Letter Sequence Supplement |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition, LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition, LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition, LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition, ML11276A118, ML113260423, ML13256A110, ML14163A002, ML16103A348
|
MONTHYEARML11276A1182011-09-28028 September 2011 Fort Calhoun Station - License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Other ML1132604232011-12-13013 December 2011 Online Reference Portal for National Fire Protection Association Standard (NFPA) 805 License Amendment Request Project stage: Other ML1135403342011-12-19019 December 2011 Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement LIC-11-0136, Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition)2011-12-22022 December 2011 Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition) Project stage: Supplement ML1136300832011-12-29029 December 2011 Acceptance Review Email, License Amendment Request to Adopt National Fire Protection Standard NFPA -805 Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generation Plants, Project stage: Acceptance Review LIC-12-0033, Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station2012-03-20020 March 2012 Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station Project stage: Request ML1210205742012-04-11011 April 2012 Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Draft RAI ML1210205612012-04-11011 April 2012 Draft Request for Additional Information Email, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition). Project stage: Draft RAI ML1210400482012-04-26026 April 2012 Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-12-0083, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition2012-07-24024 July 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Response to RAI LIC-12-0120, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-08-24024 August 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI LIC-12-0135, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-09-27027 September 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI ML13016A4322013-01-16016 January 2013 E-mail, Request for Additional Information, Round 2, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13053A2262013-02-22022 February 2013 Email, Second Round Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants. Project stage: Draft RAI LIC-13-0033, Omaha Public Power District'S, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-04-23023 April 2013 Omaha Public Power District'S, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request W3F1-2013-0022, Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 8052013-05-16016 May 2013 Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 Project stage: Request LIC-13-0060, Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-05-21021 May 2013 Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request ML13178A0352013-06-27027 June 2013 Email Request for Additional Information Round 3 (Afpb), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition). Project stage: RAI LIC-13-0096, Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 8052013-07-29029 July 2013 Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 Project stage: Request ML13226A1222013-08-14014 August 2013 Email, Request for Additional Information Round 3 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13256A1102013-09-12012 September 2013 Safe Shutdown Analysis (SSA) RAI Response - NFPA-805 Transition (ME7244) Project stage: Other ML13270A2872013-09-27027 September 2013 Email, Request for Additional Information Round 4 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition2013-10-11011 October 2013 Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition Project stage: Other LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition2013-11-0404 November 2013 Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition Project stage: Other LIC-13-0167, Safe Shutdown Analysis (SSA) RAI 17.02 Response - NFPA-805 Transition (ME7244)2013-11-11011 November 2013 Safe Shutdown Analysis (SSA) RAI 17.02 Response - NFPA-805 Transition (ME7244) Project stage: Request LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition2013-12-18018 December 2013 Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition Project stage: Other LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition2014-01-24024 January 2014 Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition Project stage: Other ML14036A0682014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 12/9/11 Affidavit Executed by C. M. Molnar, Westinghouse, LTR-RAM-II-10-046, Revision 1, Dated 4/22/2011 Project stage: Withholding Request Acceptance ML14036A0832014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 3/14/12 Affidavit Executed by J. A. Gresham, Westinghouse, Re.: Compact Containing Fire Dynamic Simulator Input Project stage: Withholding Request Acceptance ML14051A3972014-02-20020 February 2014 NFPA 805 IE PRA F&O Tables Project stage: Request ML14051A3882014-02-20020 February 2014 NFPA 805 Fpra F&O Tables Project stage: Request ML14070A5912014-02-28028 February 2014 Supplemental Response to Safe Shutdown Analyses (SSA) Request for Additional Information (RAI) 06 - NFPA-805 Transition Project stage: Supplement ML14115A2972014-04-10010 April 2014 Enclosure 1: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14115A2982014-04-10010 April 2014 Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance -Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement LIC-14-0042, Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2014-04-10010 April 2014 Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14122A2452014-05-22022 May 2014 Request for Withholding Information from Public Disclosure, 3/26/13 Affidavit Executed by C. M. Molnar, Westinghouse, Re.: LTR-RAM-II-10-046, Rev. 3 Project stage: Withholding Request Acceptance LIC-14-0075, Request Clarifications to Draft National Fire Protection Association (NFPA) 805 Safety Evaluation Report2014-06-11011 June 2014 Request Clarifications to Draft National Fire Protection Association (NFPA) 805 Safety Evaluation Report Project stage: Request ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Approval ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Other ML16103A3482016-04-0404 April 2016 Ft. Calhoun, Unit 1 - License Amendment Request (LAR) 16-01; Revised Commitment to Modify FCS Plant Systems as Part of the Implementation of NFPA 805 Project stage: Other LIC-16-0099, License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program2016-11-18018 November 2016 License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program Project stage: Request 2013-04-23
[Table View] |
|
---|
Category:Letter type:LIC
MONTHYEARLIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 An LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated LIC-19-0008, Submittal of 2018 Annual Report2019-04-0404 April 2019 Submittal of 2018 Annual Report LIC-19-0004, Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP)2019-03-28028 March 2019 Independent Spent Fuel Storage Installation - Submittal of Revision 4 to Physical Security Plan (PSP) LIC-19-0005, 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report2019-03-28028 March 2019 2019 Annual Decommissioning Funding I Irradiated Fuel Management Status Report LIC-19-0001, License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2019-02-28028 February 2019 License Amendment Request (LAR) 19-01: Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R2019-02-28028 February 2019 Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ LIC-19-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-01-0303 January 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-18-0031, Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update2018-12-17017 December 2018 Independent Spent Fuel Storage Installation - Transmittal of Emergency Plan Update LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 LIC-18-0028, Letter of Intent to Submit Request for Additional Partial Site Release2018-10-18018 October 2018 Letter of Intent to Submit Request for Additional Partial Site Release LIC-18-0027, Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2018-10-0303 October 2018 Submittal of Foreign Ownership, Control or Influence Five-Year Renewal Filing and NRC Facility Clearance Update LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool2018-09-28028 September 2018 License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool LIC-18-0025, Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 20192018-07-19019 July 2018 Guarantee of Payment of Deferred Premiums for the Period of July 1, 2018 to June 30, 2019 LIC-18-0023, Fort Calhoun Station, Unit 1 Request for Partial Site Release2018-06-29029 June 2018 Fort Calhoun Station, Unit 1 Request for Partial Site Release LIC-18-0021, Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan)2018-06-0606 June 2018 Transmittal of Revision 3 to the Physical Security Plan (PSP) and Revision 4 to the FCS Protective Strategy (Safeguards Contingency Plan) LIC-18-0017, Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy2018-04-26026 April 2018 Submittal of Revision 2 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) and Revision 3 of the FCS Protective Strategy 2023-08-24
[Table view] |
Text
WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Enclosure 1 contains proprietary information.
Upon removal of Enclosure 1, this letter is Decontrolled.
Omaha Public Power Distict 444 South 1 h Street Mall Omaha, NE 68102-2247 LIC-1 1-0136 December 22, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
References:
- 1. Docket No. 50-285
- 2. Letter from OPPD (D. J. Bannister) to NRC (Document Control Desk),
Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) at Fort Calhoun Station, dated December 19, 2012 (LIC-11-0130)
SUBJECT:
Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) at Fort Calhoun Station In Reference 2, the Omaha Public Power District (OPPD) provided information to supplement License Amendment Request (LAR) 10-07 for Fort Calhoun Station (FCS), Unit No. 1, to adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition). OPPD is providing this submittal to clarify the responses in Reference 2 as requested during a teleconference with the NRC on December 21, 2011. The information provided in Reference 2 remains accurate and this submittal is intended to supplement rather than replace the information contained in Reference 2.
Three issues were discussed during the teleconference. The issues and their resolution are provided in the attachment. Please note that Enclosure 1 contains information proprietary to Westinghouse and should be withheld from public disclosure in accordance with Enclosure 2.
There are no regulatory commitments in this letter.
Employment with.Equal Opportunin,
Proprietary - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Enclosure 1 contains proprietary information.
Upon removal of Enclosure 1, this letter is Decontrolled.
LIC-1 1-0136 Attachment Page 1 OPPD Clarification of Supplement to License Amendment Request 10-07 NRC Request #1 The NRC clarified that the facts and observations (F&Os) from the full scope peer review and subsequent focused peer reviews as well as their disposition must be docketed. Accordingly, enclosed is a letter from Westinghouse (CFTC-1 1-95, Revision 1), which contains the F&Os and their disposition. Please note that the material is proprietary to Westinghouse and should be withheld from public disclosure in accordance with the enclosed affidavit.
NRC Request #2 The NRC asked why OPPD provided the High Confidence Low Probability of Failure (HCLPF) capacity rather than an estimate for seismic core damage frequency (CDF) and large early release frequency (LERF). Therefore, OPPD wishes to clarify that the Individual Plant Examination of External Events (IPEEE) for Fort Calhoun Station did not calculate a seismic CDF or seismic LERF.
NRC Request # 3 The NRC asked for the results of the quantitative sensitivity study. The information is as follows:
Quantitative Sensitivity Study Results In FC32 (Room 19, Compressor Area), the FCS fire probabilistic risk assessment (PRA) currently assumes that hot work fires will be initiated only if the plant fails to comply with the revised hot work control procedure. The procedure disallows welding or cutting in this area while the plant is at power, and the probability of failing to comply with the procedure (hot work procedural compliance factor) is assumed to be 0.01.
If the 0.01 hot work procedural compliance factor is set to 1.0, then the FC32 total hot work CDF and LERF increase by 3.18E-07 /year and 1.34E-08 /year, respectively.
The following table summarizes the quantitative sensitivity study results used for comparison against the NFPA 805 acceptance criteria.
Proprietary - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Enclosure 1 contains proprietary information.
Upon removal of Enclosure 1, this letter is Decontrolled.
LIC-11-0136 Attachment Page 2 FC32 VFDR Total Plant Total Plant ACDF and VFDR ACDF CDF and LERF ALERF and ALERF Results when 0.01 hot work 3.75E-07 /year 6.04E-06 /year 6.04E-05 /year procedural compliance factor is CDF CDF CDF removed from FC32 1.71 E-08 /year 6.80E-07 /year 4.83E-06 /year quantification LERF LERF LERF Results when 0.01 hot work 4.48E-07 /year 9.04E-06 /year 9.43E-05 /year procedural compliance factor is CDF CDF CDF removed from FC32 2.29E-08 /year 8.59E-07 /year 8.59E-06 /year quantification, in addition to LERF LERF LERF removing all other Unreviewed Analysis Methods (UAMs) from the FCS fire PRA
Proprietary - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Enclosure 1 contains proprietary information.
Upon removal of Enclosure 1, this letter is Decontrolled.
LIC-1 1-0136 Page 1 CFTC-11-95, Revision 1 Omaha Public Power District Fort Calhoun Station NFPA 805 Fire PRA NFPA-805 ' Task 7.17 PRA Peer Review History Proprietary - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Enclosure 1 contains proprietary information.
Upon removal of Enclosure 1, this letter is Decontrolled.
Omaha Public Power District Letter for Transmittal to the NRC The following paragraphs should be inclided ill your letter to the NRC:
Enclosed are:
I. X copies of LTR-RAM- I1-10-046, Rev. 1, ""OPPD N FPA-805, Task 7.17: Fire PRA Self-Assessment, ASME/ANS RA-Sa-2009 Roadmap and Peer Review History for tile Internal Events PRA and the Fire PRA of Fort Calhoun Station" (Proprietary). April 22, 2011 (Proprietary)
Also enclosed is the Westinghouse Application for Withholding Proprietary Information from Public Disclosure CAW-] 1-3330, accompanying Affidavit, Proprietary Information Notice, and Copyright Notice.
The subject document was prepared and classified as Westinghouse Proprietary Class 2. Westinghouse requests that the document be considered proprietary in its entirety. As such, a non-proprietary version will not be issued.
As Item I contains information proprietary to Westinghouse Electric Company LLC, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390 of the Commission's regulations.
Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.
Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW-1 1-3330 and should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.
Proprietary - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Enclosure 1 contains proprietary information.
Upon removal of Enclosure 1, this letter is Decontrolled.
LIC-11-0136 Page 1 CAW-1 1-3330 "Application for Withholding Proprietary Information From Public Disclosure"
Proprietary - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 Enclosure 1 contains proprietary information.
Upon removal of Enclosure 1, this letter is Decontrolled.
U. S. Nuclear Regulatory Commission LIC-1 1-0136 Page 2 If you should have any questions regarding this letter, or require additional information, please contact Mr. Bill R. Hansher at 402-533-6894.
D. J. Bannister Vice President and CNO DJB/BJVS/mle
Attachment:
OPPD Clarification of Supplement to License Amendment Request 10-07
Enclosures:
- 1. CFTC-1 1-95, Revision 1, "Omaha Public Power District, Fort Calhoun Station NFPA 805 Fire PRA, NFPA-805 - Task 7.17 PRA Peer Review History," dated May 2, 2011
- 2. CAW-1 1-3330, "Application for Withholding Proprietary Information From Public Disclosure," dated December 9, 2011 c: E. E. Collins, Jr., NRC Regional Administrator, Region IV (w/o enclosures)
L. E. Wilkins, NRC Project Manager J. C. Kirkland, NRC Senior Resident Inspector (w/o enclosures)
Director of Consumer Health Services, Department of Regulation and Licensure, Nebraska Health and Human Services, State of Nebraska (w/o enclosures)
Westinghouse Nuclear ServicesElectric Company Westinghouse 1000 WestinghoUse Drive Cranberry Township, Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Documlent Control Desk Direct faN: (724) 720-0754 11555 Rockville Pike e-mail: greshaja@westinghouse.com Rockville, MD 20852 Proj letter: CFTC-I 1-95, Rev. I CAW-1 1-3330 Decemiiber 09, 2011 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
LTR-RAM-Il-10-046, Rev. 1, "OPPDNFPA-805, Task 7.17: Fire PRA Self-Assessment, ASME/ANS RA-Sa-2009 Roadmap and Peer Review History for the Internal Events PRA and the Fire PRA of Fort Calhoun Station", April 22, 2011 (Proprietary)
The proprietary information for which withholding is being requested in the subject document is further identified in Affidavit CAW- 11-3330 signed by the owner of the proprietary information. Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission's regulations.
The subject document was prepared and classified as Westinghouse Proprietary Class 2. Westinghouse requests that the document be considered proprietary in its entirety. As such, a non-proprietary version will not be issued.
Accordingly, this letter authorizes the utilization of the accompanying affidavit by Omaha Public Power District.
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-] 1-3330, and should be addressed to J. A. Gresham, Manager., Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.
Very truly yours,
- J. A. Gresham, Manager Regulatory Compliance Enclosures
CAW-I 1-3330 AFFIDAVIT STATE OF CONNECTICUT:
COUNTY OF HARTFORD:
Before me, the undersigned authority, personally appeared C. M. Molnar, who, being by' me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief-C. M. Molnar, Senior Engineer Regulatory Compliance Sworn to and subscribed before me this __^ ay of &4gj-Ar Agd5, 2011
- Subscn"o,,rv .Publ~ic t nbefore me, a Notary 6Wsn-L Public,,', and for "County of ard andS ato, f Connect!iut, this of..
1* *-",-_ 20....
JOAN GRAY Notarmi Public MY CommiSSior, Expires January 31, 2012
CAW-! 1-3330 (1) 1am Senior Engineer, Regulatory Compliance, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld fr'oml public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
(2) 1am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regtulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
(3) 1have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of
CAW-] 1-3330 Westinghouse's competitors without license firom \'Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool!, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
4 CAW-I 1-3330 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e) Unrestricted disclosure would jeopardize tile position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390; it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v) The proprietary information sought to be withheld in this submittal is that which is contained in LTR-RAM-II-10-046, Rev. 1, "OPPD NFPA-805, Task 7.17: Fire PRA Self-Assessment, ASME/ANS RA-Sa-2009 Roadmap and Peer Review History for the Internal Events PRA and the Fire PRA of Fort Calhoun Station" (Proprietary), dated April 22, 2011, for submittal to the Commission, being transmitted by Omaha Public Power District letter and Application for Withholding Proprietary Information firom Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with fire probabilistic risk modeling in support of the Fort Calhoun Station 10 CFR 50.48(c) License Amendment Request and may be used only for that purpose.
CAW-1 1-3330 This information is part of that which will enable Westinghouse to support the Fort Calhoun Station 10 CFR 50.48(c) License Amendment Request.
Further this information has substantial commercial value as follows:
(a) Westinghouse plans to sell the use of similar information to its customers for the purpose of gaining NRC approval of similar License Amendment Requests.
(b) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar fire protection assessments and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
PROPRIETARY INFORMATION NOTICE Transmitted herewith is the proprietary version of a document furnished to the NRC in connection with requests for generic and/or plant-specific review and approval. The document is to be considered proprietary in its entirety.
COPYRIGHT NOTICE The report transmitted herewith bears a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in this report which is necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.