ML20141N840

From kanterella
Jump to navigation Jump to search
Suppl Re Anl Evaluator Info,Opposing Summary Disposition of Contentions EPX-2 & EPX-8.Certificate of Svc Encl
ML20141N840
Person / Time
Site: Harris Duke energy icon.png
Issue date: 03/12/1986
From: Eddleman W
EDDLEMAN, W.
To:
Atomic Safety and Licensing Board Panel
References
CON-#186-405 82-468-01-OL, 82-468-1-OL, OL, NUDOCS 8603180192
Download: ML20141N840 (2)


Text

W 0

UNITED STATES OF AMERICA 12 March 1o86 00(.KETED

. :1 NUCLEAR REGULATORY COMMISSION NC 86 MAR 14 P1:45 PM f 9 hl

  • bIEFORE THE ATOMIC SAFETY AND LICENSING BOARD

' 9 Glenn Dr. O. Bri James H.ght qF_FICL O' m +" '

9A Carpenter

, James L. Kelley, Chairman DUGKEI$$Ef'W.

In the Matter of CAROLINA POWER AND LIGHT CO. et al.

(Shearon Harris Nuclear Power Plant, Unit 1) ASLBP Mo. 82-h68-01

) OL

. Wells Eddlenan's Supplenent re Argonne rati c nal Labo*a tory Fvaluators '

Info, Nnocing Sunnary Disposition of Contentions EPX-2 and EPX-8 Pursuant to oral order, Tr. 10856-57, wells rddlenan hereby files a supelement oonosinC sun .ary disnosition of Contentiers EPX-2 and -8 including $ afornatior obtained in a conference call 3-07-86.

Re EpX-2, evaluators Carolyn (Caroline?) Herzenbere and Karen Gaziel observed, respectively, one and several (not certain of the number of times) that radiological survey teans had to relay information to base because of lack of direct cennunication. Gaziel said "at tiner, field tean (SRAD-1) was unable to connunicate, but was able to velay information to base"as info was recuired, hCi O 3 ' Oh N UI'2)

Re EPX-8, Tony Fultman (Foltnan?) or Argonne observed a d!scussion of EBS coordination on Day 2 (May 18) at 0809 hours0.00936 days <br />0.225 hours <br />0.00134 weeks <br />3.078245e-4 months <br />. This it long Og af ter the time of the conference call CP&L clains had the main neoblens.

5 " Since Fultnan's job was to observe radiati on protection, he says, he did b not note details. (Various A"gonne evaluatcrs renorted herniva an PBS nessage ut 1542 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.86731e-4 months <br /> , Day 1 (con

  • atent with FF'M reno =t we EST-5), and O

m, <

n 08hg, co06, and 1257 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.782885e-4 months <br /> on Day 2. I note this apparent inconsistency S$ with Applicants ' statements on sun .ary di snos'.tf on as to when the TBS en.o was activated (see naragraths 9 and 21 of "Statament oc ttaterini " acts ...

on FPX-8") unless thare was a long delay, P1 nin, in EBS baondcastinr early on the 18th (Day 2). Argonne evaluator Chris 3aricks alno obs**ved Harnett county personnel using a ray phone to make a cell to tha!" ocrf ca.

These fa c ts add cunnort to my neg::s';t,t on to s umus.% wphi #' **' f Nd%.

A "DSc3

UNITED STATES OF AMERICA NUCLTAR REGUIATORY COMMISSION l'In the matter of CAROLLNA POWER k LIGHT CC,. It al. ) Dockaf0Mkoo Shearon Harris Nuclear Power Plant. Unit 1- ) uswc 0.L.

W fy g. [ p g CERTIFICATE 0F SERVICE

'86 MAR 14 p1 :45 Well s rddle nan's Sunnienent re 2 hereby certify that copies of

~

ArgonNe National Lacoratory Evaluators ' InfooncosingSudyy/[gug q r Disnosition en EPX-2 and EFX-8 BRANCH HAVE been served this u day of u n .ch 1981 , by deposit in the US Huil, first-class postage prepaid, upon all parties whose names are listed below, except those whose names are arked with will be .

an asterisk, for whom service asest accomplished by sena-ate mailine 3-18 with nwonosed find' rcs on reonened hen 'nc on Contention 57-c-3, in orde- to save mailinc costs for narties not directiv involved JudE es James Kelley, Glenn Bright and Janas Carpenter (1 eepy each)

Atomic Safety and Licensing Board & their Law Clerk, sane US Nuclear Megulatory Comission address Washington DC 20555 Al cole, Karen Long or Thomas A. Baxter or Jo Anne Sanford George F. Trowbridge (attorney for Applicants) FC tttornev General's Shaw, Pittman, Potts & Trowbridge ,

1600 M St. NW Office Washington, DC 20036 _

- F.qx.62.9, j , .RaI61cn NO 276C2 office of the Executive Legal Director ,-. Snence . .:-rry Attn Docke ts 50-400/h010.L. FEMA Moom 840 4

/> JP' USNRC I 500 C St. SW Washington DC 20555 8 Washington Dc 20740

' o Dan Mead i Docketing and Service section (3x) C);AMOZ'MLP 3ox 2151 Attn Decke ts 50.h00/hC1 0.L. .

l Office of the Secretary Waleigh, NC 276062 USNRC

  • Dr. Linda W. Little viashington DL. 20555 (r Plan Only)

Governor's Waste Mst. Bd.

John Runkle Steve Rochlis 513 Albenarle 33 dg FEila, Suite 700 325 n. sal'aburv st.

Granville Rd 1371 Peachtree St. NE Malmgn, NO 2?611 '

Chapel Hill Nc 2751h / Atlanta OA 30309 4sradley W. Jones

  • Robert Gruber USNRC Region II 101 Marietta St.

~

  • Travi s Payne Exec. Director Edelstein & Payne Public Staff Atlanta GA 30303 Blex 12601 Box 991 Raleigh NC 27605 Raleigh NC 27602 l
  • Richard Wilson, M.D. Certified by A' h

! 729 Hunter St.

Apex NC 27502

- ._ _ _ _ .. _ . _ _ . . _ , _ .