The Reactor Water Cleanup (RWCU) is the filtration system for the reactor vessel. (Its kinda like a pool filter) Its primary safety function is to isolate if needed. Filtering is not needed for safe shutdown but it is good to keep clean water in the vessel to avoid contaminates that may become radioactive or mitigating corrosion on various components.
System |
---|
|
|
| Site | Start date | Title | Description |
---|
IR 05000354/2023004 | Hope Creek | 1 February 2024 | Integrated Inspection Report 05000354/2023004 | | IR 05000220/2023004 | Nine Mile Point | 1 February 2024 | Integrated Inspection Report 05000220/2023004 and 05000410/2023004 | | ML23361A157 | Clinton | 24 January 2024 | Audit Plan in Support of Review of License Amendment Request Regarding Revision of Technical Specifications Related to Reactor Water Cleanup Isolation | | GO2-23-130, Reply to a Notice of Violation; EA-23-054 | Columbia | 14 December 2023 | Reply to a Notice of Violation; EA-23-054 | | NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 | Fermi | 14 December 2023 | Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 | | GO2-23-135, Notice of Readiness for Supplemental Inspection | Columbia | 14 December 2023 | Notice of Readiness for Supplemental Inspection | | U-604788, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 3 | Clinton | 12 December 2023 | Fourth Ten-Year Interval Inservice Testing Program Plan Revision 3 | | GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | Columbia | 5 December 2023 | Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | | ML23334A182 | Pilgrim | 30 November 2023 | Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 | | RS-23-121, Sixth Ten-Year Interval Inservice Testing Program | Dresden | 30 November 2023 | Sixth Ten-Year Interval Inservice Testing Program | |
|