ML113340422

From kanterella
Jump to navigation Jump to search
Initial Exam 2011-301 Final Simulator Scenarios
ML113340422
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/28/2011
From:
NRC/RGN-II/DRS/OLB
To:
Progress Energy Florida
References
50-302/11-301
Download: ML113340422 (82)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: Crystal Unit #3 Scenario No. 1 (NRC 2011) Op-Test No.: 1 Examiners: K. Schaaf Operators: ______________________

M. Broussard D. Bacon ______________________

J. Kretz P. Capehart ______________________

J. Jernigan Initial Conditions: The plant is at 75% power due to the loss of RCP-1D.

Turnover: The following equipment is OOS: Breaker 3210 (EDG-1B) (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />);

FWP-7 (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />); RWP-1, emergency use only. All required surveillances have been completed.

Event Malf. Event Event No. No. Type* Description 1 1 C (RO) FWP-2A thrust bearing friction. (AP-510/AP-545)

C (BOP) RWP-2A trips. (AR-301) 2 2 TS (SRO) SRO TS determination. (TS 3.7.9 & 3.8.1.B.2)

B ES Bus is lost due to troubleshooting activities associated C (BOP) 3 3 with the B EDG breaker. (AP-770)

TS (SRO)

SRO TS determination. (TS 3.0.3 & 3.8.9) 4 N/A R (RO) Manual power reduction. (AP-510)

Perform EOP-14, Enclosure 23, electrical bus swap. (EOP-5 N/A N (BOP) 14) 6 4 C (RO) FWV-40 malfunction requiring reactor trip. (AI-505) 7 5 C (RO) Turbine fails to trip. [CT] (EOP-02)

EFP-3 fails to start and ASV-5 fails to open.

8 6 M (ALL)

(EOP-13, Rule 3 & EOP-04)

Start EFP-1 or commence HPI/PORV cooling. [CT]

9 N/A C (BOP)

(EOP-14, Enclosure 7)

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor September 22, 2011 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Scenario Outline (D-1) Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Rev.: 00 Event

Description:

(Examiner Cue) After turnover is completed FWP-2A thrust bearing slowly fails. (MALF) High bearing temperature alarm will require shutdown of feedwater pump. A manual plant runback (AP-510) will probably be started and the FWP tripped at 50% power.

The CRS may elect to trip the pump at the current power level and perform the actions of AP-545. Either choice is acceptable.

Time Position Applicants Actions or Behavior

  • Recognize computer alarm o FWP thrust bearing temperature high (computer alarm does not come in until approximately 2 minutes after the failure is input) o Monitor rising thrust bearing temperature RO
  • May elect to trip the pump at this time based on high thrust bearing temperature o (L-1-2) FWP A Vibration High (possible) o (L-3-4) FWP Brg Oil Drain Temp High (possible) o (L-3-5) FWP Oil Clr Outlet Temp High (possible)
  • Evaluates FWP alarms
  • Makes determination to secure FWP-2A SRO
  • Directs RO/BOP actions IAW AP-510 and/or AP-545
  • Contacts work controls to initiate repair efforts 9/22/2011 Page 1 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Rev.: 00 Event

Description:

(Examiner Cue) After turnover is completed FWP-2A thrust bearing slowly fails. (MALF) High bearing temperature alarm will require shutdown of feedwater pump. A manual plant runback (AP-510) will probably be started and the FWP tripped at 50% power.

The CRS may elect to trip the pump at the current power level and perform the actions of AP-545. Either choice is acceptable.

Time Position Applicants Actions or Behavior

  • AP-510 actions:

o Notifies plant personnel o Notifies Chemistry of power change o Verifies Imbalance within limits o Notifies SPO to isolate MSR Shell Drain Heat Exchangers (N/A) o When Rx power < 80% notifies SPO to ensure MS is supplying AS (N/A) o Notify PPO to align EFIC MFW isolation switches o Maintains DFT level between 9 and 11 feet 6 in BOP o Ensures AUX transformer not supplying any bus Transfers loads to Startup transformer Performs EOP-14, Enclosure 23, Shutdown Electrical Lineup (attached)

  • AP-545 actions:

o Notifies plant personnel o Notifies Chemistry of power change o Ensure regulating rod index is within limits o Notify PPO to align EFIC MFW isolation switches o Verifies Imbalance within limits 9/22/2011 Page 2 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Rev.: 00 Event

Description:

(Examiner Cue) After turnover is completed FWP-2A thrust bearing slowly fails. (MALF) High bearing temperature alarm will require shutdown of feedwater pump. A manual plant runback (AP-510) will probably be started and the FWP tripped at 50% power.

The CRS may elect to trip the pump at the current power level and perform the actions of AP-545. Either choice is acceptable.

Time Position Applicants Actions or Behavior

  • AP-510 actions:

o Adjusts load rate per CRS instructions o Adjusts Unit Load Master to 10 o Maintains PZR level (Rule 7, attached) o Ensures MBVs remain closed

  • Monitors plant parameters
  • AP-545 actions:

o Ensure plant runback is in progress RO o Ensure proper FW valve positions

  • FWV-28 open
  • FWV-30 closed
  • FWV-29 closed o Ensure reactor power is less than maximum
  • Manually lowers power to <1174 MWt o Ensure vital plant parameters are approaching stability o Verify rods with + 6.5% of group average
  • Monitors plant parameters 9/22/2011 Page 3 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 2 Rev.: 00 Event

Description:

(Examiner Cue) RWP-2A fails due to an SW leak into its oil cooler. RWP-2B auto-start is defeated. BOP must manually start RWP-2B. SW is isolated to RWP-2As oil cooler. TS 3.7.9, Condition A, and TS 3.8.1, required Action B.2, are now applicable.

Time Position Applicants Actions or Behavior

  • Acknowledge alarms o (A-8-3) SW RW Pump A Motor Overload o (C-3-5) SW RW System Pressure Low BOP o (A-8-2) SW RW Pump B Trip o Reviews AR-304
  • Checks for common cause failure prior to starting RWP-2B
  • Notifies SRO of RWP-2A failure
  • Evaluates possible common cause failure concerns SRO
  • Directs PPO to check RWP-2A and report back
  • Directs PPO to isolate SW to RWP-2A
  • Places RWP-2A in PTL or directs PPO to open DC knife switch
  • Starts RWP-2B
  • Directs BOP to start RWP-2B
  • Directs isolation of SW to RWP-2A
  • Directs BOP to secure RWP-2A SRO
  • Evaluates TS for applicability o TS 3.7.9, Condition A, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> o TS 3.8.1, Required Action B2, is applicable (after 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> TS 3.0.3 must be entered)
  • Contacts work controls to initiate repair efforts 9/22/2011 Page 4 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Rev.: 00 Event

Description:

(Examiner Cue) After RWP-2B is started and TS actions addressed breaker 3206 opens, feeder breaker to the B ES 4160V bus. The over-current relaying is shorted out.

(MALF) This is due to troubleshooting activities associated with EDG-1B. RWP-2B and other miscellaneous plant equipment is lost. The loss of RWP-2B requires entry into TS 3.0.3.

Time Position Applicants Actions or Behavior

  • Announces and responds to alarms associated with the loss of the B ES 4160V bus
  • Performs the followup actions of AP-770 as directed o Ensures letdown flow path o Notifies plant personnel o Ensures at least 1 SW pump is running o Ensures RWP-1 is running o Verifies a MUP running o Verifies MUP cooling pumps running o Performs EOP-14, Enclosure 4, Letdown Recovery (attached) if letdown restoration is desired (N/A) o Verifies 4160V Reactor Aux Bus 3 is energized o Ensures ES MCC 3AB is energized o Verifies proper CC cooling Performs EOP-14, Enclosure 17 (not required, A train ventilation in service) o Verifies 4160V Unit bus status BOP o Verifies ES 480V UV lockout status (no lockouts) o Verifies IA pressure > 90 psig o Ensure RB cooling in service Closes SWV-151, 152 & 355 Opens SWV-353 & 354 o Verifies PZR power supply status o Prevents MUP auto start on B ES bus Ensure ES actuations reset o Prevents pump auto start capability on B ES bus Places RWP-2B and SWP-1B in PTL o Ensures breakers 3212, 3206, 3208 & 3210 open o Ensures ES 4160V bus available for recovery Per earlier role play the B ES bus is NOT available for recovery, also 86B-3206 LO is tripped o May notify PPO to restore heat tracing o Verifies SF cooling in operation o Verifies FSP operation 9/22/2011 Page 5 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 3 Rev.: 00 Event

Description:

(Examiner Cue) After RWP-2B is started and TS actions addressed breaker 3206 opens, feeder breaker to the B ES 4160V bus. The over-current relaying is shorted out.

(MALF) This is due to troubleshooting activities associated with EDG-1B. RWP-2B and other miscellaneous plant equipment is lost. The loss of RWP-2B requires entry into TS 3.0.3.

Time Position Applicants Actions or Behavior RO

  • Monitors plant parameters
  • Enters AP-770 and directs followup actions
  • Directs BOP to start RWP-1 and have PPO monitor its operation
  • May direct BOP to concurrently perform Enclosure 1, Recovery of Faulted ES Bus (no actions since bus cannot be recovered)
  • Determines ES Bus NOT available for recovery
  • Exits AP-770 at Step 3.56 SRO
  • Evaluates TS for applicability o TS 3.8.9, Condition A, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> o TS 3.0.3, plant shutdown required due to loss of both safety related RWPs
  • Directs RO to start a plant shutdown per AP-510
  • Contacts work controls to initiate repair efforts 9/22/2011 Page 6 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 4 Rev.: 00 Event

Description:

(Normal Evolution) Plant shutdown started IAW AP-510, Rapid Power Reduction.

Time Position Applicants Actions or Behavior

  • Starts power reduction o Adjusts load rate per CRS instructions RO o Adjusts Unit Load Master to 10 o Maintains PZR level (Rule 7 attached)
  • Monitors plant parameters SRO
  • Directs RO/BOP actions IAW AP-510
  • Performs actions as directed o Notifies plant personnel o Notifies Chemistry of power change o Verifies Imbalance within limits BOP o Notifies SPO to isolate MSR Shell Drain Heat Exchangers o When Rx power < 80% notifies SPO to ensure MS is supplying AS (N/A) o Maintains DFT level between 9 and 11 feet 6 in 9/22/2011 Page 7 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 5 Rev.: 00 Event

Description:

(Normal Evolution) During the power reduction the BOP will perform EOP-14, Enclosure 23, Shutdown Electrical Lineup.

Time Position Applicants Actions or Behavior

  • Performs EOP-14, Enclosure 23, Shutdown Electrical Lineup BOP (attached)

SRO

  • Directs BOP to perform EOP-14, Enclosure 23 9/22/2011 Page 8 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 Rev.: 00 Event

Description:

(Examiner Cue) Following a 5% to 10% power reduction FWV-40 will slowly fail closed. (MALF) This results in a loss of all MFW flow to the A train. The CRS should direct a reactor trip and initiation of EFW.

Time Position Applicants Actions or Behavior

  • Recognize lower MFW flow o SU flow lowering o Valve position indication RO o LLBV closing
  • May attempt to raise flow with the FWV-40 control station
  • May attempt to open FWV-31
  • Assists in diagnosing lowering FW flow SRO
  • Directs the RO to trip the reactor and perform EOP-02 actions BOP
  • Assists in diagnosing lowering FW flow
  • Manually trips the reactor when directed o Depresses Rx trip push button RO o Verifies CRD groups 1 through 7 are fully inserted o Verifies NIs indicate the Rx is shutdown o Verifies SPDS is available 9/22/2011 Page 9 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 7 Rev.: 00 Event

Description:

(Examiner Cue) After the reactor trip the turbine will fail to trip. (MALF)

The RO will close all MSIVs (CT) per the Immediate Actions of EOP-2. The BOP will initiate EFIC and verify EFW flow. A symptom scan will be performed after the Immediate Actions of EOP-2 have been verified by the SRO and RO.

Time Position Applicants Actions or Behavior

  • Performs Immediate Actions of EOP-2 o Depresses Main Turbine trip push button o Verifies TVs and GVs are closed RO Closes MSIVs when turbine does not trip (CT)
  • To meet this CT the MSIVs must be closed prior to OTSG pressure reaching 600 psig.
  • Directs the BOP to ensure EFW is operating SRO
  • Enters EOP-2 and verifies Immediate Actions are complete
  • Perform symptom scan 9/22/2011 Page 10 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 1 Event No.: 8/9 Rev.: 00 Event

Description:

(Conditional) EFP-3s diesel start circuit is blocked and will not start.

(MALF) ASV-5 will not open when commanded by EFIC. (MALF) The BOP should attempt to open ASV-5. The BOP may attempt to open ASV-204, which will open, however EFP-2 will trip two minutes later. The SRO may elect to enter EOP-4 at this time or may wait until symptoms are apparent. EOP-14, Enclosure 7, will be entered and EFP-1 started. (CT)

Time Position Applicants Actions or Behavior

  • Respond to important alarms
  • Diagnoses EFP-3 failure o Attempts to start EFP-3
  • Diagnoses EFP-2 failure o (H-7-3) EF Pump 2 Start Failure
  • Attempts to open ASV-5 (prompt and prudent action)
  • May attempt to open ASV-204
  • Reports failures to SRO
  • Performs actions as directed from EOP-4 RO/BOP o Notify personnel o Start EFP-1 per EOP-14, Enclosure 7 (CT) (attached)

To meet this CT EFP-1 must be started prior to exiting Enclosure 7.

  • Notifies PPO to perform EOP-14, Enclosure 2
  • Maintain PZR level o Adjust MUV-31 to 100 inches (Rule 7 attached) o Record Tincore temp o Minimize RCS pressure rise o Secure RCP-1A if adequate SCM exists
  • Assists in diagnosing EF pump failures
  • Directs RO/BOP to open ASV-204
  • Evaluates loss of all feedwater o May enter EOP-04 at this time, or SRO o May wait until symptoms are apparent
  • Direct actions of EOP-04 o Directs RO/BOP to perform EOP-14, Enclosure 7 (attached)

The scenario may be terminated when EFP-1 is started and controlled EFW flow to each OTSG is achieved.

9/22/2011 Page 11 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 1, LOSS OF SCM

  • ___ IF < 1 min has elapsed since losing adequate SCM, THEN immediately stop all RCPs.
  • ___ IF RCPs were NOT stopped
  • ___ Progress toward a maximum within 1 min, allowable plant cooldown to achieve THEN ensure all operating RCPs CFT and LPI flow as soon as remain running until any of the possible.

following exist:

___ SCM is restored

___ LPI flow > 1400 gpm in each injection line.

  • ___ Manually actuate ES.
  • ___ Depress "HPI MAN ACT" push buttons on Trains A and B.
  • ___ Depress "RB ISO MAN ACTUATION" push buttons on Trains A and B.
  • ___ IF LPI has NOT actuated, AND RCS PRESS 300 psig, THEN depress "LPI MAN ACT" push buttons on Trains A and B.
  • ___ Depress "ISCM" push buttons for EFIC channels A and B.
  • ___ Ensure Tincore is selected on SPDS.

9/22/2011 Page 12 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 2, HPI CONTROL

  • ___ IF HPI has actuated, 1 ___ Obtain SRO concurrence to bypass THEN bypass or reset or reset ES.

ES actuation.

2 Bypass or reset ES actuation:

___ Auto

___ Manual

  • ___ Open MUP recirc prior to
  • ___ IF recirc to MUT is desired, throttling HPI flow THEN open MUP recirc to MUT valves:

< 200 gpm/pump.

___ MUV-53 ___ MUV-257

  • ___ IF recirc to RB sump is desired, THEN open HPI recirc to sump valves:

___ MUV-543 ___ MUV-544

___ MUV-545 ___ MUV-546

  • ___ IF adequate SCM exists based,
  • ___ Prevent exceeding NDT limit on Tincore, THEN throttle HPI to maintain
  • ___ IF OTSG isolated for TRACC, required conditions. THEN maintain RCS PRESS

<1000 psig.

  • ___ IF PTS, SGTR, or dry OTSG exists, THEN maintain minimum adequate SCM.
  • ___ IF adequate SCM can be
  • ___ Ensure running HPI pump is maintained with 1 HPI pump, aligned to MUT.

AND stopping second HPI pump is desired, THEN stop 1 HPI pump.

9/22/2011 Page 13 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 3, EFW/AFW CONTROL

  • ___ Ensure available OTSGs are at "LLL" > 20 in or trending toward required level.

"NAT CIRC" > 70%

"ISCM" > 90%

  • ___ IF manual control of EFW flow is 1 ___ Obtain SRO concurrence to place desired, EFIC in manual.

THEN establish manual EFIC control. 2 ___ Control EFW to maintain required EFW flow and OTSG level.

3 ___ IF EFW flow is NOT controlled, THEN depress EFIC channels A and B "MANUAL PERMISSIVE" push buttons and close affected EFW block valve.

  • ___ IF adequate SCM does NOT > 280 gpm in 1 line exist, 2 OTSGs to each OTSG AND level in available OTSGs EFW is NOT at or trending toward > 470 gpm in 1 line 1 OTSG ISCM level, to 1 OTSG THEN establish manual required > 250 gpm to flow. 2 OTSGs

< 300 gpm/OTSG AFW

> 450 gpm to 1 OTSG

< 600 gpm

  • ___ IF adequate SCM exists,
  • Do NOT allow OTSG level to lower.

THEN throttle flow to prevent OTSG PRESS from lowering

> 100 psig below desired PRESS.

9/22/2011 Page 14 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 4, PTS

  • ___ IF any of the following exist:
  • ___ Throttle HPI flow to minimize adequate SCM.

___ Tincore < 400°F, AND cooldown rate exceeds

  • ___ Throttle LPI flow to minimize ITS limit adequate SCM.

___ RCPs off,

  • ___ PTS is applicable until an AND HPI flow exists Engineering evaluation has been completed.

THEN perform required PTS actions.

9/22/2011 Page 15 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 7, PZR LEVEL CONTROL Rx Power > 25% 25% Rx Shutdown PZR Level Band 200 in - 240 in 120 in - 200 in 50 in - 120 in

  • ___ Control PZR level using normal
  • ___ Control letdown and MU flow makeup and letdown flow.
  • ___ Cycle BWST to MUP valve as required to maintain MUT level 55 in.

NOTE The Rx shall be tripped when an RCS leak exceeds the capacity of normal makeup and a SGTR is not in progress.

  • ___ IF PZR level cannot be controlled 1 ___ Close MUV-49 minimum level THEN establish HPI flow. 2 ___ IF PZR level does NOT recover, THEN open MUV-24.

3 ___ Notify SM to evaluate EP entry.

4 ___ IF PZR level does NOT recover, THEN start second MUP and required cooling pumps.

[Rule 5, Diesel Load Control]

5 ___ IF PZR level does NOT recover, THEN open additional HPI valves.

6 ___ IF PZR level does NOT recover, THEN close MUP to MUT recircs.

  • ___ IF PZR level is minimum level,
  • ___ IF letdown restoration is desired, AND adequate SCM exists THEN CONCURRENTLY PERFORM THEN restore normal PZR EOP-14, Enclosure 4, conditions. Letdown Recovery (if accessible).

9/22/2011 Page 16 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT ACTIONS DETAILS STATUS EFW required.

7.1 ___ Verify EFP-3 is running.

___ IF EFP-3 is NOT running, THEN GO TO Step 7.6 in this enclosure.

7.2 ___ IF MFW is NOT available,

  • Select MBV to MAN and select THEN ensure MFW remains all FW isolation valves to CLOSE.

isolated.

FW valve A OTSG B OTSG LLBV ___ FWV-31 ___ FWV-32 MBV toggle ___ "MAN" ___ "MAN" MBV ___ FWV-30 ___ FWV-29 SUBV ___ FWV-36 ___ FWV-33 Cross-tie ___ FWV-28 ___ FWV-28 Suction ___ FWV-14 ___ FWV-15 9/22/2011 Page 17 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS 7.3 ___ Verify EFP-2 is running.

___ IF EFP-2 is NOT running, THEN EXIT this enclosure.

7.4 ___ WHEN available OTSGs are at 1 ___ Ensure available OTSGs are at required required level, level.

THEN stop EFP-2 See Table 1 2 ___ Depress "MANUAL PERMISSIVE" or "TEST RESULTS/RESET" push button on EFIC channel B.

(as required) 3 Ensure EFP-2 steam supply valves are closed:

___ ASV-204

___ ASV-5 7.5 ___ WHEN EFP-2 is shutdown, THEN EXIT this enclosure.

9/22/2011 Page 18 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS STATUS EFP-3 not running.

7.6 ___ Verify EFP-2 is running.

___ IF EFP-2 is NOT running, THEN GO TO Step 7.8 in this enclosure.

7.7 ___ IF OTSG PRESS is 200 psig,

  • Control OTSG PRESS using TBVs and AND adequate primary to ADVs.

secondary heat transfer exists, THEN stop RCS cooldown.

7.8 ___ IF EDG A is supplying power to A ES 4160V Bus, THEN GO TO Step 7.15 in this enclosure.

7.9 ___ Verify EFP-1 is available.

___ IF EFP-1 is NOT available, THEN GO TO Step 7.15 in this enclosure.

9/22/2011 Page 19 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS STATUS EFP-1 available.

7.10 ___ Ensure EFP-1 is running. 1 ___ Depress "MANUAL PERMISSIVE" or "TEST RESULTS/RESET" push buttons on EFIC channel A and B.

(as required).

2 Ensure EFP-1 EFIC control valves to OTSGs are closed:

A OTSG B OTSG

___ EFV-58 ___ EFV-57 3 Ensure EFP-1 EFW block valves to available OTSGs are open:

A OTSG B OTSG

___ EFV-14 ___ EFV-33 4 ___ Ensure EFP-3 is in "PULL TO LOCK".

5 ___ Start EFP-1 9/22/2011 Page 20 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS 7.11 ___ Establish EFW flow to each

  • ___ IF adequate SCM exists, available OTSG. AND OTSG level is 121/2 in, THEN feed each available dry OTSG with continuous EFW flow to 1 line within the following limits:

___ Cooldown rate minimized See Table 2 EFW or AFW Flow Limit Any RCP running 390 gpm No RCPs running 200 gpm

  • ___ IF adequate SCM exists, AND OTSG level is > 121/2 in, THEN ensure EFW flow is controlled.

[Rule 3, EFW/AFW Control]

  • ___ IF adequate SCM does NOT exist, THEN feed available OTSGs at inadequate SCM flow rate.

[Rule 3, EFW/AFW Control]

9/22/2011 Page 21 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS 7.12 ___ IF EFP-2 is running, 1 ___ WHEN available OTSGs are at THEN stop EFP-2 required level, THEN ensure EFP-2 steam supply valves are closed:

___ ASV-204

___ ASV-5 See Table 1 2 ___ Depress "EFW INITIATE" push buttons on EFIC channel A.

7.13 ___ IF MFW is NOT available,

  • Select MBV to MAN and select THEN ensure MFW remains all FW isolation valves to CLOSE.

isolated.

FW valve A OTSG B OTSG LLBV ___ FWV-31 ___ FWV-32 MBV toggle ___ "MAN" ___ "MAN" MBV ___ FWV-30 ___ FWV-29 SUBV ___ FWV-36 ___ FWV-33 Cross-tie ___ FWV-28 ___ FWV-28 Suction ___ FWV-14 ___ FWV-15 7.14 ___ WHEN OTSG level in available OTSGs is > 121/2 in, THEN EXIT this enclosure.

9/22/2011 Page 22 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS STATUS Any of the following exist:

  • EDG A supplying power to the A ES 4160V Bus.
  • EFP-1 not available.

7.15 ___ Verify AFW is available.

  • ___ Verify all of the following exist:

___ Neither ES 4160V Bus aligned to Alternate AC Diesel

___ FWP-7 available

___ CDT-1 level > 9 ft

___ IF AFW is NOT available, THEN GO TO Step 7.24 in this enclosure.

9/22/2011 Page 23 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS 7.16 ___ Verify 4160V REACTOR AUX BUS 3 is energized.

___ IF 4160V REACTOR AUX 1 ___ Open Bkr 3223 BUS 3 is NOT energized, THEN energize 4160V 2 ___ Select Alternate AC Diesel to "START" REACTOR AUX BUS 3 and hold until "EGDG-1C AVAILABLE" white light is lit (normally < 10 seconds).

3 ___ Close Bkr 3225 4 ___ Verify 4160V REACTOR AUX BUS 3 voltage is stable.

5 ___ Notify SPO to open all doors to Non-1E battery and battery charger rooms (95 ft TB near IAPs).

9/22/2011 Page 24 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS 7.17 ___ IF EFP-2 is running,

  • ___ WHEN available OTSGs are at THEN ensure EFW control required level, valves are closed. THEN close EFIC control valves:

___ EFV-56

___ EFV-55 See Table 1 7.18 ___ Ensure AFW control valves are ___ FWV-216 closed.

___ FWV-217 7.19 ___ Start FWP-7 9/22/2011 Page 25 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS 7.20 ___ Establish AFW flow to each

  • ___ IF adequate SCM exists, available OTSG. AND OTSG level is 121/2 in, THEN feed each available dry OTSG with continuous AFW flow to 1 line within the following limits:

___ Cooldown rate minimized See Table 2 EFW or AFW Flow Limit Any RCP running 390 gpm No RCPs running 200 gpm

___ Maintain total AFW flow

< 600 gpm

  • ___ IF adequate SCM exists, AND OTSG level is > 121/2 in, THEN ensure AFW flow is controlled.

___ Maintain total AFW flow

< 600 gpm

[Rule 3, EFW/AFW Control]

  • ___ IF adequate SCM does NOT exist, THEN feed available OTSGs at inadequate SCM flow rate.

___ Maintain total AFW flow

< 600 gpm

[Rule 3, EFW/AFW Control]

9/22/2011 Page 26 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS 7.21 ___ IF EFP-2 is running, 1 ___ WHEN available OTSGs are at THEN stop EFP-2 required level, THEN depress "MANUAL PERMISSIVE" or "TEST RESULTS/RESET" push button on EFIC channel B.

(as required)

See Table 1 2 Close EFP-2 steam supply valves:

___ ASV-204

___ ASV-5 9/22/2011 Page 27 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 7 EFWP MANAGEMENT (CONT'D)

ACTIONS DETAILS 7.22 ___ IF MFW is NOT available,

  • Select MBV to MAN and select THEN ensure MFW remains all FW isolation valves to CLOSE.

isolated.

FW valve A OTSG B OTSG LLBV ___ FWV-31 ___ FWV-32 MBV toggle ___ "MAN" ___ "MAN" MBV ___ FWV-30 ___ FWV-29 SUBV ___ FWV-36 ___ FWV-33 Cross-tie ___ FWV-28 ___ FWV-28 Suction ___ FWV-14 ___ FWV-15 7.23 ___ WHEN OTSG level in available OTSGs is > 121/2 in, THEN EXIT this enclosure.

9/22/2011 Page 28 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 23 SHUTDOWN ELECTRICAL LINEUP ACTIONS DETAILS 23.1 ___ IF Bkr 3101 is closed, 1 ___ Select "AUTO TRANSFER 3103" to THEN transfer "MAN".

A 6900V BUS to the START UP transformer. 2 ___ Close Bkr 3103 3 ___ Open Bkr 3101 23.2 ___ IF Bkr 3201 is closed, 1 ___ Select "AUTO TRANSFER 3203" to THEN transfer "MAN".

A Unit 4160V BUS to the START UP transformer. 2 ___ Close Bkr 3203 3 ___ Open Bkr 3201 23.3 ___ IF Bkr 3102 is closed, 1 ___ Select "AUTO TRANSFER 3104" to THEN transfer "MAN".

B 6900V BUS to the START UP transformer. 2 ___ Close Bkr 3104 3 ___ Open Bkr 3102 23.4 ___ IF Bkr 3202 is closed, 1 ___ Select "AUTO TRANSFER 3204" to THEN transfer "MAN".

B Unit 4160V BUS to the START UP transformer. 2 ___ Close Bkr 3204 3 ___ Open Bkr 3202 23.5 ___ EXIT this enclosure.

9/22/2011 Page 29 of 29 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #1\SES #1 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Scenario Outline Form ES-D-1 Facility: Crystal River #3 Scenario No.: 3 (NRC 2011) Op-Test No.: 1 Examiners: K. Schaaf Operators: F. Lawrence P. Capehart M. Kennard D. Bacon D. Taylor Initial Conditions: The plant is in Mode 2 at 2% power.

Turnover: The following equipment is OOS: MUP-1A (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />); FWP-7 (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />);

RWP-1, emergency use only.

Event Malf. Event Event No. No. Type* Description I (RO)

RC-3A-PT1 fails high. (AP-520/OP-501/OP-507) 1 1 I (BOP)

SRO TS determination. (TS 3.3.1)

TS (SRO)

RM-A6 sample pumps fail.

2 2 TS (SRO)

SRO TS determination. (TS 3.4.14) 3 3 C (BOP) MUV-260 spurious closure. (AI-500)

C (RO) 4 4 RCP-1C seal failure. (OP-302, AP-545)

C (BOP)

OTSG tube leak on the B OTSG which will require a 5 5 M (ALL) reactor trip. (EOP-06) 6 6 C (RO) Manual Rx trip pushbutton failure. [CT] (EOP-06)

B MUP bearing degradation and pump trip. [CT]

7 7 C (BOP)

(EOP-06, EOP-13)

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor 9/22/2011 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC Scenario Outline (D-1) Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 3 Event No.: 1 Rev.: 0 Event

Description:

(Examiner Cue) Soon after turnover is complete RC-3A-PT1 (selected RCS narrow range pressure transmitter) will fail high [MALF]. This will cause the Spray valve and PORV to open. Prompt action by the RO will be required to prevent a reactor trip on low RCS pressure. AP-520 may be entered to verify correct immediate actions taken. TS 3.3.1, Condition A, will be entered. The CRS will direct the BOP to place RPS Channel A to Bypass per OP-507, Operation of the ES, RPS and ATWAS Systems.

Time Position Applicants Actions or Behavior

  • Announce/acknowledge alarms o (K-03-02) SASS Mismatch (RC Press mismatch) o (J-03-01) RCS Press High o Reviews AR-502
  • PZR Spray valve opens o PZR Spray or Block valve will be closed RO
  • PZR PORV may open if timely actions not taken o PORV or PORV block valve will be closed
  • Verifies the plant is stable
  • May create another CT if timely actions not taken (CRD trip override failure is in, ie reactor will not automatically trip if an RPS setpoint is reached)
  • Notifies SRO of failure
  • Assists the RO in diagnosing the failed pressure transmitter
  • Enters TS 3.3.1, Condition A, for RPS Channel A, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
  • May enter AP-520 to verify correct prompt and prudent actions SRO taken
  • Direct selection of alternate pressure transmitter IAW OP-501
  • Contacts work controls to initiate repair efforts 9/22/2011 Page 1 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 3 Event No.: 1 Rev.: 0 Event

Description:

(Examiner Cue) Soon after turnover is complete RC-3A-PT1 (selected RCS narrow range pressure transmitter) will fail high [MALF]. This will cause the Spray valve and PORV to open. Prompt action by the RO will be required to prevent a reactor trip on low RCS pressure. AP-520 may be entered to verify correct immediate actions taken. TS 3.3.1, Condition A, will be entered. The CRS will direct the BOP to place RPS Channel A to Bypass per OP-507, Operation of the ES, RPS and ATWAS Systems.

Time Position Applicants Actions or Behavior

  • Assists RO in diagnosing the failed pressure transmitter
  • Assists RO in verifying the plant is stable
  • Reviews alarms
  • Selects alternate pressure transmitter IAW OP-501 o PZR heaters to Hand o RCV-14 to manual o RCV-10 closed BOP o RC Pressure signal select switch to RPS-B position o PZR heaters to Auto o RCV-14 to Auto o RCV-10 to Auto
  • Bypasses RPS Channel A IAW OP-507 o Reposition channel bypass key switch in RPS Channel A o Verify J-05-03 annunciated o Verify EP 0965 9/22/2011 Page 2 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 3 Event No.: 2 Rev.: 0 Event

Description:

(Examiner Cue) Once the RPS channel is bypassed RM-A6 sample pumps will fail. This will require the SRO to enter TS 3.4.14, Condition B for RCS leakage detection instrumentation.

Time Position Applicants Actions or Behavior

  • Acknowledge alarm o (H-02-02) Atmospheric Monitor Warning o High flow light on RM panel BOP o Reviews AR
  • Inform SRO of RM-A6 failure
  • May request PPO to check monitor SRO
  • TS 3.4.14, RCS Leak Detection, Condition B, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 9/22/2011 Page 3 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 3 Event No.: 3/4 Rev.: 0 Event

Description:

(Examiner Cue) Once the TS determination is completed MUV-260 will close [MALF] (RCP-1C CBO isolation valve). The BOP will open the valve with SRO concurrence. Two minutes later RCP-1C will experience 1st and 2nd stage seal failures [MALF].

OP-302, RCP Operation, will direct securing the RCP immediately. AP-545 will be entered and actions performed.

Time Position Applicants Actions or Behavior

  • Announce/acknowledge alarms o (H-04-05) RCP Seal Bleed Off High
  • Recognizes MUV-260 has closed
  • Reviews AR-403 o Maximum of 5 minutes to reopen the valve
  • Requests permission to open the valve
  • Opens MUV-260
  • Assists BOP in diagnosing the failure SRO
  • Directs BOP to open MUV-260
  • Announce/acknowledge alarms o (I-04-04) RCP Seal Upper Stage Temp High RO/BOP
  • Reviews AR-501
  • Notifies SRO of failure 9/22/2011 Page 4 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 3 Event No.: 3/4 Rev.: 0 Event

Description:

(Examiner Cue) Once the TS determination is completed MUV-260 will close [MALF] (RCP-1C CBO isolation valve). The BOP will open the valve with SRO concurrence. Two minutes later RCP-1C will experience 1st and 2nd stage seal failures [MALF].

OP-302, RCP Operation, will direct securing the RCP immediately. AP-545 will be entered and actions performed.

Time Position Applicants Actions or Behavior

  • Assists the RO/BOP in diagnosing the failure
  • Directs the BOP to check the RCP Seal Data recorders
  • Directs the BOP to:

o Monitor RCP seal conditions SRO o Verify proper service water, seal injection flows and temperatures o Ensure CBO valve for affected pump is open

  • Determines to immediately trip RCP-1C due to high seal stage temperature and differential pressure > 2100 psig
  • Directs the RO/BOP to trip RCP-1C
  • Assist in diagnosing alarms o (H-04-05) RCP Seal Bleed Off High o (I-04-04) RCP Seal Upper Stage Temp High BOP
  • Determines that seal outlet temperatures are > 180 degrees and seal differential pressure is > 2100 psig
  • Perform additional actions as directed by the SRO SRO
  • Enters AP-545, Plant Runback, and directs RO/BOP actions 9/22/2011 Page 5 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 3 Event No.: 3/4 Rev.: 0 Event

Description:

(Examiner Cue) Once the TS determination is completed MUV-260 will close [MALF] (RCP-1C CBO isolation valve). The BOP will open the valve with SRO concurrence. Two minutes later RCP-1C will experience 1st and 2nd stage seal failures [MALF].

OP-302, RCP Operation, will direct securing the RCP immediately. AP-545 will be entered and actions performed.

Time Position Applicants Actions or Behavior

  • Perform actions as directed by the SRO o Ensure MFW flows are re-ratioing (very little change due to low power level) o Ensure RCS pressure is stable o Ensure Rx power is less than maximum based on FWPs o Ensure narrow range Tc is selected to RCP-1D RO
  • Selects TT3 on RC-5B-MS2 o Ensure delta Tc stabilizes o Ensure vital plant parameters are approaching stability
  • Verifies PZR level, Tave and MS Hdr Pressure are normal (Rule 7, PZR Level Control, attached) o Verify rods are within 6.5% of their group average height o Maintain imbalance within limits
  • Perform actions as directed by the SRO o Notify personnel of entry into AP-545 o Ensure narrow range RCS pressure control is selected to B RCS loop
  • Verifies RCS pressure control is selected to B loop in BOP SASS cabinets o Ensure lift oil pump running
  • Verifies RCP-3C is running o Ensure regulating rod index is within insertion limits
  • Refers to OP-103D 9/22/2011 Page 6 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 3 Event No.: 5/6 Rev.: 0 Event

Description:

(Examiner Cue) When the plant is stabilized, or following the shutdown of RCP-1C, a 30 gpm OTSG tube leak develops on the B OTSG [MT] . This will meet the criteria to enter an Unusual Event. Once diagnosed EOP-6, OTSG Tube Rupture, will be entered. The manual Rx trip pushbutton will fail [MALF] requiring breakers 3305 and 3312 to be opened. [CT]

Time Position Applicants Actions or Behavior

  • Direct BOP to determine leak rate
  • Announce/acknowledge alarms o (H-01-05) MN Steam Line A/B High Rad Monitor Fail RO/BOP o (H-02-02) Atmospheric Monitor Warning o (H-02-01) Atmospheric Radiation High
  • Determines > 1gpm leak rate for EOP-06 entry
  • Execute EOP actions in accordance with SRO directions o Maintain PZR level per Rule 7 (attached) o Notify personnel o Determine affected OTSG
  • B is affected OTSG o Close MSV-56 o Maintain DFT level between 9 and 11 ft 6 in o Ensure MBVs remain closed o Concurrently perform EOP-14, Enclosure 17, attached o Notify SPO to concurrently perform EOP-14, Enclosure 6 o Ensure MSR high pressure bundle valves are closed RO/BOP o Verify ICS aligned for shutdown conditions o Notify SPO to concurrently perform EOP-14, Enclosure 1 o When power < 20% trip the main turbine, N/A o Ensure generator output breakers open o Ensure field breaker open and voltage regulator OFF o Trip the reactor
  • Adjust MS Hdr Pressure setpoint to 46
  • Manual Rx trip pushbutton will fail
  • Breakers 3305 and 3312 must be opened [CT] prior to continuing past Step 3.27 (MSSV verification) o Verify control rod groups inserted 9/22/2011 Page 7 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 3 Event No.: 5/6 Rev.: 0 Event

Description:

(Examiner Cue) When the plant is stabilized, or following the shutdown of RCP-1C, a 30 gpm OTSG tube leak develops on the B OTSG [MT] . This will meet the criteria to enter an Unusual Event. Once diagnosed EOP-6, OTSG Tube Rupture, will be entered. The manual Rx trip pushbutton will fail [MALF] requiring breakers 3305 and 3312 to be opened. [CT]

Time Position Applicants Actions or Behavior o Verify NIs indicate Rx is shutdown

  • Monitor PR and IR NIs o Verify MSSVs are closed
  • Checks steam safety valve monitor o Notify SPO to concurrently perform EOP-14, Enclosure 13 o Notify personnel o Verify MSV-56 closed o Verify CC cooling running in emergency mode o Notify SPO to concurrently perform EOP-14, Enclosure 1 o Verify MUV-31 setpoint at 100 inches o Select PZR heaters to off o Bypass ES when any bypass permit exists o Maintain adequate SCM
  • Start RCS depressurization
  • Fully open Spray valve Spray valve does not work and Aux spray is not aligned, PORV must be used
  • Rule 2 & Rule 7 (attached) o Start RCS boration
  • Ensure at least 1 post-filter in service
  • Open CAV-60, start CAP-1A or 1B o Bypass EFIC when either OTSG < 725 psig o Start RCS cooldown within normal limits using both OTSGs o Verify OTSG levels at or trending to required level o Determine if preferential steaming is required o Ensure ES systems properly aligned 9/22/2011 Page 8 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 3 Event No.: 7 Rev.: 0 Event

Description:

(Automatic Parameter Cue) After HPI is bypassed, approximately 2 minutes, MUP-1B will experience a bearing failure and eventually trip [MALF]. MUP-1C and its cooling water pumps must be started prior to losing subcooling margin [CT].

Time Position Applicants Actions or Behavior

  • Direct RO/BOP actions for loss of running MUP
  • Rule 7, PZR Level control (attached) o Close MUV-49 o Ensure MUV-58 open SRO o Start required cooling water pumps for affected MUP o Start ES selected MUP
  • May use OP-402, Section 4.6 to start MUP-1C (either way is acceptable)
  • Execute EOP actions in accordance with SRO directions
  • Rule 7, PZR Level control (attached) o Ensure MUV-58 open o Check closed MUV-49 o Start required cooling water pumps for affected MUP RO/BOP
  • Starts RWP-3B
  • Starts DCP-1B o Start ES selected MUP prior to losing subcooling margin

[CT]

  • Starts MUP-1C o Maintain PZR level Scenario may be terminated when a plant cooldown/depressurization is started and makeup flow is restored.

9/22/2011 Page 9 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 1, LOSS OF SCM

  • ___ IF < 1 min has elapsed since losing adequate SCM, THEN immediately stop all RCPs.
  • ___ IF RCPs were NOT stopped
  • ___ Progress toward a maximum within 1 min, allowable plant cooldown to achieve THEN ensure all operating RCPs CFT and LPI flow as soon as remain running until any of the possible.

following exist:

___ SCM is restored

___ LPI flow > 1400 gpm in each injection line.

  • ___ Manually actuate ES.
  • ___ Depress "HPI MAN ACT" push buttons on Trains A and B.
  • ___ Depress "RB ISO MAN ACTUATION" push buttons on Trains A and B.
  • ___ IF LPI has NOT actuated, AND RCS PRESS 300 psig, THEN depress "LPI MAN ACT" push buttons on Trains A and B.
  • ___ Depress "ISCM" push buttons for EFIC channels A and B.
  • ___ Ensure Tincore is selected on SPDS.

9/22/2011 Page 10 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 2, HPI CONTROL

  • ___ IF HPI has actuated, 1 ___ Obtain SRO concurrence to bypass THEN bypass or reset or reset ES.

ES actuation.

2 Bypass or reset ES actuation:

___ Auto

___ Manual

  • ___ Open MUP recirc prior to
  • ___ IF recirc to MUT is desired, throttling HPI flow THEN open MUP recirc to MUT valves:

< 200 gpm/pump.

___ MUV-53 ___ MUV-257

  • ___ IF recirc to RB sump is desired, THEN open HPI recirc to sump valves:

___ MUV-543 ___ MUV-544

___ MUV-545 ___ MUV-546

  • ___ IF adequate SCM exists based,
  • ___ Prevent exceeding NDT limit on Tincore, THEN throttle HPI to maintain
  • ___ IF OTSG isolated for TRACC, required conditions. THEN maintain RCS PRESS

<1000 psig.

  • ___ IF PTS, SGTR, or dry OTSG exists, THEN maintain minimum adequate SCM.
  • ___ IF adequate SCM can be
  • ___ Ensure running HPI pump is maintained with 1 HPI pump, aligned to MUT.

AND stopping second HPI pump is desired, THEN stop 1 HPI pump.

9/22/2011 Page 11 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 3, EFW/AFW CONTROL

  • ___ Ensure available OTSGs are at "LLL" > 20 in or trending toward required level.

"NAT CIRC" > 70%

"ISCM" > 90%

  • ___ IF manual control of EFW flow is 1 ___ Obtain SRO concurrence to place desired, EFIC in manual.

THEN establish manual EFIC control. 2 ___ Control EFW to maintain required EFW flow and OTSG level.

3 ___ IF EFW flow is NOT controlled, THEN depress EFIC channels A and B "MANUAL PERMISSIVE" push buttons and close affected EFW block valve.

  • ___ IF adequate SCM does NOT > 280 gpm in 1 line exist, 2 OTSGs to each OTSG AND level in available OTSGs EFW is NOT at or trending toward > 470 gpm in 1 line 1 OTSG ISCM level, to 1 OTSG THEN establish manual required > 250 gpm to flow. 2 OTSGs

< 300 gpm/OTSG AFW

> 450 gpm to 1 OTSG

< 600 gpm

  • ___ IF adequate SCM exists,
  • Do NOT allow OTSG level to lower.

THEN throttle flow to prevent OTSG PRESS from lowering

> 100 psig below desired PRESS.

9/22/2011 Page 12 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 4, PTS

  • ___ IF any of the following exist:
  • ___ Throttle HPI flow to minimize adequate SCM.

___ Tincore < 400°F, AND cooldown rate exceeds

  • ___ Throttle LPI flow to minimize ITS limit adequate SCM.

___ RCPs off,

  • ___ PTS is applicable until an AND HPI flow exists Engineering evaluation has been completed.

THEN perform required PTS actions.

9/22/2011 Page 13 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 7, PZR LEVEL CONTROL Rx Power > 25% 25% Rx Shutdown PZR Level Band 200 in - 240 in 120 in - 200 in 50 in - 120 in

  • ___ Control PZR level using normal
  • ___ Control letdown and MU flow makeup and letdown flow.
  • ___ Cycle BWST to MUP valve as required to maintain MUT level 55 in.

NOTE The Rx shall be tripped when an RCS leak exceeds the capacity of normal makeup and a SGTR is not in progress.

  • ___ IF PZR level cannot be controlled 1 ___ Close MUV-49 minimum level THEN establish HPI flow. 2 ___ IF PZR level does NOT recover, THEN open MUV-24.

3 ___ Notify SM to evaluate EP entry.

4 ___ IF PZR level does NOT recover, THEN start second MUP and required cooling pumps.

[Rule 5, Diesel Load Control]

5 ___ IF PZR level does NOT recover, THEN open additional HPI valves.

6 ___ IF PZR level does NOT recover, THEN close MUP to MUT recircs.

  • ___ IF PZR level is minimum level,
  • ___ IF letdown restoration is desired, AND adequate SCM exists THEN CONCURRENTLY PERFORM THEN restore normal PZR EOP-14, Enclosure 4, conditions. Letdown Recovery (if accessible).

9/22/2011 Page 14 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING ACTIONS DETAILS 17.1 ___ Verify ES MCC 3AB is energized.

___ IF ES MCC 3AB is NOT 1 ___ IF energized ES 480V Bus is powered energized, from Diesel, THEN energize THEN ensure Diesel load is ES MCC 3AB. 3200 KW.

2 ___ Depress transfer push button for ES MCC 3AB to energized bus.

NOTE A Train is preferred if ES has actuated with B ES 4160V Bus powered by B ES Diesel.

17.2 ___ IF CC ventilation will be Diesel Max Allowable powered by a Diesel, 3280 KW Load THEN verify Diesel load is

< Max Allowable Load on A ES Diesel Load ________ KW applicable Diesel.

B ES Diesel Load ________ KW Alternate AC Diesel Load ________ KW 9/22/2011 Page 15 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS 17.3 ___ Align CC ventilation in recirc.

  • Select "CONTROL COMPLEX HVAC ISOLATE/RESET" switches to "ISO":

___ A Train

___ B Train 17.4 ___ Verify CC isolation dampers are ___ AHD-12 closed.

___ AHD-12D

___ AHD-2C

___ AHD-2E

___ AHD-1C

___ AHD-1E 9/22/2011 Page 16 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS 17.5 ___ Ensure CC ventilation fans are 1 Stop Control Complex Return Fans:

shut down.

A Train B Train

___ AHF-19A ___ AHF-19B 2 Stop Control Complex Normal Duty Supply Fans:

A Train B Train

___ AHF-17A ___ AHF-17B NOTE A Train is preferred if ES has actuated with B ES 4160V Bus powered by B ES Diesel.

17.6 ___ Start 1 train of CC ventilation in 1 Start Control Complex Emergency Duty emergency recirc. Supply Fans:

A Train B Train

___ AHF-18A ___ AHF-18B 2 Start Control Complex Return Fans:

A Train B Train

___ AHF-19A ___ AHF-19B 9/22/2011 Page 17 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS 17.7 ___ IF no EFIC fan is running,

  • ___ IF starting AHF-54A, THEN start an EFIC Fan. THEN perform the following:

___ Select "TEMP CONT. VV, CHV-113" switch to "MOD" position.

___ Start AHF-54A

  • ___ IF starting AHF-54B, THEN perform the following:

___ Select "TEMP CONT. VV, CHV-100" switch to "MOD" position.

___ Start AHF-54B 17.8 ___ Establish ventilation for

  • Start 1 train of ventilation:

chemistry sampling.

A Train B Train

___ AHF-20A ___ AHF-20B in "SLOW" in "SLOW"

___ AHF-44A ___ AHF-44B

___ AHF-30 (if available) 9/22/2011 Page 18 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS 17.9 ___ IF all the following exist:

___ CC chiller running

___ Ventilation trains have NOT been shifted THEN EXIT this enclosure.

NOTE A Train is preferred if ES has actuated with B ES 4160V Bus powered by B ES Diesel.

17.10 ___ IF ES has actuated, 1 ___ Start TBP-3 AND all of the following exist:

2 ___ Select TBP-2 to PULL TO LOCK.

___ B ES 4160V Bus is powered by B ES Diesel 3 ___ IF 4160V REACTOR AUX BUS 3 is NOT energized,

___ B Train CC chiller will THEN CONCURRENTLY be started PERFORM AP-770, Emergency Diesel Generator Actuation, beginning

___ TBP-2 is running with Step 3.1 THEN shutdown TBP-2 9/22/2011 Page 19 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS 17.11 ___ Ensure at least 1 CC chiller Bkr ___ CHHE-1A is closed.

___ CHHE-1B 17.12 ___ Notify PPO to PERFORM the remainder of this enclosure.

17.13 ___ IF a CC chiller is running, THEN GO TO Step 17.26 in this enclosure.

9/22/2011 Page 20 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS STATUS CC chiller not running.

17.14 ___ IF AHF-18A is running,

  • ___ Ensure CHV-4 THEN ensure chilled water is "CC COOLER A OUTLET ISO" properly aligned. is open (164 ft CC between AHHE-5A and AHHE-5B).
  • ___ Ensure CHV-2 "CC COOLER B OUTLET ISO" is closed (164 ft CC by Ventilation Room door).

17.15 ___ IF AHF-18B is running,

  • ___ Ensure CHV-2 THEN ensure chilled water is "CC COOLER B OUTLET ISO" properly aligned. is open (164 ft CC by Ventilation Room door).
  • ___ Ensure CHV-4 "CC COOLER A OUTLET ISO" is closed (164 ft CC between AHHE-5A and AHHE-5B).

9/22/2011 Page 21 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS STATUS CC chiller startup required.

17.16 ___ Notify Control Room to ___ CHHE-1A determine CC chiller to be started. ___ CHHE-1B 17.17 ___ IF CHHE-1A is selected, 1 ___ Ensure SWV-60 THEN ensure cooling water is "SW ISO TO CHHE-1B" aligned to CHHE-1A is closed.

(164 ft CC above chillers).

2 ___ Ensure SWV-59 "SW ISO TO CHHE-1A" is open.

17.18 ___ IF CHHE-1B is selected, 1 ___ Ensure SWV-59 THEN ensure cooling water is "SW ISO TO CHHE-1A" aligned to CHHE-1B is closed.

(164 ft CC above chillers).

2 ___ Ensure SWV-60 "SW ISO TO CHHE-1B" is open.

9/22/2011 Page 22 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS 17.19 ___ Prepare desired CC chiller for

  • ___ Ensure "TEMPERATURE CONTROL startup. POINT" is at marked setpoint.
  • ___ Ensure "MAX. LOAD ADJUSTMENT IN %" is at 100
  • ___ Ensure "PREROTATION VANES" switch is selected to "HOLD".
  • ___ Depress "STOP-RESET" push button.
  • ___ Ensure "AUX. OIL PUMP" switch is selected to "AUTO".
  • ___ Record "OIL PRESSURE":

______ psig

  • ___ Verify "OIL HEATER" white light is lit.
  • ___ Ensure "PURGE UNIT" switch is selected to "ON".
  • ___ Verify "OIL/MOTOR TEMP" red light is off.

9/22/2011 Page 23 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS 17.20 ___ Start chilled water pump. 1 ___ Notify Control Room to ensure adequate Diesel margin exists to start chilled water pump.

[Rule 5, Diesel Load Control]

2 Start chilled water pump for selected CC chiller:

___ CHP-1A "A CHILLED WATER PUMP" (164 ft CC on wall north of CHHE-1A)

___ CHP-1B "B CHILLED WATER PUMP" (164 ft CC on wall south of CHHE-1B) 3 ___ Verify "CH WATER FLOW" amber light is off.

9/22/2011 Page 24 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS NOTE High SW temperature during a LOCA can cause the CC Chiller to trip on high condenser pressure. 30 minute interlock timer prevents restarting the CC Chiller after initial starting.

17.21 ___ Start CC chiller compressor. 1 ___ Notify Control Room to ensure adequate Diesel margin exists to start CC chiller.

[Rule 5, Diesel Load Control]

2 ___ Depress "COMPRESSOR START" push button.

3 ___ Verify "AUX. OIL PUMP" white light is lit.

4 ___ Verify "OIL PRESSURE" raises to 35 psig above prestart "OIL PRESSURE" and record:

______ psig 5 ___ Verify compressor auto starts after 30 sec time delay.

6 ___ Record CC chiller start time:

9/22/2011 Page 25 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS 17.22 ___ Verify CC chiller operating

  • ___ "OIL PRESSURE" 60 to 75 psig conditions.
  • ___ "CONDENSER PRESSURE" 0 to 14.5 psig
  • ___ "SYSTEM RUN" white light lit
  • ___ "ANTI-RECYCLE" amber light lit
  • ___ "AUX. OIL PUMP" white light off 3 min after compressor starts
  • ___ All other lights off 9/22/2011 Page 26 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS 17.23 ___ IF at any time, while manually 1 ___ Jog "PREROTATION VANES" switch loading CC chiller, surging of between "CLOSE" and "HOLD" until load exists, surging of load stops.

THEN reduce load prior to subsequent reload. 2 ___ WHEN surging has stopped, THEN continue manually loading CC chiller.

17.24 ___ WHEN CC chiller has been 1 Jog "PREROTATION VANES" switch running for > 3 min, between "OPEN" and "HOLD" until any of THEN manually load the following exists:

CC chiller.

___ "CONDENSER PRESSURE" stabilizes at < 14 psi.

___ Jogging open "PREROTATION VANES" switch causes no rise in "CONDENSER PRESSURE"

___ Chiller outlet temperature at CH-650-TI CHHE-1A & CHHE-1B OUTLET TEMPERATURE is 50°F (164 ft CC by CHHE-1A).

2 ___ Select "PREROTATION VANES" switch to "AUTO".

3 ___ SELECT PURGE UNIT Control Switch to OFF.

4 ___ Notify Control Room that CC chiller is loaded.

17.25 ___ EXIT this enclosure.

9/22/2011 Page 27 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS STATUS

  • CC chiller running.
  • Ventilation trains have been shifted.

NOTE

  • If both CC coolers are isolated, the CC chiller may trip on low chilled water flow rate.
  • If both CC coolers are in service, the chilled water pump may trip on overcurrent.

17.26 ___ IF AHF-18A is running, 1 ___ Throttle CHV-2 THEN ensure chilled water is "CC COOLER B OUTLET ISO" properly aligned. 10 turns closed.

(164 ft CC by Ventilation Room door).

2 ___ Throttle CHV-4 "CC COOLER A OUTLET ISO" 2 turns open.

(164 ft CC between AHHE-5A and AHHE-5B).

3 ___ Close CHV-2 "CC COOLER B OUTLET ISO".

4 ___ Open CHV-4 "CC COOLER A OUTLET ISO".

9/22/2011 Page 28 of 29 8:49 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #3\SES #3 2011 NRC - Operator Actions Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION AND COOLING (CONT'D)

ACTIONS DETAILS NOTE

  • If both CC coolers are isolated, the CC chiller may trip on low chilled water flow rate.
  • If both CC coolers are in service, the chilled water pump may trip on overcurrent.

17.27 ___ IF AHF-18B is running, 1 ___ Throttle CHV-4 THEN ensure chilled water is "CC COOLER A OUTLET ISO" properly aligned. 10 turn closed.

(164 ft CC between AHHE-5A and AHHE-5B).

2 ___ Throttle CHV-2 "CC COOLER B OUTLET ISO" 2 turns open.

(164 ft CC by Ventilation Room door).

3 ___ Close CHV-4 "CC COOLER A OUTLET ISO".

4 ___ Open CHV-2 "CC COOLER B OUTLET ISO".

17.28 ___ EXIT this enclosure.

Appendix D Scenario Outline Form ES-D-1 Facility: Crystal River #3 Scenario No.: 4 (NRC 2011) Op-Test No.: 1 Examiners: K. Schaaf Operators: M. Broussard P. Capehart J. Jernigan D. Bacon J. Kretz Initial Conditions: The plant is at 60% power due to CDP-1B magnetic coupling replacement.

Turnover: The following equipment is OOS: RWP-1 (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />); SWP-1C, emergency use only.

Severe thunderstorms are predicted for Citrus and Levy counties.

Event Malf. Event Event No. No. Type* Description I (BOP) MS-113-PT fails low. (OP-450) 1 1 TS (SRO) SRO TS determination. (TS 3.3.11)

PZR level controller fails high. Manual level control required.

2 2 C (RO)

(AI-505/OPS-NGGC-1000)

PORV opens due to low range setpoint failure.

3 3 I (RO)

(AI-505/AP-520/OPS-NGGC-1000)

C (BOP) SWP-1A shaft shears, SWP-1B fails to automatically start.

4 4 TS (SRO) [CT] (AI-500) SRO TS determination (TS 3.7.7)

N (BOP) Restore letdown R (RO) EHC fluid reservoir leak. Rapid power reduction and manual 5 5 N (BOP) turbine trip required. (AP-510/AP-660)

A OTSG steam leak in the RB following the turbine trip.

6 6 M (ALL)

(EOP-2) 7 7 I (BOP) Manual MFLI required. [CT] (EOP-5)

EFV-58 fails as is, EFV-14 fuse blows. [CT]

8 8 C (RO)

(EOP-13, Rule 3)

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor September 22, 2011 E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Scenario Outline (D-1) Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 1 Rev.: 0 Event

Description:

(Examiner Cue) Shortly after turnover MS-113-PT, the "B" OTSG pressure transmitter for the "D" EFIC Channel, fails low resulting in a Half-Trip of both "A" and "B" EFIC Trains for EFW, MSLI and MFWI. TS 3.3.11 Condition A and D are entered per Table 3.3.11-1. The CNO/PPO should be directed to bypass the C EFIC cabinet and contingency actions should be formulated. Once the channel is bypassed the EFIC Half-Trip can be reset.

Time Position Applicants Actions or Behavior

  • Announces and responds to alarms o (H-06-01) Steam Gen B Main Steam Iso Actuated o (H-06-02) Steam Gen B Feedwater Iso Actuated o (H-06-03) Emerg FW Actuation o (H-06-08) EFIC Not Bypassed o Reviews AR
  • Verifies EFIC actuation is not valid
  • Verifies no EFW equipment started
  • Notifies SRO of instrument malfunction
  • Calls PPO to check status of EFIC Channels
  • Coordinates bypassing of the D EFIC Channel with the PPO BOP per OP-450, Section 4.16, as directed by the SRO o May have the PPO come to the Control Room for a pre-job brief on Bypassing D EFIC Channel o Verifies no RPS Channels bypassed o When PPO places D Channel in Bypass, verifies:
  • Channel D - Event point 2028 o DEPRESS Test Results/ Reset pushbutton on MCB for associated EFIC trains o ENSURE EFIC channel half trip has RESET o Depress Channel D low pressure bypass button
  • Participates in mini brief if held by SRO 9/22/2011 Page 1 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 1 Rev.: 0 Event

Description:

(Examiner Cue) Shortly after turnover MS-113-PT, the "B" OTSG pressure transmitter for the "D" EFIC Channel, fails low resulting in a Half-Trip of both "A" and "B" EFIC Trains for EFW, MSLI and MFWI. TS 3.3.11 Condition A and D are entered per Table 3.3.11-1. The CNO/PPO should be directed to bypass the C EFIC cabinet and contingency actions should be formulated. Once the channel is bypassed the EFIC Half-Trip can be reset.

Time Position Applicants Actions or Behavior

  • Ensures BOP/RO verify that the EFIC actuation is not valid
  • Assists the BOP in diagnosing failure
  • Directs the BOP to have the PPO check EFIC Channels and report status
  • Enters TS 3.3.11, Condition A, 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to bypass
  • Enters TS 3.3.11, Condition D, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to fix SRO
  • Once D EFIC Channel is Bypassed, should hold mini brief to discuss the consequences of the failed transmitter on an EFW actuation.

o Contacts Work Controls to initiate repair efforts (may request the SM or STA to perform this)

  • Verifies the EFIC actuation is not valid RO
  • Assists BOP in diagnosing failure
  • Participates in mini brief if held by SRO 9/22/2011 Page 2 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 2 Rev.: 0 Event

Description:

(Examiner Cue) Once EFIC is reset the PZR level controller will fail high.

(MALF) This will require manual PZR level control for the remainder of the scenario.

Time Position Applicants Actions or Behavior

  • Acknowledge alarms o (I-07-01) Pressurizer Level High RO
  • PZR Spray valve may open
  • Notifies SRO of MUV-31 controller failure
  • Takes manual control and lowers makeup flow
  • Acknowledges failure and directs RO to take manual control of SRO MUV-31 9/22/2011 Page 3 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 3 Rev.: 0 Event

Description:

(Examiner Cue) When PZR manual level control is established the PORV Low Range setpoint malfunctions. (MALF) The PORV will open and the RO must either select the PORV closed or close the PORV block valve. AP-520, Loss of RCS Coolant or Pressure, may be entered at the discretion of the SRO.

Time Position Applicants Actions or Behavior

  • Acknowledge alarms o (I-05-01) PORV Safety Valve Open o (I-06-01) PORV Solenoid Energized o (I-07-05) RCS Press High Temp Low o Reviews AR-501 RO
  • Diagnoses PORV setpoint failure o Closes PORV or PORV Block valve o Monitors RCS pressure
  • Informs SRO of failure
  • Assist in diagnosing PORV setpoint failure SRO
  • Assists RO in diagnosing failure
  • Evaluates TS for applicability SRO o TS 3.4.10 may be referenced (not required)
  • Contacts work controls to initiate repair efforts 9/22/2011 Page 4 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 4 Rev.: 0 Event

Description:

(Examiner Cue) Once the plant has stabilized SWP-1A shaft shears and SWP-1B fails to automatically start. (MALF) SWP-1B or SWP-1C must be manually started

[CT]. TS 3.7.7, Condition A, should be entered. Letdown may isolate if an SW pump is not started expeditiously. If so OP-402 will be used to re-establish letdown.

Time Position Applicants Actions or Behavior

  • Announce/acknowledge alarms o (I-01-03) (I-02-03) (I-03-03) (I-04-03) RC Pump Clg Wtr Flow Low RO/BOP o (C-02-05) SW System Press Low
  • Note SW pressure and SW pump amps low
  • Diagnose sheared shaft on SWP-1A
  • Notifies SRO of failure
  • Starts SWP-1B or SWP-1C within 5 minutes. [CT]
  • Stops SWP-1A BOP
  • Letdown will probably be lost due to a high temperature isolation o OP-402, Section 4.15, is attached if letdown recovery needed
  • Assists RO/BOP with diagnosis of sheared shaft
  • Enters TS 3.7.7, Condition A, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, for one SW Pump SRO inoperable
  • Contacts work controls to initiate repair efforts
  • Reviews AR-303 and AR-501 BOP
  • Monitors temperatures of SW cooled components 9/22/2011 Page 5 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 5 Rev.: 0 Event

Description:

(Examiner Cue) After an SW pump is started and the TS actions addressed the EHC fluid reservoir will experience a leak. (MALF) The leak is slow enough to allow time to reduce power and trip the turbine without automatically tripping the reactor.

Time Position Applicants Actions or Behavior

  • Announces and responds to alarms o (N-06-03) EH Fluid Tank Level Low BOP o Reviews AR-602
  • Direct SPO to investigate low EHC reservoir
  • Assists BOP in diagnosing alarm
  • Once report from SPO is received will enter AP-510 and direct a SRO power reduction to below the turbine trip setpoint.
  • Performs actions of AP-510:

o Adjust ICS Load Rate as directed o Adjust Unit Load Master to 10 o Stops rapid power reduction when all Turbine Trip Bypass alarms are received.

Selects SG/RX Demand to Hand and back to Auto o Maintains PZR level (Rule 7, attached)

RO o Verifies Imbalance within limits o Maintain DFT level between 9 ft and 11 ft 6 in o Selects MAN and Close on MBVs

  • Performs actions of AP-660:

o Ensure RCS pressure is stable o Ensure ICS runback is in progress o Ensure TBVs and ADVs controlling header pressure 9/22/2011 Page 6 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 5 Rev.: 0 Event

Description:

(Examiner Cue) After an SW pump is started and the TS actions addressed the EHC fluid reservoir will experience a leak. (MALF) The leak is slow enough to allow time to reduce power and trip the turbine without automatically tripping the reactor.

Time Position Applicants Actions or Behavior

  • Performs actions of AP-510:

o Notifies personnel o Notifies Chemistry o Notify SPO to isolate MSR Shell Drain Heat Exchangers o Verifies Aux Transformer is not supplying any bus BOP

  • Performs actions of AP-660:

o Depress Main Turbine Trip push button o Ensure TVs and GVs are closed o Notify plant personnel 9/22/2011 Page 7 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 6/7 Rev.: 0 Event

Description:

(Automatic Parameter Cue) The turbine trip will cause a steam leak on the A OTSG (MALF) inside the reactor building. (MT) RB pressure will start rising and a manual reactor trip should be initiated prior to reaching 4 psig in the RB. EOP-2, Vital System Status Verification, will be entered and a symptom scan performed. EOP-5, Excessive Heat Transfer, should be entered. Once the steam leak is confirmed a MSLI and MFLI will be performed. The MFLI will not work automatically (MALF) and the operator must manually perform the actions (CT).

Time Position Applicants Actions or Behavior

  • Recognize indications of a steam leak in the RB o Alarms CREW o RB pressure and temperature rising o No RM-A6 rise o No loss of RCS inventory
  • Announce/acknowledge alarms o (B-02-05) RB Fan A Condensate High o (E-02-05) RB Fan B Condensate High BOP o (E-03-02) Reactor Bldg Temp High
  • Monitors RB pressure, temperature and sump level
  • Verifies no rise in RM-A6
  • Verifies no loss of RCS inventory 9/22/2011 Page 8 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 6/7 Rev.: 0 Event

Description:

(Automatic Parameter Cue) The turbine trip will cause a steam leak on the A OTSG (MALF) inside the reactor building. (MT) RB pressure will start rising and a manual reactor trip should be initiated prior to reaching 4 psig in the RB. EOP-2, Vital System Status Verification, will be entered and a symptom scan performed. EOP-5, Excessive Heat Transfer, should be entered. Once the steam leak is confirmed a MSLI and MFLI will be performed. The MFLI will not work automatically (MALF) and the operator must manually perform the actions (CT).

Time Position Applicants Actions or Behavior

  • Acknowledges receipt of alarms
  • Assists the RO/BOP in diagnosing the failure
  • Directs the RO to trip the reactor prior to 4 psig RB pressure
  • Enters EOP-2, Vital System Status Verification
  • Direct RO actions per EOP-2 o Depress the Rx trip pushbutton o Verify CRD groups 1 through 7 are fully inserted o Verify NIs indicate Rx is shutdown SRO o Verify SPDS is available o Depress Main Turbine trip pushbutton o Verify TVs and GVs are closed
  • Direct formal Symptom Scan with RO and BOP o Check for Station Black Out o Check for Adequate Sub Cooling Margin o Check for Inadequate Heat Transfer o Check for Excessive Heat Transfer o Check for OTSG Tube Rupture
  • Directs BOP to determine faulted OTSG and isolate
  • When the Rx is tripped, performs EOP-2, Immediate Actions, from memory o Depresses Rx Trip pushbutton o Verifies Groups 1 thru 7 rod inserted o Verifies NIs indicate Rx is shutdown RO o Verifies SPDS available o Depress Turbine Trip pushbutton o Verifies all TVs and GVs are closed
  • Re-performs EOP-2, Immediate Actions, as directed by SRO 9/22/2011 Page 9 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 6/7 Rev.: 0 Event

Description:

(Automatic Parameter Cue) The turbine trip will cause a steam leak on the A OTSG (MALF) inside the reactor building. (MT) RB pressure will start rising and a manual reactor trip should be initiated prior to reaching 4 psig in the RB. EOP-2, Vital System Status Verification, will be entered and a symptom scan performed. EOP-5, Excessive Heat Transfer, should be entered. Once the steam leak is confirmed a MSLI and MFLI will be performed. The MFLI will not work automatically (MALF) and the operator must manually perform the actions (CT).

Time Position Applicants Actions or Behavior

  • Perform symptom scan o Station Blackout o Inadequate SCM o Inadequate Heat Transfer o Excessive Heat Transfer CREW o SG Tube Rupture
  • Determine that Excessive Heat Transfer symptom exists and enters EOP-5, Excessive Heat Transfer
  • Recognize that Rule 2, HPI Control and Rule 3, EFW Control are in effect (attached)
  • Depresses Global Silence pushbutton
  • Isolates the A OTSG (CT) o (stopping MFW flow completes this critical task)
  • Recognizes that MFLI did not occur and performs the following:

o Selects close FWV-31 o Selects close FWV-30 BOP o Selects close FWV-36 o Selects close FWV-28 o Selects close FWV-14 o Trips FWP-2A

  • Notifies SRO of MFLI automatic isolation failure 9/22/2011 Page 10 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 8 Rev.: 0 Event

Description:

(Automatic Parameter Cue) EFIC will actuate from the HPI signal. The operator will recognize excessive EFW flow to the A OTSG through EFV-58. Rule 3 will be in effect and the operator will attempt to isolate flow by taking EFIC to manual and closing EFV-14 (block valve). The block valve will stroke partially in the closed direction and then the motor power fuse will blow. [MALF] The operator must secure EFP-3 (CT) to stop EFW flow to the OTSG.

Time Position Applicants Actions or Behavior

  • Enters EOP-5, Excessive Heat Transfer
  • Direct RO/BOP actions per EOP-5 o Isolate affected OTSGs Depress MSLI and MFLI push buttons Ensure FW sources and leak paths are closed If any affected EFIC control valve fails to close then select Manual Permissive and close the associated block valve.

o Ensure ES equipment is properly aligned If RBIC has actuated and adequate SCM exists, then stop all RCPs SRO o Maintain PZR level (Rule 7, attached) o Notify personnel of entry into EOP-5 o If RCS temp remains < 532° F then start RCS boration o Ensure proper MSLI and MFLI o Notify Chemistry to sample for tube leakage o Verify proper CC cooling o Ensure level in available OTSG trending to correct level o Minimize RCS temperature changes o Minimize RCS pressure changes o Verify OTSG tube leakage < 1 gpm o Ensure MSR HP bundle isolation valves are closed o Bypass ES if permit exists o Maintain minimum adequate SCM 9/22/2011 Page 11 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 1 Scenario No.: 4 Event No.: 8 Rev.: 0 Event

Description:

(Automatic Parameter Cue) EFIC will actuate from the HPI signal. The operator will recognize excessive EFW flow to the A OTSG through EFV-58. Rule 3 will be in effect and the operator will attempt to isolate flow by taking EFIC to manual and closing EFV-14 (block valve). The block valve will stroke partially in the closed direction and then the motor power fuse will blow. [MALF] The operator must secure EFP-3 (CT) to stop EFW flow to the OTSG.

Time Position Applicants Actions or Behavior

  • Performs Rule 3, EFW/AFW Control
  • Attempts to close EFV-58
  • Determines that EFW flow is not controlled and depresses Manual Permissive on both channels
  • Selects close EFV-14
  • Recognizes that EFV-14 did not fully close o Amber light only o Flow indication on EF-25-FI1
  • Requests permission from SRO to secure EFP-3
  • Secures EFP-3 (CT) prior to violating the NDT curve or lowering RCS temp to < 441° F (core lift concern).
  • Ensure ES equipment is properly aligned o If RBIC has actuated and adequate SCM exists, then stop all RO/BOP RCPs
  • Maintain PZR level (Rule 7, attached)
  • Notifies personnel of entry into EOP-5
  • If RCS temp remains < 532° F then start RCS boration
  • Ensures proper MSLI and MFLI
  • Notify Chemistry to sample for tube leakage
  • Verify proper CC cooling
  • Minimizes RCS temperature changes
  • Minimizes RCS pressure changes
  • Verifies OTSG tube leakage < 1 gpm
  • Ensures MSR HP bundle isolation valves are closed
  • Maintains minimum adequate SCM o PZR Spray o PORV Scenario may be terminated any time after actions to minimize subcooling margin have been taken.

9/22/2011 Page 12 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 1, LOSS OF SCM

  • ___ IF < 1 min has elapsed since losing adequate SCM, THEN immediately stop all RCPs.
  • ___ IF RCPs were NOT stopped
  • ___ Progress toward a maximum within 1 min, allowable plant cooldown to achieve THEN ensure all operating RCPs CFT and LPI flow as soon as remain running until any of the possible.

following exist:

___ SCM is restored

___ LPI flow > 1400 gpm in each injection line.

  • ___ Manually actuate ES.
  • ___ Depress "HPI MAN ACT" push buttons on Trains A and B.
  • ___ Depress "RB ISO MAN ACTUATION" push buttons on Trains A and B.
  • ___ IF LPI has NOT actuated, AND RCS PRESS 300 psig, THEN depress "LPI MAN ACT" push buttons on Trains A and B.
  • ___ Depress "ISCM" push buttons for EFIC channels A and B.
  • ___ Ensure Tincore is selected on SPDS.

9/22/2011 Page 13 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 2, HPI CONTROL

  • ___ IF HPI has actuated, 1 ___ Obtain SRO concurrence to bypass THEN bypass or reset or reset ES.

ES actuation.

2 Bypass or reset ES actuation:

___ Auto

___ Manual

  • ___ Open MUP recirc prior to
  • ___ IF recirc to MUT is desired, throttling HPI flow THEN open MUP recirc to MUT valves:

< 200 gpm/pump.

___ MUV-53 ___ MUV-257

  • ___ IF recirc to RB sump is desired, THEN open HPI recirc to sump valves:

___ MUV-543 ___ MUV-544

___ MUV-545 ___ MUV-546

  • ___ IF adequate SCM exists based,
  • ___ Prevent exceeding NDT limit on Tincore, THEN throttle HPI to maintain
  • ___ IF OTSG isolated for TRACC, required conditions. THEN maintain RCS PRESS

<1000 psig.

  • ___ IF PTS, SGTR, or dry OTSG exists, THEN maintain minimum adequate SCM.
  • ___ IF adequate SCM can be
  • ___ Ensure running HPI pump is maintained with 1 HPI pump, aligned to MUT.

AND stopping second HPI pump is desired, THEN stop 1 HPI pump.

9/22/2011 Page 14 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 3, EFW/AFW CONTROL

  • ___ Ensure available OTSGs are at "LLL" > 20 in or trending toward required level.

"NAT CIRC" > 70%

"ISCM" > 90%

  • ___ IF manual control of EFW flow is 1 ___ Obtain SRO concurrence to place desired, EFIC in manual.

THEN establish manual EFIC control. 2 ___ Control EFW to maintain required EFW flow and OTSG level.

3 ___ IF EFW flow is NOT controlled, THEN depress EFIC channels A and B "MANUAL PERMISSIVE" push buttons and close affected EFW block valve.

  • ___ IF adequate SCM does NOT > 280 gpm in 1 line exist, 2 OTSGs to each OTSG AND level in available OTSGs EFW is NOT at or trending toward > 470 gpm in 1 line 1 OTSG ISCM level, to 1 OTSG THEN establish manual required > 250 gpm to flow. 2 OTSGs

< 300 gpm/OTSG AFW

> 450 gpm to 1 OTSG

< 600 gpm

  • ___ IF adequate SCM exists,
  • Do NOT allow OTSG level to lower.

THEN throttle flow to prevent OTSG PRESS from lowering

> 100 psig below desired PRESS.

9/22/2011 Page 15 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 4, PTS

  • ___ IF any of the following exist:
  • ___ Throttle HPI flow to minimize adequate SCM.

___ Tincore < 400°F, AND cooldown rate exceeds

  • ___ Throttle LPI flow to minimize ITS limit adequate SCM.

___ RCPs off,

  • ___ PTS is applicable until an AND HPI flow exists Engineering evaluation has been completed.

THEN perform required PTS actions.

9/22/2011 Page 16 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 RULE 7, PZR LEVEL CONTROL Rx Power > 25% 25% Rx Shutdown PZR Level Band 200 in - 240 in 120 in - 200 in 50 in - 120 in

  • ___ Control PZR level using normal
  • ___ Control letdown and MU flow makeup and letdown flow.
  • ___ Cycle BWST to MUP valve as required to maintain MUT level 55 in.

NOTE The Rx shall be tripped when an RCS leak exceeds the capacity of normal makeup and a SGTR is not in progress.

  • ___ IF PZR level cannot be controlled 1 ___ Close MUV-49 minimum level THEN establish HPI flow. 2 ___ IF PZR level does NOT recover, THEN open MUV-24.

3 ___ Notify SM to evaluate EP entry.

4 ___ IF PZR level does NOT recover, THEN start second MUP and required cooling pumps.

[Rule 5, Diesel Load Control]

5 ___ IF PZR level does NOT recover, THEN open additional HPI valves.

6 ___ IF PZR level does NOT recover, THEN close MUP to MUT recircs.

  • ___ IF PZR level is minimum level,
  • ___ IF letdown restoration is desired, AND adequate SCM exists THEN CONCURRENTLY PERFORM THEN restore normal PZR EOP-14, Enclosure 4, conditions. Letdown Recovery (if accessible).

9/22/2011 Page 17 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 Section 4.15 Recovery From Letdown Isolation (Reference) [NOCS 000209]

IF recovery is due to high temperature THEN PROCEED to next step .............................................................................................................

IF NOT THEN GO TO Step 0 ............................................................................................................................

IF MUDM-1A is in service, THEN PERFORM the following:

ENSURE CLOSED the following:

  • MUV-133 MUDM-1B Inlet ......................................................................................
  • MUV-201 1A to 1B Series .......................................................................................
  • MUV-116 MUDM-1A Outlet .....................................................................................

ENSURE OPEN the following:

  • MUV-124 MUDM-1A Inlet .......................................................................................
  • MUV-200 1B to 1A Series .......................................................................................
  • MUV-117 MUDM-1B Outlet .....................................................................................

IF MUDM-1B is in service, THEN PERFORM the following:

ENSURE CLOSED the following:

  • MUV-124 MUDM-1A Inlet .......................................................................................
  • MUV-200 1B to 1A Series .......................................................................................
  • MUV-117 MUDM-1B Outlet .....................................................................................

ENSURE OPEN the following:

  • MUV-133 MUDM-1B Inlet .......................................................................................
  • MUV-201 1A to 1B Series .......................................................................................
  • MUV-116 MUDM-1A Outlet .....................................................................................

ENSURE Block Orifice Isolation and Orifice Bypass are CLOSED:

ENSURE CLOSED the following:

  • MUV-50 Block Orifice Isolation ...............................................................................
  • MUV-51 Block Orifice Bypass .................................................................................

9/22/2011 Page 18 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ENSURE two Letdown Coolers are being supplied by SW, AND Valve Alignment is arranged to cool letdown:

  • MUHE-1A or MUHE-1C:
  • ENSURE OPEN SWV-47 ........................................................................................
  • ENSURE OPEN SWV-50 ........................................................................................
  • MUHE-1B:
  • ENSURE OPEN SWV-48 ........................................................................................
  • ENSURE OPEN SWV-49 ........................................................................................

ENSURE a letdown flow path exists:

ENSURE at least 1 prefilter in service ...................................................................................

OR MUV-194 is OPEN .................................................................................................................

ENSURE at least 1 MU demin in service ...............................................................................

OR MUV-126 is OPEN .................................................................................................................

OR Bypassed per Step 4.15.2......................................................................................................

OR Bypassed per Step 4.15.3......................................................................................................

ENSURE at least 1 Post-Filter in service ...............................................................................

OR MUV-100 is OPEN .................................................................................................................

ENSURE letdown isolation valves are OPEN:

IF recovering from high temp, THEN SELECT MUV-49 HIGH TEMP BYPASS switch to BYPASS .............................................................................................................................

OPEN MUV-49.......................................................................................................................

ENSURE OPEN MUV-567.....................................................................................................

9/22/2011 Page 19 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 NOTES

  • Letdown (LD) Cooler 1C is NOT normally aligned for service whenever Coolers 1A and 1B are both available. Normally LD Cooler 1C will have its SW outlet closed (SWV-691, RB entry required for opening) and its primary inlet (MUV-498) closed with electrical power removed.
  • Restoration of Letdown Coolers can be classified as a R2 Reactivity Manipulation or a R3 Reactivity Related Activity based on the expected reactivity impact due to component boron concentration.

BEGIN R2/R3 REACTIVITY EVOLUTION IF it is desired to place A Letdown Cooler (MUHE-1A) in service, THEN PERFORM the following:

ENSURE OPEN the following:

  • SWV-47, SW Inlet ...................................................................................................
  • SWV-50, SW Outlet ................................................................................................

OPEN MUV-38, Cooler Inlet ..................................................................................................

OPEN MUV-40, Cooler Outlet ...............................................................................................

IF it is desired to place B Letdown Cooler (MUHE-1B) in service, THEN PERFORM the following:

ENSURE OPEN the following:

  • SWV-48, SW Inlet ...................................................................................................
  • SWV-49, SW Outlet ................................................................................................

OPEN MUV-39, Cooler Inlet ..................................................................................................

OPEN MUV-41, Cooler Outlet ...............................................................................................

NOTE: SW flow to Letdown (LD) Cooler 1C is set lower than LD Coolers 1A and 1B, therefore, letdown flow adjustments may be necessary to prevent high SW outlet temperatures.

IF either Letdown Cooler A or B can NOT be aligned for service, OR it is required to remove Letdown Cooler A or B from service, THEN PLACE Letdown Cooler C (MUHE-1C) in service as required:

THROTTLE OPEN SWV-691 1/2 turn ...................................................................................

ENSURE OPEN the following:

  • SWV-47, SW Inlet ...................................................................................................
  • SWV-50, SW Outlet ................................................................................................

CLOSE breaker for MUV-498, Reactor MCC 3A1, Bkr.D ......................................................

OPEN MUV-498, Cooler Inlet ................................................................................................

ENSURE OPEN MUV-505, Cooler Outlet .............................................................................

9/22/2011 Page 20 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx

Appendix D Required Operator Actions Form ES-D-2 ESTABLISH desired letdown flow:

THROTTLE OPEN MUV-51 to 25 gpm and RAISE letdown flow 15 to 20 gpm each minute until desired flow is reached ................................................................................

OPEN MUV-50, Block Orifice Isolation .................................................................................................

ADJUST MUV-51 for desired Letdown flow..........................................................................................

WHEN letdown temperature is < 130°F, THEN SELECT MUV-49 HIGH TEMP BYPASS to NORMAL ..........................................................

IF MUDM-1A is to be returned to service, THEN PERFORM the following:

ENSURE OPEN the following:

  • MUV-124 MUDM-1A Inlet ......................................................................................................
  • MUV-116 MUDM-1A Outlet ...................................................................................................

ENSURE CLOSED the following:

  • MUV-133 MUDM-1B Inlet ......................................................................................................
  • MUV-117 MUDM-1B Outlet ...................................................................................................
  • MUV-200 1B to 1A Series ......................................................................................................
  • MUV-201 1A to 1B Series ......................................................................................................
  • MUV-126 MU Demin Bypass Valve .......................................................................................

IF MUDM-1B is to be returned to service, THEN PERFORM the following:

ENSURE OPEN the following:

  • MUV-133 MUDM-1B Inlet ......................................................................................................
  • MUV-117 MUDM-1B Outlet ...................................................................................................

ENSURE CLOSED the following:

  • MUV-124 MUDM-1A Inlet ......................................................................................................
  • MUV-116 MUDM-1A Outlet ...................................................................................................
  • MUV-200 1B to 1A Series ......................................................................................................
  • MUV-201 1A to 1B Series ......................................................................................................
  • MUV-126 MU Demin Bypass Valve .......................................................................................

END R2/R3 REACTIVITY EVOLUTION END OF SECTION 9/22/2011 Page 21 of 21 8:50 AM E:\NRC - 2011\POST PREP Week 31-11\SES\SES #4\SES #4 2011 NRC Operator Actions [D-2] Final.docx