ML092610459

From kanterella
Jump to navigation Jump to search
Operator Licensing Written Examination Approval 05000302/2009301
ML092610459
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/17/2009
From: Widmann M
NRC/RGN-II/DRS/OLB
To: Dixon P
Progress Energy Florida
References
50-302/09-301
Download: ML092610459 (2)


See also: IR 05000302/2009301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

September 17, 2009

Ms. Phyllis Dixon, Training Manager

Crystal River Nuclear Plant

8200 West Venable Street

Crystal River, FL 34429

SUBJECT: CRYSTAL RIVER POWER STATION - OPERATOR LICENSING WRITTEN

EXAMINATION APPROVAL 05000302/2009301

Dear Ms. Dixon:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written

examination at Crystal River Power Plant.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license

applications submitted in connection with this examination and separately provided a list of approved

applicants to your office. The NRC staff administered operating tests to these individuals, as applicable,

during the weeks of August 31, 2009 and September 14, 2009. Note that any examination waivers and

application denials have been addressed in separate correspondence.

The NRC has approved the subject written examination and hereby authorizes you to administer the

written examination in accordance with Revision 9, Supplement 1, of NUREG-1021, Operator Licensing

Examination Standards for Power Reactors, on September 22, 2009.

This examination has undergone extensive review by my staff and representatives responsible for operator

training at your facility. Based on this review I have concluded that the examination meets the guidelines of

NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you

also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of

licensed operators at your facility. If you determine that this examination is not appropriate for licensing

operators at your facility, do not administer the examination and contact me at (404) 562-4550.

Please contact your Chief Examiner, Mr. Gerry Laska, at (404) 562-4626 if you have any questions or

identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete

written examination and/or operating test) specified for each applicant on the list of approved applicants.

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket No.: 50-302

License No.: DPR-72

G SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE /RA/ /RA/

NAME GLASKA:JCB MWIDMANN

DATE 9/17/2009 9/17/09 9/ /2009 9/ /2009 9/ /2009 9/ /2009 9/ /2009

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO