Rev 0 to 1997 Evaluated Exercise for Dbnps
ML20140B618
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/04/1997
From:
CENTERIOR ENERGY
To:
Shared Package
ML20007F471 List:
References
NUDOCS 9703170081
Download: ML20140B618 (20)


Text

o .

l (e .

{

bi 1997 Evaluated Exercise 1.0 SCOPE AND OBJECTIVES NOTE In the development of an accident sequence, which is severe enough to adequately test the emergency response capabilities, it is necessary to postulate extremely .

unrealistic situations and multiple failures of redundant reactor protection functions and systems. Although the possibility of these events occurring is

' remote, Players are reminded that they are to respond to the indications as if they were real.

1.1 SCOPE The June 4,1997 Davis-Besse Emergency Preparedness Partial Participation Exercise l will test and provide the opponunity to evaluate the Davis-Besse Emergency Plan and )

Procedures. It will test the Emergency Response Organization's ability to assess and respond to emergency conditions and take actions to protect the health and safety of the public and station personnel.

This Partial Participation Exercise will also demonstrate activation and operation of major elements of the Non-utility Emergency Response Organization (ERO). The non- 1 utility ERO responding will include Ottawa, Lucas and Sandusky Counties, and the State of Ohio. Those functions that are most scenario dependent will be played in sequence. However, most non-utility field activities will be played out-of-sequence.

Whenever practical, this Exercise incorporates provisions for " free play" on the part of the participants. Selected "real time" activities will be conducted to allow the repair teams the opportunity to provide service and repairs to station equipment during the course of the Exercise. These " repairs" will allow the response organization to have an increased impact upon the direction that the Exercise proceeds as well as impacting the completion of the Exercise activities. In addition, the Control Room Simulator will be used to permit a degree of" free play" on the part of the Operations staff. The extent of this " free play" may be partially restricted by Controllers as necessary to keep the sequence of events on track.

The scenario will simulate events resulting in a radiological release to the environment.

This release will be of sufficient magnitude to warrant mobilization of state and local agencies.

The scenario will also incorporate an out-of-sequence medical drill with panicipation l

l by local emergency medical services and support hospitals.

l Rev.0 hl 0 s C(()

l l-2 1997 Evaluated Exercise

+

- 1.2 OBJECTIVES The objectives for this Partial Participation Exercise have been selected from l

RA-EP-00200, Emergency Plan Drill and Exercise Program procedure (Utility) and from FEMA REP 14 and 15 (Non-Utility). The scenario has been designed such that ,

each participating organization will be provided with the opportunity to demonstrate their selected objectives. Some non-utility objectives will be demonstrated out-of-sequence to accommodate the responding volunteer organization.

! 1.2.1 DAVIS-BESSE NUCIPAR POWER STATION UTILITY OBJECTIVES l

i The utility objectives are cross-referenced to RA-EP-00200, Emergency Plan l Drill and Exercise Program, Attachment 1, Six-Year Exercise Plant, in the first I column. The " FACILITIES" column identified the area that the objective is applicable. During the conduct of the Exercise, unidentified objectives may be

successfully accomplished by the ERO. Credit will be given for the objectives and their performance will be documented in the Exercise Report.

l l

i I

1 l

Rev.O

l .

1-3 1997 Evaluated Exercise l- ,

1.2 DAVIS-BESSE NUCLEAR POWER STATION OBJECTIVES REF.

  1. FACILITIES OBJECTIVE ,

i CONDUCT AN ASSESSMENT OF THE DBNPS EMERGENCY l A.1 Administrative PLAN.10 CFR 50 APPENDIX E, SECTION IV.F.2. l l

A.2 Administrative PROVIDE AN OPPORTUNITY FOR THE STATE, OTTAWA AND LUCAS COUNTIES TO PARTICIPATE IN AN EXERCISE l BIENNIALLY.

A.3 Administrative PREPARE AN EXERCISE INFORMATION PACKAGE TO MEET MINIMUM STANDARDS.

A.4 Administrative CONDUCT A CRITIQUE OF THE EXERCISE.

l A.5 Administrative ESTABLISH MEANS TO ENSURE COMPLETION OF CORRECTIVE ACTIONS.

A.6 Administrative INVOLVE FEDERAL, STATE, COUNTY AND EP RESPONSE PERSONNEL AND AGENCIES IN A JOINT EXERCISE AT LEAST EVERY TWO YEARS.

A.9 Administrative CONDUCT THE EXERCISE IN VARIOUS WEATHER CONDITIONS (DURING DIFFERENT SEASONS).

j B.1 All DEMONSTRATE THE DIRECTION OF 'I HE EMERGENCY ORGANIZATION AND IMPLEMENTATION OF THE EMERGENCY PLAN AND EMERGENCY PLAN PROCEDURES.

B.2 Control Room, DEMONSTRATE TE E TRANSFER OF THE EMERGENCY ECC DIRECTOR DUTIES.

i B.3 All DEMONSTRATE THE ABILITY FOR TIMELY ACTIVATION AND STAFFING OF THE EMERGENCY FACILITIES. ,

i B.4 All DEMONSTRATE THE ABILITY TO CONTROL ACCESS TO EMERGENCY FACILITIER C.1 Control Room, DEMONSTRATE THE AdlLITY TO ASSESS THE INCIDENT

' TSC CONDITIONS.

Rev.0

m. .. - - . . . - . . _ . . - . - . . - ~ . _ ~ . - - - . - . ~

l-4 1997 Evaluated Exercise

~1.2 DAVIS-BESSE NUCLEAR POWER STATION OBJECTIVES (Cont'd)

REF.

  1. FACILITIES OBJECTIVE  !

C.2 Control Room, DEMONSTRATE THE ABILITY TO RECOGNIZE EMERGENCY

]

L ECC, TSC ACTION LEVELS (EAL'S) AND PROPERLY CLASSIFY THE I INCIDENT.

D.I Control Room, DEMONSTRATE THE ABILITY TO NOTIFY KEY OFFICIALS ECC IN THE EMERGENCY ORGANIZATION, VIA NOTIFICATION SYSTEM / PROCEDURES WITHIN 15 MINUTES OF -

CLASSIFICATION.

D.2 Control Room, DEMONSTRATE THE ABILITY TO NOTIFY THE NRC OF ANY

, ECC EMERGENCY CLASSIFICATION WITHIN ONE HOUR OF THE OCCURRENCE.

D.3 All DEMONSTRATE THE CAPABILITY TO NOTIFY AND/OR l ACTIVATE EMERGENCY PERSONNEL IN EACH RESPONSE j ORGANIZATION. j D.4 Control Room, DEMONSTRATE THE ABILITY TO DEVELOP AND SEND AN '

ECC INITIAL EMERGENCY MESSAGE FOR OFFSITE NOTIFICATION.  :

l \

D.5 Control Room, DEMONSTRATE THE ABILITY TO DEVELOP AND SEND j ECC FOLLOW-UP MESSAGES FOR INFO'RMATION FOR OFFSITE AUTHORITIES.

! D.6

  • Control Room, DEMONSTRATE THE COMMUNICATIONS CAPABILITY TSC, ECC AMONG THE CONTROL ROOM,TSC AND ECC, AND AMONG DBNPS, THE STATE OF OHIO, O'ITAWA COUNTY, AND LUCAS COUNTY EMERGENCY OPERATIONS CENTERS AND THE FIELD ASSESSMENT TEAMS, TO INCLUDE EVALUATION OF THE ABILITY TO UNDERSTAND MESSAGE CONTENT (COMMUNICATIONS EXERCISE REQUIREMENT).

> D.12 SEC DEMONSTRATE THE COMMUNICATIONS CAPABILITY WITH FIXED AND MOBILE SUPPORT FACILITY (MEDICAL DRILL REQUIREMENT). THIS OBJECTIVE WILL BE DONE OUT-OF-SEQUENCE.

i Rev.O l

l

- l-5 1997 Evaluated Exercise 1.2 DAVIS-BESSE NUCI EAR POWER STATION OBJECTIVES (Cont'd)

REF.

  1. FACILITIES OBJECTIVE E.1 ECC DEMONSTRATE THE METHODS AND TECHNIQUES FOR l DETERMINING THE SOURCE TERM OF RELEASES OR POTENTIAL RELEASES OF RADIOACTIVE MATERIAL j WITHIN PLANT SYSTEMS.

! E.2 ECC,TSC DEMONSTRATE THE METHODS AND TECHNIQUES FOR l DETERMINING THE MAGNITUDE OF THE RELEASES OF RADIOACTIVE MATERIALS BASED ON PLANT SYSTEM PARAMETERS AND EFFLUENT MONITORS.

E.3 ECC DEMONSTRATE THE ABILITY TO ESTIMATE INTEGRATED DOSE FROM PROJECTED AND ACTUAL DOSE RATES AND TO COMPARE THESE ESTIMATES WITH THE PAG'S.

E.4 OSC DEMONSTRATE THE ABILITY TO IMPLEMENT EXPOSURE GUIDELINES.

E.5 OSC DEMONSTRATE THE ABILITY TO CONTINUOUSLY MONITOR AND CONTROL EMERGENCY WORKER EXPOSURE.

E.15 OSC,SEC DEMONSTRATE THE CAPABILITY FOR TRANSPORTATION OF A RADIOLOGICAL ACCIDENT VICTIM (MEDICAL DRILL REQUIREMENT). THIS OBJECTIVE WILL BE DONE OUT-OF-SEQUENCE.

E.16 RTL,OSC DEMONSTRATE THE CAPABILITY FOR ONSITE AND OFFSITE RADIOLOGICAL MONITORING TO INCLUDE COLLECTION A'ND ANALYSIS.

E.17 RTL DEMONSTRATE THE RESPONSE TO AND ANALYSIS OF SIMULATED EVALUATED AIRBORNE AND LIQUID SAMPLES AS WELL AS DIRECT RADIATION MEASUREMENTS IN THE ENVIRONMENT.

F.1 ECC DEMONSTRATE THE ABILITY TO RECOMMEND PROTECTIVE ACTIONS TO APPROPRIATE OFFSITE j AUTHORITIES, BASES OF RECOMMENDATIONS TO INCLUDE i CONSIDERATION OF PROTECTION AFFORDED BY SHELTERING, AS WELL AS, EVACUATION TIME ESTIMATES.

Rev.O

~

- 1-6 1997 Evaluated Exercise 1.2 DAVIS-BESSE NUCLEAR POWER STATION OBJECTIVES (Cont'd)

REF.

  1. FACILITIES OBJECTIVE F.2 JPIC DEMONSTRATE THE OPERATION OF THE JOINT PUBLIC INFORMATION CENTER AND THE AVAILABILITY OF SPACE FOR THE MEDIA.

F.3 JPIC DEMONSTRATE THE ABILITY TO BRIEF THE MEDIA IN A CLEAR, ACCURATE AND TIMELY MANNER.

l F.11 OSC DEMONSTRATE THE CAPABILITY FOR ONSITE FIRST AID.

THIS OBJECTIVE WILL BE DONE OUT-OF-SEQUENCE.

F.12 OSC,RTL DEMONSTRATE THAT THE PROVISIONS ARE AVAILABLE FOR THE EVALUATION OF RADIATION EXPOSURE OF, AND RADIATION UPTAKE IN A RADIOLOGICAL ACCIDENT VICTIM. .

G.1 ALL DEMONSTRATE PRELIMINARY DISCUSSION OF RE-ENTRY '

AND RECOVERY CAPABILITIES AND AVAILABILITY OF PROCEDURES. i f

l l

)

l l

l t

Rev.O

I-i i

(- l-7 1997 Evaluated Exercise i

l t Non-Utility objectives available upon request.

l l

l i

4

)

l l

I l

1 i

i l

i I

3-1 1997 Evaluated Exercise '

3.0 REFERENCES

/ ABBREVIATIONS / DEFINITIONS

3.1 REFERENCES

3.1.1 DBNPS Emergency Plan 3.1.2 DBNPS Emergency Plan Implementing Procedures 3.1.3 10 CFR 50.47,50.54 and Appendix E 3.1.4 DBNPS Radiation Protection Manual 3.1.5 DBNPS Offsite Dose Calculation Manual 3.1.6 DBNPS, Unit 1, Tecimical Specifications 3.1.7 DBNPS Piping and Instrumentation Drawings 3.1.8 DBNPS IJpdated Safety Analysis Report 3.1.9 Corporate Emergency Response (CER) Plan 3.1.10 Public Information Emergency Response Procedures 3.1.11 NUREG 0654/ FEMA REP-1 3.1.12 Ohio Plan for Response to Radiation Emergencies at Licensed Nuclear Facilities 3.1.13 Ottawa County Plant for Response to Radiation Emergencies at Licensed Nuclear Facilities 3.1.14 Lucas County Radiological Emergency Response Plan 3.1.15 Sandusky County Radiological Emergency Response Procedure Document

, 3.1.16 Erie County Radiolgocal Emergency Response Procedure Document 3.1.17 FEMA REP 14 3.1.18 FEMA REP 15 l

3.1.19 FEMA Guidelines, MS-1 3.2 ABBREVIATIONS AFP Auxiliary Feed (Water) Pump ALARA As Low As Reasonably Achievable ARM Area Radiation Monitor ARTS Anticipatory Reactor Trip System ATMOS Atmosphere ATWS Anticipated Transient Without Scram AUX Auxiliary AVG Average BAAT Boric Acid Addition Tank BKWSH Back Wash

(

l BRKR Electrical Circuit Breaker l BWST Borated Water Storage Tank CAM Continuous Air Monitor CANS Computerized Automated Notification System CAS Central Alarm Station CCW Component Cooling Water System l

CERO Corporate Emergency Response Organization l

l Rev 0

l '

3-2 1997 Evaluated Exercise i

! CFR Code of Federal Regulations CNDS Condensate System ,

COND Condenser CPM Counts Per Minute CRS Control Room Simulator l CS- Containment Spray System CST Condensate Storage Tank j CT Circulating Water and Cooling Tower System '

l CTMT Reactor Containment Building CTRM Control Room l DADS Data Acquisition and Display System  !

DBAB Davis-Besse Administrative Building DBNPS Davis-Besse Nuclear Power Station ,

l DEI Dose Equivalent Iodine DEMIN Demineralizer DHR Decay Heat Removal DISCH Discharge DP Differential Pressure DWS Demineralized Water System EAL Emergency Action Level EAS Emergency Alert System  ;

ECC

HLCWT High Level Cooling Water Tank HPI High Pressure Injection System HVAC Heating Ventilation and Air Conditioning System HX Heat Exchanger l I&C Instrument and Control Section L IF Instructor Facility (at the CRS) l IN Inch INST Instrument i JPIC Joint Public Infonnation Center KI Potassium lodide f

Rev.0

3-3 1997 Evaluated Exercise LP Low Pressure l LVL Level MISC Miscellaneous MSIV Main Steam Isolation Valve MTR Motor MU Makeup System l NI Nuclear instrumentation NRC Nuclear Regulatory Commission OTSG Once Through Steam Generator i OOS Out of Service OSC Operations Support Center PA Public Address System PASS Post Accident Sampling System PC Protective Clothing PI Pres sure Indication PMP Pu:np PORV Power Operated Relief Valve PPF Personnel Processing Facility PR Public Relations PSF Personnel Shop Facility PSIA Pounds Per Square Inch Absolute PSIG Pounds Per Square Inch Gauge l PT Periodic Test PTS Pressurized Thermal Shock l PWR Pressurized Water Reactor l PWST Primary Water Storage Tank l PZR Pressurizer RRA Radiologically Restricted Area l RC Radiological Controls RCP Reactor Coolant Pump RCS Reactor Coolant System lE Fixed Radiation Instrument RLF ReliefValve RM Radiation Monitor i RMT Radiation Monitoring Team (

RP Radiation Protection RTL Radiological Testing Laboratory Rx Reactor SAS Secondary Alarm System SFP Spent, Fuel Pool I

SFAS Safety Features Actuation System l

i SFRCS Steam and Feed Water Rupture Control System SJAE Steam Jet Air Ejector l

SPDS Safety Parameter Display System l

SPF Spent Fuel Rev.O

_ _ _ ._ > ._. _ . _ _._. _ ..__....m . . _ _ . . _ . _ . - . _ _ . _ _ _ _ _ . - - _ - . _

l

  • 3-4 1997 Evaluated Exercise SRST Spent Resin Storage Tank l ST Surveillance Test i

-SW' Service Water System  ;

SYS System Tc Reactor Coolant System Cold Leg Temperature .

TC Thermocouple TDG Total Dissolved Gases Th Reactor Coolant System Hot Leg Temperature  ;

TPCW Turbine Plant Cooling Water }

TRBL Trouble  !

TSC- Technical Support Center VOM Volt Ohm Meter l WGST Waste Gas Storage Tank WK Week .

WR Wide Range Instrument  !

WTR Water. >

XFER Transfer i XMIT Transmit -

3.3 DEFINITIONS

3.3.1 ALERT

The level of emergency classification which indicates events are in progress or have occurred which involve an actual or potential' substantial '

l degradation of the level of safety of the plant. l l

1

, 3.3.2 ANTICIPATED TRANSIENT WITHOUT SCRAM (ATWS): Failure of the

! reactor control rods to insert into the core upon a signal to do so from the

! Reactor Protection System or the failure of the Reactor Protection System to trip when limits have been exceeded.

L 3.3.3 ASSESSMENT ACTIONS: Those actions taken during or after an accident to obtain and process information that is necessary to make decisions to implement specific emergency measures.

l 3.3.4 CONTROL ROOM (CTRM): The principle onsite location from which the reactor is controlled and from which emergency control is initially exercised. i The CTRM is located on the 623' elevation of the Auxiliary Building. l

3.3.5 CONTROLLER

A member of the control group, assigned to one or more activities or functions for the purpose of keeping the action going according to a i scenario, resclving scenario discrepancies, and supervising the actions of the ,

I players.

l l i

p Rev.0 p

l L,_. _ , _ _

_._._..____________....y i

3-5 1997 Evaluated Exercise l i

.+. .

3.3.6. CORRECTIVE ACTIONS: Those emergency measures taken to mitigate or ,

terminate a potential or uncontrolled release of radioactive material or to j minimize the consequences of such a release. j

3.3.7 DECONTAMINATION

The process by which the body or an object is

+

relieved of radioactive substances (contamination).

i 3.3.8 DOSE ASSESSMENT: The process of estimating the amount of radiation a  !

person will potentially receive as a result of exposure to a radiological release. l l 3.3.9 DRILL: A supervised instruction period aimed at testing, developing, and l maintaining skills in a particular operation. l t

3.3.10 EMERGENCY ACTION LEVELS (EALs)- Radiological dose rates; specific ,

l

' contamination levels or airborne, waterborne, or surface-deposited concentrations of radioactive materials, or specific instrument readings and indications (including their rate of change) that may be used as thresholds for l initiating specific emergency measures.

l 3.3.11 EMERGENCY CONTROL CENTER (ECC): The Davis-Besse Emergency Response Facility from which overall direction and control are exercised for emergencies at DBNPS. The facility also provides a central point of contact I with extemal organizations, and is fully activated for emergencies classified as j l an ALERT or higher.

l t

l 3.3.12 EMERGENCY OPERATIONS CENTER (EOC): An offsite location used by l I state, county and other government agencies and organizations to perform ' l l radiological assessment and to coordinate offsite activities. The EOCs are l located as follows:

l Ottawa County: Ottawa County Emergency Management Agency .

315 Madison Avenue Port Clinton, Ohio 43452 Lucas County: Lucas County Emergency Management Agency 2144. Monroe Street Toledo, Ohio 43624 l

t l

State of Ohio: Emergency Operations Center / Joint Dispatch Facility 2855 West Dublin-Granville Rd.

Worthington, Ohio 43235-2206

! State of Michigan: Emergency Management Division Suite 300 i 3005 Washington Square I Lansing, Michigan 48913 i

l Rev.O l

l i . , . . _ _ _.

1 3-6 1997 Evaluated Exercise 3.3. EMERGENCY PLANNING ZONES (EPZs): Two zones established around a nuclear power station in which predetermined protective action plans are l l

needed. One zone, with a radius of 10 miles (16090 meters) for a PLUME EXPOSURE PATHWAY; and the other with a radius of 50 miles (80450 i meters) for an INGESTION EXPOSURE PATHWAY. In these zones, l predetermine PROTECTIVE ACTION plans are needed.  :

l l 3.3.14 EMERGENCY RESPONSE FACILITY: Any of several onsite and offsite  !

centers which are activated to coordinate emergency actions. Included in this I category are the Control Room, Technical Support Center, Operations Support f Center, Emergency Control Center, Joint Public Information Center, and State l and local Emergency Operations Centers.

3.3.15 EVALUATOR: A member of the evaluation group, assigned to one or more j activities or functions for the purpose of evaluating and making I recommendations for improvement. An evaluator may serve in a dual capacity as both a Controller and Evaluator.

3.3.16 EXCLUSION AREA: The area surrounding the plant in which the Licensee has the authority to determine all activities including exclusion or removal of persons and property from the area.

3.3.17 EXERCISE: An event that tests the integrated capability and a major portion of the basic elements within the Emergency Plan.

3.3.18 GENERAL EMERGENCY: The most severe level of emergency classification which indicates that events are in progress or have occurred which involve i actual or imminent substantial core degradation or melting with potential for l loss of containment integrity. Release of radioactive material can be reasonably expected to exceed PAG exposure levels offsite.

3.3.19 INGESTION PATHWAY: The means by which contaminated water or foodstuff can expose the POPULATION-AT-RISK to radiation. The time of potential exposure could range from hours to months. The principal exposure sources from this pathway are:

1. Ingestion of contaminated drinking supplies, such as water or milk.
2. Ingestion of contaminated food, such as fresh vegetables or aquatic foodstuff.

i l

l Rev.0 l

3-7 1997 Evaluated Exercisc ,

~

! 3.3.20 JOINT PUBLIC INFORMATION CENTER (JPIC): A location for

! coordinating news releases and providing joint briefings to the news media j during an emergency. It provides a central point for information to be disseminated to the public by the utility, the federal, state and local officials.

t l 3.3.21 OBSERVER: Any individual who is authorized to observe, but is not authorized to interact with the players.  !

3.3.22 OFFSITE: Any areas outside the Owner Controlled Area. .

3.3.23 ONSITE: The area within the Owner Controlled Area.

l 3.3.24 OPERATIONS SUPPORT CENTER (OSC): An onsite emergency response t facility which provides a location where emergency response teams can be assembled and coordinated during an emergency.

3.3.25 OWNER CONTROLLED AREA: The area contiguous with the Protected Area, designated by the owner organization to be patrolled for security j purposes.

l 3.3.26 PARTICIPANT: An individual who has some part, whether as an Evaluator,  !

Controller, Player or Observer.

3.3.27 PLAYERS: Allindividuals who are assigned to perform functions of the l Emergency Response Organization, as described in the appropriate Emergency  ;

Plan Implementing Procedures.

1 3.3.28 PLUME EXPOSURE PATHWAY: The means by which a radioactive cloud I (plume) can expose the POPULATION-AT-RISK to radiation. The time of l l potential exposure could range from hours to days. The principal exposure sources for this pathway are as follows:

1. Whole body external exposure to gamma radiation from the radioactive plume and from deposited material.
2. Inhalation exposure from the passing radioactive plume.

l 3.3.29 POPULATION AT RISK: Those persons for whom protective actions are being or would be taken.

3.3.30 PROTECTED AREA: The area within the Owner-Controlled Area

! encompassed by physical barriers and to which access is' controlled for security purposes, i

Rev.0 1

l'

!' l

3-8 1997 Evaluated Exercise 3.3.31 PROTECTIVE ACTION: Those emergency measures taken after an uncontrolled release has occurred, for the purpose of preventing or minimizing radiological dose to persons that would likely be exposed if the action was not taken.

3.3.32 PROTECTIVE ACTION GUIDES (PAGs): Projected radiological dose or dose commitment value to individuals in the general population which warrant protective action.

3.3.33 RADIOLOGICALLY RESTRICTED AREA (RRA): Any area accessed which '

1 is limited by the Licensee for the purpose of protecting individuals against undue risks from exposure to mdiation or radioactive materials.

3.3.34 RADIOLOGICAL MONITORING TEAMS (RMTs): Two-person teams responsible for monitoring radiation levels in the environment and collecting l soil, air, vegetation, snow, and water samples for laboratory analysis.

3.3.35 SITE AREA EMERGENCY: The level of emergency classification which l indicates that events are in progress or have occurred which involve actual or likely major failures of plant functions needed for protection of the public. Any j releases of radioactive material are not expected to exceed Protective Action Guide (PAG) exposure levels, except near the Site Boundary. j 3.3.36 TECHNICAL SUPPORT CENTER (TSC): An onsite emergency response facility for use by technical and management personnel in support of the command and control functions executed in the Control Room.  ;

3.3.37 UNUSUAL EVENT: The lowest level of emergency classification, which  !

indicates events are in progress or have occurred which indicate a potential degradation of the level of safety of the plant.

i i

l Rev.0 I

(_

5-1 1997 Evaluated Exercise l

l l 5.0 SCHEDULE OF EVENTS

! 5.1 TIMES AND PLACES

! )

Preparatory meetings held prior to the week of the Exercise will be schedule and .

coordinated by the Emergency Preparedness Staff. The meetings schedule for the week )

of the Exercise will be held with Tables 5.1-1 and Table 5.1-2.

Schedule of Meetings  ;

Table 5.1-1 j

\ l t

Date/ rime 1Yhere .Whal  !

1 June 2,1997 Energy Education Center Utility Controllers 1000 -1200 DBNPS Admin Building Final Briefing June 2,1997 Room 209/210 NRC/ Lead Controllers 1430 - 1600 DBNPS Admin. Building NRC Entrance / Briefing / fours !

June 3,1997 Energy Education Center Utility Players Briefing 1500 - 1545 DBNPS Admin Building June 4,1997 All Facilities Exercise June 5,1997 Energy Education Center Utility Controller Debriefing 0800 - 1200 DBNPS Admin Building June 6,1997 Energy Education Center Utility Player /NRC Critique 0800 - 1100 DBNPS Admin Building June 6,1997 To Be Determined FEMA /NRC Public Meeting l

i W

e Rev.O i l

5-2 1997 Evaluated Exercise Schedule of Meetings Table 5.1-2 Date/Fime Where What June 3,1997 EEC Conference Area Exercise Offsite Controller Briefing Davis-Besse Admin Building June 4,1997 (All Day) Offsite Facilities Exercise June 5,1997 Emergency Preparedness Exercise Offsite Controller Deriefing DBNPS Admin Building (Second Floor) i h

I l

Rev.O l

  • 5-3 1997 Evaluated Exercise l 5.2 OBSERVER APPROVAL Permission to observe the Exercise must be obtained from:

Davis-Besse Nuclear Power Station State of Ohio

! L Mr. Patrick J. McCloskey, Supervisor Mr. Larry Grove, Chief -

l Emergency Preparedness Ohio Emergency Management Agency .

Toledo Edison Company Department of Public Safety 5501 N. State Route 2, Stop DB 3060 2855 W. Dublin-Granville Road 1 Oak Harbor, OH 43449-9760 Columbus, OH 43235-2206 PH: (419) 321-7148 PH: (614) 889-7173 l FAX: (419) 249-2302 FAX: (614) 889-7183

! Ottawa County Sandusky County Mr. James P. Greer, Director Ms. Berdit;e Parish, Director  ;

l Ottawa County EMA Sandusky County EMA l 315 Madison Street 100 N. Park Avenue Port Clinton, OH 43452 Fremont,OH 43420 PH: (419) 734-6901 PH: '(419)334-8933

! FAX: (419) 249-2361 FAX: (419) 334-6427 Lucas County l

- Mr. William S. Halsey, Director Lucas County EMA 2144 Monroe Street Toledo, OH 43624 l PH: (419) 249-0661 I

FAX: (419) 249-5360 5.3 IRAVEL INFORMATION This section provides travel information to those individuals from Corporate, other utilities, local / state / federal government, and/or other organizations who may participate ,

in the Exercise.

i 1

l r

I Rev.0 l

i. _

l 1

  • 5-4 1997 Evaluated Exercise 1

l Once permission is obtained to attend the Exercise, accommodations can be made as l

follows:

1. Air: l Detroit Metro Airport (70 miles from Davis-Besse)

Detroit, MI Toledo Express Airport (50 miles from Davis-Besse)

Toledo, OH i

Cleveland Hopkins Airport (85 miles from Davis-Besse)

Cleveland, OH 4

2. Automobile:

The Davis-Besse Station is located on Ohio State Route 2, approximately 25 miles east of Toledo,10 miles northwest of Port Clinton, and 75 miles west of Cleveland along State Route 2.

3. Accommodations: l Fairfield Inn (419) 732-2434 Best Western (800) 231-4871 3760 East State Road Port Clinton, OH Port Clinton, OH Fremont, OH Comfort Inn (419) 732-2929 Comfort Inn (419) 691-8911 1723 East Perry Street 2930 Navarre Avenue (SR 2)

Port Clinton, OH Oregon, OH OurGuest (419) 734-3000 Holiday Inn (800)465-4329 2039 E. Harbor Road Toledo, OH Port Clinton, OH Fremont, OH Sandusky, OH Maumee Bay Resort & Conference Center Days Inn (419) 734-4945 1750 Park Road #2 2149 E. Gill Road Oregon, Oli 43618-9700 Port Clinton, OH (419)836-1466 t

i l

Rev.0 l