NPL-97-0129, Forwards Control Rod Data from Tests Conducted in 1996 During Unit 2 Refueling Outage in Response to NRC Bulletin 96-01

From kanterella
(Redirected from ML20140C198)
Jump to navigation Jump to search
Forwards Control Rod Data from Tests Conducted in 1996 During Unit 2 Refueling Outage in Response to NRC Bulletin 96-01
ML20140C198
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/03/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-96-001, IEB-96-1, NPL-97-0129, NPL-97-129, NUDOCS 9706090159
Download: ML20140C198 (3)


Text

- - .-.

Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755-2321 6610 Nuclear Rd.. Two Rivers. WI 54241 NPL 97-0129 10 CFR 50.54(f)

June 31997 Document Control Desk US NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301 RESPONSE TO NRC BULLETIN 96-01 CO'NTROL ROD TEST DATA FROM UNIT 2 OUTAGE U2R22 POINT BEACil NUCLEAR PLAN f. UNITS 1 AND 2 in accordance with commitments made in our April 3,1996 response to Bulletin 96-01, control rod data from tests conducted in 1996 during our Unit 2 refueling outage are attached. As discussed in our response to the Bulletin, we committed to submit this data within 30 days of completing the last test of each outage. Due to the extension of our U2R22 refueling outage beyond calendar year 1996, we have decided to transmit the 1996 data now, rather than wait for q the completion of our current U2R22 outage.

U2R22 was commenced in Oc*.ober 1996. Completed tests include:

(1) End-of-Cycle (EOC) Rod Drop Testing of Unit 2 rodded fuel assemblies was completed in October 1996. Without exception, the drop time for each control rod was less than the maximum limit of 2.2 seconds established in Technical Specification 15.3.10.It Recoil was evident on all control rods. Test results are enclosed.

(2) EOC Drag Force Tests on Discharged Assemblies from Unit 2 were completed in October 1996. Drag force tests were performed on all rodded assemblies from Unit 2 Cycle 22 during rod unlatching (Unit 2 containment). Test results are enclosed.

Due to the length of our U2R22 outage, Beginning-of-Cycle (BOC) Control Rod Drag Force Testing and BOC Control Rod Drop Tests have not yet been conducted for Unit 2 Cycle 23.

Because these tests will not have been conducted in calendar year 1996, they are not subject to our Bulletin 96-01 commitment to submit test data. Likewise, the commitment to submit a core map of rodded fuel assemblies for Unit 2 Cycle 23 does not apply for 1997 core configurations.

[%

).

9706090159 PDR 970603 1

ADOCK 05000266 A subsMhryofMIsconshiExp Corpornm klk !! i

P t

i

! NPL 97-0129 l June 2,1997 Page 2 l

This submittal completes our commitments related to Bulletin 96-01. Please contact us if there l

are any questions or if you require additional information.

Sincerely, l

h .

Douglas F. Johnson - Manager Regulatory Services and Licensing hds Attachment cc: NRC Resident Inspector Subscribed and sworn before me on NRC Regional Administrator, PSCW, this3d day of Twn ,1997.

PSCW (Attn: Paul Kitzenbel) A /d Al h M Notary Public, State of Wisconpin My commission expires V//7//y91.

i l

l i

i

O POINT BEACH NUCLEAR PLANT '

UNIT 2 CYCLE 22 .

END-OF-LIFE ROD DROP TIMES AND DRAG TEST RESULTS FUEL ASSEMBLY CORE GUIDETUB DASHPOT ROD DROP TIME ID BURNUP LOCATION DRAG DRAG DASHPOT l SEAT }

AA77 10842 L8 13.4 lb 14.5 lb 1.466 sec ll 2.013 see AA82 10782 L6 14.0 lb 15.3 lb 1.515 sec 2.103 see AA66 12837 K5 16.1 lb 19.0 lb 1.531 sec 2.125 sec Z73 28150 K7 23.7 lb 29.2 lb 1.494 sec 2.013 sec AA61 12802 K9 15.9 lb 23.9 lb 1.452 sec 1.992 sec Z63 27205 J10 22.6 lb 26.2 lb 1.464 sec 2.013 sec Z60 27617 J4 18.1 lb 22.5 lb 1.511 sec 2.045 sec AA65 12842 13 11.8 lb 20.0 lb 1.498 sec 2.025 sec Z77 26773 15 18.4 lb 22.9 lb 1.526 sec 2.053 sec Z76 27268 19 28.1 lb 32.0 lb 1.508 sec 2.188 sec AA59 12892 11 1 9.3 lb 14.5 lb 1.472 sec 1.988 sec AA75 10856 H12 15.6 lb 19.6 lb 1.461 sec 2.052 sec AA58 13048 H8 23.5 lb 24.2 lb 1.535 sec 2.117 sec AA57 12939 H6 27.5 lb 30.6 lb 1.544 sec 2.136 sec AA81 10820 H2 9.4 lb 9.9 lb 1.469 sec 2.047 sec Z68 27645 G3 16.3 lb 27.0 lb 1.470 sec 2.043 sec Z59 27921 G7 35.7 lb 41.9 lb 1.548 sec 2.101 sec Z79 28248 G11 24.2 lb 29.7 lb 1.465 sec 2.027 sec AA80 11041 F12 9.7 lb 14.3 lb 1.476 sec 2.064 sec AA56 13190 F8 23.9 lb 22.5 lb 1.515 sec 2.057 sec AASS 12910 F6 24.2 lb 24.2 lb 1.499 sec 2.076 sec AA79 10929 F2 12.9 lb 14.5 lb 1.502 sec 2.073 see AA63 12690 E3 9.7 lb 12.5 lb 1.469 sec 2.029 sec Z72 26640 ES 11.6 lb 16.1 lb 1.490 sec 1.983 sec Z75 27358 E9 20.9 lb 24.3 lb 1.527 sec 2.039 see AA64 12943 E11 17.7 lb 18.9 lb 1.485 sec 2.050 sec Z64 27117 D10 24.2 lb 28.3 lb 1.520 sec 2.267 sec Z67 27211 D4 11.3 lb 22.6 lb 1.446 sec 2.027 sec AA60 12882 C5 9.9 lb 14.9 lb 1.462 sec 2.011 sec Z71 27794 C7 20.5 lb 21.6 lb 1.520 sec 2.137 sec AA62 12956 C9 8.7 lb 12.6 lb 1.518 sec 2.123 sec AA78 10806 B8 9.4lb 12.9 lb 1.474 sec 2.064 sec AA76 11255 B6 9.3 lb 11.4 lb 1.480 sec 2.048 sec

_ _ - _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _