MONTHYEARBSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999 Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 ML20217G1191999-10-0808 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months ML20217C6931999-10-0606 October 1999 Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-23023 September 1999 Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-21021 September 1999 Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 19991999-09-14014 September 1999 Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999 BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval1999-09-14014 September 1999 Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP1999-09-0808 September 1999 Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld1999-09-0202 September 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-0202 September 1999 Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1999-09-0101 September 1999 Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl ML20211K9001999-08-27027 August 1999 Forwards Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl1999-08-26026 August 1999 Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 21999-08-25025 August 1999 Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-08-25025 August 1999 Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl1999-08-25025 August 1999 Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl1999-08-20020 August 1999 Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl1999-08-13013 August 1999 Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl ML20210S9061999-08-11011 August 1999 Informs That GE Document Entitled, Addl Info Regarding 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant1999-08-11011 August 1999 Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant ML20210S9121999-08-11011 August 1999 Informs That Document NEDC-31624P,Suppl 2,Rev 6,entitled, Loss-Of-Coolant Accident Analysis Rept for Brunswick Steam Electric Plant Unit 2,Reload 13,Cycle 14 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) ML20210P8221999-08-11011 August 1999 Advises That Info Contained in Which Submitted Document,Prepared by Siemens Power Corp,EMF-2168(P) Rev 0, Marked Proprietary,Will Be Withheld from Public Disclosure, Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20210P9381999-08-10010 August 1999 Forwards SE Accepting Licensee & Suppls & 0517,which Submitted Assessment of Impact on Operation of Unit 1 with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P8911999-08-10010 August 1999 Forwards SE Authorizing Relief Requests CIP-01,02,06,07,08, 09,10,11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Requests CIP-04 & 05 Would Result in Hardship,Relief CIP-03 Not Required & CIP-11 Denied in Part BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI1999-08-0505 August 1999 Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI BSEP-99-0123, Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 21999-08-0505 August 1999 Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2 ML20210Q4581999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section to Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit List of Individuals to Take exam,30 Days Before Exam Date ML20210P2031999-08-0505 August 1999 Discusses Staff Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity for Plant,Units 1 & 2 ML20210N2041999-08-0505 August 1999 Forwards SE Accepting Response to GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46, & Suppl 1 BSEP-99-0127, Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl1999-08-0505 August 1999 Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl BSEP-99-0124, Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld1999-07-30030 July 1999 Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld ML20210G2941999-07-28028 July 1999 Discusses Public Meeting Conducted on 990720 to Present Results of Periodic Plant Performance Review for Brunswick Facility for Period of May 1997 to January 1999.List of Attendees Encl BSEP-99-0122, Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld1999-07-20020 July 1999 Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld BSEP-99-0121, Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant1999-07-19019 July 1999 Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant BSEP-99-0111, Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR1999-07-19019 July 1999 Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR ML20210E1181999-07-19019 July 1999 Forwards Insp Repts 50-324/99-04 & 50-325/99-04 on 990509- 0619.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209G1081999-07-13013 July 1999 Forwards Radiological Emergency Response Plan & Revised Epips,Including Rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26 BSEP-99-0106, Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl1999-06-28028 June 1999 Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl BSEP-99-0103, Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 11999-06-24024 June 1999 Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 1 BSEP-99-0100, Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results1999-06-23023 June 1999 Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results BSEP-99-0105, Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl1999-06-23023 June 1999 Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl ML20196H8191999-06-21021 June 1999 Informs That on 980915,Commission Suspended SALP Program for an Interim Period Until NRC Completes Review of Process for Assessing Performance at NPPs ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First BSEP-99-0091, Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-06-14014 June 1999 Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20196A8111999-06-14014 June 1999 Ack Receipt of 990401 Response to NRC Ltr Issued on 990302 Re OI Investigation to Determine Whether Former BSEP Manager Threatened to Fire Employees Who Brought Safety Concerns to Nrc.Concluded That No Violation Occurred ML20195J1971999-06-14014 June 1999 Advises That GE-NE-523-B13-01920-56,Rev 1,submitted with 990202 Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended BSEP-99-0090, Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 9905141999-06-0909 June 1999 Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 990514 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARBSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6)1999-10-19019 October 1999 Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V3511999-10-13013 October 1999 Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 BSEP-99-0114, Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl1999-10-0404 October 1999 Forwards Supplemental Biological Assessment Submitted by CP&L Providing Updated Data for 1998 & 1999. Pictures of Intake Canal at Diversion Structure During High Tide Conditions Also Encl BSEP-99-0157, Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii)1999-10-0404 October 1999 Submits Annual Rept Summarizing Effect of Changes & Errors in Accepted loss-of-coolant Accident ECCS Evaluation Models Applicable to Bsep,Units 1 & 2 IAW 10CFR50.46(a)(3)(ii) BSEP-99-0142, Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-23023 September 1999 Forwards Proprietary Updated List of Home Addresses for Individuals Licensed to Operate CP&L Bsep,Units 1 & 2. Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0158, Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-21021 September 1999 Provides Proprietary Notification of Change in Operator Status.Individual Name,Docket Number,License & Effective Date of Expiration Provided in Encl to Ltr.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0153, Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 19991999-09-14014 September 1999 Forwards Monthly Operating Repts for Brunswick Steam Electric Plant,Units 1 & 2.CP&L Is Submitting Encl Rept of Operating Statistics & SD Experience for Aug 1999 BSEP-99-0147, Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval1999-09-14014 September 1999 Forwards Response to NRC Telcon RAI Re Relief Requests RR-5, 12,13,14,22,23,24 & 25,per Inservice Insp Program for Third 10-yr Interval BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP1999-09-0808 September 1999 Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP BSEP-99-0150, Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-09-0202 September 1999 Forwards Proprietary Info Re Positive Drug Test for Operator Licensed on CP&L Bsep,Units 1 & 2,in Response to NRC .Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0149, Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld1999-09-0202 September 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Form 398 & NRC Form 396,for Operators Licensed at Plant.Proprietary Encls Withheld BSEP-99-0112, Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl1999-09-0101 September 1999 Forwards Summary of Exam Results for Feedwater Sparger & Nozzle Exams Performed During RFO13.Evaluation of Exam Results Documented in ESR 98-00333, Unit 2 Feedwater Sparger Evaluation Based on B214R1 IVVI Exam Results, Encl BSEP-99-0146, Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl1999-08-26026 August 1999 Forwards Revised EPIPs for Bsep,Units 1 & 2.List of Revised Procedures & Summary of Changes Are Encl BSEP-99-0141, Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-08-25025 August 1999 Forwards Proprietary Info Re Expiration of Operator Licenses SOP-20812-1,OP-20977-1 & OP-21217,per 10CFR50.74(b) Re Notification of Changes in Operator Status.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0148, Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 21999-08-25025 August 1999 Forwards Rev 0 to NF-908.03, Brunswick Unit 2,Cycle 14 Neutronics Startup Rept, IAW Section 13.4.2.1 of UFSAR for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-99-0130, Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl1999-08-25025 August 1999 Requests Relief from ASME Boiler & Pressure Vessel Code, Section Xi,Iaw 10CFR50.55a(g)(5)(iii) & NRC GL 90-05, Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1,2 & 3 Piping. Regulatory Commitments,Encl BSEP-99-0132, Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl1999-08-20020 August 1999 Requests Delay in Providing Update on Util Intended Actions Re GL 96-06,until 180 Days After NRC Approval of Generic Technical Basis.List of Regulatory Commitments,Encl BSEP-99-0134, Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl1999-08-13013 August 1999 Forwards Monthly Operating Repts for July 1999 for BSEP, Units 1 & 2.Revised Rept for June 1999 for Unit 2,reflecting Info on 990628 Forced Shutdown of Plant,Encl BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant1999-08-11011 August 1999 Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant BSEP-99-0127, Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl1999-08-0505 August 1999 Forwards Rev 3 to Physical Security & Safeguards Contingency Plan, for Brunswick Steam Electric Plant,Units 1 & 2.Without Encl BSEP-99-0123, Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 21999-08-0505 August 1999 Forwards Rev 54 to Radiological Emergency Response Plan (RERP) & Revised Epips,Including Re 44 to OPEP-02.1,rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26.Summary of Changes Provided in Encl 2 BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI1999-08-0505 August 1999 Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI BSEP-99-0124, Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld1999-07-30030 July 1999 Forwards Proprietary Medical Status Rept & NRC Form 396 for Individual Holding License SOP-20811-1. Proprietary Encls Withheld BSEP-99-0122, Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld1999-07-20020 July 1999 Informs That,Effective 990702,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired Because Individual Employment at BSEP Was Terminated.Proprietary Encl Containing Name,Docket & License Number Withheld BSEP-99-0111, Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR1999-07-19019 July 1999 Forwards New Affidavit Supporting Withholding of Proprietay Info Provided by GE Entitled, Addl Info Re 1.09 Cycle Specific SLMCPR for Brunswick Unit 1 Cycle 12 & Included in Util 980223 LAR BSEP-99-0121, Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant1999-07-19019 July 1999 Submits Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. Estimates That 14 Submittals Will Be Made During Fy 2000 & Nine Will Be Made During Fy 2001 for Plant ML20209G1081999-07-13013 July 1999 Forwards Radiological Emergency Response Plan & Revised Epips,Including Rev 4 to OPEP-02.1.1 & Rev 7 to OPEP-02.6.26 BSEP-99-0106, Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl1999-06-28028 June 1999 Informs That Units 1 & 2 Odcm,Spec 7.3.10, Gaseous Radwaste Treatment Sys Requires Gaseous Radwaste Treatment Sys to Be in Operation Whenever Main Condenser Air Ejector Sys Is in Operation.Special Rept Encl BSEP-99-0103, Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 11999-06-24024 June 1999 Submits follow-up Info Re Interlaboratory Comparison Program for 1998 Radiological Environ Operating Rept,Suppl 1 BSEP-99-0100, Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results1999-06-23023 June 1999 Forwards Rev 0 to Calculation 2B11-0001, Core Shroud B214R1 Structural Evaluation, Which Provides Evaluation of Unit 2 Core Shroud Insp Results BSEP-99-0105, Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl1999-06-23023 June 1999 Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl BSEP-99-0091, Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-06-14014 June 1999 Notifies That Operator Licensed on Units 1 & 2,has Been Reassigned to non-licensed Activities & Operator License Considered Expired.Proprietary Info Encl.Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0090, Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 9905141999-06-0909 June 1999 Provides Notification That Data Point D23C0315 Has Been Restored to Original Configuration During RFO on 990514 BSEP-99-0092, Informs That,Effective 990513,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired.Proprietary Encl Containing Name of Individual,Docket Number,License Mumber & Date of Expiration Encl.Proprietary Encl Withheld1999-06-0808 June 1999 Informs That,Effective 990513,NRC Operator License for Individual Licensed on BSEP Units 1 & 2,expired.Proprietary Encl Containing Name of Individual,Docket Number,License Mumber & Date of Expiration Encl.Proprietary Encl Withheld BSEP-99-0085, Forwards Proprietary Rev 67 to EPIP OPEP-App a, Emergency Response Resources & non-proprietary Rev 53 to Radiological Emergency Response Plan, Rev 15 to EPIP OPEP- 03.8.2 & Rev 17 to EPIP OPEP-04.2.Proprietary Info Withheld1999-05-27027 May 1999 Forwards Proprietary Rev 67 to EPIP OPEP-App a, Emergency Response Resources & non-proprietary Rev 53 to Radiological Emergency Response Plan, Rev 15 to EPIP OPEP- 03.8.2 & Rev 17 to EPIP OPEP-04.2.Proprietary Info Withheld BSEP-99-0078, Provides Addl Info Re Jet Pump Riser Weld Insp Results,Per 990406 Telcon with NRC Re Effect of worst-case Crack on LPCI Sys Flow & PCT1999-05-17017 May 1999 Provides Addl Info Re Jet Pump Riser Weld Insp Results,Per 990406 Telcon with NRC Re Effect of worst-case Crack on LPCI Sys Flow & PCT BSEP-99-0080, Forwards Revs Made to TS Bases Between 980605 & 990507 Without Prior NRC Approval1999-05-17017 May 1999 Forwards Revs Made to TS Bases Between 980605 & 990507 Without Prior NRC Approval BSEP-99-0083, Forwards Two Proprietary License Renewal Applications Consisting of NRC Forms 398 & 396,for Operators Licensed on CP&L Bsep,Units 1 & 2,IAW 10CFR55.57.Proprietary Info Withheld from Public Disclosure IAW 10CFR2.790(a)(6)1999-05-14014 May 1999 Forwards Two Proprietary License Renewal Applications Consisting of NRC Forms 398 & 396,for Operators Licensed on CP&L Bsep,Units 1 & 2,IAW 10CFR55.57.Proprietary Info Withheld from Public Disclosure IAW 10CFR2.790(a)(6) BSEP-99-0056, Forwards 1998 Radiological Environ Operating Rept for BSEP, Units 1 & 2. Encl 1 Provides List of Regulatory Commitments.Vols II & Iii,Sample Analysis Data for Jan-June 1998 & Jul-Dec 1998,respectively1999-05-13013 May 1999 Forwards 1998 Radiological Environ Operating Rept for BSEP, Units 1 & 2. Encl 1 Provides List of Regulatory Commitments.Vols II & Iii,Sample Analysis Data for Jan-June 1998 & Jul-Dec 1998,respectively BSEP-99-0073, Withdraws Request for Approval of Proposed QAP Change Which Was Submitted by1999-05-12012 May 1999 Withdraws Request for Approval of Proposed QAP Change Which Was Submitted by BSEP-99-0062, Forwards Latest Revs of COLR & Suppl Reload Licensing Rept, for Bsep,Unit 2.Proprietary Rev 6,Suppl 2 to NEDC- 31624P & EMF-2168P,included.Proprietary Encls Withheld, Per 10CFR2.790 & 10CFR9.171999-05-11011 May 1999 Forwards Latest Revs of COLR & Suppl Reload Licensing Rept, for Bsep,Unit 2.Proprietary Rev 6,Suppl 2 to NEDC- 31624P & EMF-2168P,included.Proprietary Encls Withheld, Per 10CFR2.790 & 10CFR9.17 BSEP-99-0079, Forwards Proprietary One License Renewal Application Consisting of NRC Form 398, Personal Qualification Statement - Licensee & NRC Form 396, Certification Of... Proprietary Info Withheld,Per 10CFR2.790(a)(6)1999-05-0707 May 1999 Forwards Proprietary One License Renewal Application Consisting of NRC Form 398, Personal Qualification Statement - Licensee & NRC Form 396, Certification Of... Proprietary Info Withheld,Per 10CFR2.790(a)(6) BSEP-99-0066, Submits Revised Relief Requests Which Provides Alternative to ASME B&PV Code Requirements for Insp of Containments. Revised Copies of Relief Requests CIP-03,CIP-04,CIP-05, CIP-10,CIP-16 & CIP-17 Provided1999-05-0404 May 1999 Submits Revised Relief Requests Which Provides Alternative to ASME B&PV Code Requirements for Insp of Containments. Revised Copies of Relief Requests CIP-03,CIP-04,CIP-05, CIP-10,CIP-16 & CIP-17 Provided ML20195D6301999-04-30030 April 1999 Forwards Natl Marine Fisheries Svc Biological Opinion Based on Review of Continued Use of Cooling Water Intake Sys at Bsep.Rept Reviews Effects of Activity on Loggerhead,Kemps Ridley,Green,Hawksbill & Leatherback Sea Turtles BSEP-99-0071, Forwards Notice of Expiration of Operator License,Per 10CFR50.75(b).Details Withheld Per 10CFR2.790(a)(6)1999-04-27027 April 1999 Forwards Notice of Expiration of Operator License,Per 10CFR50.75(b).Details Withheld Per 10CFR2.790(a)(6) BSEP-99-0069, Discusses Rev of Relief Request RR-17, Leakage at Bolted Connections, for ISI Program for Third ten-yr Interval.Util & NRC Were Unable to Reach Agreement Re Use of ASME Code Case N-566-1 as Permanent Basis for Relief Request RR-171999-04-26026 April 1999 Discusses Rev of Relief Request RR-17, Leakage at Bolted Connections, for ISI Program for Third ten-yr Interval.Util & NRC Were Unable to Reach Agreement Re Use of ASME Code Case N-566-1 as Permanent Basis for Relief Request RR-17 BSEP-99-0063, Notifies NRC of Plans to Install Mod for Bsep,Units 1 & 2 Erds.Physical Computer Sys Changeout Activities Will Temporarily Affect Availability of ERDS Computer Points Via NRC Data Link1999-04-21021 April 1999 Notifies NRC of Plans to Install Mod for Bsep,Units 1 & 2 Erds.Physical Computer Sys Changeout Activities Will Temporarily Affect Availability of ERDS Computer Points Via NRC Data Link BSEP-99-0050, Informs NRC That Certain Category C,D & E Piping Welds in Units 1 & 2 Have Not Been Inspected in Accordance with Frequencies Provided by NRC GL 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping,1999-04-0606 April 1999 Informs NRC That Certain Category C,D & E Piping Welds in Units 1 & 2 Have Not Been Inspected in Accordance with Frequencies Provided by NRC GL 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, BSEP-99-0051, Forwards Response to Ofc of Investigations Rept 2-1998-014 to Support Final Resolution of Allegations.Response in Encl 1 Withheld.Public Version of Response in Encl 21999-04-0101 April 1999 Forwards Response to Ofc of Investigations Rept 2-1998-014 to Support Final Resolution of Allegations.Response in Encl 1 Withheld.Public Version of Response in Encl 2 BSEP-99-0015, Forwards Response to NRC 981221 RAI Re Cp&Ls Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves1999-03-31031 March 1999 Forwards Response to NRC 981221 RAI Re Cp&Ls Response to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves 1999-09-08
[Table view] |
Text
m CP&L l Corolina Power & Light Company William R. Campbell PO Box 10429 j Vice President Southport NC 28461 0429 Brunswick Nuclear Plant l JUL 301996 SERIAL: BSEP 96-0287 i
10 CFR 50.90
! TSC 94TSB16 l
l l
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 l DOCKET NOS. 50-325 AND 50-324/ LICENSE NOS. DPR-71 AND DPR-62
! SUPPLEMENTAL INFORMATION TO REQUEST FOR LICENSE AMENDMENTS -
POWER UPRATE l
i Gentlemen:
On July 9, Juiy 15, and July 18,1996, the NRC staff forwarded additional questions to Carolina Power & Light Company (CP&L) on the proposed amendment to the Technical Specifications for the Brunswick Steam Electric Plant (BSEP), Unit Nos.1 and 2 which was submitted on April 2,1996. These proposed amendments revise the BSEP Technical Specifications to allow uprate of the units to 105% of rated thermal power.
Enclosure 1 provides CP&L's formal response to the questions raised by the NRC staff.
Enclosure 2 provides a list of regulatory commitments.
Please refer any questions regarding this submittal to Mr. Tony Harris at (910) 457-3312.
Sincerely, I
William R. Campbell VUkah i Enclosures i
i 9600050218 960730 PDR ADOCK 050003 4 g{
m i
4 I
{
4 Tel 910 457 2496 Fox 910 457-2803
Document Control Desk BSEP 96-0287 / Page 2 William R. Campbell, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, and agents of Carolina Power & Light Company.
(1 -
" ' Notary (Sejl)
My commission expires: k /2,/79f pc: Mr. S. D. Ebneter, Regional Administrator, Region ll Mr. D. C. Trimble, Jr., NRR Project Manager - Brunswick Units 1 and 2 Mr. C. A. Patterson, Brunswick NRC Senior Resident inspector The Honorable H. Wells, Chairman - North Carolina Utilities Commission 1
i
i l
ENCLOSURE 1 l
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 !
NRC DOCKET NOS. 50-325 AND 50-324 OPERATING LICENSE NOS. DPR-71 AND DPR-62 REQUEST FOR LICENSE AMENDMENTS
)
POWER UPRATE !
SECOND NRC STAFF REQUEST F_QRADDITIONAL INFORMATION Question 1 In the RAI response dated July 2,1996, the last page contained a table of commitments. For the reliabihty monitoring of the HPCI and RCIC systems via the Maintenance Rule, the sheet is noted as "N/A" Why is this considered "Not Applicable"?
CP&L Response to Question 1 Enclosure 4 of CP&L's July 2,1996 response contains a list of commitments in the letter. The table has a column to denote the actual commitment, and a column to denote the date for implementation of the commitment. Since the commitment to monitor reliability of the HPCI and RCIC systems was being completed under the Maintenance Rule, and the commitment is an I ongoing commitment, the date is annotated as NA. CP&L remains committed to monitoring the reliability of both the HPCI and RCIC systems under the Maintenance Rule.
Question 2 Table 4-1 of the topical report NEDC-32466P provided the long-term suppression pool temperature response calculated for a postulated DBA-LOCA. In addition to this table, Section 4.2 on Page 4-6 of NEDC-32466P provided a different value for the long-term suppression pool temperature response. Provide an explanation for the different values provided in the report.
CP&L Response to Question 2 The Brunswick LFSAR contains analyses of four (4) cases of RHR cooling for the long-term ;
suppression pool temperature response (Reference UFSAR Section 6.2.1.1.3.2). As stated in the UFSAR, Case C is the " design basis event" for peak bulk suppression pool temperature.
This case assumes a DBA-LOCA occurs with the following low pressure coolant systems operable: One (1) Core Spray loop, one (1) RHR loop containing one (1) RHR pump, one (1)
RHR heat exchanger, and two (2) Service Water pumps. The current UFSAR evaluation was performed at 2550 MWt, and the resultant peak suppression chamber temperature is 205*F.
General Electric evaluated Case C for power uprate conditions. In performing the evaluation, a more realistic decay heat model was used. In order to provide an appropriate comparison between the current power level (2436 MWt) and the uprated power level (2558 MWt), a calculation was performed for 102% of 2436 MWt using the more realistic decay heat model.
This calculation determined the current paak bulk suppression pool temperature to be 197'F.
E1-1
\
l The calculation was also performed for a power level of 102% of 2558 MWt, with a resultant peak suppression pool temperature of 201 *F. These values are provided in Table 4-1 of the topical report (NEDC-32466P).
In calculating the available Net Positive Suction Head (NPSH), the UFSAR states that Case B is the correct mode of operation to be used (Reference UFSAR Table 6.2.1-8). Assuming a power level of 102% of 2558 MWt, the peak bulk suppression pool Case B temperature is calculated to be 189"F. This value is provided on Page 4-6 of the topical report (NEDC-32466P).
Question 3 l
The License Amendment Request submitted a change in the SRV lift tolerance from 1% to i 3%. Was the overpressure analysis for the reactor coolant system performed using the 3%
l tolerance? If so, is the use of the 3% tolerance conservative?
l CP&L Response to Question 3 i j The BWROG submitted topical report NEDC-31753P to the NRC staff July 9,1990. The topical report provides the results of generic evaluations performed for the BWROG to support j changes to Technical Specification requirements for safety relief valves (SRVs). The NRC l provided a safety evaluation (SE) for this report on March 8,1993. The March 8,1993 NRC SE l provided six requirements for licensee analyses which would implement the proposed l specifications. CP&L evaluated the requested change in accordance with the guidelines )
established in the NRC Safety Evaluation for acceptance of General Electric topical report l NEDC-31753P, "BWROG In-Service Pressure Relief Technical Specification Revision Licensing Topical Report". Specifically, the six requirements from the NRC SE, and CP&L's evaluation of l these requirements, are provided belcw.
- 1. Transient analysis of all abnormal operational occurrences as described in NEDC-31753P, should be performed utilizing a 13% setpoint tolerance for the safety mode of the SRVs.
CP&L Evaluation: For power uprate, the analyses performed were identified in Table 9-1 of the topical report, with the initial conditions assumed. This table referenced the l analytical limits for the SRVs as shown in Table 5-1. These analytical limits included the l 3% lift tolerance.
- 2. Analysis of the design basis overpressure event using the 3% tolerance limit for the SRV setpoint is required to confirm that the vessel pressure does not exceed the ASME pressure vessel code upset limit.
l I
CP&L Evaluation: The results of the Brunswick specific analysis are discussed in Section
- 3.2 of the topical report. Section 3.1 of the report details the important assumptions for
{ this evaluation, including a SRV lift tolerance of13%.
j 3. The plant specific analyses described in Items 1 and 2 should assure that the number of j SRVs included in the analyses correspond to the number of valves required to be g operable in the technical specification.
, E1-2
1 .
CP&L Evaluation: The License Amendment Request submitted on April 2,1996, included j a revision to the SRV Limiting Condition for Operation to specify the required number of SRVs. The plant-specific analysis described in Items 1 and 2 conservatively assumed one less SRV was operable than required by current Technical Specifications.
- 4. Reevaluation of the performance of high pressure systems (pump capacity, discharge pressure, etc.), motor-operated valves, and vessel instrumentation and associated piping must be completed, considering the 3% lift tolerance.
CP&L Evaluation: The BNP Power Uprate topical report (NEDC-32466P) details the results of the system evaluations for power uprate. RCIC system is addressed in Section 3.8 and the HPCI system is addressed in Section 4.2.1. The evaluations were performed considering a 3% SRV lift tolerance.
- 5. Evaluation of the 3% tolerance on any plant specific alternate operating modes (e.g.,
increased core flow, extended operating domain, etc.) should be completed.
CP&L Evaluation: The Power Uprate power / flow map includes the Maximum Extended Operating Domain (MEOD) which allows operation between 81% and 105% of rated core flow at the new rated power. This map is provided in the topical report as Figure 2-1.
The transient analyses performed for power uprate utilized this figure as the basis for the analyses, including the new SRV lift settings and the t3% tolerance. The results of the transient analyses indicate the overall capability of the design of the Brunswick units to meet all transient safety criteria for uprated operation. These results are reported in Section 9.1 of the topical report.
- 6. Evaluation of the effect of the 3% tolerance limit on the containment response during loss of coolant accidents and the hydrodynamic loads on the SRV discharge lines and containment should be completed.
CP&L Evaluation: The results of the Brunswick specific evaluation indicate that the Brunswick containment wi!I continue to perform its function and maintain the accident pressures and temperatures within the existing design limits assuming a 3% SRV lift tolerance. The results of the analysis are described in Section 4.1.2 of the topical report.
Question 4 In the application package, the licensee did not provide an analysis for single loop operation and any multipliers that may be used for limits such as MAPLHGR and MCPR. Please explain why no such discussion was included.
CP&L Response to Question 4 Extended single loop operation is not currently licensed for BNP and is not being requested under the power uprate license amendment request; therefore, no discussion was included in the package. However, the power uprate evaluation did review this operating mode and found it to be acceptable under power uprate conditions, as stated in Section 4.3 (Page 4-8) of the topical report. The SLO option is currently limited to 88% power. Under power uprate operation, the limiting power level would be limited to 83.8%.
E1-3 l
The current Brunswick practice is to submit any multipliers to the MCPR and MAPLHGR with the Core Operating Limits Report (COLR) for each cycle. The multipliers would be included in the COLR for the upcoming power uprate cycle for Brunswick Unit 1 (Cycle 11). Any future amendment request for single loop operation would ensure that the limitations imposed by the power uprate analyses are addressed.
Question 5 Regarding the licensee's answer to Question 2, explain why Case C and its associated peak bulk suppression pool temperature are an overly restrictive condition for calculating NPSH margin.
CP&L Response to Question 5 Cases A through D are defined in BNP UFSAR Section 6.2.1.1.3.2.1.b.2 (page 6.2.1-15).
Case A includes both RHR trains running, with no loop / equipment failures. Case B includes a sing'e RHR train running (other train assumed failed). Cases C and D have only a partial RHR train running (assumed failure of other loop a_nldr one RHR pump in operating train in Case C, and also an additional Service Water Pump failure in Case Di. Cases C and D include multiple unrelated failures and are therefore non-credible events an ayond the licensing basis of the plant. A note in UFSAR Table 6.2.1-8 (page 6.2.1-53) indicates that Cases A and B are the only credible scenarios.
Question 6 Regarding licensee's answer to Question 2, has the new GE decay model used for calculation of peak bulk suppression pool temperature been reviewed and approved by the NRC? If so, please provide references.
CP&L Response to Question 6 The "more realistic decay heat model" referred to in the response to Question 2 is the ANSI /ANS 5.1-1979 model. The generic power uprate licensing report (NEDC-31897P-A) described GE's methodology for containment evaluations, including use of the SHEX computer model and the ANSl/ANS 5.1-1979 decay heat model (see Appendix G and Reference 18 of that report).
NRC staff approval of NEDC-31897P-A provided conditional approval of GE's containment methodology. A December 1991 meeting was held with the NRC to clarify the NRC's position.
The outcome of the meeting was an understanding that the NRC accepted the use of SHEX and the ANS decay heat model, provided that, if the use of these models represented a change from the plant's original licensing basis, then the application would discuss any changes to input parameters and would provide benchmarking analyses (i.e., a containment evaluation at the original power level and an evaluation at the uprated power level).
GE wrote a letter to the NRC (MFN-026-93, dated March 12,1993) requesting that the NRC document their acceptance of the NEDC-31897P-A methodology. The NRC responded with a letter dated July 13,1993. The NRC has also reviewed and approved the use of SHEX and ANS decay he at model on other uprate applications.
E1-4
1 l
l The use of SHEX and the ANS decay heat model for Brunswick power uprate is described in NEDC-32466P, Section 4.1.1. The analysis performed included a benchmark at the current power level in addition to the analysis at the new uprated power level to ascertain the true affects due to power uprate vice the changes due to the decay heat model.
Question 7 Section 9.3.1 of NEDC-32466P, Supplement 1, Page 9-3, indicates that the "ATWS high pressure analytical limit" was increased by 50 psi. That value was then used as a key input for calculating peak vessel pressure during an ATWS event. What is the "ATWS high pressure analytical limit" referred to in this section. Is it the ATWS high reactor precsure trip setpoint?
Why was it necessary to increase this value by 50 psi for the Brunswick specific ATWS analysis at the uprated power?
CP&L Response to Question 7 l l
The ATWS high pressure analytical limit referred to in Section 9.3.1 of Supplement 1 to -
NEDC-32466P is the ATWS-RPT analytical limit. The ATWS-RPTinitiates a trip of the recirculation pumps in the event of an ATWS transient. This analytical limit is being changed from 1120 psig to 1170 psig, which is the 50 psig increase noted in our submittal. Although the analytical limit for the ATWS-RPT is being increased by 50 psi, the allowable value for this trip i increases from 1120 psig to 1143 psig (23 psi) and the trip setpoint increases from 1120 psig to 1137.8 psig (17.8 psi). Analysis of events u performed based on the analyticallimit increase of 50 psi.
As stated in the Basis for Change No. 24 on page E1-7 of the License Amendment Request ;
(Letter BSEP 96-0123, dated April 2,1996), this value was increased in the power uprate ATWS evaluation to account for the increase in vessel operating pressure, SRV setpoints and tolerances, and to maintain operational margin. Raising the ATWS-RPT high pressure setpoint prevents unnecessary recirculation pump trips following pressurization transients with a reactor scram (e.g. turbine trip or load reject without bypass), while maintaining the requirements of 10 CFR 50.62. These recirculation pump trips lead to thermal stratification within the reactor vessel, as noted by the NRC in Infommtion Notice 93-62. Continued recirculation pump operation following a scram allows for better mixing of the reactor coolant and reduces vessel thermal stratification.
Question 8 Sec. 9.3.1 of NEDO-32466 Supplement 1 only discusses acceptability of ATWS analysis with respect to reactor pressure. It does not clearly discuss acceptability with respect to the other acceptance criteria associated with ATWS. Piease provide an appropriate discussion and conclusion for this.
CP&L Response to Question 8 in Supplement 1 to the topical report, the results of the ATWS analysis for a higher ATWS-RPT analyticallimit were provided. The change to this parameter only rasults in a significant effect on the peak vessel pressure. There is no effect on suppression pool temperature and peak fuel E1-5
conditions (maximum clad temperature and maximum local clad oxidation). Since the only significant impact was to the peak vessel pressure, this was the only discussion included in the topical report supplement.
i Question 9 !
Section 9.3.1 of NEDC-32466P Supplement 1 (Power Uprate Safety Analysis Report for Brunswick Steam Electric Plant) describes a Brunswick specific analysis for Anticipated i Transients Without Scram (ATWS), which relies, in part, on a generic analysis described in l Sec. 3.7 of NEDC-31984P Supplement 1 (Generic Evaluations of General Electric Boiling Water Reactor Power Uprate). Sec. 9.3.1 (NEDC-32466 Supp.1) states that, per the generic ,
analysis (NEDC-31984P Supp.1), the inadvertent MSIV Closure (MSIVC) event is the limiting l ATWS event. In reviewing the generic ana!ysis, the NRC staff noted that a pressure regulator failure may be a more limiting ATWS ever.i with respect to some parameters analyzed. What is .
your basis for concluding that MSIVC is the most limiting ATWS event when all of these parameters are considered? Please address both the case where the ATWS trip setpoint was assumed to be increased by 20 psi and the case where the setpoint was increased by 50 psi.
Were both the MSIVC and pressure regulator failure events reanalyzed at the increased (50 psi increase) ATWS high pressure setpoint? If so, please provide the results at the +50 psi setpoint for each parameter analyzed and the associated acceptance criteria.
CP&L Response to Question 9 As indicated in the response to Question 7, increasing the ATWS-RPT setpoint would maintain l operational margin and reduce the probability of thermal stratification. Although the analytical limit for the ATWS-RPT is being increased by 50 psi, the allowable value for this trip increases from 1120 psig to 1143 psig (23 psi), and the trip setpoint increases from 1120 psig to 1137.8 psig (17.8 psi). Analysis of events was performed based on the analyticallimit increase of 50 psi.
As stated in response to Question 8, the only significant effect of an increase in the ATWS-'RPT analytical limit is an increase in the peak vessel pressure. The results in NEDC-31894P Supplement 1 (Section 3.7) indicate that for peak vessel pressure, the MSIV closure event is limiting. The analysis performed in NEDC-31894P, Supplement 1 was based on the original ATWS analysis performed for the BWR product lines detailed in NEDE-24222 " Assessment of BWR Mitigation of ATWS, Volume 11"(NUREG 0460 Alternate No. 3). In this analysis the Pressure Regulator Failure - Maximum Demand (PREGO) event was shown to follow the MSIVC event after the initial decrease in reactor power and pressure. Since the reactor pressure increases are limited by the action of the SRVs and the RPT, and the RPT high pressure setpoint was the only variable changed for the Brunswick specific analysis, the PREGO event was not reanalyzed for the increase in the ATWS-RPT setpoint. The MSIVC event remains the most limiting event for the Brunswick Plant considering the 50 psi increase in the ATWS-RPT analyticallimit.
E1-6
m I
ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50-325 & 50-324 OPERATING LICENSE NOS. DPR-71 & DPR-62 LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power & Light Company in this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina
- Power & Light Company. They are described to the NRC for the NRC's information and are not considered regulatory commitments. Please notify the Manager Regulatory Affairs at the Brunswick Nuclear Plant of any questions regarding this document or any associated regulatory commitments.
Commitment Committed Date No New Commitments Are Contained in This Letter N/A E1-7