Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report, 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re, 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip., 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C, 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip, 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250, ML11259A012, ML11300A226, ML11342A195, ML12031A032, ML12053A231, ML12107A068, ML12202A734, ML12205A357, ML12205A358, ML12240A119, ML12255A409, ML12262A385, ML12314A391, ML12314A392, ML12314A393, ML13032A540
|
MONTHYEAR3F0811-04, Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-02, Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-01, Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-18018 August 2011 Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-03, Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-25025 August 2011 Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11259A0122011-09-14014 September 2011 NRR E-mail Capture - Clarification for August 25 Emcb RAI Acceptance Review Letter Project stage: Other ML11286A0922011-10-11011 October 2011 Response to Request for Additional Information to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11300A2262011-10-25025 October 2011 Feedwater Line Break Overpressure Protection Analysis to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Update LAR and LAR Approval Schedule Project stage: Other 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip Project stage: Other ML11326A2312011-12-0707 December 2011 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 Project stage: Other 3F1211-05, Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-06, Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-10, Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-21021 December 2011 Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12030A2092012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Instrumentation and Control Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11342A1952012-01-0606 January 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-safeguards Information Project stage: Other ML12024A3002012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Component Performance and Testing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-06, Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report2012-01-31031 January 2012 Corrections to the Extended Power Uprate LAR #309 Vendor Affidavit and Technical Report Project stage: Other ML12003A2172012-02-0808 February 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12052A1302012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12053A2312012-03-0202 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related Extended Power Uprate Technical Report Project stage: Other 3F0312-02, Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR2012-03-19019 March 2012 Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0312-01, Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-03-22022 March 2012 Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12031A0322012-03-26026 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12107A0682012-04-0404 April 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb) Project stage: Other 3F0412-05, Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0412-04, Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-07, Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-12012 April 2012 Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-06, Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-16016 April 2012 Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-09, Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-26026 April 2012 Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12102A0442012-05-0404 May 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 Project stage: Other ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. Project stage: Other 3F0612-05, Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-06-18018 June 2012 Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. Project stage: Other ML12184A3442012-07-0202 July 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Discussion/Clarification of Emcb Draft RAIs Project stage: Draft Other ML12174A2922012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12171A3472012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3562012-07-17017 July 2012 Supplement to the Extended Power Uprate License Amendment Request #309 Project stage: Supplement 3F0712-06, Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-17017 July 2012 Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12194A4172012-07-17017 July 2012 Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0712-07, Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0712-08, Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12125A1622012-08-0101 August 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12202A7342012-08-0101 August 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12202A0602012-08-0202 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12213A3032012-08-0303 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request (Srxb) Project stage: RAI ML12219A1912012-08-16016 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0812-02, Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-08-21021 August 2012 Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 2012-03-26
[Table View] |
|
---|
Category:Letter type:
MONTHYEAR3F0824-01, Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 52024-08-21021 August 2024 Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5 3F0824-02, Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 2622024-08-12012 August 2024 Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 262 3F0624-02, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-06-13013 June 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0624-01, Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 20242024-06-11011 June 2024 Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 2024 3F0524-03, Annual Financial Report and Certified Financial Statement2024-05-30030 May 2024 Annual Financial Report and Certified Financial Statement 3F0524-01, Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan2024-05-0909 May 2024 Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan 3F0424-03, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report 3F0424-02, – 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 – 2023 Annual Radioactive Effluent Release Report 3F0424-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-12012 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-04, Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 42024-02-23023 February 2024 Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4 3F0224-05, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-22022 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-0808 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-19019 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-01, Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version)2024-01-18018 January 2024 Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version) 3F0623-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-06-0101 June 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0423-03, 2022 Annual Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Annual Radiological Environmental Operating Report 3F0423-02, 2022 Annual Radioactive Effluent Release Report2023-04-18018 April 2023 2022 Annual Radioactive Effluent Release Report 3F0423-01, 2022 Individual Monitoring NRC Form 5 Report2023-04-0404 April 2023 2022 Individual Monitoring NRC Form 5 Report 3F0323-03, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2023-03-31031 March 2023 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20222023-03-29029 March 2023 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022 3F0323-01, Onsite Property Insurance Coverage2023-03-0202 March 2023 Onsite Property Insurance Coverage 3F0123-01, Proof of Financial Protection2023-01-26026 January 2023 Proof of Financial Protection 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0522-03, Notification of Revised Decommissioning Cost Estimate2022-05-26026 May 2022 Notification of Revised Decommissioning Cost Estimate 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0422-02, 2021 Annual Radiological Environmental Operating Report2022-04-0606 April 2022 2021 Annual Radiological Environmental Operating Report 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20212022-03-30030 March 2022 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021 3F0322-03, Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1)2022-03-10010 March 2022 Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1) 3F0322-02, 2021 Individual Monitoring NRC Form 5 Report2022-03-0707 March 2022 2021 Individual Monitoring NRC Form 5 Report 3F0222-01, ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2022-02-0909 February 2022 ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) 3F0222-02, Onsite Property Insurance Coverage2022-02-0909 February 2022 Onsite Property Insurance Coverage 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0122-02, Proof of Financial Protection2022-01-17017 January 2022 Proof of Financial Protection 3F0122-03, Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report2022-01-17017 January 2022 Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report 3F1021-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-10-21021 October 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0921-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C)2021-09-29029 September 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C) 3F0921-01, to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a2021-09-14014 September 2021 to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a 3F0721-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-07-13013 July 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0621-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S2021-06-16016 June 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S 3F0421-05, 2020 Individual Monitoring NRC Form 5 Report2021-04-27027 April 2021 2020 Individual Monitoring NRC Form 5 Report 3F0421-04, ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2021-04-13013 April 2021 ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0421-03, Proof of Financial Protection2021-04-0707 April 2021 Proof of Financial Protection 3F0421-01, 2020 Annual Radioactive Effluent Release Report2021-04-0606 April 2021 2020 Annual Radioactive Effluent Release Report 3F0421-02, 2020 Annual Radiological Environmental Operating Report2021-04-0606 April 2021 2020 Annual Radiological Environmental Operating Report 3F0321-07, (XEG)-DOE/NRC Forms 741 742 and 743C2021-03-30030 March 2021 (XEG)-DOE/NRC Forms 741 742 and 743C 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20202021-03-29029 March 2021 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020 3F0321-01, License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual2021-03-17017 March 2021 License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F0321-05, Onsite Property Insurance Coverage2021-03-15015 March 2021 Onsite Property Insurance Coverage 3F0321-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-03-0909 March 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 2024-08-21
[Table view] |
Text
SProgress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 July 17, 2012 3F0712-06 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (ESGB) Technical Review of the CR-3 Extended Power Uprate LAR (TAC No.
ME6527)
References:
- 1. FPC to NRC letter dated June 15, 2011, "Crystal River Unit 3 - License Amendment Request #309, Revision 0, Extended Power Uprate" (ADAMS Accession No. ML112070659)
- 2. NRC to FPC letter dated July 5, 2012, "Crystal River Unit 3 Nuclear Generating Plant - Request For Additional Information For Extended Power Uprate License Amendment Request (TAC No. ME6527)" (ADAMS Accession No. ML12174A292)
Dear Sir:
By letter dated June 15, 2011, Florida Power Corporation (FPC) requested a license amendment to increase the rated thermal power level of Crystal River Unit 3 (CR-3) from 2609 megawatts (MWt) to 3014 MWt. (Reference 1) On July 5, 2012, the NRC provided a Request for Additional Information (RAI) to support the ESGB technical review of the CR-3 Extended Power Uprate (EPU) License Amendment Request (LAR). (Reference 2)
The attachment to this correspondence, "Response to Second Request for Additional - Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 EPU LAR," provides the formal response to the RAI.
This correspondence contains no new regulatory commitments.
If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Superintendent, Licensing and Regulatory Programs at (352) 563-4796.
Si Jo .Fr ice President Crystal River Nuclear Plant JAF/gwe
Attachment:
Response to Second Request for Additional Information - Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 EPU LAR xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector State Contact ODI Crystal River Nuclear Plant 1 /1 15760 W. Powerline Street Crystal River, FL 34428
U.S. Nuclear Regulatory Commission Page 2 of 3 3F0712-06 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.
2012, by Jon A. Franke.
624 C IOTMN CAOY E.
Signature of Notary Public State of Florida Signtur Expiotres Marlch,21 ThmTroy Bon~ded FainIrnaffnce 800-385-7019 (Print, type, or stamp Commissioned Name of Notary Public)
Personally Produced Known -OR- Identification
FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 ATTACHMENT RESPONSE TO SECOND REQUEST FOR ADDITIONAL INFORMATION - STEAM GENERATOR TUBE INTEGRITY AND CHEMICAL ENGINEERING BRANCH TECHNICAL REVIEW OF THE CR-3 EPU LAR
U. S. Nuclear Regulatory Commission Attachment 3F0712-06 Page 1 of 2 RESPONSE TO SECOND REQUEST FOR ADDITIONAL INFORMATION - STEAM GENERATOR TUBE INTEGRITY AND CHEMICAL ENGINEERING BRANCH TECHNICAL REVIEW OF THE CR-3 EPU LAR By letter dated June 15, 2011, Florida Power Corporation (FPC) requested a license amendment to increase the rated thermal power level of Crystal River Unit 3 (CR-3) from 2609 megawatts (MWt) to 3014 MWt (Reference 1). On July 5, 2012, the NRC provided a Request for Additional Information (RAI) to support the ESGB technical review of the CR-3 Extended Power Uprate (EPU) License Amendment Request (LAR).
For tracking purposes, each item related to this RAI is uniquely identified as ESGB X-Y, with X indicating the RAI set and Y indicating the sequential item number.
- 1. (ESGB 2-1)
The monitoring program described in letter dated January 27, 2010 (ADAMS Accession No. ML100290366), states that CR-3 will perform in-situ neutron attenuation testing for spent fool pools A and B. The program description does not provide the schedule for the testing. Please discuss the schedule for in-situ neutron attenuation testing for the materials in spent fuel pools A and B.
Response
As described in an FPC response to an RAI associated with the CR-3 License Renewal (LR) submittal (Reference 2, Enclosure 2), the Fuel Pool Rack Neutron Absorber Monitoring Program will be enhanced and will include, in part, periodic neutron attenuation testing for materials in CR-3 Spent Fuel Pools A and B. Specifically, the enhancements to this program are scheduled to be implemented prior to the period of CR-3 extended operation as required by CR-3 LR Regulatory Commitment #27 (Reference 3, Enclosure 2) and in-situ neutron attenuation testing of the spent fuel pools will be repeated at 10-year intervals within the extended operating period as described in Enclosure 1, "Response to Request for Additional Information," of the FPC to NRC letter dated January 27, 2010 (Reference 2).
- 2. (ESGB 2-2)
Please clarify whether soluble boron is credited in the criticality safety analysis for maintaining keff [effective multiplication factor] within limits in the spent fuel pools.
Response
An evaluation was performed to determine the criticality margins for the spent fuel racks in Spent Fuel Pools A and B resulting from CR-3 operation at EPU conditions. To maintain keff within the limits of 10 CFR 50.68(b)(4) in the CR-3 spent fuel pools during normal and accident conditions, soluble boron is required. As indicated in the basis of change for Improved Technical Specification (ITS) 3.7.14, "Spent Fuel Pool Boron Concentration," (Reference 1, ), the limiting boron concentration assumptions of 203 ppm for normal conditions and 571 ppm for accident conditions in Pool B are required to meet the criticality design requirements.
U. S. Nuclear Regulatory Commission Attachment 3F0712-06 Page 2 of 2 As described in the CR-3 EPU LAR (Reference 1, Attachments 1, 2, 3 and 4), FPC requests, in part, a license basis change to credit the use of soluble boron in the spent fuel pool to preclude spent fuel pool criticality accidents as allowed by 10 CFR 50.68(b)(4) and proposes concomitant changes to ITS 3.7.14 and ITS 4.3.1, "Criticality."
References
- 1. FPC to NRC letter dated June 15, 2011, "Crystal River Unit 3 - License Amendment Request #309, Revision 0, Extended Power Uprate." (ADAMS Accession No. ML112070659)
- 2. FPC to NRC letter dated January 27, 2010, "Crystal River Unit 3 - Response to Request for Additional Information for the Review of the Crystal River Unit 3, Nuclear Generating Plant, License Renewal Application (TAC NO. ME0274) and Amendment #9." (ADAMS Accession No. ML100290366)
- 3. FPC to NRC letter dated December 16, 2008, "Crystal River Unit 3 - Application for Renewal of Operating License." (ADAMS Accession No. ML090080054)