MONTHYEARRA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML1133404102011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative Documents ML1133404292011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative JPMs ML1133404252011-11-28028 November 2011 Initial Exam 2011-301 Final Sim/In-Plant JPMs ML1133404222011-11-28028 November 2011 Initial Exam 2011-301 Final Simulator Scenarios ML1133404202011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative Documents ML1133404182011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative JPMs ML1133404172011-11-28028 November 2011 Initial Exam 2011-301 Draft Sim/In-Plant JPMs ML1133404162011-11-28028 November 2011 Initial Exam 2011-301 Draft Simulator Scenarios ML1133404142011-11-28028 November 2011 Initial Exam 2011-301 Draft SRO Written Exam ML1133404122011-11-28028 November 2011 Initial Exam 2011-301 Draft RO Written Exam IR 05000302/20113012011-10-24024 October 2011 Er 05000302-11-301; Operating Test September 12 - 16 & Written Exam September 22, 2011; Crystal River Unit 3; Operator License Examinations ML1128705742011-10-13013 October 2011 Initial Exam 2011-301 Final RO Written Exam ML1128705722011-10-13013 October 2011 Initial Exam 2011-301 Final SRO Written Exam ML1020106232010-07-16016 July 2010 NRC Generic Fundamentals Examination Results ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML0932702122009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative JPMs ML0932702032009-11-18018 November 2009 Initial Exam 2009-301 Final Sim/In - Plant JPMs ML0932701962009-11-18018 November 2009 Initial Exam 2009-301 Final Simulator Scenarios ML0932701912009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative Documents ML0932701852009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative JPMs ML0932701812009-11-18018 November 2009 Initial Exam 2009-301 Draft Sim/IN-Plant JPMs ML0932701572009-11-18018 November 2009 Initial Exam 2009-301 Draft Simulator Scenarios ML0932701452009-11-18018 November 2009 Initial Exam 2009-301 Draft SRO Written Exam ML0932701412009-11-18018 November 2009 Initial Exam 2009-301 Draft RO Written Exam ML0932701322009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative Documents ML0928906372009-10-16016 October 2009 Initial Exam 2009-301 Final RO Written Exam ML0928906422009-10-16016 October 2009 Initial Exam 2009-301 Final SRO Written Exam ML0928906472009-09-28028 September 2009 2009 Reactor Operator and Senior Reactor Operator Written Examination Package and Post-Exam Comments ML0926104592009-09-17017 September 2009 Operator Licensing Written Examination Approval 05000302/2009301 3F0609-04, Initial Exam 2009-301 General Correspondence2009-06-10010 June 2009 Initial Exam 2009-301 General Correspondence ML0806704722008-02-14014 February 2008 Retake Exam - 05000302-08-301 Draft Admin JPMs ML0806704472008-02-14014 February 2008 Rtk Exam - 05000302-08-301 Final Admin JPMs ML0806704152008-02-14014 February 2008 Retake Exam - 05000302-08-301 Administrative Documents 3F0108-09, Summary of Ultrasonic Examination Results of Structural Weld Overlays2008-01-23023 January 2008 Summary of Ultrasonic Examination Results of Structural Weld Overlays ML0733212682007-11-29029 November 2007 October Exam 05000302-07-301 Licensee Post-Exam Comments ML0733212782007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam with Answers, References, and KAs ML0733212742007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam List of References ML0610802472006-04-17017 April 2006 Senior Reactor Operator Initial Retake Examination - Crystal River Nuclear Plant 05000302/2006301 ML0601000342006-01-0505 January 2006 Requalification Program Inspection - Crystal River Plant ML0607502602005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft RO Written Exam IR 05000302/20053012005-10-31031 October 2005 NRC Examination Report 05000302-05-301 ML0528000302005-10-31031 October 2005 October 2005 Exam, 05000302/2005-301 Final RO Written Exam ML0607502482005-10-31031 October 2005 September 2005 Exam 05000302/2005301 Administrative Documents ML0607502512005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Scenarios & Outlines ML0607502542005-10-31031 October 2005 October 2005 Exam 05000302/2005301, Draft JPMs & Outlines ML0607502572005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Written Exam Quality Checklist (ES-401-6) & Written Exam Sample Plan ML0528000322005-10-31031 October 2005 October 2005 Exam 0500302/2005301 Final SRO Written Exam ML0607502612005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft SRO Written Exam ML0607502702005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Jpms 2014-06-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML1133404102011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative Documents ML1133404292011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative JPMs ML1133404252011-11-28028 November 2011 Initial Exam 2011-301 Final Sim/In-Plant JPMs ML1133404222011-11-28028 November 2011 Initial Exam 2011-301 Final Simulator Scenarios ML1133404202011-11-28028 November 2011 Initial Exam 2011-301 Final Administrative Documents ML1133404182011-11-28028 November 2011 Initial Exam 2011-301 Draft Administrative JPMs ML1133404172011-11-28028 November 2011 Initial Exam 2011-301 Draft Sim/In-Plant JPMs ML1133404162011-11-28028 November 2011 Initial Exam 2011-301 Draft Simulator Scenarios ML1133404142011-11-28028 November 2011 Initial Exam 2011-301 Draft SRO Written Exam ML1133404122011-11-28028 November 2011 Initial Exam 2011-301 Draft RO Written Exam IR 05000302/20113012011-10-24024 October 2011 Er 05000302-11-301; Operating Test September 12 - 16 & Written Exam September 22, 2011; Crystal River Unit 3; Operator License Examinations ML1128705742011-10-13013 October 2011 Initial Exam 2011-301 Final RO Written Exam ML1128705722011-10-13013 October 2011 Initial Exam 2011-301 Final SRO Written Exam ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML0932702122009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative JPMs ML0932702032009-11-18018 November 2009 Initial Exam 2009-301 Final Sim/In - Plant JPMs ML0932701962009-11-18018 November 2009 Initial Exam 2009-301 Final Simulator Scenarios ML0932701912009-11-18018 November 2009 Initial Exam 2009-301 Final Administrative Documents ML0932701852009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative JPMs ML0932701812009-11-18018 November 2009 Initial Exam 2009-301 Draft Sim/IN-Plant JPMs ML0932701572009-11-18018 November 2009 Initial Exam 2009-301 Draft Simulator Scenarios ML0932701452009-11-18018 November 2009 Initial Exam 2009-301 Draft SRO Written Exam ML0932701412009-11-18018 November 2009 Initial Exam 2009-301 Draft RO Written Exam ML0932701322009-11-18018 November 2009 Initial Exam 2009-301 Draft Administrative Documents ML0928906372009-10-16016 October 2009 Initial Exam 2009-301 Final RO Written Exam ML0928906422009-10-16016 October 2009 Initial Exam 2009-301 Final SRO Written Exam ML0928906472009-09-28028 September 2009 2009 Reactor Operator and Senior Reactor Operator Written Examination Package and Post-Exam Comments ML0926104592009-09-17017 September 2009 Operator Licensing Written Examination Approval 05000302/2009301 3F0609-04, Initial Exam 2009-301 General Correspondence2009-06-10010 June 2009 Initial Exam 2009-301 General Correspondence ML0806704472008-02-14014 February 2008 Rtk Exam - 05000302-08-301 Final Admin JPMs ML0806704152008-02-14014 February 2008 Retake Exam - 05000302-08-301 Administrative Documents ML0806704722008-02-14014 February 2008 Retake Exam - 05000302-08-301 Draft Admin JPMs 3F0108-09, Summary of Ultrasonic Examination Results of Structural Weld Overlays2008-01-23023 January 2008 Summary of Ultrasonic Examination Results of Structural Weld Overlays ML0733212782007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam with Answers, References, and KAs ML0733212742007-11-29029 November 2007 October Exam 05000302-07-301 Final RO-SRO Written Exam List of References ML0733212682007-11-29029 November 2007 October Exam 05000302-07-301 Licensee Post-Exam Comments ML0610802472006-04-17017 April 2006 Senior Reactor Operator Initial Retake Examination - Crystal River Nuclear Plant 05000302/2006301 ML0601000342006-01-0505 January 2006 Requalification Program Inspection - Crystal River Plant ML0607502782005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Sample Plans/Outlines ML0607502482005-10-31031 October 2005 September 2005 Exam 05000302/2005301 Administrative Documents ML0607502512005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Scenarios & Outlines ML0607502542005-10-31031 October 2005 October 2005 Exam 05000302/2005301, Draft JPMs & Outlines ML0607502572005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft Written Exam Quality Checklist (ES-401-6) & Written Exam Sample Plan ML0607502602005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft RO Written Exam ML0607502612005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Draft SRO Written Exam ML0607502702005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Jpms ML0607502732005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Scenarios ML0607502832005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Final Written Outlines, Combined Ro/Sro with Kas, Answers, References & Analysis ML0528000252005-10-31031 October 2005 October 2005 Exam 05000302/2005301 Post-Exam Comments 2014-06-03
[Table view] |
Text
ber 31, 2005
SUBJECT:
CRYSTAL RIVER UNIT 3 - NRC EXAMINATION REPORT 05000302/2005301
Dear Mr. Young:
During the period September 12-15, 2005, the Nuclear Regulatory Commission (NRC)
administered operating examinations to employees of your company who had applied for licenses to operate your Crystal River Unit 3. At the conclusion of the examination, the examiners discussed the examination questions and preliminary findings with those members of your staff identified in the enclosed report. The written examination was administered by your staff on September 19, 2005.
Two Reactor Operator (RO) and two Senior Reactor Operator (SRO) applicants passed both the written and operating examinations. One SRO applicant failed the simulator portion of the operating test. There was one post examination comment. This comment is summarized in Enclosure 2. A Simulation Facility Report is included in this report as Enclosure 3.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4647.
Sincerely,
/RA/
James H. Moorman, III, Chief Operations Branch Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72
Enclosures:
(See page 2)
FPC 2 Enclosures: 1. Report Details 2. NRC Post Examination Comment Resolution.
3. Simulation Facility Report
REGION II==
Docket No.: 50-302 License No.: DPR-72 Report No.: 05000302/2005301 Licensee: Progress Energy Florida (Florida Power Corporation)
Facility: Crystal River Unit 3 Location: 15760 Power Line Street Crystal River, FL 34428 Dates: Operating Tests - September 12 - 15, 2005 Written Examination - September 19, 2005 Examiners: G. Laska, Chief, Senior Operations Examiner S. Rose, Senior Operations Engineer R. Aiello, Senior Operations Engineer Approved by: James H. Moorman, III, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS ER 05000302/2005301, 9/12-19/2005; Crystal River Unit 3; Licensed Operator Examinations.
The NRC examiners conducted operator licensing initial examinations in accordance with the guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR
§55.41, §55.43, and §55.45.
The NRC administered the operating tests during the period of September 12-15, 2005.
Members of the Crystal River Unit 3 training staff administered the written examination on September 19, 2005. The written examinations and the operating tests were developed by the Crystal River Training Staff.
Two Reactor Operators (RO) and two Senior Reactor Operators (SRO) passed both the operating test and written examination. One SRO applicant failed the simulator portion of the operating test. All of the applicants who passed their examinations were issued operator licenses commensurate with the level of examination administered. There was one post examination comment.
No findings of significance were identified.
Report Details 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope The Crystal River Unit 3 Training Staff developed operating test and written examinations in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9. The licensees examination team reviewed the proposed examinations. Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.
The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of examinations and tests.
The examiners evaluated two RO and three SRO applicants who were being assessed under the guidelines specified in NUREG-1021. The examiners administered the operating tests during the period of September 12-15, 2005. Members of the Crystal River Unit 3 training staff administered the written examination on September 19, 2005. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the Crystal River Unit 3, met requirements specified in 10 CFR 55, Operators Licenses.
b. Findings No findings of significance were identified.
The NRC determined that the details provided by the licensee for the walkthrough and simulator tests were within the range of acceptability expected for the proposed tests.
Two RO and two SRO applicants passed both the operating test and written examination. One SRO applicant failed the simulator portion of the operating test.
The final RO and SRO written examinations with knowledge and abilities (K/As)
question references/answers, examination references, and licensees post examination comments may be accessed in the ADAMS system (ADAMS Accession Numbers, ML052800030, ML052800032, and ML052800025).
The exam team noted several generic weaknesses during the exam; inconsistent use of Annunciator Response (AR) procedures, systems knowledge of operation and importance of low head injection and building spray, and inconsistent marking of procedure steps N/A. Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.
4OA6 Meetings Exit Meeting Summary On September 16, 2005, the examination team discussed generic issues with Mr. and members of the Crystal River Unit 3 staff. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee personnel D. Young, Vice President - CR3 J. Franke, Plant General Manager R. Davis, Training Manager D. Roderick, Director Site Operations M. Van Sicklen, Supervisor Operator Initial Training T. Hobbs, Manager Nuclear Assessment Section D. Jones, Supervisor Operations Training B. Wunderly, Manager Shift Operations J. Owen, Supervisor Operator Continuing Training.
NRC personnel G. Laska, Senior Operations Engineer S. Rose, Senior Operations Engineer
Crystal River 2005-301 NRC Resolution to the Crystal River Post Examination Comment A complete text of the licensees post-exam comments can be found in ADAMS under Accession Number ML052800025.
ADMIN JPM - CO2 Calculate SDM with a Misaligned Control Rod LICENSEE COMMENT:
Following performance of Administrative JPM titled Calculate SDM with a Misaligned Control Rod, one candidate used a Xenon value of 0.0% K/K to perform his calculation instead of - 2.48% K/K, the value provided on the Candidate Cue sheet. His final SDM calculation of approximately + 3.15% K/K differs from the value of approximately + 0.7% K/K provided in the key.
Further review of SP-421, Reactivity Balance Calculations, reveals that when calculating Shutdown Margin it is acceptable to use either the given Xenon value or a value of 0.0%.
Specifically, the procedure states the following in Note 6 of Enclosure 1B: Using a Xenon value of 0.0% K/K is conservative and may be used at any time.
Based on this information we request that both calculations be accepted as correct for this JPM.
NRC RESOLUTION:
Recommendation accepted. The JPM answer key will be changed to accept the calculation with the xenon value given, or using a value of 0.0% K/K .
Enclosure 2
SIMULATION FACILITY REPORT Facility Licensee: Crystal River Unit 3 Facility Docket Nos.: 05000302 Operating Tests Administered on: September 12-15, 2005 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance in accordance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating tests, examiners observed the following items:
4. While setting up the simulator for a scenario it was noted that a portion of the control board was not responding correctly. It was determined that a fuse had blown. The fuse was replaced and the simulator was ready to run in approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. No other problems were encountered.
Enclosure 3