LER 82-028/03L-0:on 820429,during Power Ascension Loop,One Wide Range RCS Pressure indication,NPS-122,failed High. Replacement Read Low on 820523.Caused by Open Stain Gauge & Faulty Calibr,Respectively
ML20053E341
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/27/1982
From: Palmer R
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20053E330 List:
References
LER-82-028-03L, LER-82-28-3L, NUDOCS 8206070810
Download: ML20053E341 (1)


LER-2082-028,
Event date:
Report date:
3152082028R00 - NRC Website

text

LICENSEE EVENT REPORT j CO$ TROL BLOCK: l l l l l I l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) io lil8l 9M I ILICENSEE I D ICCODE IC 11 l@l 14 15 o f 01 o f LICENSE 0101010101010 NuMuEs l o.6 l@l4111111111@l 26 uCENSE TYPE JG I l@

67 LA T bd CON'T IOIiI

  1. 8

$$RCbol L l@l015 DOEKET 61 l0 l0 NUMBER l0 l 311l 568 l@l69 01412 l 9 I 8 l 2 l@l0 REPORT EVENT DATE 14 75 l5 l2DATE l7 l8 l280 l@

EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h

l o 121 ITWO EVENTS OCCURRED ASSOCIATED WITH LOOP ONE WIDE RANGE REACTOR COOLANT SYSTEM

.Io13I IINDICATION (NPS-122). THE FIRST EVENT OCCURRED ON 4-29-82, DURING POWER ASCENSION, I Ioi41IWHEN NPS-122 FAILED. THIS RESULTED IN THE TRANSMITTER BEING REPLACED. THE SECOND l I o I s I lEVENT OCCURRED ON 5-23-82, DURING STEADY STATE OPERATION, WHEN NPS-122 INDICATION WAS I l

I O le 1 IF0VND TO BE READING LOW. THESE EVENTS WERE NON-CONSERVATIVE IN RESPECT TO TECHNICA i O l 7 l l SPECIFICATION 3.3.3.8, TABLE 3.3.11, ITEM 4. I l

f o is t i

' C5IlE '#"$E C0 SSC$$E COuPONENT CODE Su'8CT[OE SEEE 10191 l I I A l@ l El@ l E l@ l I l N I S l T l R l U l@ IT 18 19 l@ [Z._j 20 J C 9 10 11 12 13 ivENTvE,R AEP TRT ,FO! ~ "iO0E %W *I" N

@ luR,RO l8l2l E

l-l 101218 l l/l 1013 l lLl [--] l0 l

,_21 22 23 24 26 27 28 29 30 31 32 HOURS S a IT O PORtb 6. SUPPLIE MAN FACTURER KEN AC ON ON PLANT MET Lc._J@lzl@

33 34 l35z l@ lzl@ l01010101 36 31 40 t.N_j @

41 lYl@ lAl@ lBl018l01@

42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h I

l i 101 ITHE CAUSE OF NPS-122 FAILING HIGH ON 4-29-82 WAS DUE TO AN OPEN STRAIN GUAGE. THE Iilii lTRANSMITTER. MANUFACTURED BY ITT BARTON MODEL 763, WAS REPLACED AND RETURNED TO SERVICEI l

ii12i l0N 5-3-82, THE NEW TRANSMITTER WAS'F0UND TO HAVE A LOW OUTPUT. THE CALIBRATION WAS 1iI311 CHECKED WITH A 5.4% SHIFT NOTED OVER THE ENTIRE RANGE. THE TRANSMITTE iED AND OBSERVED FOR SEVERAL DAYS WITH NO FURTHER SHIFTS NOTED. J Ii ia i

's'T'AWS sPOwER OTwER STATUS @ EiSEONRv' ' DISCOVERY DESCRiPriON @

OPERATOR OBSERVATION l l i I 5 I (_C_J@ l 0l 8 l Ol@l NA l lAl@l ACTIVITY CO TENT AMOUNT OF ACTIVITY LOCATION OP RELEASE aELE ASED OP Rete ASE NA l l NA l I i 16 l [ z_] @ l Zl@l PER$QNNEL EXPOS ES NUMBER TYPE DESCRIPTION NA l l i t il 101010 l@[_z_J@l PERSONNE L INJURIES NUMBER DESCRIP flON NA l li 141 l 0 l 0 l 0 I@l LOSS OF OR O AG To F ACILI TV NA l I i l o l LZ_l@l10 80 3 8 9 ESCRIPTION 2 a ISSUED LN_j @l NA l llIllIIIIlIII5

^' *

' os 6, So. ;

5206070010 820527 NE-N DRADOCK05000g mer pnoys {