Letter Sequence Supplement |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition, LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition, LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition, LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition, ML113260423, ML13256A110, ML14163A002
|
MONTHYEARLIC-11-0099, Table B-2 Nuclear Safety Capability Assessment Methodology Review2011-09-28028 September 2011 Table B-2 Nuclear Safety Capability Assessment Methodology Review Project stage: Request ML11276A1182011-09-28028 September 2011 License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Request ML1132604232011-12-13013 December 2011 Online Reference Portal for National Fire Protection Association Standard (NFPA) 805 License Amendment Request Project stage: Other ML1135403342011-12-19019 December 2011 Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement LIC-11-0136, Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition)2011-12-22022 December 2011 Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition) Project stage: Supplement ML1136300832011-12-29029 December 2011 Acceptance Review Email, License Amendment Request to Adopt National Fire Protection Standard NFPA -805 Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generation Plants, Project stage: Acceptance Review LIC-12-0033, Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station2012-03-20020 March 2012 Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station Project stage: Request ML1210205742012-04-11011 April 2012 Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Draft RAI ML1210205612012-04-11011 April 2012 Draft Request for Additional Information Email, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Draft RAI ML1210400482012-04-26026 April 2012 Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-12-0083, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition2012-07-24024 July 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Response to RAI LIC-12-0120, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-08-24024 August 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI LIC-12-0135, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-09-27027 September 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI ML13016A4322013-01-16016 January 2013 E-mail, Request for Additional Information, Round 2, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13053A2262013-02-22022 February 2013 Email, Second Round Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants Project stage: Draft RAI 05000285/LER-2013-004, Regarding Inverters Inoperable During Emergency Diesel Generator Operation2013-04-23023 April 2013 Regarding Inverters Inoperable During Emergency Diesel Generator Operation Project stage: Request LIC-13-0033, Omaha Public Power Districts, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-04-23023 April 2013 Omaha Public Power Districts, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request W3F1-2013-0022, Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 8052013-05-16016 May 2013 Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 Project stage: Request LIC-13-0060, Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-05-21021 May 2013 Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request ML13178A0352013-06-27027 June 2013 Email Request for Additional Information Round 3 (Afpb), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-13-0096, Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 8052013-07-29029 July 2013 Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 Project stage: Request ML13226A1222013-08-14014 August 2013 Email, Request for Additional Information Round 3 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13256A1102013-09-12012 September 2013 Safe Shutdown Analysis (SSA) RAI Response - NFPA-805 Transition (ME7244) Project stage: Other ML13270A2872013-09-27027 September 2013 Email, Request for Additional Information Round 4 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition2013-10-11011 October 2013 Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition Project stage: Other LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition2013-11-0404 November 2013 Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition Project stage: Other LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition2013-12-18018 December 2013 Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition Project stage: Other LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition2014-01-24024 January 2014 Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition Project stage: Other ML14036A0682014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 12/9/11 Affidavit Executed by C. M. Molnar, Westinghouse, LTR-RAM-II-10-046, Revision 1, Dated 4/22/2011 Project stage: Withholding Request Acceptance ML14036A0832014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 3/14/12 Affidavit Executed by J. A. Gresham, Westinghouse, Re.: Compact Containing Fire Dynamic Simulator Input Project stage: Withholding Request Acceptance ML14070A5912014-02-28028 February 2014 Supplemental Response to Safe Shutdown Analyses (SSA) Request for Additional Information (RAI) 06 - NFPA-805 Transition Project stage: Supplement ML14115A2972014-04-10010 April 2014 Enclosure 1: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14115A2982014-04-10010 April 2014 Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance -Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement LIC-14-0042, Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2014-04-10010 April 2014 Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14122A2452014-05-22022 May 2014 Request for Withholding Information from Public Disclosure, 3/26/13 Affidavit Executed by C. M. Molnar, Westinghouse, Re.: LTR-RAM-II-10-046, Rev. 3 Project stage: Withholding Request Acceptance ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Approval ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Other ML16103A3482016-04-0404 April 2016 Ft. Calhoun, Unit 1 - License Amendment Request (LAR) 16-01; Revised Commitment to Modify FCS Plant Systems as Part of the Implementation of NFPA 805 Project stage: Request LIC-16-0099, License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program2016-11-18018 November 2016 License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program Project stage: Request 2013-02-22
[Table View] |
Text
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 The Attachment to this letter contains security-related information.
~~
jjjjjjjj Omaha Public Power Oistrict Upon removal of the Attachment, this letter is Decontrolled.
444 South 1 (jh Street Mall Omaha, NE 68102-2247 LlC-14-0009 February 28, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
Subject:
Supplemental Response to Safe Shutdown Analyses (SSA) Request for Additional Information (RAI) 06 - NFPA-805 Transition (ME7244)
References:
- 1. Letter from OPPD (J. A. Reinhart) to NRC (Document Control Desk), License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) at Fort Calhoun Station, dated September 28, 2011 (LlC-11-0099) (ML112760660)
- 2. Letter from OPPD (D. J. Bannister) to NRC (Document Control Desk),
Responses to Requests for Additional Information Re: License Amendment Request 10-07 to Adopt NFPA 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants," 2001 Edition, at Fort Calhoun Station, dated July 24, 2012 (LlC-12-0083) (ML12208A131)
- 3. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk),
Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 -
NFPA-805 Transition (ME7244), dated January 27,2014 (LlC-14-0004)
The purpose of this letter is to supplement the Omaha Public Power District's (OPPD) response to Safe Shutdown Analyses (SSA) RAI 06 as submitted to the NRC in Reference 2. Page 87 of the Enclosure to Reference 2 noted that the revision to the License Amendment Request (LAR)
(Reference 1), Transition Report, Attachment C, Table B-3 provided on the SharePoint Portal would be reflected in the NFPA-805 transition LAR supplement.
However, as noted in Reference 3, OPPD will not be supplementing the NFPA-805 LAR because the information is contained in OPPD's RAI responses. Therefore, the attachment to this letter is provided to docket the information placed on the Share Point Portal in response to SSA RAI 06.
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 The Attachment to this letter contains security-related information.
Upon removal of the Attachment, this letter is Decontrolled.
Employment with Equal Opportunity
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 The Attachment to this letter contains security-related information.
Upon removal of the Attachment, this letter is Decontrolled.
U. S. Nuclear Regulatory Commission LI C-14-0009 Page 2 Attachment C (Table 8-3) of the LAR was updated to incorporate the response to SSA RAI 006.
Please note that the information for fire area 06-9 (page C-101 of Attachment C, Table 8-3) was updated and thus is different from the information uploaded to the Share Point Portal in the original SSA RAI 006 response. Attachment C (Table 8-3) was also updated to identify fire protection features that are "Required for Risk Significance," as credited in the final fire PRA model supporting the response to PRA RAI 24.01.
OPPD requests that the Attachment, which contains sensitive security-related information, be withheld from public disclosure pursuant to 10 CFR 2.390.
No regulatory commitments are contained in this letter.
In accordance with 10 CFR 50.91, a copy of this letter, without the attachment, is being provided to the designated State of Nebraska official.
If you should have any questions regarding this submittal or require additional information, please contact Mr. 8i11 R. Hansher, Supervisor-Nuclear Licensing, at 402-533-6894.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 28, 2014.
Louis P. Cortopassi Site Vice President and CNO LPC/BJV Imle
Attachment:
LAR Attachment C Table 8-3 Fire Area Transition c:
M. L. Dapas, NRC Regional Administrator, Region IV (w/o Attachment)
J. W. Sebrosky, NRC Senior Project Manager (w/o Attachment)
J. C. Kirkland, NRC Senior Resident Inspector (w/o Attachment)
Manager Radiation Control Program, Nebraska Health & Human Services, R & L Public Health Assurance, State of Nebraska (w/o Attachment)
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 The Attachment to this letter contains security-related information.
Upon removal of the Attachment, this letter is Decontrolled.