ML061080247
| ML061080247 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/17/2006 |
| From: | Moorman J Division of Reactor Safety II |
| To: | Young D Progress Energy Florida |
| References | |
| 50-302/06-301 50-302/06-301 | |
| Download: ML061080247 (5) | |
See also: IR 05000302/2006301
Text
April 17, 2006
Mr. Dale E. Young, Vice President
Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing &
Regulatory Programs
15760 West Power Line Street
Crystal River, FL 34428-6708
SUBJECT:
SENIOR REACTOR OPERATOR INITIAL RETAKE EXAMINATION - CRYSTAL
RIVER NUCLEAR PLANT 05000302/2006301
Dear Mr. Young:
During a phone conversation on April 6, 2006, between Mr. Frank Dola, Supervisor, Licensed
Operator Initial Training, and Mr. Mark Bates, Operations Engineer, arrangements were made
for the administration of a licensing retake operating test at the Crystal River Nuclear Plant on
June 8, 2006.
As agreed during this conversation, your staff will prepare three simulator scenarios, two of
which will be administered and one spare. The operating test will be developed based on the
guidelines in Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors." The facility has also agreed to make all necessary copies of the operating
test prior to administration. The NRC regional office will discuss with your staff any changes
that might be necessary before the test is administered.
To meet the above schedule, Mr. Dola agreed that your staff will furnish the test outlines by
May 9, 2006, and scenario details and the supporting reference materials identified in
Attachment 2 of ES-201 by May 17, 2006. Pursuant to 10 CFR 55.40(b)(3), an authorized
representative of the facility licensee shall approve the outlines and tests before they are
submitted to the NRC for review and approval. All materials shall be complete and ready-to-
use. Any delay in receiving the required examination and reference materials, or the submittal
of inadequate or incomplete materials, may cause the examination to be rescheduled.
In order to conduct the requested operating test, it will be necessary for your staff to provide
adequate space and accommodations in your simulation facility. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the operating test is being administered.
To permit timely NRC review and evaluation, your staff should submit the preliminary operator
license application (Office of Management and Budget (OMB) approval number 3150-0090),
medical certification (OMB approval number 3150-0024), and waiver request (OMB approval
number 3150-0090) by May 9, 2006.
2
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018), which expires on June 30,
2006. The public reporting burden for this collection of information is estimated to average 50
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and
Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget,
Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC's Public Document Room or from the
Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page
of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Dola has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mark Bates at (404) 562-4612, (Internet E-mail:
MAB7@NRC.GOV), or me at (404) 562-4647, (Internet E-mail: JHM2@NRC.GOV).
Sincerely,
/RA/
James H. Moorman, III, Chief
Operations Branch
Division of Reactor Safety
Docket No.: 50-302
License No.: DPR-72
cc: (See page 3)
3
cc contd:
Daniel L. Roderick
Director Site Operations
Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
Jon A. Franke
Plant General Manager
Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
Terry D. Hobbs
Manager Nuclear Assessment
Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
Michael J. Annacone
Engineering Manager
Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
R. Alexander Glenn
Associate General Counsel (MAC - BT15A)
Florida Power Corporation
Electronic Mail Distribution
Steven R. Carr
Associate General Counsel - Legal Dept.
Progress Energy Service Company, LLC
Electronic Mail Distribution
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee, FL 32304
William A. Passetti
Bureau of Radiation Control
Department of Health
Electronic Mail Distribution
Craig Fugate, Director
Division of Emergency Preparedness
Department of Community Affairs
Electronic Mail Distribution
Chairman
Board of County Commissioners
Citrus County
110 N. Apopka Avenue
Inverness, FL 36250
Jim Mallay
Framatome Technologies
Electronic Mail Distribution
Ronald W. Davis
Training Manager
Crystal River Nuclear Plant
8200 W Venable Street
Crystal River, FL 34429
_________________________
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA/
/RA/
NAME
MBates:pmd
JMoorman
JMunday
DATE
4/ 10 /06
4/ 16 /06
4/ 10 /06
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO