Category:Letter type:
MONTHYEAR3F0824-01, Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 52024-08-21021 August 2024 Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5 3F0824-02, Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 2622024-08-12012 August 2024 Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 262 3F0624-02, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-06-13013 June 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0624-01, Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 20242024-06-11011 June 2024 Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 2024 3F0524-03, Annual Financial Report and Certified Financial Statement2024-05-30030 May 2024 Annual Financial Report and Certified Financial Statement 3F0524-01, Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan2024-05-0909 May 2024 Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan 3F0424-03, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report 3F0424-02, – 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 – 2023 Annual Radioactive Effluent Release Report 3F0424-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-12012 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-04, Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 42024-02-23023 February 2024 Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4 3F0224-05, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-22022 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-0808 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-19019 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-01, Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version)2024-01-18018 January 2024 Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version) 3F0623-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-06-0101 June 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0423-03, 2022 Annual Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Annual Radiological Environmental Operating Report 3F0423-02, 2022 Annual Radioactive Effluent Release Report2023-04-18018 April 2023 2022 Annual Radioactive Effluent Release Report 3F0423-01, 2022 Individual Monitoring NRC Form 5 Report2023-04-0404 April 2023 2022 Individual Monitoring NRC Form 5 Report 3F0323-03, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2023-03-31031 March 2023 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20222023-03-29029 March 2023 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022 3F0323-01, Onsite Property Insurance Coverage2023-03-0202 March 2023 Onsite Property Insurance Coverage 3F0123-01, Proof of Financial Protection2023-01-26026 January 2023 Proof of Financial Protection 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0522-03, Notification of Revised Decommissioning Cost Estimate2022-05-26026 May 2022 Notification of Revised Decommissioning Cost Estimate 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0422-02, 2021 Annual Radiological Environmental Operating Report2022-04-0606 April 2022 2021 Annual Radiological Environmental Operating Report 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20212022-03-30030 March 2022 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021 3F0322-03, Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1)2022-03-10010 March 2022 Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1) 3F0322-02, 2021 Individual Monitoring NRC Form 5 Report2022-03-0707 March 2022 2021 Individual Monitoring NRC Form 5 Report 3F0222-01, ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2022-02-0909 February 2022 ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) 3F0222-02, Onsite Property Insurance Coverage2022-02-0909 February 2022 Onsite Property Insurance Coverage 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0122-02, Proof of Financial Protection2022-01-17017 January 2022 Proof of Financial Protection 3F0122-03, Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report2022-01-17017 January 2022 Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report 3F1021-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-10-21021 October 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0921-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C)2021-09-29029 September 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C) 3F0921-01, To License Amendment Request, Revision 0, ISFSI Security Plan, Revision a2021-09-14014 September 2021 To License Amendment Request, Revision 0, ISFSI Security Plan, Revision a 3F0721-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-07-13013 July 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0621-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S2021-06-16016 June 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S 3F0421-05, 2020 Individual Monitoring NRC Form 5 Report2021-04-27027 April 2021 2020 Individual Monitoring NRC Form 5 Report 3F0421-04, ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2021-04-13013 April 2021 ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0421-03, Proof of Financial Protection2021-04-0707 April 2021 Proof of Financial Protection 3F0421-01, 2020 Annual Radioactive Effluent Release Report2021-04-0606 April 2021 2020 Annual Radioactive Effluent Release Report 3F0421-02, 2020 Annual Radiological Environmental Operating Report2021-04-0606 April 2021 2020 Annual Radiological Environmental Operating Report 3F0321-07, (XEG)-DOE/NRC Forms 741 742 and 743C2021-03-30030 March 2021 (XEG)-DOE/NRC Forms 741 742 and 743C 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20202021-03-29029 March 2021 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020 3F0321-01, License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual2021-03-17017 March 2021 License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F0321-05, Onsite Property Insurance Coverage2021-03-15015 March 2021 Onsite Property Insurance Coverage 3F0321-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-03-0909 March 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 2024-08-21
[Table view] Category:License-Operator
MONTHYEARRA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML1133404102011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative Documents ML1133404292011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative JPMs ML1133404252011-11-28028 November 2011 Initial Exam 2011-301 Final Sim/In-Plant JPMs ML1133404222011-11-28028 November 2011 Initial Exam 2011-301 Final Simulator Scenarios ML1133404202011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative Documents ML1133404182011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative JPMs ML1133404172011-11-28028 November 2011 Initial Exam 2011-301 Draft Sim/In-Plant JPMs ML1133404162011-11-28028 November 2011 Initial Exam 2011-301 Draft Simulator Scenarios ML1133404142011-11-28028 November 2011 Initial Exam 2011-301 Draft SRO Written Exam ML1133404122011-11-28028 November 2011 Initial Exam 2011-301 Draft RO Written Exam IR 05000302/20113012011-10-24024 October 2011 Er 05000302-11-301; Operating Test September 12 - 16 & Written Exam September 22, 2011; Crystal River Unit 3; Operator License Examinations ML1128705742011-10-13013 October 2011 Initial Exam 2011-301 Final RO Written Exam ML1128705722011-10-13013 October 2011 Initial Exam 2011-301 Final SRO Written Exam ML1020106232010-07-16016 July 2010 NRC Generic Fundamentals Examination Results ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML0932702122009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative JPMs ML0932702032009-11-18018 November 2009 Initial Exam 2009-301 Final Sim/In - Plant JPMs ML0932701962009-11-18018 November 2009 Initial Exam 2009-301 Final Simulator Scenarios ML0932701912009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative Documents ML0932701852009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative JPMs ML0932701812009-11-18018 November 2009 Initial Exam 2009-301 Draft Sim/IN-Plant JPMs ML0932701572009-11-18018 November 2009 Initial Exam 2009-301 Draft Simulator Scenarios ML0932701452009-11-18018 November 2009 Initial Exam 2009-301 Draft SRO Written Exam ML0932701412009-11-18018 November 2009 Initial Exam 2009-301 Draft RO Written Exam ML0932701322009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative Documents ML0928906372009-10-16016 October 2009 Initial Exam 2009-301 Final RO Written Exam ML0928906422009-10-16016 October 2009 Initial Exam 2009-301 Final SRO Written Exam ML0928906472009-09-28028 September 2009 2009 Reactor Operator and Senior Reactor Operator Written Examination Package and Post-Exam Comments ML0926104592009-09-17017 September 2009 Operator Licensing Written Examination Approval 05000302/2009301 3F0609-04, Initial Exam 2009-301 General Correspondence2009-06-10010 June 2009 Initial Exam 2009-301 General Correspondence ML0806704722008-02-14014 February 2008 Retake Exam - 05000302-08-301 Draft Admin JPMs ML0806704472008-02-14014 February 2008 Rtk Exam - 05000302-08-301 Final Admin JPMs ML0806704152008-02-14014 February 2008 Retake Exam - 05000302-08-301 Administrative Documents 3F0108-09, Summary of Ultrasonic Examination Results of Structural Weld Overlays2008-01-23023 January 2008 Summary of Ultrasonic Examination Results of Structural Weld Overlays ML0733212682007-11-29029 November 2007 October Exam 05000302-07-301 Licensee Post-Exam Comments ML0733212782007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam with Answers, References, and KAs ML0733212742007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam List of References ML0610802472006-04-17017 April 2006 Senior Reactor Operator Initial Retake Examination - Crystal River Nuclear Plant 05000302/2006301 ML0601000342006-01-0505 January 2006 Requalification Program Inspection - Crystal River Plant ML0607502602005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft RO Written Exam IR 05000302/20053012005-10-31031 October 2005 NRC Examination Report 05000302-05-301 ML0528000302005-10-31031 October 2005 October 2005 Exam, 05000302/2005-301 Final RO Written Exam ML0607502482005-10-31031 October 2005 September 2005 Exam 05000302/2005301 Administrative Documents ML0607502512005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Scenarios & Outlines ML0607502542005-10-31031 October 2005 October 2005 Exam 05000302/2005301, Draft JPMs & Outlines ML0607502572005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Written Exam Quality Checklist (ES-401-6) & Written Exam Sample Plan ML0528000322005-10-31031 October 2005 October 2005 Exam 0500302/2005301 Final SRO Written Exam ML0607502612005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft SRO Written Exam ML0607502702005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Jpms 2014-06-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML1133404102011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative Documents ML1133404292011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative JPMs ML1133404252011-11-28028 November 2011 Initial Exam 2011-301 Final Sim/In-Plant JPMs ML1133404222011-11-28028 November 2011 Initial Exam 2011-301 Final Simulator Scenarios ML1133404202011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative Documents ML1133404182011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative JPMs ML1133404172011-11-28028 November 2011 Initial Exam 2011-301 Draft Sim/In-Plant JPMs ML1133404162011-11-28028 November 2011 Initial Exam 2011-301 Draft Simulator Scenarios ML1133404142011-11-28028 November 2011 Initial Exam 2011-301 Draft SRO Written Exam ML1133404122011-11-28028 November 2011 Initial Exam 2011-301 Draft RO Written Exam IR 05000302/20113012011-10-24024 October 2011 Er 05000302-11-301; Operating Test September 12 - 16 & Written Exam September 22, 2011; Crystal River Unit 3; Operator License Examinations ML1128705742011-10-13013 October 2011 Initial Exam 2011-301 Final RO Written Exam ML1128705722011-10-13013 October 2011 Initial Exam 2011-301 Final SRO Written Exam ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML0932702122009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative JPMs ML0932702032009-11-18018 November 2009 Initial Exam 2009-301 Final Sim/In - Plant JPMs ML0932701962009-11-18018 November 2009 Initial Exam 2009-301 Final Simulator Scenarios ML0932701912009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative Documents ML0932701852009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative JPMs ML0932701812009-11-18018 November 2009 Initial Exam 2009-301 Draft Sim/IN-Plant JPMs ML0932701572009-11-18018 November 2009 Initial Exam 2009-301 Draft Simulator Scenarios ML0932701452009-11-18018 November 2009 Initial Exam 2009-301 Draft SRO Written Exam ML0932701412009-11-18018 November 2009 Initial Exam 2009-301 Draft RO Written Exam ML0932701322009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative Documents ML0928906372009-10-16016 October 2009 Initial Exam 2009-301 Final RO Written Exam ML0928906422009-10-16016 October 2009 Initial Exam 2009-301 Final SRO Written Exam ML0928906472009-09-28028 September 2009 2009 Reactor Operator and Senior Reactor Operator Written Examination Package and Post-Exam Comments ML0926104592009-09-17017 September 2009 Operator Licensing Written Examination Approval 05000302/2009301 3F0609-04, Initial Exam 2009-301 General Correspondence2009-06-10010 June 2009 Initial Exam 2009-301 General Correspondence ML0806704472008-02-14014 February 2008 Rtk Exam - 05000302-08-301 Final Admin JPMs ML0806704152008-02-14014 February 2008 Retake Exam - 05000302-08-301 Administrative Documents ML0806704722008-02-14014 February 2008 Retake Exam - 05000302-08-301 Draft Admin JPMs 3F0108-09, Summary of Ultrasonic Examination Results of Structural Weld Overlays2008-01-23023 January 2008 Summary of Ultrasonic Examination Results of Structural Weld Overlays ML0733212782007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam with Answers, References, and KAs ML0733212742007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam List of References ML0733212682007-11-29029 November 2007 October Exam 05000302-07-301 Licensee Post-Exam Comments ML0610802472006-04-17017 April 2006 Senior Reactor Operator Initial Retake Examination - Crystal River Nuclear Plant 05000302/2006301 ML0601000342006-01-0505 January 2006 Requalification Program Inspection - Crystal River Plant ML0607502782005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Sample Plans/Outlines ML0607502482005-10-31031 October 2005 September 2005 Exam 05000302/2005301 Administrative Documents ML0607502512005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Scenarios & Outlines ML0607502542005-10-31031 October 2005 October 2005 Exam 05000302/2005301, Draft JPMs & Outlines ML0607502572005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Written Exam Quality Checklist (ES-401-6) & Written Exam Sample Plan ML0607502602005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft RO Written Exam ML0607502612005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft SRO Written Exam ML0607502702005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Jpms ML0607502732005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Scenarios ML0607502832005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Written Outlines, Combined Ro/Sro with Kas, Answers, References & Analysis ML0528000252005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Post-Exam Comments 2014-06-03
[Table view] |
Text
Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 January 23, 2008 3F0108-09 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Summary of Ultrasonic Examination Results of Structural Weld Overlays
References:
- 1. CR-3 to NRC letter 3F0907-05, dated September 13, 2007, "Crystal River Unit 3 -
Relief Request #07-003-RR, Revision 1, and Response to Request for Additional Information"
- 2. NRC to CR-3 letter, dated November 15, 2007, "Crystal River Unit 3 - Relief Request
- 07-003-RR Regarding Structural Weld Overlays (TAC NO. MD5552)
Dear Sir:
As committed in Reference 1 and reiterated in Reference 2, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc., Crystal River Unit 3 (CR-3), is submitting a summary of ultrasonic examination performed on structural weld overlays completed during Crystal River Unit 3 Refueling Outage 15 (R15).
CR-3 satisfactorily completed structural weld overlays for all Alloy 600/82/182 pressurizer butt weld locations during R15. CR-3 also performed overlay techniques on the hot leg surge nozzle. That weld overlay was completed, but partially removed due to indications in the repair metal. A Performance Demonstrative Initiiative (PDI) inspection was performed on the remaining weld configuration with acceptable results.
Ultrasonic examinations were completed on November 24, 2007. This submittal is being made within 60 days of the completion of these examinations and fulfills the regulatory commitment made in Reference 1.
This submittal contains no new regulatory commitments.
If you have any questions regarding this submittal, please contact Mr. Dennis Herrin, Acting Supervisor, Licensing and Regulatory Programs at (352) 563-4633.
Sincerely, StEeernJ. Cahill e~s. ~::o%4cd- (o~c49.-j~
Engineering Manager SJC/seb Attachment xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector Progress Energy Florida, Inc. , --
k 1ý 9,"
Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 1Je-,.Q
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50.- 302 / LICENSE NUMBER DPR - 72 Attachment Summary of Ultrasonic Examination Results of Structural Weld Overlays Performed During R15
U.S. Nuclear Regulatory Commission Attachment 3F0108-09 Page 1 of 2 Summary of Ultrasonic Examination Results of Structural Weld Overlays Performed During R15 Pressurizer Spray Nozzle Weld Overlay Examination (Weld No. B4.1.1A)
A preemptive full structural reinforcement weld overlay of the pressurizer spray nozzle was performed during Refueling Outage 15 (R15). Several nondestructive examinations (NDE) were performed as required by the examination procedures for this component. Liquid Penetrant (PT) and Magnetic Particle (MT) surface examinations resulted in no recordable indications and no exam limitations.
Ultrasonic (UT) examinations of the applied overlay and adjacent base material were accomplished utilizing personnel and procedures qualified in accordance with ASME Code Section XI, 1995 Edition including Addenda through 1996, Appendix VIII, Supplement 11, with alternatives used to comply with the Performance Demonstrative Initiative (PDI) Program.
These examinations resulted in no reportable indications and 100% coverage of both the preservice inspection (PSI) and inservice inspection (ISI) examination volumes were obtained.
Pressurizer Relief Nozzle Overlay Examination (Weld No. B4.1.4A)
A preemptive full structural reinforcement weld overlay of the pressurizer relief nozzle was performed during R15. Several NDE examinations were performed as required by the examination procedures for this component. PT surface examinations resulted in no recordable indications and no exam limitations.
UT examinations of the applied overlay and adjacent base material were accomplished utilizing personnel and procedures qualified in accordance with ASME Code Section XI, 1995 Edition including Addenda through 1996, Appendix VIII, Supplement 11, with alternatives used to comply with the PDI Program. These examinations resulted in no reportable indications and 100% coverage of both the PSI and ISI examinations volumes were obtained.
Pressurizer Relief Nozzle Overlay Examination (Weld No. B4.1.6A)
A preemptive full structural reinforcement weld overlay of the pressurizer relief nozzle was performed during R15. Several NDE examinations were performed as required by the examination procedures for this component. PT surface examinations resulted in no recordable indications and no exam limitations.
UT examinations of the applied overlay and adjacent base material were accomplished utilizing personnel and procedures qualified in accordance with ASME Code Section XI, 1995 Edition including Addenda through 1996, Appendix VIII, Supplement 11, with alternatives used to comply with the PDI Program. These examinations resulted in no reportable indications and 100% coverage of both the PSI and ISI examinations volumes were obtained.
U.S. Nuclear Regulatory Commission Attachment 3F0108-09 Page 2 of 2 Pressurizer Relief Nozzle Overlay Examination (Weld No. B4.1.8A)
A preemptive full structural reinforcement weld overlay of the pressurizer relief nozzle was performed during R15. Several NDE examinations were performed as required by the examination procedures for this component. PT surface examinations resulted in no recordable indications and no exam limitations.
UT examinations of the applied overlay and adjacent base material were accomplished utilizing personnel and procedures qualified in accordance with ASME Code Section XI, 1995 Edition including Addenda through 1996, Appendix VIII, Supplement 11, with alternatives used to comply with the PDI Program. These examinations resulted in no reportable indications and 100% coverage of both the PSI and ISI examinations volumes were obtained.
Pressurizer Surge Nozzle Overlay Examination (Weld No. B4.1.10A)
A preemptive full structural reinforcement weld overlay of the pressurizer surge nozzle was performed during R15. Several NDE examinations were performed as required by the examination procedures for this component. PT surface examinations resulted in no recordable indications and no exam limitations.
UT examinations of the applied overlay and adjacent base material were accomplished utilizing personnel and procedures qualified in accordance with ASME Code Section XI, 1995 Edition including Addenda through 1996, Appendix VIII, Supplement 11, with alternatives used to comply with the PDI Program. These examinations resulted in no reportable indications and 100% coverage of both the PSI and ISI examinations volumes were obtained.