 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 16 of 19 - Appendix A15, Survey Unit Release Record 9514-0001, East Primary Parking Lot ML0717304882007-03-16016 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 14 of 19 - Appendix A13, Survey Unit Release Record 9313-0000, Central Site Grounds ML0717304422007-03-0707 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 7 of 19 - CYAPCO Final Status Survey Release Record Former Radiologically Controlled Area North of the Primary Auxillary Building and Tank Farm, Survey Unit 9312-0004 ML0717304802007-03-0303 March 2007 Final Status Survey (FSS) Final Report - Phase VII - Chapter 11 of 19 - Appendix A10, Survey Unit Release Record 9312-0008, 115 Kv West Side Gw Treatment Facility (Former Radiologically Controlled Area) ML0731304392007-02-28028 February 2007 Final Status Survey, Final Report Phase VI, Appendix A16, Survey Unit Release Record 9539-0002, ISFSI Haul Road ML0731304302007-02-28028 February 2007 Final Status Survey, Final Report Phase VI, Appendix A15, Survey Unit Release Record 9539-0001, ISFSI Haul Road ML0731304232007-02-28028 February 2007 Final Status Survey, Final Report Phase VI, Appendix A6, Survey Unit Release Record 9522-0001, Southeast Site Grounds (Non-Protected Area) ML0707405982007-02-13013 February 2007 Final Status Survey Final Report Phase VI - Appendix A4, Survey Unit Released Record 9506-0000, North Site Grounds, Book 5 of 18 ML0707405432007-02-12012 February 2007 Final Status Survey Final Report Phase VI - Book 1 of 18 ML0707405892007-02-0505 February 2007 Final Status Survey Final Report Phase VI - Appendix A3, Survey Unit Release Record 9504-0000, Bypass Road and Secondary Parking Lot, Book 4 of 18 ML0707406722007-02-0303 February 2007 Final Status Survey Final Report Phase VI - Appendix A13, Survey Unit Release Record 9527-0005, East Mountain Side, Book 14 of 18 ML0707406752007-02-0101 February 2007 Final Status Survey Final Report Phase VI - Appendix A14, Survey Unit Release Record 9527-0006, East Mountain Side, Book 15 of 18 ML0707406102007-02-0101 February 2007 Final Status Survey Final Report Phase VI - Appendix A5, Survey Unit Release Record 9512-0000, Northwest Site Grounds (Non-Protected Area), Book 6 of 18 2023-03-06 |
Text
7J CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD e EAST HAMPTON, CT 06424-3099 March 16, 2009 CY-09-005 Docket No. 50-213 Re: 10 CFR 50.75(f)
U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Reference:
(a) License No. DPR-61 (Docket No. 50-213)
(b) Letter: CYAPCO to USNRC; Haddam Neck Plant Certifications Of Permanent Cessation of Power Operation and that Fuel has been Permanently Removed From the Reactor, dated December 5, 1996 (c) Letter: USNRC to Wayne Norton; Haddam Neck Plant - Release of Land from Part 50 License, dated November 26, 2007 (d) USNRC Regulatory Issue Summary (RIS) 2001-07, REV 1
Subject:
Decommissioning Funding Assurance Status Report- 10CFR 50.75 Gentlemen:
In reference (b) Connecticut Yankee Atomic Power Company (CYAPCO) informed the USNRC that the Board of Directors of CYAPCO had decided to permanently cease operations at the Haddam Neck Plant and that fuel had been permanently removed from the reactor. In accordance with 10CFR 50.82(a)(2) the certifications in the letter modified the CYAPCO license to permanently withdraw CYAPCO's authority to operate the reactor. In 1996, CYAPCO commenced decommissioning the power plant. In Reference (c), the NRC amended the CYAPCO license, releasing most of the formerly licensed land for unrestricted use, shrinking the licensed land to the ISFSI only.
In accordance with the requirements of 10 CFR 50.75, direction provided by the NRC staff on March 5, 2008 and recent RIS 2001-07, Rev 1 regulatory clarification, CYAPCO hereby submits its report on the status of decommissioning funding for the year ending December 31, 2008 for CYAPCO. Attachment 1 provides the requested information.
If you should have any questions, please contact me at (860) 267-6426 x304.
Sincerely, Carla M. Pizzella Date Treasurer
USNRC CY-09-005/Page 2 - "NRC Decommissioning Funding Status Report" cc: Mr. E. Cobey, Chief, Decommissioning Branch, Region I Mr. S. J. Collins, NRC Regional Administrator, Region 1 Mr. J. Goshen, NRC Project Manager, Haddam Neck Plant Mr. E. L. Wilds, Jr., Director, CT DEP, Radiation Division
CY-09-005 Attachment 1 NRC Decommissioning Funding Status Report March 2009
USNRC CY-09-005/Attachment 1/Page 1 Attachment 1 NRC Decommissioning Funding Status Report Connecticut Yankee - Haddam Neck Plant (Status as of 12131/08)
- 1. The amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c) $152.9 million1 2
- 2. The amount accumulated at the end of the calendaryear $109.0 million preceding the date of the report for items included in 10 CFR 50.75 (e)(1)(i).
3
- 3. Schedule of the annual amounts remainingto be collected $34.7 million Including amounts beyond those requiredin 10 CFR 50. 75(e)(1)(i) (2009)
$39.7 million (2010)
$40.9 million (2011-2014)
$43.7 million (2015)
- 4. The assumptions used regardingescalationof the decommissioning cost estimate, rates of earningson decommissioningfunds, and rates of other factors used in funding projectionsare:
Annual escalation rate 2.5%
1Since the original power plant has been decommissioned and the license amended, the only remaining decommissioning as defined by the NRC in 10 CFR 50.75 is decontamination and dismantlement of the ISFSI once the fuel is removed.
The Site-Specific Cost Estimate for future costs beyond 2008 is $152.9 million (in 2008 dollars) and includes the current estimate for spent fuel management costs, i.e. Long-term ISFSI operations through 2023 ($145.4 million) and D&D of the ISFSI ($7.5 million).
2 This accrued market value balance includes amounts in the Decommissioning Trust for all decommissioning costs including site restoration and long-term spent fuel storage as well as decommissioning as defined in 10 CFR 50.75. Since the original power plant has been decommissioned and the license amended, the only remaining decommissioning is decontamination and dismantlement of the ISFSI (estimated at $5.3 million of the current market value balance) once the fuel is removed, 3 CYAPCO has revised its annual decommissioning collection rates effective October 1, 2008 continuing through 2015, based on the decommissioning cost reConciliation/PBOP/true-up rate filing and settlement submitted with the FERC on July 31, 2008 and accepted on September 10, 2008.
USNRC CY-09-005/Attachment 1/Page 2 Attachment 1 NRC Decommissioning Funding Status Report Connecticut Yankee - Haddam Neck Plant (Status as of 12/31/08)
Annual after-tax earnings rate on decommissioning trust funds 5.4% (reduced in last few years)
Otherfactors assumed None
- 5. Any contractsupon which the licensee is relying pursuantto 10 CFR 50. 75(e)(1)(ii)(A)
CYAPCO is currently collecting funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations ofthe purchasers for the costs of the HNP Including, decommissioning costs. Such contracts have been filed with FERC.
- 6. Any modifications to a licensee's current method of providing financial assuranceoccurringsince the last submitted report. None
- 7. Any materialchanges to trust agreements. None