PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power | 16 September 1999 | PNO-I-99-043:on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power | |
IR 05000219/1998012 | 4 March 1999 | Insp Rept 50-219/98-12 During Periods 981214-18,990106-07 & 20-22.No Violations Identified.Major Areas Inspected: Review of Licensee self-assessment of Plant Environ Qualification Program & Corrective Actions for Open Items | |
IR 05000219/1998009 | 25 November 1998 | Insp Rept 50-219/98-09 on 980914-1025.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support | Shutdown Margin High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Hydrostatic Temporary Modification Foreign Material Exclusion Operability Determination Battery sizing Maintenance Rule Program |
ML20196C607 | 25 November 1998 | Notice of Violation from Insp on 980914-1025.Violation Noted:On 981014,security Force Vehicle Escort Left Non licensee-designated Vehicle Unattended in Protected Area & Failed to Ensure That Vehicle Ignition Locked & Key Removed | |
IR 05000219/1998008 | 20 October 1998 | Insp Rept 50-219/98-08 on 980727-0913.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Safe Shutdown Shutdown Margin Temporary Modification Emergency Lighting Systematic Assessment of Licensee Performance Operability Determination Earthquake Fire Protection Program Coast down |
IR 05000219/1998005 | 26 August 1998 | Insp Rept 50-219/98-05 on 980614-0726.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support | High Radiation Area Temporary Modification Condition Adverse to Quality |
IR 05000219/1998099 | 17 July 1998 | SALP Rept 50-219/98-99 for 961201-980613 | Fire Barrier Temporary Modification Missed surveillance Systematic Assessment of Licensee Performance Fire Protection Program |
IR 05000219/1998007 | 2 July 1998 | Insp Rept 50-219/98-07 on 980615-19.No Violations Noted. Major Areas Inspected:Status of Plant motor-operated Valve Program to Determine Acceptability for Closure of NRC Review Under GL 89-10 | Stroke time Anchor Darling Operability Determination Weak link |
ML20249B366 | 15 June 1998 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Prior to 980304, Licensee Failed to Establish Adequate Design Control Measures to Verify Adequacy of Design Voltage | |
ML20237E449 | 10 June 1998 | EN-98-047:on 980615,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Involving Inoperability of Three of Five Automatic Depressurization Valves | |
ML20217F664 | 22 April 1998 | Insp Rept 50-219/98-80 on 980223-0313 & 0330-0402.Violations Noted.Major Areas Inspected:Engineering | Safe Shutdown Stroke time Temporary Modification Power Operated Valves |
ML20217F649 | 22 April 1998 | Notice of Violation from Insp on 980223-0313 & 0330-0402. Violations Noted:On 980226,seismic Deficiency W/Containment Spray Heat Exchanger,That Had Been Identified in Late 1996 by Licensee,Had Not Been Adequately Corrected | |
ML20216H191 | 15 April 1998 | Insp Rept 50-219/98-04 on 980226-0318.Violations Noted.Major Areas Inspected:Operations,Maint & Plant Support | Offsite Dose Calculation Manual |
ML20216H170 | 15 April 1998 | Notice of Violation from Insp on 980226-0318.Violations Noted:Since Initial Plant Operation,Operators Implemented Procedure 307,isolation Condenser Sys,Permitting Fill & Make Up to Isolation Condensers During Normal Plant Operations | |
ML20216J018 | 14 April 1998 | Notice of Violation from Insp on 971229-980208.Violation Noted:Written SE Was Not Performed to Provide Bases for Determination That Change in Facility as Described in SAR Did Not Involve USQ | Temporary Modification |
IR 05000219/1997008 | 4 December 1997 | Insp Rept 50-219/97-08 on 971020-24.No Violations Noted. Major Areas Inspected:Onsite Emergency Plan | Locked High Radiation Area Earthquake |
ML20199G788 | 17 November 1997 | Notice of Violation from Insp on 970707-970824.Violation Noted:In Oct 1993,vendor Specification for Emergency Svc Water Pump Bowl Assemblies Was Changed from Cast Iron to Stainless Steel | Condition Adverse to Quality |
PNO-I-97-045, on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR | 4 August 1997 | PNO-I-97-045:on 970801,electricians Restoring One Set of Main Generator Exciter Brushes,Following Routine Surveillance,When One of Brushes Sparked Excessively & Disintegrated.Electricians Exited Area & Notified CR | |
IR 05000219/1997004 | 29 July 1997 | Insp Rept 50-219/97-04 on 970526-0706.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support | High Radiation Area Grab sample NJPDES Temporary Modification Job Performance Measure Process Control Program Siren |
IR 05000219/1997005 | 17 July 1997 | Insp Rept 50-219/97-05 on 970407-11.No Violations Noted. Major Areas Inspected:Engineering | Anchor Darling Squib |
ML20141G943 | 3 July 1997 | Insp Rept 50-219/97-03 on 970414-0525.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support | |
ML20141G940 | 3 July 1997 | Notice of Violation from Insp on 970414-0525.Violation Noted:On 970423,CROs Placed a & B Loops of Shutdown Cooling Sys in Svc W/O Placing Suction Pressure Interlocks in Svc for a & B Pumps by Opening Ps Isolation Valves | |
IR 05000219/1997002 | 19 May 1997 | Insp Rept 50-219/97-02 on 970224-0413.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support | High Radiation Area Grab sample Offsite Dose Calculation Manual Temporary Modification |
ML20141J522 | 19 May 1997 | Notice of Violation from Insp on 970224-0413.Violation Noted:Permanent Change,Dec 95,made to Facility,As Described in SAR Involving Removal of Isolation Condenser Radiation Monitors W/O Considering All Relevant Portions of SAR | |
PNO-I-97-024, on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem | 23 April 1997 | PNO-I-97-024:on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem | |
PNO-I-97-022, on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention | 10 April 1997 | PNO-I-97-022:on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention | |
ML20137E941 | 21 March 1997 | Notice of Violation from Insp on 970113-0223.Violation Noted:Procedure 108.7, Lockout/Tagout Procedure, Rev 4, Did Not Include Appropriate Quantitative or Qualitative Acceptance Criteria | |
ML20137E949 | 21 March 1997 | Insp Rept 50-219/97-01 on 970113-0223.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Temporary Modification Double blade guide Systematic Assessment of Licensee Performance Flow Induced Vibration Operability Assessment |
IR 05000219/1996099 | 9 January 1997 | SALP Rept 50-219/96-99 for Oyster Creek Nuclear Generating Station for 950625-961130 | High winds Temporary Modification Scram Discharge Volume Systematic Assessment of Licensee Performance Biofouling Fire Protection Program |
ML20133D678 | 2 January 1997 | Notice of Violation from Insp on 961021-1201.Violation Noted:Written Safety Evaluation Was Not Performed to Provide Bases for Determination That Change to Station Procedure 336.3 Did Not Involve Unreviewed Safety Question | |
PNO-I-96-078, on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event | 29 October 1996 | PNO-I-96-078:on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event | |
IR 05000219/1996010 | 27 September 1996 | Insp Rept 50-219/96-10 on 960923-27.No Violations Noted. Major Areas Inspected:Radiological Source Term Assessment, Results of Exposure Reduction Initiatives & Evidence of Station ALARA Program | High Radiation Area Design basis earthquake Earthquake Scaffolding |
IR 05000219/1996011 | 2 January 1996 | Insp Rept 50-219/96-11 on 961021-1201.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support | Hydrostatic Temporary Modification Operability Determination |
IR 05000219/1992099 | 26 January 1994 | SALP Rept 50-219/92-99 for Period 920719-931211 | High Radiation Area Temporary Modification Systematic Assessment of Licensee Performance Operability Determination Fire Protection Program |
ML20059B633 | 23 December 1993 | Notice of Violation from Insp on 930927-1015.Violation Noted:All NRC Violations & Ten Licensee Event Repts Issued in 1992 & 1993 Did Not Receive Required Independent Safety Reviews | |
IR 05000219/1993081 | 22 December 1993 | Insp Rept 50-219/93-81 on 930927-1015.Violations Noted.Major Areas Inspected:Engineering,Maint,Surveillance & Mgt & Corrective Actions | Hot Short Unanalyzed Condition Commercial Grade Dedication Hydrostatic Temporary Modification Emergency Lighting Operability Determination Earthquake Scaffolding |
IR 05000219/1993026 | 18 November 1993 | Insp Rept 50-219/93-26 on 931101-05.No Violations Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Access Control of Personnel & Packages & Vehicles | |
IR 05000219/1993024 | 18 November 1993 | Insp Rept 50-219/93-24 on 930921-1101.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering,Plant Support,Including Security & Emergency Preparedness & Safety Assessment/Quality Verification | |
ML20058A379 | 12 November 1993 | Insp Rept 50-219/93-23 on 931018-20.Onsite Response to Exercise Scenario Was Good.Major Areas inspected:full- Participation Ingestion Pathway Emergency Preparedness Exercise | |
ML20059M321 | 9 November 1993 | EN-93-081A:on 930812,notice of Proposed Imposition of Civil Penalty in Amount of $75,000 Issued to Licensee.Action Based on Five Radiological Controls Violations | |
IR 05000219/1993025 | 9 November 1993 | Insp Rept 50-219/93-25 on 931018-22.No Violations Noted. Major Areas Inspected:Design Mods & Engineering Support | |
ML20059F625 | 28 October 1993 | Insp Rept 50-219/93-22 on 930920-24.No Violations Noted. Major Areas Inspected:Addressed Open Items Associated W/Eop & Reviewed Licensee Actions in Response to Violations Associated W/Recirculation Loop Isolation Event | Condition Adverse to Quality Job Performance Measure |
IR 05000219/1993018 | 28 October 1993 | Insp Rept 50-219/93-18 on 930823-1020.No Violations Noted. Major Areas Inspected:Alara,Rirs,Qa Audits,Air & Swipe Sample Counting Facilities & Radiological Controls Organization Professional Staffing | Scaffolding |
IR 05000219/1993020 | 19 October 1993 | Insp Rept 50-219/93-20 on 930816-930917.No Violations Noted. Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs Including Mgt Controls & QA Audits | Grab sample Offsite Dose Calculation Manual |
IR 05000219/1993021 | 15 October 1993 | Insp Rept 50-219/93-21 on 930810-0920.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering,Plant Support & Safety Assessment/Quality Verification | Temporary Modification Fire Watch Hourly Fire Watch Operability Assessment |
ML20059A220 | 15 October 1993 | Notice of Violation from Insp on 920719-0825.Violation Noted:Licensee Determined That Records Required to Be Maintained by Commission Regulations or License Conditions Not Complete & Accurate in All Matl Respects | |
IR 05000219/1993017 | 14 September 1993 | Exam Rept 50-219/93-17OL on 930810-12.Exam Results:All 16 Licensed Operators Passed All Portions of Exam That Was Administered & All Three Crews Performed Satisfactorily in Simulator | Job Performance Measure |
ML20149D502 | 13 September 1993 | Notice of Violation from Insp on 930629-0809.Violation Noted:On 930709,NRC Identified Condition Adverse to Quality That Had Existed Since 920709 | Condition Adverse to Quality |
IR 05000219/1993011 | 10 September 1993 | Insp Rept 50-219/93-11 on 930629-0809.No Violations Noted. Major Areas Inspected:Day Shift & Back Shift Hours of Station Activities | High winds Stroke time NJPDES GOTHIC |
ML20149D705 | 10 September 1993 | Notice of Violation from Insp on 930816-20.Violation Noted: as of 930820,appropriate Measures Were Not Established to Assure Adequate Quality Was Suitably Included in Documents for Procurement of Svcs |