Category:CORRESPONDENCE-LETTERS
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20210K1621999-07-0707 July 1999 Informs That Licensee in Process of Preparing Scope of Service Delineation for Environ Assessment to Be Performed for New Airport Located Near Russellville,Ar,To Identify Anticipated Environ Impacts from Various Agencies 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation1999-07-0606 July 1999 Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 0CAN069906, Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages1999-06-30030 June 1999 Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs1999-06-17017 June 1999 Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs 0CAN069903, Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii)1999-06-10010 June 1999 Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii) 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 20001999-06-0202 June 1999 Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 1CAN069901, Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice1999-06-0202 June 1999 Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice 0CAN059906, Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-05-28028 May 1999 Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 1CAN059904, Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn1999-05-20020 May 1999 Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn 2CAN059906, Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-11999-05-18018 May 1999 Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-1 1CAN059902, Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program1999-05-17017 May 1999 Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program 2CAN059905, Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative1999-05-14014 May 1999 Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative ML20206P7681999-05-10010 May 1999 Forwards Applications for Renewal of Operating License (Form 398) for MW Little & F Uptagrafft.Without Encl 2CAN059903, Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance1999-05-10010 May 1999 Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206H7121999-05-0606 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept, for Ano.All Radionuclides Detected by Radiological Environ Monitoring Program During 1998 Were Significantly Below Regulatory Limits 1999-09-09
[Table view] |
Text
{{#Wiki_filter:, .
-? bMlOl'gy En!ergy Operations, Mc, Operations ,
t r
l Ma), 12, 1942 l 2CAN059202 L
l' U. S. Nuclear Regulatory Commission l Document Control Desk Mall St.atior.PI '.37 p Washington, DC 205'5
Subject:
Arkansas Nuclear One - Unit 2 !
Docket No. 50-368
. License No. NPF-6 j l Voluntary Steasa Generator Tubes )
Plugged or Sleeved Report i l
! Gentlemen; i
Arkansas Nuclear Ora, Unit 2 ( ANO-2) Technical Specificat.lon 4.4.5.5 a
! requires the number of tubes plugged or sleeved h. each steam generator to be reported to the Commission. The inspections performed during the recent forced outage were not the Technical Specificatior, required inservice
-inspections. However, Entergy Operations is reporting the nuinber of tubes that were plugged or sleeved during the forced outage.
l
- . In 2E-24A (steam generator "A"), 29 t.ubes were pluggen and 392 tubes were I 's le eved. In 2E-24B (steam generator "B"), 11 tubes were plugged at'd 56
. tubes were sleeved. Tables 1 and 2 prm'Jle the location of the tubes that l were pl::ggad . In the "A" ard "B" s t eam generators, respect?vely. The locatir.u of the "A" and "B" steam generator tubes that ere sleeved is providad in Tables 3 and 4, respectively.
! Ente.rgy Operations intends ta provide the complete results of the stutm l generator tube inspections performed during the' forced outage in a future ceport. Should you have any questions regarding this submit.tal, please Contact KO.
I Very truly yours, i
pp~s /, '. d~
p'.Jrnes . Fisicaro Direct.or, Licensing
! JJF/1. iC / sj f A
e - --
(h 9205180320'920512 1
(
- POR ADOCK OS000369
, P Pf3
...,4 e .. . . . .. _. ....,-,. .. , _ - . _ . . _. . -. .
' r; ' lk;.; '
4 i
*j . i
.e ,
.)
U.- S. NRC.
E .Nay 12;'1992' .
Page 2 9.f
;r; rect Mr. Robert Martin-
.- ;U. S. Nucicar Regulatory Conmission Regica IV' 611 Ryan Plaza Drive, E$dite 400 '
~_ Arlington, TK 76011-0064 l l
N3C Senior Resident. Inspector !
Arkantas Nuclear One ANO-1 &.2 ;
Number'1,' Nuclear Plant Read Russellville,'AR 72601 i
Mr. ' Thomas : W.- Ale >:lon j c NRRf Project Manager, _ Reglen IV/ Ah0-l' U.,Si Nuclear. Regulatory Commission !
< ~NRR Hail Stop'.13-H-3 One:Rhite Flint North
~
11555 Rockville Pike Rockville,- McrylanM -20852
- c. .. .
' _ Ms,.~ Shori- Peterson NRR. ProjectLMunager, Regio; IV/ ANO-2 U. O Nuclear Regulatory Commission ,
KaR'Ma11'Stop-13-H p One White Flint' North a h 11555 Rockville Pike j' Rockville, Maryland 208S2 L
m f e L
v ,
7 o
Y ,
b 4
m p) e I .
') -
t
~
e . me . . - . - .- . - - - - - - - . - - - - - - - - - _ - -
,M....
E 4
.I p-s;E 4i S .}/, _j Q w
. l 1
.i
_ TABLE 1 I g , ,
. "A" STEAM GENERATOR TUBES PLUGGED I
f.D PLUG i ROW COL OUTAGE INDICAT.Toli TYPE LOCATION 2 .13 147 03/92 LKR_ PLUGGED WELD TEH
-13 14 '/_- 03/92 LKR PLUGGED MECH TEC 14 148_- 03/.92 LKR PLUGGED MECH TEH 14 148- 03/92 LKR PLUGGED MECH. TEC 1 19- 137 03/92 LKR PLUGGED ' MECH TEH !
19 337 03/92 LKR PLUGGED MECH TEC~ l 25 .131. 03/92'LKR PLUGGED MECH TEH l 25 131 -03/92 LKR PLUGGED MECH -TEC 26 52- 03/92 LKR -PLUGGED MECH TEH i 26 .C2 03/92 LKR PLUGGED. MECH TEC
- V- 28 128- 03/92 LKR PLUGGED MCCH TEH 28 128 03/92 LKR PLUGGED MECH TEC
,30- 124 03/92 LKR PLUGGED MECH TEH 30 124 03/92 LKR PLUCGED MECH TEC 40 .120 03/92 LKR PLUGGED MECH-STAN TEH l
. -4 0 ' 120 03/92-LKR PLUGGED MECH-STAB TEC i
- 46. 50 03/92 LKR- PLUGGED MECH TEH ,
46- 50 03/92LLKR PLUGGED MECH TEC
.46- 78 03/92'LKR PLUGGED MECH-STAB TFP 46' 78 03/ 92 lLKR PLUGGED : MECH-STAB TEC !
N 8,2 52 03/92 LKR PLUGGED MECH TEH
't 52 52 03/92 LKR PLUGGED MECH -TEC 55- '63 ' 03/92 LKR PLUGGED WELD TER '
50 . 63- 03/92 ' LKR PLUGGED MECH TEC C 166' l208 ; 03/92 T I!KR PLUGGED MECH TEH-66 108 03/92 LKR PLUGGED MECH TEC a 67: 109 03/92_LKR PLUGGED MECH STAB TEH
-67.
- 109 03/92 LER PLUGGED . MECH-STAB TEC
-68 108 03/92 LKR PLUGGED . MECH TEH
-68l 108 -03/92_LKR- PI1JGGED MECH TEC 70- 74 03/92 LKR PLUGGEC MECH-STAB TEH ,
70' 74 03/92 LKR PLUGGED MECH-STAB TEC 75z 131 03/92 LKR PLUGGED MECH TER 75 131 03/92 LKR- . PLUGGED- MECH TEC 76 76 -03/92 LKR PLUGGED MECH-STAB .TEH 76- 76 03/92 LKR PLUGGED MECH-STAB TEC 80 84 03/92 LKR PLUGCED- MECH-ST.AB TEH
, 80 84 03/92 LKR PLUGGED MECH-STAB- -TEC
, 801 90 03/92:LFP ' PLUGGED MECH TEH E .50- 90 03/92-LKR PLUGGED MECH TEC 81- 127; 03/92.LKR PLUGGED MECH TEH L81 127 03/92 LKR PLUGGED MECH TEC
-83 83 03/92 LKR P.LUGGEO MECH-STAB TEH l 83- 83 03/92 LKR PLUGGED MECH-STAB iEC 83: _ 127 03/92. LKR PLUGGED MECH TEH ;
83 127 03/92 LKR PLUGGED MECH TEC
?. 88 126 03/92 LKR PLUGGED MECH TEH ]
.1 i
.i I. t I+ , , ,. _ . _ _ . . ~ . - _ . . - - . . . _ , . . . ~ . , . ,ei
. . -~ _ _ . . . - . . ,_ . . _- . . . . .. .. - . ,
G lwc ,
i 4 ,.
tb 1 ' , .
i h TABLE 1- '
"A" STEAM GENERATOR TUBES PLUGGED I
PLUG ROW, COL OUTAGE INDICATION TYPE LOCATION s 08 l- -126 03/92 LKR' PLUGGED' MECH TEC e , '92 46- -03/92 LKR- PLUGGED MECH TEH
_92 ~ 46 03/92 LKR PLUGGED MECH TEC '
't '
. 103' 105 MECH-STAB TEH-03/92 LKR PLUGGED 103 -105. 103/92 LKR PLUGGED MECH-STAB TEC
- 107-97' 03/92 LKR PLUGGED MECH TEH
. - 107 97 03/92 LKR PLUGGED MECH TEC
. - 109 ;77 03/92 LKR PLUGGED MECH. TER h .109 77: 03/92 LKR PLUGGED MECH TEC 120 72 03/92 LKR PLUGGED MEC11 TEH 72
, 120- 03/92 LKR PLUGGED MECH ' TEC '
p
- '. . -LUGEND'
- TEH = TUBE END HOT-TEC = TUBE'END' COLD .
LKR =' LEAKER .;
MECH =1 MECHANICAL ~ PLUG, L- '
MECU-STAB ' = MECHANICAL ' PLUG AND STALILIZER WELD = WELDED'TUBESHEET PLUG -
o, ,
'N--
s u.i, 1
L I
' \\ . t, -
i
- h. t m ,
1) m k
; -( !
e J
e r 4, *n , f 1, -
w e v 4
. -j q{. ._-- '
p, ;,. ,
i -l "
1 l
M. ? TABLE 2
@ "B"~ STEAM: GENERATOR' TUBES. PLUGGED ,
)
': pLuc
, ROW COL- OUTAGE . INDICATION TYPE LOCATION s.
o .
4f 15- 31: 03/92 LKR PLUGGED- MECH TEH '
115- 31- 03/92 LKR PLUGGED :FECH TEC
.i.T
'19 55 03/92 LKR PLUGGED WELD TEH 19 55' 03/92 LKR PLUGGED MECU- TEC A 136 130 03/92.LKR PLUGGED' WELD TEH ,
130 ~ 03/92 LKR PLUGGED TEC
'36 PECH '
- 60. .100 03/92 LKn PLUGGED MEcli TEH 100 03/92 LKR
'60 PLUGGED MECH TEC R4. 40 - 03/ 9 2 Ll'R- PLUGGED MECH TEll .
842 40 03/92 LKR PLUGGED MECH TEC ,
.150
-841 03/92 'LKR PLUGGE9 MECH TEH 84' 150 03/92 LKR PLUGGED MECH TEC 91- 85. 03/92-LKR PLUGGED _ MECH-STAB TEH
-_ 91 . 05 03/92 LKR PLUGGED MECH-STAB TEC 96 116 03/92 LYJ1 PLUGGED WELD TEH 96l 116 03/92 LKR PLUGGED MECli TEC <
, >104 60 03/92,LKR PLUGGED MECH TEH 104- 60. ;03/92 LXR PLUGGED MECH TEC 104' 90 .03/C2~LKR ' PLUGGED MECH TEH .,
104:- 90 03/92 LKR PLUGGED MECH TEC
.131 110 03/92 LKR . PLUGGED MECH TEH j 131~ c113 03/92 LKR PLUGGED MECH TEC
- s. .
L ULEGEND : TEH ='TOBE END I HOT TEC =--TUBE END COLD LKR w LEAKER 1
_ MECH = MECHANICAL PLUG h.
MECH-STAB = MECHANICAL. PLUG AND STABILI2ER i G( Wi!LD = 1 WELLED' TUBESHEET PLUG
-h 9 e i
t I
a L
g- 'j u l
4 5
l
,..-..m .:-.- . , . , _ , . ,
, . , . _ . . _. . ,._ ._ . . . _ . . , ~ . , . _ _ _ _ - - .
k ?
m u
i TABLE 3 -
"A'! STEAM GENERATOR TUBES SLEEVED W - SLEEVE
. < ROW COL OUTAGE INDICATION TYPE -LOCATION i 4 28 03/92 LKR SLEEVED DESIGN 1 TSH +- 6.5 4 :5 53 03/92 LKR SLEEVED- DESIGN 1 TSII + ~6.5
- 5. 55 03/92 LKR FLEEVED _ DESIGN 1 TSH -+ 6.5 6 . 114- 03/92.LKR 3LEEVED -DESICF 1 TSH + 6.5 8_ 16 :03/92 LKR SiEEVED DESIGN 1 TSH + 6.5
+ -'
8' 54 03/92 LKR SLEEVED DESIGN 1 TsH 6.5 8 .114 03/92 LKR
- ~ SLEEVED DESIGN 1 TSH + 6.5 9 - 151 03/92 1XR- SLEEVED. DESIGN 1 TSH, +- 6.5 11- 19 03/92 LKR SLEEVED DESIGN 1 .TSH + 6. 5 e 11 45 '03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
'll 61 03/92 LKR SLEEVED' DESIGN 1 TSH +- 6.5 e: 11 - 145; ,03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 11 .149. 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 a 31 .151- ' 03/92 LFJR SLEEVED DESIGN 1 TSH + 6.5
, "2 '28 03/92 LKR SLEEVED DESIGK 1- TSH + 6.3 4
_12 128 03/92'LKR SLEEVUD DESIGN 1 TSH + 6.5.
12 142 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 _
Q 12 146,- 03/92 LKR SLEEVED- -DESIGN 1 TSH + 6.5 F 13 '17 03/92 LKR SLEEVED . DESIGN 1 TSH + 6.5 h4 : 1~3 25- - 03/92 - LKit SLERVED DESIGN 1- T S H -- + 6.5 L13 . '2 7 03/92'LKR SLEEVED ' DESIGN 1- TSH + 6.5 .
. 13 53= 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 13 127- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
~13 .141 03/92.LKR SLEEVED. DESIGN 1 TSH + 6.5 -
- 4. 13- .149 '03/92 LKR SLEEVED DESIGN 1 TSH + ;6.5 I 13' . 151 03/91 LKR SLEEVED DESIGN 1 TSH & _ '6. 5
- 13. 153 -03/92 LKR- SLEEVED DESIGN 1 TSH + 6.5 i, 14 '2B '03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 '
,142 b 4 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
. _ 14 .. - 244 03/92_LKR SLEEVED DESIGN 1 TSH + 6.5 3-14 152- L03/92 LKR ' SLEEVED DESIGN 1 ' TSH_ + 6.5 p IF 31 03/G2 LKR SLEEVED DESIGN:1 TSH + 6.5 J lb.. 59 03/92:LKR SLEEVED DESIGN l' TSH +_ 6.5 115- 141- 03/92 LKR. SLEEVED DESIGN 1 - TSH + 6.5 4
15 143- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 15 : 145- .03/92 IZR SLEEVED DESIGN'1- TSH +- 6.5
~15- 147 03/92 LKR SLEEVED - DESIGN 1 TSH + 6.5-I' 15 149 _03/92 LKR S LEEVED DESIGN 1 TSH + 6.5 '
16- 112 03/92.LKR SLEEVED. DESIGN 1 TSH + 6.5 16 146 03/92 LXR SLEEVED DESIGN-1 TSH 4 6.5
. 16 - 148 ,03/92_ LKd SLEEVED DESIGN-1 TSH +- 6.5 DESIGN 1
- t16 _ 152 03/92 LKR SLEEVED TSH + 6.5 c17 '33- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
, 17- 147- 03/92 LKR SLEEVED DESIGN 2 TSH + 6.5-c L17- 151 03/92 _ LitR SLEEVED DESIGN 1 - TSH :+ 65 i '18- 32 03/92 LKR SLEEVED DESIGN 1 2SH + 6.5
, 218 .34 03/92 LKR ~ SLEEVED DESIGN 1 TSH + 6.5 18 136 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 ,
j, - 1P - 13C 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 1
-. - __m-- -
-v m i~~ , , - . . - -,e e p --
h -f J.
l
. tj i
TABLE-3 "A" STEAM GENERATOR TUBES SLEEVED -
SLEEVE ROW ' COL. OUTAGE INDICATION' TYPE LOCATION
- i 19 35 03/92 LKR SLEEVED DESIGN 1 'i'SH + 6,5 20 36 03/92 LKR' SLEEVED DESIGN 1- TSH i 6.5
, 20 52 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 20 60 03/92 IKR SLEEVED DESIGN 1 TSH + 6.5
-20 136 03/92 LKR_ SLELVEr DESIGN 1 TSH e 6.5 r
, 21 33- 03/92 LKR. SLEEVED DESIGN 1 TSH ^ 6.5 '
~21 35 03/92 LKR- SLEFVED DESIGN 1 TSH + 65'
, 21 39- 03/92'LKR SnEEVED DESIGN 1 TSH + 6.5-
- 21' 53. 03/92 LER SLEEVED DESIGN 1 TSH + 6.5 21 135 --03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 2.1 147 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 u 21 149 03/92.LKR SLEEVED DESIGN.1 TSH + 6.5 21 151 O'?/ 92 LKR S L'UEVED - DESIGN 1 .TSH + 6.5 l 22 30 03/92.LKR SLEEVED DLSIGN 1 TSH + 6.5 22 36 03/92 LKR SLEEVED DESIGE 1 TSH . + 6.5 22- 134 03/92 LKR SLEEVED DESIGN 1 TSH +- 6.5 22 136 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
- 22 146 03/92-LKR SLEEVED DESIGN 1 TSH + 6.5 23 31 03/92-LKR SLEEVED DESIGN 1 TSH + 6.5 23 53.- 03/92.LKR -SLEEVED DESIGN 1 TSH + 6.5 23 125 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
~23 133 03/92 LKR SLEEVE 9 DESIGN'1 TSH + 6.5 24 34 03/92.LKR SLEEVED DESIGN 1 - TSH + 6.5
- 24. 114 03/92 LKR SLEEVED DESIGN 1 TSH -+ 6.5- "
-24 146 03/92 LKR SLEEVED DESIGN 1 ISH & 6.5 25 39 03/92 LKR SLEEVED DESTrN : TSH + 6.5
-26' 34 - 03/92 LKR SLEEVED DESIGN 1 TSH' + 6.5 26 128 03/92'LKR SLEEVED DESIGN 1 TSH + 65 26 130 03/92 LKR SLEEVED, DESIGN 1 TSH + 6.5
,~
26' -132 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 27 33 03/92 LKR SLEEVED. DESIGN .1 TSH + . 6.5
- i' 27 35 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 27 ~39 03/92 LKR SLEEVED DESIGN 1 TSH. i 6.5 -
27 111 03/92 LKR_ SLEEVED DESIGN 1 TSH + 6.5 7 27 129 03/92 LKR . SLEEVED DESIGN-1 TSH + 6.5
~
28 32 03/9.2 LKR SLELVED DESIGN 1 TSH i 6.5 .
28 52 03/92 LKR SLEEVED DESIGN 1- TSH + 6.5
- 28. 112 03/92 LKR SLEEVED DESIGN 1- TSH + 6.5 28 126 03/92.LKR SLEEVED DESIGN 1 TSH + 6.5 28 130- 03/92-LKR SLEEVED DESIGN.1 TSH i 6.5 28- 132 03/92 LKR SLLEVED DESIGN 1 TSH + .6.5
- . '2 9 41 03/92 LKR SLEEVEC DESIGN 1 TSH + 6.5 ,
- '29 ' 51 SLEEVED +
03/92 LKR DESIGN 1 TSH 6.5 s 29 111 03/92 LKR SLEEVED DESIGd'l TSH + 6.S E 29 -127 03/92 LKR SLEEVED DESIGN 1 TSH + 6. 5 29 129 03/92 .LKR SLEEVED DESIGN 1 TSH + 6.5 29 133 03/92 LKR SLEEVED ' DES.IGN 1 TSH + 6.5
- 30 38 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 30 50 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 l 30 112 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 ,
~ "
g M, ,
+
Ep 1
TABLE -
"A"iSTEAM GENERATOR TUBES SLEEV3D
- SLEEVE ROW COL OUTAGE' INDICATION ' TYPE LOGATION 30 114 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
~30. 12.0 03/92 LIG1 SLEEVED DESIGN 1 TSH . + 6.5 31 41 33/92.LKR SLEEVED DESIGN _1 TSH. + 6.5
- 31. 51 03/92 LKR SLEEVED .. DESIGN 1 TSH + 6.5 31; 53 03/92 LKR SLEEVED DESIGN 1 TSH. +. 6.5 1 31 63 03/92 LKP SLEEVED DESIGN 1 TSH + _ t. 5 _ ;
31- 123 03/92 LKR SLEE"ED- . DESIGN 1 TSH + -6.5 m- 31 125 03/92LLKR SLEEVED DFSIGN i TSH + 6.5 j
%' . 31 ' 127 .03/92 LKR SLEEVED DESIGN 1 TSH + E.5 i
? 32 20- 03/92 LKR SLEEVED DESIGN 1- TSH + 6.5 l
_- 2 2 46 '03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 L 32' 48 03/92.LKR SLEE7CD DESIGN 1 TSH + 6.5 32f 50 03/92 LKR SLEEVED DESIGN 1 TSH + '6.5 32 52 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 32 124'- 03/92-L1W . SLEEVED . DESIGN 1 TSH +.-6.5 32- 130 03/92 LKR SLEEVED- DESIGN 1 TSH + 6.5 34 24 03/ 92 -' LER SLEEVED DESIGN-1 TSH + 6.5
'34 40 0"/92 LKR' S LEEVED - DESIGN 1 TSH + 6.5 34 .42 03/92 LKR SLEEVED- DESIGN 1 TSrl -
- 6. 5 34 44' 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 l 34- 50 03/92 LFR- SLEEVED DESIGN-1 TSH + 6.5 l
.34- 98 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5.
.3 4 ' 112~ 03/92 - LKR SLEEVED DESIGN 1 TSH + 6.5 34 128- 03/92'LKR SLEEVED . DESIGN 1 TSH + 6.5 35 127 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 36 38 0 3/ 9.'t LKR SLEEVED . DESIGN 1 .TSH + 5. 5 36 -44 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 j 3 S_ 50 ~03/92-LKR SLEEVED ~ DESIGN 1 TSH + 6.5 i 36 . 52 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 l
, -36 130 03/02'LKR _ SLEEVED. DESIGN 1 TSH + 6.5 !
A 37 27 03/92-LKR _ SLEEVED DESIGN 1 TSH' + 6.5 37 37 03/92 LKR SLEEVED TSH +- l
_ DESIGN 1 . 6.5 :
g, _ .3 7 .39 -03/92 LKR SLEEVED . DESIGN-1 TSH + _ 6.5 1 L 3 "' 95_ 03/92 LKR- SLEEVED' = DESIGN 1 TSH ~+ 6.5 40_ 22 03/92^LKR S'LEEVED DESIGN 1 .TSH + 6.5 l
'40 56: 03/92 LKR SLEEVED DESIGN 1 TSh 6.5 -l 40: 140' 03/921LKR -SLEEVED DESIGN 1 TSH + 6.5 '
41' 35 03/92 LKR SLEEVED . DESIGN.1 TSH + 6. 5 -
[W 41' 39 03/92 LKR SLEEVED DESIGN 1 TSH + - 6.5 109 03/92 LKR' ' SLEEVED DESIGN 1 TSH + 6.5 ,
42 118 03/92 LKR. SLEEVED DESIGN 1 -TSH -+ 6.5 y~. ' ;42l 132 03/92.LKR SLEEVED DESIGN 1 TSH + 6.5-1
. 4 3; 119 03/92 LKR SLEEVED- DESIGN 1 T. : H + 6.5
, _44 46 03/92 LKR SLEEVED. DESIGN 1 TSH + 5.5' '
f 44 48 03/9? LFR SLEEVED DESIGN 1 TSH + 6.5-44 108 03/92 LKR SLEEVED DESIGN 1 TSH +. 6.5 44 120 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 45 47 03/92 LKR SLEEVED DESIGN 1 TSH + 6 ., 5 45- 49 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 ll 45 119 03/92 LKR SLEEVED DESIGN 1 TSH +- 6.5 t
i l, .
1 u- 4, 4 . -
I'.M 4
TABLE 3 "P" STEAM GENERATOR TUBES SLEEVED
- ROW. COL' OUTAGE INDICATION . TYPE SLEEVE LOCATION
-45 121 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 46 46 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 46 48- 03/92 LKR SLEEVED' DESIGN 1 TSH ' + 6.5 '
46 54 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 46 38 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 46 74 03/92 LKR . SLEEVED DESIGN 1 TSH -e 6.5 46 106 03/92 LKR SLEEVED DESIGN.1 TSH +- 5.5 1
-46 120 03/92 LKR SLEEVED DESIGN 1 TSH. + 6.5 47 49 03/92 LKR SLEEVED DESIGN 1 *SH + 6.5
-47 63 03/92-LKR SLEEVED DESIGN 1 TSH. + 6. 5'
- 47 '121 03/92-LKR SLEEVED' E.
- SIGN 1 TSH + 6.5 47 139' '03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 48 104 03/92 LKR' SLEEVED DESIGN 1 TSH + 6.5 48 106 -03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 ,
. 49 49 03/92.LKR SLEEVED DESIGN 1 TSH + 6.5 1 , 50 38 03/97 LKR SLEEVED DESIGN 1 TSH- + 6.5 50 64 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 -i 50 66 03/92 LKR- SLEEVED DESIGN 1 TSH + 6.5 L 50 202 03/92 LKR SLEEVED DESIGN 2 TSH + 6.5 '
50 104 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 ,
.50 114 -03/92 LKR SLEEVED DESIGN 1- TSF + 6.5 50 118 03/92 LKR SLEEVED DESIGN 1 TSH v 6.5 50 120 03/92 LKR SLEEVED DESIGN-1 TSH + 6.5 51 45 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
-51 51 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 51 117, 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 51 119~- 03/92 LKR SLEEVED DESIGN 1 TSH' + 6.5
- 52 '4 4 - 03/92 LKR Sr* VED DESIGN 1 TSH + 6.5
, -52 -5 4 - 03/92 LKR S Lt.EVED DESIGN 1 TSH + 6.5 52 102 .03/92 LKR SLEEVED. DESIGN 1 TSH- + 6.5-L52 106 "0 3/9 2 - LKR . -SLEEVED DE' SIGN 1 TSH + 6.5 '
'52 116 03/92 LKR -SLEEVED. DESIGN 1 TSH & 6.5 n 53 ~33 03/92'LKR SLEEVED DESIGN 1 TSH + .
6.5 7 53. 67. .03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 e =53. 115 03/92 LKR SLEEVED > DESIGN'1 TSH + 6.5 54 54 03/92 LKR SLEEVED- DESIGN 1 TSH + '6.5-l*'
54 . 114. 03/92 LKR' SLEEVED DESIGN 1 TSH + 6.5 4
'54 116- 03/92 LKR ' SLEEVED DESIGN 1 TSH ' + 6.5
'55- .53 03/92-LKR SLEEVED DESIGN 1 TSH + 6.5 55 65- 03/92'LKR SLEEVED DESIGN 1 TSH +- 6.5 55, 77 03/92'LKR SLEEVED DESIGN 1 TSH + 6.5 56 54 03/92'LKR SLEEVED . DESIGN i ' TSti +. 65 56 62 03/92 LKR SLEEVED . DESIGN 1 TSH & 6.5 .
'56 64: 03/92.LKR SLEEVED DESIGN 1 TSH + 6.5
- 56 100 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 '
l57 65 03/92'LKR SLEEVED DESIGN 1 TSH + . 6.5
, 57 67 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 ~l 58 32 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 38 56. 03/92 LKR SLEEVED DESIGN 1 TSH 4 6.5
[. 58 . 64' 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 5
i
.. . - . ~ ..
n- - . . - - . .- - . .
5::;j !-{ ' : *l
^
w 4
TABLE-3 "A" STEAM GENERATOR TUBES SLEEVED SLEEVE ROW COI OUTAGE -1NDICATION -TYPE LOCATION
, 58 66 03/92-LKR SLEEVED DESIGN 1 TSH + 6.5 59 Si 03/92 LKR: S LEEVED DERIGN 1 TSH + 6.5-59' 63 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 59 65 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 -
60- 56 03/92 LKR SLEEVED DESIGN 1 TSH -+ 6.5 60 66 03/ 92_ LKR SLEEVED DESIGN 1 TSH + 6.5
'60- 68 03/92.LKR_ SLEEVED DESIGN 1 TSH -+. 6.5 <
60 '112 03/92 LKR SLEEVED . DESIGN 1 TSH + 6.5 60 114l 03/92 LKR S LEEVED . DESIGN ? TSH + . 6.5
-61 111 03/92_LKR SLEEVED DESIGN 1 TSH +: 6.5
=62- 58' 03/92 LKR SLEEVED DESIGN 1 TSH - + 6.5 -
62 64 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 62 66_ 03/92 LKR SLEEVED DESIGN 1 -TSH + 6.5 62 70 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 62 112 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 ,
62 138 ._03/02 LFR_ SLEEVED DESIGN 1 TSH + 6.5 163. .59 03/92 LKR SLELVED EESIGN 1 TSH + 6.5 63 61- 03/92 LKR SLEEVED T :IGN 1 TSH + 6.5 63 67_ 03/92 LKR SLEEVED- L? SIGN 1 TSH & 6.5 L 63- 69 -03/92.LKR SLEEVED DESIGN 1 TSH + 6.5
, 63 -77 03/92.LKR SLEEVED DESIGN 1- TSH + 6.5 63 31- 03/92;LKR SLEEVED DESIGH 3 TSH + 6.5 63 91. 03/92 LKR SLEEVED DESIGN-1 TSH + 6.5 63 97 03/92 LKR.- SLEEVED DESCGN 1 TSH ' 6.5 63 111: 03/92 LKR SLEEVED DESIGri 1 TSH + 6.5 64 _68 03/92 LKR. SLEEVED DESIGN 1 TSH + 6.5 64 70. 03/92 LKR SLEEVED DESIGN.1 TSH + 6.5 64 76. 03/92 LKR SLEEVED DESIGN 1 TSH t 6, S 164 82 03/92 LKR SLEEVED - DESIGN 1 TSS + 6.5 64 90 03/92.IIR. _ SLEEVED DESIGN 1 TSH + -6.5 I 64- 92 03/92 LKR SLEEVED T MIGU 1 TSH + 6.5 65- 77 _ Cr3/92 . LKR SLEEVED L. SIGN 1 TSH- + 6.5
'65 '89 03/92 LKR SLEEVED DLSIGN.1 TSH + 6.5 65_ 93_ 03/92 LKR - GLEEVED DEGIGN-1 TSH + 6.5
_66 50 03/92-IKR SLEEVED DESIGN 1 TSH + 6.5.
l, 66- 82 :03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 66 84 03/92 LKR' SLEEVED DESIGN 1 TSH + 6.5-66 92 03/92.LKR SLEEVED- DESIGN.1 TSH + 6.5l 66- 106 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
- 67. 7 7.- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
-67 81 03/02 LKR . SLEEVED DESIGN 2 TSH + 6.5 j68 32' .03/92:LKR SLEEVED DESIGN 1 TSH + 6.5 i l1 60 76 03/92 Lim SLEEVED- DESIGN 1 TSH + 6.5 W _7 8 - 03/92 LKR. SLEEVED DESIGN 1 TSH + 6.5 t
68 80 . 03/ 9 2 ' LKR . SLEEVED DESIGN 1 TSH + '6.5 68 84 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 -
68 110- 03/92 LKR SLEEVED- DESIGN 1 TSH + 6.5 69 65 03/92-LKR SLEEVED DESIGN 1 TSH + 6.5
? 69 95 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
- l. 70 72 03/92 LKR SLEEVED DESIGN 1 TSH _+ 6.5 t
t
- s,
+, n .,~ - , - .
" i ~;
TABLL 3 "A" STEAM GENERATOR TUBES SLEEVED SLEEVE
_ ROW- COL OUTAGE INDICATION TYPE LOCATION 70 78 03/92'LKR SLEEVED DESIGN 1 TSH + 6.5 ;
- 71 ' _73 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
-71 105 03/92.LKR SLEEVED DESIGN 1 TSH + 6,5
- 71. 107. 03/92 lim SLEEVED DESIGN 1 TSH + 6.5 71 131 03/92 LKR SLEEVED JESIGN 1 TSH + 6.5 72 ,72 03/92.LKR SLEEVED DESIGN 1 TSH + 6.5 72_ -74 ' 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 72; .76 -03/92=LKR SLEEVED DESIGN 1 TSH + 6.5 72 104 03/92 LKR SLEEVED DESIGN 1- TSH + . 6.5
-73 69 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
~
-73: 73 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 133
- 73 .' 03/92 LKR -SLEEVED DESIGN 1 TSH + 6.5
-74 130_ 03/92.LKR SLEEVED DESIGN 1 TSH + 6.5
- 74 132 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 75 73 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 76 .74- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 76- 80 03/92-LKR SLEEVED DESIGN 1 TSH + 6.5 77 81' DESIGN 1 +
03/92_LKR SLEEVED TSH 6.5 77 99 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 77 101- 03/92 LKR SLEEVED DESI?N 1 TSH + 6.5
, 78. 78- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 78- 84 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 17 8 86 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 78 130 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 79' 79 03/92 LKR -SLEEVED DESIGN 1 TSH + 6.5 p -79 81 O/92 LKR SLEEVED DESIGN 1 TSH + 6.5 79 87 61/92 LKR SLEEVED DESIGN 1 TSH + 6.5 80 78 03/92 LKR SLEEVED DESIGN 1 TSH +- 6.5
't 80 92- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 -
80' 91 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 80- 94 03/92 LKR -SLEEVED DESIGN 1 "SH + 6.5
, 81_- 63 03/92 LKR -t'LEEVED DESIGN TSR + 6.5
- 81._ 93 :03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
.82) 90 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 82 86 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 84 126 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 l- : 85 133 _03/92 LKP -SLEEVED DESIGN 1 TSH & 6.5
-86 84 03/92 LKR SIEEVED DESIGN 1 TSH + 6.5 g--
86 .124' 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 87- -43 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
;. 88 :46 03/92 LKR- SLEEVED DESIGN 1 TSH +. 6.5
.90' 80 03/92 LKR SLEEVED- DESIGN 1 TSH + 6.5 90 84 03/92 LKR SLEEVED DESIGN 1 TSH_ + 6.5 j_ 90 122 03/92 LKR SLEEVED DESIGN 1 TSH t 6.5 n 45 03/92'LKR SLEEVED DESIGN 1 TSH + 6.5 ll 91 119 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 l 92 78- 03/92 LKR SLEEVED DESIGN 1 TSH + 5.5 l- 92 118 03/92 LKR SLEEVED DESIGN 1 TSU + 6.5 L 93 45- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 94 46 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
. ,- -- - =_ _ . . .- .
t TABLE 3
' "A" STEAM GENERATOR TUBES SLEEVED SLEEVE
, ROW COL OUTAGE INDICATION TYPE LOCATION _,
t 94 50- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 95 119 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
- 96. 46 03/92-LKR SLEEVED DESIGN 1 TSH + 6.5 96 84 '03/92 LKR SLEEVF. DESIGN 1 TSH + 6.5
- 96. 118 03/ 92 . IJGR SLEEVED DESIGN 1 TSH + 6.5 97: 1115 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 97 -121 03/92 LKR -SLEEVED' DESIGN 1 TSH + 6.5
, 198 84_ 03/92 LKR SLEEVED DES 1GN 1 TSH + 6.5 98 110 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 98 116 03/92 LKR S LEEVED DESIGN 1 TSH +, 6.5-
' 9 9.- 109- 03/92 LKR SLEEVED DESIGN 1 rQ[ "
"5, 100 7;8 03/92 LKR SLEEVED DESIGN 1 :* o:
100 122 03/92 LKR SLEEVED DESIGN 1 ' di <- 0."
- 101 69 .03/92 LKR SLEEV?D DESIGN - Ild .c ' .'
101 73 03/92 LKR SLEEV1.D DESICP x T4 a.5 301 79 03/92 LKR. SLEEVED DESIR a 72 *f 6.5 101 109 03/92 LKR SLEEVEL DESIC < i 2d e 6.5 102 -72 03/92 LKR. SLEEVED DESIGN 1 . h,a + 6.5 102- 76- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 102 82 03/92z LKR SLEEVED DESIGN 1 TSH + 6.5 L
102' 8 4 -- 03/92,LKR SLEEVED DESIGN 1 TSH + 6.5 102- 94 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 102 -106 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 103_ 63 03/92 IJ3t SLEEVED DESIGN 1 TSH + 6.5 103- 69 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 103' 97 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
-103 _107 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 103 109 03/92 LKR SLEEVED DESIGN l' TSH + 6.5 e- .104- 78 ,03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 104 '82 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
.104- 92 03/92 LKR SLEEVED DESIGN 1 TSH '+ 6.5
- 104. 1 96. 03/92 LKR SLEEVED DESIGN 1 TSH +_ 6.5 104 108 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 105 63 03/32 LKR SLEEVEJ DESIGN 1 TSH + 6.5
~105 63 03/92'LKR SLEEVED- DESIGN 1 TGH + 6.5 105 6,7 03/92 LKR SLEEVED- DESIGN 1- TSH + 6.5 105; 69 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
-105 71 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 105 73 . 03/ 92 12G1 SLEEVED DESIGN 1 TSH + '6. 5 105- 77 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
- 105 79 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 105 85 03/92 LKR SLEEVED DESIGN 1- TSH + 6.5
'105 103 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 106 64 03/92 LKR SLEEvmD DESIGN 1 TSH + 6.5 11061 16 8 03/92 IMG1 SLEEVED- DESIGN 1~ TSH + 6.5 106 70 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 106 76 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
'106 78 03/92 LKR SLEEVED DESIGN 1 TSH. + 6.5 106 80 03/92 LKR SLELVED DESIGN 1 TSH + 6.5 106 82 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 Y
l
- a - - - -. . . . - - .. - . . . -- --- . - _ . . - .
. ., g . , , -. . , . .~ - . ~~- . -- -. . .-
g .
TABLE-3
; "A" STEAM GENERATOR TUBES SLEEVED i
SLEEVE
~ ROW COL OUTAGE INDICATION TYPE LOCATION 106 86 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 106 88 03/92 LKR_ SLEEVED DESIGN 1 TSH + 6.5 106 92 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
-106 96 ~03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
'106 98 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
, :U '106 100 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
'106 104 03/92 LKR. SLEEVED DESIGN 1 TSH + 6-5 107' 63 03/92 LKR SLEEVED DESIGN 1 T5H + 6_, S 107- 65 _03/92 LKR SLEEVED DESIGN.1 TSH + 6a 10*1 69 03/92 LKR SLEEVED DESIGN 1 TSH + 6.'
107 71 03/92 LKR SLEEVED DESIGN 1 TSH + /
107' 73 03/92 LKR SLEEVED DESIGN 1 TSH + t-107 75 03/92 LKR SLEEVED DESIGN 1 TSH + 6.6 !
107- -81 03/92 LKR SLEEVED DESIGN 1 TSH + _.
6.5 107 87 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 107 89 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 l 107- 91 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
'107 93 03/92 LKR -SLEEVED DESIGN 1- TSH + 6.5 107 95 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 108 72 -03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
, 108 -74 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 108 76 03/92'LKR SLEEVED DESIGN 1 TSH + 6.5
. 108 82 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 108 88 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 108 90 03/92 LKR SLEEVED DESIGN ] TSH r 6.5 108 92 03/92 LKR SLEEVED DESIGN 1 TSH v 6.5
~108- 94 03/92 LKR SLEEVED. DESIGN 1 TSH + 6.5 109 85 03/92 LKR -SLEEVED DESIGN 1 TSH + 6.5 1110 62 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 110 68 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 110 74 03/92 LKR SLEEVED DESIGN 1 TSH + F. 5 11G_ 92 03/92 LKR : SLEEVED DESIGN 1 TSH + 6. 5~
-111 93 03/92 LKR ' SLEEVED DESIGN 1 TSH + 6.5 111. 95 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
, ~113 67 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 i- 113 71 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 113 73_ 03/92 LKR SLEEVED DESIGN 1 TSH _+ 6.5
'113 91- 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 113 93 03/92 LKR- SLEEVED DESIGN 1 TSH + 6.5 114_ 72 03/92 LKR SLEEVED DESIGN 1 TSH- + 6.5 1151 71 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 1133- 85 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 139 95 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 LEGEND : TEH = TUBE END HOT TEC c TUBE END COLD TSr. + = INCHES ABOVE TUBE SHEET HOT SECONDARY FACE LKR = LEAKER
(. MECH = MECHANICAL PLUG
e TABLE 3 "A" STEAM GENERATOR TUBES SLEEVED SLEEVE ROW COL OL2 AGE INDICATION TYPE LOCATION MECH-STAB = MECHANICAL PLUG AND STABILIZER WELD = WELDED TUBESHEET PLUG
)
TABLE 4' "B" STEAM GENERATOR TUBES-SLEEVED SLEEVE c ROW COL OUTAGE INDICATION TYPE LOCATION '
11 17 ' 03/92 3LKR SLEEVED DESIGN 1 TSH + 6.5
- 14' '148~ 03/92 LKR SLEEVED . DESIGN 1 TSH + _ 6.5 15 19 03/92 LKR-SLEEVED DESIGN 1 -TSH. + 6.5 15 145. 03/92 LKR SLEEVED _ DESIGN 1 TSH + 6.5 17- 147 03/92 LKR- SLEEVED DESIGN 1 TSH + 6.5 18 154 03/92 LKR SLEEVED DESIGN 1 TSH _+ 16 . 5
- 19 151- 03/92 LKR S LEEVED DESIGN 1 TSH + 6.5
' 19 165 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
-20 16 03/92-LKR S LEEVED _ DESIGN 1 TSH + 6.5
, 20 164 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 i 21. 19 03/92 LKR S LEEVED DESIGN 1 TSH + 6.5 24 54 03/92 LKR S LEEVED DESIGN 1 TSH + 6.5 43 67 03/92 LKR S LEEVED DESIGN 1 TSH + 6.5 43 101 03/92 LKR S LEEVED. DESIGN 1 TSH + 6.5 l - 53 45 03/92 LKR S LEEVED - DESIGN 1 TSH + 6.5
--60 -32 03/92 LKR SLEEVED DESIGN 1 TSH_ +
66 132 .03/92 LKR SLEEVED DESIGN 1 TSH + . 6.5 6.5
- 67 45 03/92 LKR SLEEVED- DESIGN 1 TSH + 6.5 68 48- - 03/92 LIGR SLEEVED DESIGN 1 TSH. + 6.5 74 <4 0 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 76, 94 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 81: -39 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5
- 81 43 03/92 IJGR SLEEVED DESIGN 1 TSH + 6.5
- 81 45 - 03/92 LKR S LEEVED DESIGN 1 TSH- + 6.5 81~ 87 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 84 42 03/92 IJGR SLEEVED DESIGN 1 TSH + 6.5 84 441 - 03/92
- LKR SLEEVED DESIGN 1 TSH + 6.5
. 87 '119 03/92 LKR SLEEVED -DESIGN 1 TSH + 6.5
' 90 120 03/92 LKR SLEEVED DESIGN 1- TSH + 6.5 91- 53 03/92-LKR SLEEVED DESIGN 1 TSH + 6.5
.91 125. 03/92 LKR SLEEVED DESIGN 1- - TSH + 6.5 93 53 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 54 03/92 LKR SLEEVED DESIGN 1 TSH +- 6.5 98 52 03/92 IEJ1 SLEEVED -DESIGN 1 TSH + 6.5 100- - 106_ 03/92 LKR SLEEVED. DESIGN 1 TSH + 6.5 102 96 _ 03/92 LKR
- SLEEVED DESIGN 1 TSH + 6.5
! 103 65 03/92LLKR SLEEVED DESIGN 1 TSH + 6.5-104 68 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 104 106 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 105 61 03/92 LKR. SLEEVED DESIGN 1 TSH + 6.5 105 69 03/92.LKR SLEEVED DESIGN .1 TSH -+ 6.5 105 89 03/92 IaG1 SLEEVED DESIGN 1 TSH + 6.5 105 93 03/92 LKR SLELVED DESIGN 1 TSH + 6.5 106 70 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 106 82 - 03/92 LKR SLEEVED DESIGN 1 TSH r 6.5 F 107 63 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 107 71 03/92 LKR- SLEEVED DESIGN 3 TSH + 6.5 107 79- 03/92 LKR- SLEEVED DESIGN 1 TSH + 6.5
,e ., ,.
TABLE 4 "B" STEAM GENERATOR TUBES SLEEVED SLEEVE ROW COL OUTAGE INDICATION TYPE LOCATION
" -108 702 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 108 46 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 110- 70 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 111 71 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 111- 73 03/92 LKR SLEEVED DESIGN 1 TSH .+ 6.5 111- 85. 03/92 LKR SLEEVED DESIGN 1 CSH + 6.5 111' 99 03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 113 99' -03/92 LKR SLEEVED DESIGN 1 TSH + 6.5 LEGEND : TEH = TUBE E"D HOT TEC = TUBE END COLD TEH + = INCHES ABOVE TUBE SHEET HOT SECONDARY FACE LKR = LEAKF9 MECH = MECHANICAL PLUG MECH-STAB = MECHANICAL PLUG AND STABILIZER
. WELD = WELDED-TUBESHEET PLUG -
s ..
i lb i
If e
..ei - , , . _ . n-e -
,m._.y, , _ , + -}}