CY-15-007, Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation (ISFSI) - Decommissioning Funding Assurance Status Report
ML15128A374
Person / Time
Site: Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/03/2015
From: Pizzella C
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
CY-15-007
Download: ML15128A374 (10)


Text

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT 06424-3099 March 3, 2015 CY- 15-007 10 CFR 50.4 10 CFR 50.75(f)(1) and (2) 10 CFR 50.82(a)(8)(v) and (vi)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 Connecticut Yankee Atomic Power Company Haddam NeckPlant Independent Spent Fuel Storage Installation NRC License Nos. DPR-61 and SFGL-21 (NRC Docket Nos. 50-213 and 72-39)

Subject:

Decommissioning Funding Assurance Status Report On December 5, 1996, Connecticut Yankee Atomic Power Company (CYAPCO) informed the USNRC that the Board of Directors of CYAPCO had decided to permanently cease operations at the Haddam Neck Plant and that fuel had been permanently removed from the reactor (Reference 1). In accordance with 10 CFR 50.82(a)(2), the certifications in the letter modified the CYAPCO license to permanently withdraw CYAPCO's authority to operate the reactor. In 1996, CYAPCO commenced decommissioning the power plant. On November 26, 2007, the NRC released most of the formerly licensed land for unrestricted use, shrinking the licensed land to the Independent Spent Fuel Storage Installation (ISFSI) only (Reference 2). The only decommissioning activities that remain are those associated with the decommissioning of the Haddam Neck Plant ISFSI, which is currently scheduled to be completed in calendar year 2032, after the Department of Energy (DOE) removes the irradiated fuel and Greater than Class C (GTCC) waste.

In Attachment 1, CYAPCO provides the attached Decommissioning Funding Assurance Status Report for the Haddam Neck Plant ISFSI to comply with 10 CFR 50.75(f)(1) and (2) and 10 CFR 50.82(a)(8)(v) and (vi).

This letter contains no regulatory commitments.

If you have any questions regarding this letter, please do not hesitate to contact me at (860) 267-6426 x304.

Pspect fully, Carla M. Pizzella *"*

Vice President, Chief Financial Officer, and Treasurer

C Connecticut Yankee Atomic Power Company CY-15-007\March 3, 2015\Page 2

Attachment:

1. Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2014)

References:

1. CYAPCO letter to USNRC, "Haddam Neck Plant Certifications of Permanent Cessation of Power Operation and that Fuel Has Been Permanently Removed from the Reactor Vessel,"

dated December 5, 1996

2. USNRC letter to CYAPCO, "Haddam Neck Plant - Release of Land from Part 50 License,"

dated November 26, 2007 cc: D. H. Dorman, NRC Region I Administrator M. S. Ferdas, Chief, Decommissioning Branch, NRC, Region I J. Goshen, NRC Project Manager Director, CT DEEP, Radiation Division I I

ATTACHMENT 1 TO CY-15-007 DECOMMISSIONING FUNDING STATUS REPORT FOR THE HADDAM NECK PLANT INDEPENDENT SPENT FUEL STORAGE INSTALLATION (STATUS AS OF 12/31/2014)

Attachment 1 to CY-15-007 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2014) 10 CFR Requirement Response Comment 10 CFR 50.75(f)(1) and (2) Requirements

1. The amount of decommissioning -$18.6 million 10 CFR 50.75(c) provides the calculation basis for determining minimum amounts of funds estimated to be required (in 2014 funding required to demonstrate reasonable assurance of funds for decommissioning.

pursuant to 10 CFR 50.75 (b) and dollars) However, the methodology does not take into consideration work that has already been (c) commenced decommissioning the power plant. On November 26, 2007, the NRC released most of the formerly licensed land for unrestricted use, shrinking the licensed land to only those associated with the Haddam Neck Plant Independent Spent Fuel Storage Installation (ISFSI). Thus, the only decommissioning activities and decommissioning funding requirements that remain are those associated with the decommissioning of the Haddam Neck Plant ISFSI, which is currently scheduled to be completed in calendar year 2032, after the Department of Energy (DOE) removes the irradiated fuel and Greater than Class C (GTCC) waste.

On December 17, 2012, Connecticut Yankee Atomic Power Company (CYAPCO) provided a decommissioning funding plan for the Haddam Neck Plant ISFSI in accordance with 10 CFR 72.30(b)(2) that included a revised Decommissioning Cost Estimate (DCE) for the Haddam Neck Plant ISFSI. The cost estimate has been escalated to 2014 dollars.

2. The amount accumulated at the -$23.9 million CYAPCO has established an account within its Nuclear Decommissioning Trust (NDT) end of the calendar year preceding (as of entitled '"ISFSI Radiological Decom" that segregates the funds for radiological the date of the report for items 12/31/14) decommissioning of the ISFSI from the larger balance of funds for ongoing included in 10 CFR 50.75 management of irradiated fuel and GTCC waste held in the NDT. This market balance (e)(1)(i) as of 12/31/14 only reflects the funds in the segregated account for radiological decommissioning of the ISFSI.
3. Schedule of the annual amounts $0 No additional comments.

remaining to be collected Including amounts beyond those required in 10 CFR 50.75(e)(1)(i)

Page 1 of 7

-- Attachment I to CY-15-007 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2014) 10 CFR Requirement Response Comment

  1. Years to collect N/A "
4. The assumptions used regarding No additional comments.

escalation of the decommissioning cost estimate, rates of earnings on decommissioning funds, and rates of other factors used in funding projections are:

Annual escalation rate 2.5%

Annual after-tax earnings rate on 4.5%

decommissioning trust funds Other factors assumed None

5. Any contracts upon which the Yes CYAPCO may collect funds through its power contracts and amendatory agreements licensee is relying pursuant to under FERC regulation. The power contracts and the amendatory agreements specify 10 CFR 50.75(e)(1)(ii)(A) the obligations of the purchasers for the costs of CYAPCO, including decommissioning costs. Such contracts have been filed with FERC.
6. Any modifications to a licensee's None No additional comments.

current method of providing financial assurance occurring since the last submitted report.

7. Any material changes to trust None No additional comments.

agreements.

Page 2 of 7

Attachment 1 to CY-15-007 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status a2 of 12/31/2fl14) 10 CFR Requirement Response Comment 10 CFR 50.82(a)(8)(v) (A) through (D) Requirements

1. The amount spent on - - In 1996, CYAPCO-commenced decommissioning the power plant. On November 26, decommissioning, both: 2007, the NRC released most of the formerly licensed land for unrestricted use, shrinking the licensed land to ISFSI only. The only decommissioning activities that Cumulative $0 (Refer to remain are those associated with the decommissioning of the Haddam Neck Plant Comment) ISFSI, which is currently scheduled to be completed in calendar year 2032, after the and CDOE removes the irradiated fuel and GTCC waste.

Over the previous calendar year $0 10 CFR 50.82(a)(8)(v) became effective on December 17, 2012. At that time, the only areas that were within the control of the Operating License No. DPR-61 were those associated with the Haddam Neck Plant ISFSI. Thus, CYAPCO is only presenting the information associated with the decommissioning of the areas that remain within the control of Operating License No. DPR-61.

Presently, CYAPCO is storing irradiated fuel and GTCC waste on site until it is removed by the DOE. Decommissioning of the Haddam Neck Plant ISFSI is currently scheduled to be completed in calendar year 2032, after the DOE removes the irradiated fuel and GTCC waste. Thus, the cumulative cost spent on decommissioning the Haddam Neck Plant ISFSI is $0, and the amount spent in calendar year 2014 is $0.

2. The remaining balance of any -$23.9 million CYAPCO has established an account within its NDT entitled "ISFSI Radiological decommissioning funds. (as of Decom" that segregates the funds for radiological decommissioning of the ISFSI from 12/31/14) the larger balance of funds for ongoing management of irradiated fuel and GTCC waste held in the NDT. This market balance only reflects the funds in the segregated account for radiological decommissioning of the ISFSI.

Page 3 of 7

Attachment 1 to CY-15-007 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2014) 10 CFR Requirement Response Comment

3. The amount provided by other $0.0 million As of 12/31/14, CYAPCO's NDT account entitled "ISFSI Radiological Decom" has a financial assurance methods being balance sufficient to cover the estimated cost of the remaining radiological relied upon decommissioning of the ISFSI. However, if in the future, the balance in the account is not fully funded to cover the estimated cost of the remaining radiological decommissioning of the ISFSI, the Company has several methods of obtaining additional funds, if required, to cover projected costs.

First, CYAPCO may collect funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of CYAPCO, including decommissioning. Pursuant to these power contracts, CYAPCO has the ongoing ability to seek collections from its purchasers for additional funds that may be required to cover these costs.

Second, CYAPCO has received proceeds from the successful litigation of the first and second phases of its breach of contract damages claims against the DOE for failure to begin the removal of spent nuclear fuel (SNF) and GTCC waste from the site in 1998.

CYAPCO will continue to file claims against the DOE as long as the DOE continues to breach its contract obligations related to SNF and GTCC waste. To that end, in August, 2013 the Company filed a third round of claims against the DOE seeking damages for the years 2009 - 2012. The trial is scheduled to commence in June 2015.Each of these prospective claims will likely result in the receipt of proceeds that can be used to offset future costs, if required.

Accordingly, CYAPCO's most recent. FERC filing which was approved in June, 2013, implemented a fifteen year funding mechanism. Until the 2013 FERC filing, the Company had employed a "full funding" assumption in developing funding requirements. The fifteen year funding mechanism was put in place to incorporate the potential for the receipt of future DOE breach of contract damages as a source of funding as discussed below. If future damage recovery does not occur, the Company has the ability to apply to FERC for more funding, if necessary. The approved FERC filing Page 4 of 7

Attachment I to CY-15-007 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation

______- -(Status-as-of-1-2/-31/2014) --

10 CFR Requirement Response Comment also requires CYAPCO to provide an information filing regarding the adequacy of funding iffive years pass without receipt of damage awards from litigation with the DOE.

Third, CYAPCO expects to utilize the investment return on Decommissioning Trust assets as a funding source. The current assumed rate of investment return, after fees and taxes, is 4.5%.

4. An estimate of the costs to -$18.6 million On December 17, 2012, CYAPCO provided a decommissioning funding plan in complete decommissioning, (in 2014 accordance with 10 CFR 72.30(b)(2) that included a revised DCE for the Haddam Neck reflecting any difference between dollars) Plant ISFSI. The cost estimate has been escalated to 2014 dollars.

actual and estimated costs for work performed during the year.

5. The decommissioning criteria 10 CFR The assumptions regarding the decommissioning cost estimate are provided in the DCE upon which the estimate is based 20.1402 for the Haddam Neck Plant ISFSI provided on December 17, 2012.
6. Any modifications occurring to a None No additional comment.

licensee's current method of providing financial assurance since the last submitted report.

7. Any material changes to trust None No additional comment.

agreements or financial assurance contracts.

Page 5 of 7

Attachment 1 to CY-15-007 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation (Status as of 12/31/2014) 10 CFR 50.82(a)(8)(vi) Requirement

1. Additional financial assurance None As of 12/31/14, CYAPCO's NDT account entitled "ISFSI Radiological Decom" has a required to cover the estimate. cost balance sufficient to cover the estimated cost of the remaining radiological of completion. decommissioning of the ISFSI. However, if in the future, the balance in the account is not fully funded to cover the estimated cost of the remaining radiological decommissioning of the ISFSI, the Company has several methods of obtaining additional funds, if required, to cover projected costs.

First, CYAPCO may collect funds through its power contracts and amendatory agreements under FERC regulation. The power contracts and the amendatory agreements specify the obligations of the purchasers for the costs of CYAPCO, including decommissioning. Pursuant to these power contracts, CYAPCO has the ongoing ability to seek collections from its purchasers for additional funds that may be required to cover these costs.

Second, CYAPCO has received proceeds from the successful litigation of the first and second phases of its breach of contract damages claims against the DOE for failure to begin the removal of spent nuclear fuel (SNF) and GTCC waste from the site in 1998..

CYAPCO will continue to file claims against the DOE as long as the DOE continues to breach its contract obligations related to SNF and GTCC waste. To that end, in August, 2013 the Company filed a third round of claims against the DOE seeking damages for the years 2009 - 2012. The trial is scheduled to commence in June 2015. Each of these prospective claims will likely result in the receipt of proceeds that can be used to offset future costs, if required.

Accordingly, CYAPCO's most recent FERC filing which was approved in June, 2013, implemented a fifteen year funding mechanism. Until the 2013 FERC filing, the Company had employed a "full funding" assumption in developing funding requirements. The fifteen year funding mechanism was put in place to incorporate the potential for the receipt of future DOE breach of contract damages as a source of funding as discussed below. If future damage recovery does not occur, the Company has the ability to apply to FERC for more funding, if necessary. The approved FERC filing Page 6 of 7

Attachment 1 to CY-15-007 Decommissioning Funding Status Report for the Haddam Neck Plant Independent Spent Fuel Storage Installation

_(Status as of 12/31/2014)-

also requires CYAPCO to provide an information filing regarding the adequacy of funding if five years pass without receipt of damage awards from litigation with the DOE.

Third, CYAPCO-expects to utilize the investment return on Decommissioning Trust assets as a finding source. The current assumed rate of investment return, after fees and taxes, is 4.5%.

Page 7 of 7 b