ML20246F939

From kanterella
Jump to navigation Jump to search
Emergency Preparedness Exercise Manual,890808-09
ML20246F939
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/09/1989
From: Demaison B
TOLEDO EDISON CO.
To:
Shared Package
ML20246F928 List:
References
NUDOCS 8908310178
Download: ML20246F939 (500)


Text

{{#Wiki_filter:. _ . . . _ - _ s/

        .I l}

DAVIS-BESSE NUCLEAR POWER STATION DRILL / EXERCISE AUTHORIZATION COVER SHEET DRILL / EXERCISE TITLE: 1989 Evaluated Exercise DATE OF CONDUCT: August 8, 9, 1989 TIME OF CONDUCT: 0730 DRILL / EXERCISE LEAD CONTROLLER: B. DeMaison APPROVED: 9!

                                                                                                              ' Date/ Time oat:c SUberv or Emergency Planning APPROVED:             $              htly.k1                                        *-$-Tf/)3cD Date/ Time ManagrEmergency/ Preparedness APPROVED: .                  5                                                        [/ Pf        /-
                                        ~     ~

N ant Manag 'Dat4/Ti . APPROVED: - Yt/!/7 ///[ Vice Presideng Nuclear (Da(e/ Time / D178 999924 fh83fDOCK05000346 p PDC

                                                                                                                                                      . i; ,+
       !        ' ? U!                    o           i y :.
                           -{ j.                                                             : ._ _ - - d.
      , )                                         . .

F, . , , ! 't ')

                       .4:

i 1 ;' ( f! , r-i'

       ',3-k

( J

           . s.

w e_ g-l'

  .s,'

V: . 6 , ..

h. i .

( 1

                                                                      =:THE' TOLEDO EDISON COMPANY-'

DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE MANUAL August 8, 9, 1989 4 , <

                                                                                                                                                 'W l
                                                                                                                                                   'i
 'C j

The Toledo Edison Company Davis-Besse Nuclear Power Station' a 1989 Emergency Preparedness Exercise' f

                                                     -Forward-                                         ,

i The Davis-Besse Nuclear Power Station (DBNPS) Emergency Plan describes the I nuclear emergency response capabilities at DBNPS, including support provided by federal, state and local' governments, and private organizations. The Plan describes a program of continuous emergency preparedness, one element of which is an annual cealested exercise. j

         -The conduct of this exercise provides the opportunity to implement the emergency                                                           i plan and its associated. procedures, and to activate and enable the evaluation of                                                          l major portions of the emergency response organizations, as required in 10 CFR 50.47.(b)(14) and Appendix E. This exercise therefore provides an opportunity to further enhance emergency response capabilities.

The 1989 exercise program provides for activation of the DBNPS emergency . response organization, with participation by offsite agencies, i This Exercise Manual provides the basis for the conduct of the exercises a simulated radiological incident at the Davis-Besse Nuclear Power Station, located near Oak Harbor,.0hio. It is to be used as the control mechanism for the conduct and evaluation of the exercise, and consists of two parts. Part 1 defines the scope and objectives of the exercise, and provides an overview of the activities. Part 2 includes the specific sequence of events (i.e. the y scenario) and pertinent data. It is therefore subject to a limited, controlled I distribution. Only Exercise Controllers, Evaluators and authorized observers vill receive' advance distribution of the information in Part 2. In the development of an accident which is severe enough to adequately test the emergency response capabilities of participating organizations, it is necessary to postulate extremely unrealistic situations and multiple failures of redundant reactor protection functions and systems. The objective of this exercise is to demonstrate the ability of the partici-pating organizations to protect the public, and appropriately respond to this highly improbable sequence of events. 1 l l Rev. 2

p i 1989

                       .                          Davis-Besse Nuclear Power Station Emergency Preparedness Exercise SCENARIO DEVELOPMENT COMMITTEE                                   .3 1

l

                      -Co-Chairman                  B. DeMaison              Emergency Preparedness                     i.

Co-Chairman B. Cope Emergency Preparedness j A. Plant' Operations

1. J. Johnson Quality Assurance (SRO) .
2. J. Blay Operations (SRO)
3. V. S. Schum Emergency Preparedness L
4. T. Lehman Operations (SRO) l 1

Radiological Control l 1

1. C. Upchurch Emergency Preparedness
2. D. Jazviecki Radiological Control
3. L. Bonker Radiological Control Maintenance
1. J. Staudacher Electrical
2. J. Madison Mechanical
3. D. Jones I&C l Dose Assessment ,

t

1. I. Borland Emergency Preparedness
2. .B. Musico Emergency Preparedness Core Damage Assessment / Engineering l
1. D. R. Blakely Engineering  !
2. D. G. Kuhtenia Engineering -j Chemistry / PASS
1. J. Ferguson Chemistry Computer Support (DADS /SPDS/ MET)
1. R. K. Sharpe Computer Group
2. R. Bast Computer Group 1

1 i 1 I Rev. 2 l l l I' . . . . . . . , .

4-SCENARIO DEVELOPMENT COMMITTEE (continued)

       -JPIC/ Corporate
1. JJ. Basa. Etaergency Preparedness
2. B. Eggert- Corporate Security
1. R. Buehler Security
2. F. Pitzen Security Fire Protection
1. R.. Strauss Fire Protection Medical
1. R. Dielman NISH
2. V. E. Comings NISH State and County Agencies.
1. M. Findlay Emergency Preparedness 2.. .J. Vetter Emergency Preparedness
3. J. Teal Emergency Preparedness
4. K. Cole OEMA
5. D. Matthews OEMA
6. L. Bokman OEMA
7. B. Miller Michigan EMA Rev. 2

H

 .i TABLE OF CONTENTS FOR 1989 DRILL MANUALS A: ONSITE MANUAL PART I GENERAL INFORMATION 1.0 SCOPE AND OBJECTIVES 1.1 Scope 1.2. Objectives 1.2.1-     Toledo Edison 1.2.2      State of Ohio 1.2.3      State of Michigan 1.2.4      Ottava County 1.2.5      Lucas County 1.2.6      Sandusky County 2.0 EZERCISE INFORMATION' 2.1 Exercise Participants 2.2 Exercise Organizations 2.3 Emergency Response Facilities 2.4 Exercise Conduct 2.5 Precautions'and Limitations 2.6 Evaluation and Critiqte

3.0 REFERENCES

/ ABBREVIATIONS / DEFINITIONS
            .3.1  References 3.2 Abbreviations 3.3 Definitions 4.0 CONTROLLER / EVALUATOR INFORMATION 5.0 SCHEDULE OF EVENTS PART II CONTROLLED INFORMATION 6.0 EXERCISE SCENARIO 6.1 Narrative Summary 6.2 Initial Conditions 6.2.1      Close of Business 8/7/89 6.2.2      Start of Exercise 8/8/89 6.3 Onsite Sequence of Events 7.0 STATION CUE CARDS AND PLANT DATA SHEETS 8.0 STATION RADIOLOGICAL DATA ANL RADI0 CHEMISTRY DATA 8.1 In-plant Radiation Data 8.2 Onsite (out of plant) Radiation Levels 8.3 Medical Drill Synopsis 8.4 Radiochemistry Data Rev. 2
e.  !

9.0 0FPSITE RADIOLOGICAL DATA k 9.1 Radiological and Meteorological Summary l 9.1.1 Ingestion Pathway Protective Actions-TABLES l 9.1 Meteorological Data j 9.2 Closed and Open Vindov Whole Body Dose Rate { 9.3 child Thyroid Dose Rates 9.4 Iodine Concentrations { i

 .,'                                           9.5 SAM-2 Readings' 9.6 PRM-6 Readings                                                          j 9.7 State of Ohio - Field Monitoring Data (Day 1)/ SPA-3 Readings 9.8 State of Ohio - Field Monitoring Data      (, Day 1)/ Gross Gamma Readings 9.9 Reentry Sampling Points 9.10 Reentry Sampling Points (August 10 Data) 9.11 Ohio - Sample and Laboratory Data Sheets / Ingestion Pathway            1 (Day 2) 9.12 Michigan - Sample and Laboratory Data / Ingestion Pathway (Day 2)    '!

l FIGURES

                                                                                                                          ]

9.1 Meteorological Data - Vesther Forecast 9.2 Meteorological Data - Extended Forecast l 9.3 Radioactive Plume Travel ' 9.4 Sample Analysis Points for Determining Restricted Zone During l Reentry / Recovery (Day 1) - 10 Mile EPZ 9.5 Sample Analysis Points for Determining Restricted Zone During Recovery / Reentry (Day 1) - 3 Mile Area  ! 9.6 Sample Analysis Points for Determining Restricted Zone During Recovery / Reentry (Day 2) - 3 Mile Area , 9.7 Ingestion Pathway Impact Area - 50 Mile EPZ 9.8 Ohio Dept. of Health - Sample and Laboratory Data Sheets i. 10.0 ATTACHMENTS 10.1 Lucas County l a. Exercise Action - Site Information

b. Timeline Chart
c. Offsite Medical Data and Cue Cards 10.2 Ottava County
a. Exercise Action - Site Information
b. Timeline Chart 10.3 Sandusky County
a. Exercise Action - Site Information
b. Timeline Chart 10.4 State of Ohio
a. Timeline Chart 10.5 Out of Sequence Medical Drill
a. Sequence of events
b. Cue Cards Rev. 2

a i [. ). ' SECTION 1.0 SCOPE AND OBJECTIVES l l i,

[E _m 1 L 'l.0 SCOPE'AND OBJECTIVES 1.1 Scope The 1989 Davis-Besse Emergency Preparedness Exercise, to be conducted on August 8 and 9,_1989 vill test and provide the opportunity to eval-uate the Toledo Edison Emergency Plan and Emergency Plan procedures.. It vill also test the emergency. response organization's ability to f

               -assess and respond to emergency conditions and take adequate actions to protect the health and safety of the public.. The exercise vill, demonstrate the utilization of the Station's Emergency Response Organ-ization " Team A" personnel with exceptions. The exercise vill not involve activation of the Toledo Edison Corporate Emergency Response Organization (CER). Whenever practical, the exercise incorporates provisions for " free play" on the part of'the participants.
    ~

The scenario will simulate a sequence of events resulting in a radio-logical release to the environment. This release vill be of suffi-cient magnitude to warrant mobilization.of State.and local agencies in response to.the emergency,-including the State of Ohio, State of Michigan, Ottava County, Lucas County and Sandusky County emergency response organizations. LIngestion Exposure Pathway activities vill be demonstrated on August 9, 1989. The exercise vill also incorporate the conduct of the Station's Annual Medical Drill, Semiannual Health Physics Drill and Annual Post Acci-dent Sampling System Drill for analysis of'an actual. sample obtained from the post-accident sampling system. i Rev. 7

l 1 Section 1.2 Objectives l 1.2.1 -TOLEDO EDISON OBJECTIVES SEO. REF. OBJECTIVE 01 A.1-CONDUCT AN EXERCISE OF THE DAVIS-BESSE NUCLEAR POWER STATION (DBNPS) EMERGENCY PLAN. 02 A.2 PROVIDE OPPORTUNITY FOR THE STATE, OTTAVA, LUCAS COUNTIES, TO PARTICIPATE IN AN EXERCISE ANNUALLY. 03 A.3 PREPARE AN EXERCISE PACKAGE TO MEET MINIMUM STANDARDS OF THE REFERENCE. 04 'A.4 CONDUCT A CRITIQUE OF THE EXERCISE. - 05 A.5 ESTABLISH MEANS TO ENSURE COMPLETION OF CORRECTIVE ACTIONS. 06 A.6 INVOLVE FEDERAL, STATE, OTTAVA AND LUCAS COUNTY EMERGENCY PRE-PAREDNESS RESPONSE PERSONNEL, ORGANIZATIONS AND AGENCIES IN A JOINT EXERCISE AT LEAST.ONCE EVERY 5 YEARS. 07 A.9 CONDUCT THE EXERCISE IN VARIOUS VEATHER CONDITIONS (DURIF' DIFFERENT SEASONS). 08 B.1 DEMONSTRATE THE DIRECTION OF THE EMERGENCY ORGANIZATION AND IMPLEMENTATION OF THE EMERGENCY PLAN AND EMERGENCY PLAN IMPLE- 1 MENTATION PROCEDURES. j 09 B.2' DEMONSTRATE THE TRANSFER OF THE EMERGENCY COORDINATOR DUTIES. 10 B.3 DEMONSTRATE THE ABILITY FOR TIMELY ACTIVATION AND STAFFING OF THE EMERGENCY FACILITIES. 11- B.4 DEMONSTRATE THE ABILITY TO CONTROL ACCESS TO EMERGENCY FACILITIES. 12 B.5 DEMONSTRATE THE ABILITY OF CORPORATE PERSONNEL TO AUGMENT AND SUPPORT THE PLANT STAFF. 13 B.6 DEMONSTRATE THE AVAILABILITY OF OUTSIDE ORGANIZATIONS VHO CAN BE RELIED UPON IN AN EMERGENCY TO PROVIDE ASSISTANCE. 14 B.8 DEMONSTRATE THE ABILITY TO REQUEST, SUPPORT AND UTILIZE FEDERAL ASSISTANCE. 15 B.9 DEMONSTRATE THE AVAILABILITY AND DISPATCH OF A TECHNICAL LIAISON TO OFFSITE GOVERNMENTAL EOC'S. (DEMONSTRATED ONLY VITH FULL OFFSITE PARTICIPATION.) 16 B.10 DEMONSTRATE THE CAPABILITY FOR CONTINUOUS (24 HOUR) OPERATIONS FOR A PROTRACTED PERIOD FOR EACH PRINCIPAL ORGANIZATION. Rev. 2

1-3 Toledo Edison Objectives Continued 17 B.11 DEMONSTRATE CATION LINKS. THE ABILITY FOR 24 HOUR PER DAY MANNING OF C 18 B.13 DEMONSTRATE MANNER. THE CAPABILITY FOR STAFF AUGMENTATION IN A STAFF AUGMENTATION DRILL REQUIREMENT. 19 C.1 l DEMONSTRATE THE ABILITY TO ASSESS THE INCIDENT CONDITIONS.{ 20 C.2 DEMONSTRATE THE ABILITY TO RECOGNIZE EMERGENCY ACTION LE (EAL'S) AND PROPERLY CLASSIFY THE INCIDENT. 21 D.1 i DEMONSTRATE THE ABILITY TO NOTIFY KEY OFFICIALS IN THE ORGANIZATIONS. EMER i (STATION, CORPORATE, STATE OF OHIO, OTTAVA COUNTY ' AND LUCAS COUNTY) CLASSIFICATION. VIA NOTIFICATION SYSTEM VITHIN 15 MINUTES O 22 D.2 , DEMONSTRATE THE ABILITY TO NOTIFY THE NRC OF ANY EMERGENC i CLASSIFICATION VITHIN ONE HOUR OF THE OCCURRENCE. f 23 D.3 4 DEMONSTRATE THE CAPABILITY TO NOTIFY AND/0R ACTIVATE EMER PERSONNEL IN EACH RESPONSE ORGANIZATION. 24 D.4 DEMONSTRATE THE ABILITY TO DEVELOP AND SEND AN INITIAL EME ' MESSAGE FOR OFFSITE NOTIFICATION. I 25 D.5 DEMONSTRATE THE ABILITY TO DEVELOP AND SEND FOLLOV-UP MESS FOR INFORMATION FOR OFFSITE AUTHORITIES. 26 D.6 DEMONSTRATE THE COMMUNICATIONS CAPABILITY AMONG THE CONTROL ROOM, TSC, AND ECC, AND AMONG DBNPS, STATE OF OHIO, OTTAVA AND LUCAS COUNTY EMERGENCY OPERATIONS CENTERS AND THE FIELD ASSESSMENT TEAMS, TO INCLUDE EVALUATION OF THE ASILITY TO UNDERSTAND MESSAGE CONTENT (COMMUNICATION DRILL REQUIREMENT). 27 D.8 DEMONSTRATE THE ABILITY TO DEVELOP A LEGITIMATE, INFORMATIVE, AND CLEARLY UNDERSTOOD MESSAGE TO BE SENT TO STATE, AND COUNTY OFFI-CIALS SYSTEMS.VHO MAKE DECISIONS TO ACTIVATE THE ALERT AND NOTIFICATIO 23 D.9 DEMONSTRATE THE COMMUNICATIONS CAPABILITY VITH THE STATE, OTTAVA COUNTY AND LUCAS COUNTY VITHIN THE PLUME EXPOSURE (COMMUNI- EPA.  ! CATION DRILL VERIFY OPERABILITY OF HARDVARE ONLY) l 29 D.10 1 DEMONSTRATE THE. COMMUNICATIONS CAPABILITY VITH FEDERAL EM

RESPONSE

EPA. ORGANIZATIONS AND THE STATE OF MICHIGAN IN THE IN (COMMUNICATION DRILL ONLY-VERIFY HARDVARE OPERABILITY) 30 D.11 DEMONSTRATE THE COMMUNICATIONS CAPABILITY FROM THE CONTROL ROOM, j TSC, ECC, VITH THE NRC HEADQUARTERS AND REGION III EMERGENCY OPERATIONS CENTER. Rev. 2 1

Y 1-4' Toledo Edison Objectives Continued 31 D.12 DEMONSTRATE THE COMMUNICATIONS CAPABILITY VITH FIXED AND MEDICAL SUPPORT FACILITIES.. 32 E.1 DEMONSTRATE THE METHODS AND TECHNIQUES FOR DETERMINING TH TERM 0F RELEASES OR POTENTIAL RELEASES OF RADIOACTIVE MATER VITHIN PLANT SYSTEMS.

      -33    E.2 DEMONSTRATE THE METHODS AND TECHNIQUES FOR DETERMINING THE

, TUDE OF THE RELEASES OF RADIOACTIVE MATERIALS BASED ON PLANT SYSTEM PARAMETERS AND EFFLUENT MONITORS. 34 E.3 DEMONSTRATE THE ABILITY TO ESTIMATE INTEGRATED DOSE FROM PRO-JECTED AND ACTUAL DOSE RATES AND TO COMPARE THESE ESTIMATES THE' PAG'S. 35 E.4 . DEMONSTRATE THE ABILITY TO IMPLEMENT EXPOSURE GUIDELINES. 36 E.5 DEMONSTRATE THE ABILITY TO CONTINUOUSLY MONITOR AND CONTROL EMER GENCY VORKER EXPOSURE. 37 E.7 DEMONSTRATE THE RESOURCES AND CAPABILITY FOR FIELD MONITORING VITHIN THE PLUME EXPOSURE EP7. 38 E.8 DEMONSTRATE THE ABILITY TO ESTIMATE TOTAL POPULATION EXPOSURE. 39 E.15 DEMONSTRATE THE CAPABILITY FOR TRANSPORTATION OF A RADIOLOGICAL ACCIDENT VICTIM. (MEDIAL DRILL REQUIREMENT.) 40 E.17 DEMONSTRATE THE RESPONSE TO AND ANALYSIS OF, SIMULATED ELEVATED AIRBORNE AND LIQUID SAMPLES AS VELL AS DIRECT RADIATION MEASURE-MENTS IN THE ENVIRONMENT. (HEALTH PHYSICS DRILL REQUIREMENT) 41 E.1B DEMONSTRATE THE CAPABILITY TO ANALYZE AN ACTUAL SAMPLE OBTAINED FROM A PLANT SYSTEM INCLUDING USE OF THE POST ACCIDENT SAMPLING SYSIEM VITHIN 3 HOURS. (HEALTH PHYSICS DRILL REQUIREMENT) 42 F.1 DEMONSTRATE THE ABILITY TO RECOMMEND PROTECTIVE ACTIONS TO APPRO-PRIATE OFFSITE AUTHORITIES; BASES OF RECOMMENDATIONS TO INCLUDE CONSIDERATION OF PROTECTION AFFORDED BY SHELTERING, AS VELL AS EVACUATION TIME ESTIMATES. 43 F.2 DEMONSTRATE THE OPERATION OF THE JOINT PUBLIC INFORMATION CENTER AND THE AVAILABILITY OF SPACE FOR THE MEDIA. 44 F.3 DEMONSTRATE THE ABILITY TO BRIEF THE MEDIA IN A CLEAR, ACCURATE AND TIMELY MANNER. 45 F.4 DEMONSTRATE THE ABILITY TO PROVIDE ADVANCE COORDINATION OF INFOR-MATION RELEASED (DEMONSTRATED ONLY VITH FULL OFFSITE PARTICIPA-TION.) 46 F.6 DEMONSTRATE THE CAPABILITY TO EVACUATE NON-ESSENTIAL PERSONNEL. Rev. 2

l' 1-5 Toledo Edison Objectives Continued 47 F.8-DEMONSTRATE THE ABILITY TO ACCOUNT FOR ALL INDIVIDU PROTECTED AREA VITHIN 30 MINUTES. 48 F.9 DEMONSTRATE THE ABILITY TO CONDUCT SEARCH AND RE 49 F.10 DEMONSTRATE ABILITY TO ESTABLISH AND' OPERATE RUM COORDINATED PATION) FASHION (DEMONSTRATED ONLY VITH FUL 50 F.11 l- DEMONSTRATE THE CAPABILITY FOR ONSITE FIRST AID.DRILL (MEDICAL REQUIREMENT) 51 F.12 DEMONSTRATE THAT PROVISIONS ARE AVAILABLE FOR THE E RADIATION EXPOSURE OF, AND RADIATION UPTAKE IN A RADIOLOGICAL ACCIDENT VICTIM. (MEDIAL DRILL REQUIREMENT) 52 G.1 DEMONSTRATE PRELIMINARY DISCUSSIONS OF REENTRY AND BILITIES AND AVAILABILITY OF PROCEDURES.- l l 1 I Rev. 2

      ,.m.

1-6

 .           1.2.2-    ' State of Oh'o i Objectives SE0#   REPit                            OBJECTIVE 01    Ol'       DEMONSTRATE ABILITY TO MONITOR, UNDERSTAND, USE EMERGENCY CLASSI-FICATION LEVELS (ECL) THROUGH THE APPROPRIATE IMPLEMENTATION-OF EMERGENCY FUNCTION AND ACTIVITIES CORRESPONDING TO ECL'S AS'
                             -REQUIRED BY THE SCENARIO.
                             -Limiting Conditions: None 02    02        DEMONSTRATE THE ABILITY TO ALERT,' MOBILIZE AND ACTIVATE PERSONNEL FOR BOTH FACILITY AND FIELD-BASED EMERGENCY FUNCTIONS.

Limiting Conditions: Pre-stage all field activities. 03 03 DEMONSTRATE THE ABILITY D0 DIRECT, COORDINATE AND CONTROL EMER-GENCY ACTIVITIES. Limiting Conditions: None 04 04 DEMONSTRATE THE ABILITY TO COMMUNICATE VITH ALL APPROPRIATE LOCA-TIONS, ORGANIZATIONS AND FIELD PERSONNEL. Limiting Conditions: None 05 05 DEMONSTRATE THE ADEQUACY OF FACILITIES, EQUIPMENT, DISPLAYS AND

                              'OTHER MATERIALS TO SUPPORT EMERGENCY OPERATIONS.

Limiting Conditions: None 06 06 DEMONSTRATE THE ABILITY TO CONTINUOUSLY MONITOR AND CONTROL EMER-GENCY VORKER EXPOSURE.

                             -Limiting Conditions: None 07    07        DEMONSTRATE THE APPROPRIATE EQUIPMENT AND PROCEDURES FOR DETER-MINING FIELD RADIATION MEASUREMENTS.

Limiting Conditions: None 08 08 DEMONSTRATE THE APPROPRIATE EQUIPMENT AND PROCEDURES FOR THE MEASUREMENT OF AIRBORNE RADI0 IODINE CONCENTRATIONS AS LOV AS 10-7 MICR0 CURIES PER CC IN THE PRESENCE OF NOBLE GASES. Limiting Conditions: None 09 09 DEMONSTRATE THE ABILITY TO OBTAIN SAMPLES OF PARTICULATE ACTIVITY IN THE AIRBORNE PLUME AND PROMPTLY PERFORM LABORATORY ANALYSES. (NEW OBJECTIVE) Limiting Conditions: Samples will be transported by vehicle rather than Guard helicopters. Rev. 2

9 1-7 7: State of Ohio Objectives Continued 10 10 -DEMONSTRATE THE ABILITY, VITHIN THE PLUME EXPOSURE PATHVAY TO PROJECT DOSAGE TO THE PUBLIC VIA PLUME EXPOSURE, BASED ON PLANT AND FIELD DATA. Limiting Conditions: None 11' 11 _ DEMONSTRATE THE ABILITY TO MAKE APPROPRIATE PROTECTIVE ACTION

                                      -DECISIONS, BASED ON PROJECTED OR ACTUAL DOSAGE, EPA PAG'S AVAILABILITY OF ADEQUATE SHELTER, EVACUATION TIME ESTIMATES AND OTHER RELEVANT FACTORS.
                                      ~ Limiting' Conditions: None 12   14       DEMONSTRATE THE ABILITY TO BRIEF THE MEDIA IN AN' ACCURATE, COOR-DINATED AND TIMELY MANNER.

Limiting Conditions: None 13 15 DEMONSTRATE THE ABILITY TO ESTABLISH AND OPERATE RUMOR CONTROL IN A COORDINATED AND TIMELY FASHION. Limiting Conditions: None 14 16 DEMONSTRATE.THE ABILITY TO MAKE THE DECISION TO RECOMMEND THE USE OF KI TO EMERGENCY VORKERS AND INSTITUTIONALIZED PERSONS, BASED ON PREDETERMINED CRITERIA, AS VELL AS TO DISTRIBUTE AND ADMINISTER IT ONCE THE DECISION IS MADE, IF NECESSITATED. Limiting Conditions: None

                                                                                                         .i 15   26 DEMONSTRATE THE ABILITY TO IDENTIFY THE NEED FOR AND CALL UPON FEDERAL AND OTHER OUTSIDE SUPPORT AGENCIES ASSISTANCE.                ;

Limiting Conditions: None i 16 27 # DEMONSTRATE THE APPROPRIATE USE OF EQUIPMENT AND PROCEDURES FOR COLLECTION AND TRANSPORT OF SAMPLES OF VEGETATION, FOOD CROPS, MILK, MEAT, POULTRY, VATER AND ANIMAL FEEDS. (INDIGEN0US TO THE

  • AREA AND STORED.)

Limiting Conditions: None 17 28 L DEMONSTRATE THE APPROPRIATE LAB OPERATIONS AND PROCEDURES FOR i MEASURING AND ANALYZING SAMPLLS OF VEGETATION, FOOD CROPS, MIIK, j ' MEAT, POULTRY, VATER AND ANIMAL FEEDS (INDICEN005 TO THE AREA AND STORED. Limiting Conditions: Vill not actually demonstrate analyzing i meat and poultry. 1 Rev. 2 _ _ _ _ _ _ _ - _ _ i

l[

18 g3 State of Ohio Objectives continued

                 .18   19       DEMONSTRATE THE ABILITY TO PROJECT DOSAGE TO THE PUBLIC FOR V'
  • INGESTION.PATHVAY EXPOSURE AND DETERMINE APPROPRIATE PROTECTIVE MEASURES BASED ON FIELD DATA, FDA PAG'S ANDl0THER RELEVANT-
                              . FACTORS.-

Limiting Conditions: V111' limit releases to noble gases and radioi6 dines, a- 19 ' 30' DEMONSTRATE THE' ABILITY TO IMPLEMENT BOTH PREVENTATIVE AND. 1 EMERGENCY PROTECTIVE ACTIONS FOR INGESTION PATHVAY HAZARDS.: Limiting Conditions: Organizational ability.only. 20 32 DEMONSTRATE.THE ABILITY.TO DETERMINE APPROPRIATE MEASURES FOR CONTROLLED REENTRY AND RECOVERY BASED ON ESTIMATED TOTAL POPULA-TION EXPOSURE,'AVAILABLE EPA PAG'S AND OTHER RELEVANT FACTORS. Limiting Conditions:- Vill limit releases'to noble gases and radiciodines.

                -21    33      DEMONSTRATE THE ABILITY TO IMPLEMENT APPROPRIATE MEASURES'FOR CONTROLLED REENTRY AND RECOVERY.

Limiting conditions: Organizational ability only, g 1' L 1 l: Rev. 2 l _ . _ _ _ - ____-___-__ _ ___ _ ___ _

E i 4 t. 1-9 ' 1.2.3 , State of Michigan' objectives SEO. REPl# -OBJECTIVE h- 01 3

   '                     DEMONSTRATE THE ABILITY T0 DIRECT, COORDINATE AND CONTROL EMERGENCY ACTIVITIES.
                       . Limiting Conditions: 2nd day only.
       .02      4-DEMONSTRATE THE ABILITY TO COMMUNICATE WITH ALL APPROPRIATE
                       . LOCATIONS,' ORGANIZATIONS AND FIELD PERSONNEL.

Limiting Conditions: 2nd day only.

       '03.   ~I3 DEMONSTRATE THE ABILITY TO COORDINATE 7FE FORMULATION AND DISS INATION OF ACCURATB INFORMATION AND INSTRUCTIONS TO THE PUBLIC A TIMELY FASHION AFTER THE INITIAL ALERT AND NOTIFICATION HAS OCCURRED.

Limiting Conditions: 2nd day only. Rev. 2

1-10 1.2.4 Ottava County' Objectives SEQt REPl# OBJECTIVE 01 01 DEMONSTRATE ABILITY TO MONITOR, UNDERSTAND, USE EMERGENCY CLASSI-FICATION LEVELS THROUGH THE APPROPRIATE IMPLEMENTATION O GENCY

                        .JY         FUNCTIONS THE SCENARIO."        AND ACTIVITIES CORRESPONDING TO ECL'S Limiting Conditions:. None 02     02 DEMONSTRATE THE ABILITY TO ALERT, MOBILIZE AND ACTIVATE PERSONNEL FOR BOTH FACILITY AND FIELD-BASED EMERGENCY FUNCTIONS.

Limiting Conditions: Some pre-staging may occur and certain activities may be demonstrated out of sequence depending on the

                       . scenario-(as noted in applicable objectives).                       ~

03 03 DEMONSTRATE TEt ABILITY TO DIRECT, COORDINATE AND CONTROL EMERGENCY ACTIVITIES. Limiting Conditions: None 04 04 DEMONSTRATE THE ABILITY TO COMMUNICATE VITH ALL APPROPRIATE L TIONS, ORGAh.'.ZATIONS AND FIELD PERSONNEL. Limiting Conditions: None 05 05 DEMONSTRATE THE ADEQUACY OF FACILITIES, EQUIPMENT, DISPLAYS AND OTHER MATERIALS TO SUPPORT EMERGENCY OPERATIONS. Limiting Conditions: None 06 06 DEMONSTRATE THE ABILITY TO CONTINUOUSLY MONITOR AND C0';1ROL EMER- a GENCY VORKER EXPOSURE. Limiting Conditions: None 07 11 DEMONSTRATE THE ABILITY TO MAKE APPROPRIATE PROTECTIVE ACTION DECISIONS, BASED ON PROJECTED.OR ACTUAL DOSAGE, EPA PAG'S AVAILABILITY OF ADEQUATE SHELTER, EVACUATION TIME ESTIMATES AND OTHER RELEVANT FACTORS. Limiting Conditions: Ottava County vill adjust State and Utility l protective action recommendations based on local constraints. i 08 12 DEMONSTRATE THE ABILITY TO INITIALLY ALERT THE PUBLIC VITHIN THE 10-MILE EPZ AND BEGIN DISSEMINATION OF AN INSTRUCTIONAL MESSAGE VITHIN 15 MINUTES OF A DECISION BY APPROPRIATE STATF AND/0R LOCAL OFFICIALS. L Limiting Conditions: Siren and EBS activation vill be demen= strated procedurally. Sirens vill not be sounded and an EBS announcement vill not be broadcast to the public. { Rev. 2

1-11 Ot tava County Objectives Continued 09 13 DEMONSTRATE THE ABILITY TO COORDINATE THE FORMULA INATION OF ACCURATE INFORMATION AND INSTRUCTIONS TO A TIMELY FASHION AFTER THE INITIAL ALERT AND NOTIFICATION OCCURRED. Limiting Conditions: Instructions vill not be broadcast to the public; however, capabilities vill be demonstrated procedurally. 10 14 DEMONSTRATE THE ABILITY TO BRIEF THE MEDIA IN AN ACCURATE, COORDINATED AND TIMELY MANNER. Limiting Conditions: Media briefing vill not be demonstrated at the Ottava County facility. All media briefings will be con-ducted at the JPIC. J 11 15 DEMONSTRATE THE ABILITY TO ESTABLISH AND OPERATE RUMOR A COORDINATED AND TIMELY FASHION. Limiting Conditions: None 12 16 DEMONSTRATE THE ABILITY TO MAKE THE DECISION TO RECOM  ! 0F "KI" TO EMERGENCY VORKERS AND INSTITUTIONALIZED PERSONS, BASED ON PREDETERMINED CRITERIA, AS VELL AS TO DISTRIBUTE AND ADMINISTER IT ONCE THE DECISION IS MADE, IF NECESSITATED. 1 Limiting Conditions: The Phio Department of health issues the recommendation to take "KI". Administering "KI" to institution-alized persons vill be demonstrated procedurally at a specified facility. 13 18 DEMONSTRATE THE ABILITY AND RESOURCES NECESSARY TO IMPLEMEN APPROPRIATE PROTECTIVE ACTIONS FOR THE IMPACTED PERMANENT TRANSIENT PLUME EPZ POPULATION. INCLUDING TRANSIT-DEPENDENT, SPECIAL NEEDS POPS, HANDICAPPED AND INSTITUTIONALIZED PERSONS. Limiting Conditions: Capabilities vill be demonstrated proce-durally at the EOC. Administration of one care facility vill be available for interview by evaluators. l 14 19 l DEMONSTRATE THE ABILITY AND RESOURCES NECESSARY TO IMPLEME APPROPRIATE PLUME EPZ. PROTECTIVE ACTIONS FOR SCHOOL CHILDREN VITHIN T Limiting Conditions: Capabilities vill be demonstrated proce-durally. Students will not be transported. A school superin-1 tendent, principal, teacher and bus driver from one EPZ school district vill be available for interviewing by evaluators. l Rev. 2

(- 1-12 l

                           .0ttava County Objectives Continued 15    20 l-                                  DEMONSTRATE THE ORGANIZATIONAL ABILITY AND RESOURCES NE CONTROL EVACUATION TRAFFIC FLOW AND TO CONTROL ACCESS T0-ATED AND SHELTERED AREAS.

Limiting Conditions: One traffic control point vill be - established. 16 21 DEMONSTRATE'THE ADEOUACY OF PROCEDURES, FACILITIES, EQUIPMENT AND PERSONNEL FOR THE REGISTRATION, RADIOLOGICAL MONITORING'AND DECONTAMINATION OF EVACUEES. Limiting Conditions: Radiological monitoring and decontamination vill be demonstrated procedurally at one facility (in Sandusky County) possibly out of sequence (depending on scenario). , 17 22 DEMONSTRATE THE ADEQUACY OF FACILITIES, EQUIPMENT AND PERSONNEL FOR CONGREGATE CARE OF EVACUEES. Limiting. conditions: One congregate care facility (in Sandusky County) will be demonstrated, possibly out of sequence (depending on scenario). Care Center capabilities to provide food, bedding-and other necessities vill be demonstrated procedurally. 18 23 DEMONSTRATE THE ADEQUACY OF VEHICLES, EQUIPMENT, PROCEDURES AND PERSONNEL FOR TRANSPORTING CONTAMINATED, INJURED OR EXPOSED INDIVIDUALS. Limiting Conditions: None 19 24 DEMONSTRATE THE ADEQUACY OF MEDICAL FACILITIES, EQUIPMENT, PROCEDURES AND PERSONNEL FOR HANDLING CONTAMINATED, INJURED OR EXPOSED INDIVIDUALS. Limiting Conditions: None 20 25 DEMONSTRATE THE ADEQUACY OF FACILITIES, EQUIPMENT, SUPPLIES, PROCEDURES AND PERSONNEL F0h DECONTAMINATION OF EMERGENCY VORKERS, EQUIPMENT AND VEHICLES AND FOR VASTE DISPOSAL. Limiting Conditions: Capability vill be demonstrated at one facility possibly out of sequence (depending on scenario). Some portions of procedures may be by-passed or demonstrated procedurally. 21 32 DEMONSTRATE THE ABILITY TO DETERMINE APPROPRIATE MEASURES FOR CONTROLLED REENTRY AND RECOVERY BASED ON ESTIMATED TOTAL POPULA-TION EXPOSURE, AVAILABLE EPA PAG'S AND OTHER RELEVANT FACTORS. Limiting Conditions: Controlled re-entry and recovery will be demonstrated procedurally. Rev. 2

                                                                             ^

t - ,} '- 1-13 Ottava County Objectives Continued' 22 33 DEMONSTRATE THE. ABILITY TO: IMPLEMENT APPROPRIATE MEAS

                                           ' CONTROLLED REENTRY AND RECOVERY.

Limiting Conditions: Organizational ability will~be

                                           . demonstrated.

23' 34 DEMONSTRATE THE ABILITY TO MAINTAIN STAFFING ON A CONTIN HOUR BASIS BY AN ACTUAL SHIFT CHANGE. Limiting Conditions: None i l J r l Rev. 2 w_____-__--_______--_-------------------- -

I 1 [- 1-14 1.2.6' Lucas County Objectives SE0# REPl# OBJECTIVE 01- 01 DEMONSTRATE ABILITY TO MONITOR, UNDERSTAND, USE EMERGENCY CLASSIFICATION LEVELS THROUGH THE APPROPRIATE IMPLEMENTAT 1 EMERGENCY FUNCTIONS AND ACTIVITIES CORRESPONDING TO ECL'S A REQUIRED BY THE SCENARIO. Limiting Conditions: None 02 02 DEMONSTRATE THE ABILITY TO ALERT, MOBILIZE AND ACTIVATE PERSONNEL FOR BOTH FACILITY AND FIELD-BASED EMERGENCY FUNCTIONS. Limiting Conditions: Any event cut of sequence not covered. 03 03 DEMONSTRATE THE ABILITY TO DIRECT, COORDINATE AND CONTROL EMERGENCY ACTIVITIES. Limiting Conditions: None on demonstrated activities. 04 04

                                . DEMONSTRATE THE ABILITY TO COMMUNICATE WITH ALL APPROPRIATE-LOCATIONS, ORGANIZATIONS AND FIELD PERSONNEL.

Limiting Conditions: None 05 05 DEMONSTRATE THE ADEQUACY OF FACILITIES, EQUIPMENT, DISPLAYS AND OTHER MATERIALS TO SUPPORT EMERGENCY OPERATIONS. Limiting Conditions: None 06 06 DEMONSTRATE THE ABILITY TO CONTINUOUSLY MONITOR AND CONTROL EMERGENCY VORKER EXPOSURE. Limiting Conditions: None 07 11 DEMONSTRATE THE ABILITY TO MAKE APPROPRIATE PROTECTIVE ACTION DECISIONS, BASED ON PROJECTED OR ACTUAL DOSAGE, EPA PAG'S AVAILABILITY OF ADEQUATE SHELTER, EVACUATION TIME ESTIMATES AND OTHER RELEVANT FACTORS. Limiting Conditions: Lucas County vill adjust recommendations based on local constraints and conditions. 08 12 DEMONSTRATE THE ABILITY TO INITIALLY ALERT THE PUBLIC VITHIN THE 10-MILE EPZ AND-BEGIN DISSEMINATION OF AN INSTRUCTIONAL MESSAGE VITHIN 15 MINUTES OF A DECISION BY APPROPRIATE STATE AND/OR LOCAL-0FFICIALS. Limiting Conditions: Sirens vill not actually be sounded - Demonstrated procedurally only. EBS vill not be activated - Demonstrated procedurally only. Rev. 2

1-15 a. Lucas County Objectives Continued' 09 13 DEMONSTRATE THE ABILITY TO COORDINATE THE FORMULATION DISSEMINATION OF ACCURATE INFORMATION AND INSTRUCT PUBLIC TION IN A TIMELY FASHION AFTER THE INITIAL ALERT AND HAS DCCURRED.

                                                        . Limiting Conditions:

Sirens vill not actually be sounded k i Demonstrated. procedurally only. EBS vill not be activated - Demonstrated procedurally only. 10' 14' DEMONSTRATE THE ABILITY TO BRIEF THE MEDIA IN AN ACCURATE, COORDINATED AND TIMELY MANNER. c Limiting Conditions: Activation of JPIC only. 11 15 DEMONSTRATE THE ABILITY TO ESTABLISH AND OPERATE R A COORDINATED AND TIMELY FASHION. Limiting Conditions: None 12 18 DEMONSTRATE THE ABILITY AND RESOURCES NECESSARY TO IMP APPROPRIATE PROTECTIVE TRANSIENT PLUME EPZ; POPULATION. ACTIONS FOR THE IMPACTED PERMAN INCLUDING TRANSIT-DEPENDENT, SPECIAL NEEDS POPS, HANDICAPPED AND INSTITUTIONALIZED PERSONS. Limiting Conditions: Organizational ability only. 13 19 DEMONSTRATE THE ABILITY AND RESOURCES NECESSARY TO IM APPROPRIATE PLUME EPZ. PROTECTIVE ACTIONS FOR SCHOOL CHILDREN V Limiting Conditions: School not in session. School superinten-dent or alternate available for questioning. No bus driver available. No school principal available. 14 20 DEMONSTRATE THE ORGANIZATIONAL ABILITY AND RESOURCES CONTROL EVACUATION TRAFFIC FLOV AND TO CONTROL ACCESS TO EVACUATED AND SHELTERED AREAS. Limiting Conditions: Organizational ability in EOC. One traffic control point activated for approximately one hour only. sequence). (in 15 21 DEMONSTRATE THE ADEQUACY OF PROCEDURES, FACILITIES, EQUIPMENT AN PERSONNEL FOR THE REGISTRATION, RADIOLOGICAL MONITORING AND DECONTAMINATION OF EVACUEES. t Limiting Conditions: None Rev. 2

1-16 h Lucas County Objectives Continued 16' 22. !.' DEMONSTRATE THE ADEOUACY OF FACILITIES, EQUIPMENT AND PERSONNEL FOR CONGREGATE CARE OF EVACUEES. f Limiting Conditions: One facility opened. Determination of which facility vill depend on availability due to normal summer-school maintenance. 17 23 DEMONSTRATE THE ADEQUACY OF VEHICLES,' EQUIPMENT, PROCEDURES AND PERSONNEL FOR TRANSPORTING CONTAMINATED, INJURED OR EXPOSED INDIVIDUALS. Limiting Conditions: None 18 24 DEMONSTRATE THE ADEOUACY OF MEDICAL FACILITIES, EQUIPMENT, PROCEDURES AND PERSONNEL FOR HANDLING CONTAMINATED, INJURED OR EXPOSED INDIVIDUALS. Limiting Conditions: None 19' 25 DEMONSTRATE THE ADEQUACY OF FACILITIES, EQUIPMENT, SUPPLIES, PROCEDURES AND PERSONNEL FOR DECONTAMINATION OF EMERGENCY VORKERS, EQUIPMENT AND VEHICLES AND FOR VASTE DISPOSAL. Limiting Conditions: One facility only. 20 32 DEMONSTRATE THE ABILITr TO DETERMINE APPROPRIATE MEASURES FOR CONTROLLED REENTRY AND RECOVERY BASED ON ESTIMATED TOTAL POPULA-TION EXPOSURE, AVAILABLE EPA EPG'S AND OTHER RELEVANT FACTORS. Limiting Conditions: Demonstrate organizational ability only. 21 -33 DEMONSTRATE THE ABILITY TO IMPLEMENT APPROPRIATE MEASURES FOR CONTROLLED REENTRY AND RECOVERY. Limiting Conditions: Demonstrate organizational ability only. 22 34 DEMONSTRATE THE ABILITY TO MAINTAIN STAFFING ON A CONTINUOUS 24-HOUR BASIS BY AN ACTUAL SHIFT CHANGE. Limiting Conditions: EOC shift change only. Rev. 2

x 1-17'

        -;1.2.7
                      ' Sandusky County. 0bjectives
         ' SEO# ' 'REPl#                               OBJECTIVE 1         21 DEMONSTRATE THE ADEQUACY OF PROCEDURES, FACILITIES, EQUIPMENT AND
                           -PERSONNEL FOR THE REGISTRATION, RADIOLOGICAL MONITORING AND DECONTAMINATION OF EVACUEES.

Limiting Conditions: Radiological monitoring and decontamination vill be demonstrated procedurally.at one facility (in Sandusky

                                                                  ~

County) possibly out of sequence (depending on scenario). 2 .22 DEMONSTRATE. THE ADEQUACY OF FACILITIES, EQUIPMENT AND PERSONNEL FOR CONGREGATE CARE OF EVACUEES. Limiting Conditions: One congregate care facility (in Sandusky. County) vill be demonstrated, possibly out of sequence (depending on scenario). Care Center capabilities to provide food, bedding and other necessities will be demonstrated procedurally. Rev. 2

 ^1 SECTION 2.0 EXERCISE INFORMATION

i j-l ,r ' 2-1 > 1' 2.0 EXERCISE INFORMATION 2.1 Exercise Participants. The participants in the Exercise vill include the following groups: 2.1.1 The Toledo Edison Company

1. Control Room Staff (CR)-
2. Technical Support Center (TSC)
3. Operations Support Center (OSC)
4. Emergency Control Center (ECC)
5. Dose Assessment Center (DAC)
6. Radiological Testing Lab (RTL)
7. Radiation Monitoring Teams (RMTs)
8. Joint Public Information Center (JPIC)
9. DBNPS Nuclear Security Force (SEC) 2.1.2 Other
1. Ottava County
2. Lucas County
3. Sandusky County
4. State of Ohio
5. State of Michigan 2.2 Exercise Organization The organization for this Exercise vill consist of the Exercise Coor-dinators, the controllers, the Evaluators, the Players, and the Observers, as follows:

2.2.1 The Exercise Coordinators (B. Cope and B. DeMaison) are responsible for a successful exercise, and vill coordinate all Exercise preparations. Subsequent to the conduct of the exerrise, they vill coordinate the preparation of a consoli-d;ced evaluation package, and prepare and follow up on the corrective actions recommended as a result of the evaluation and critique. Rev. 2

t L 2-2 4 2.2.2 The Lead Exercise Controller l(B.' Cope).is responsible for. the' safe conduct of the exercise. He vill coordinate'the

               -resolution of any. scenario-related inter-facility questions, and ensure that the conduct of the' exercise'does not adversely impact the operation of.the Station..

2.2.3 Controllers (see Figure 5.1) are' qualified ~ personnel selected to perform functions as folloes:

1. A Lead Controller is assigned.to each emergency response-facility. The Lead Controllet is responsible for all Controller, Evaluator, and.0bsercer' activities for that facility;and, as appropriate, its associated teams. Controllers for teams or subgroups et s' faci-
                      .lity report to the Lead Controller.of that facility.
2. The Controllers will deliver " Cue Cards" to designated players at specified times and places during the Exercise, including contingency messages as required to keep the Exercise moving according to the scenario, observe the Exercise at their assigned locations, and
                     -prepare an evaluation. Controllers will submit written recommendations to the Lead Controllers, who vill sun-marize all comments for submittal to the Exercise Coor-dinator. The Onsite Controllers are provided with instructions and evaluation forms in Section 4.0 of this manual. The Offsite Controllers are provided with instructions, evaluation forms and cue cards in manuals separate to this package.
3. All Controllers vill act as Evaluators, as described belov, and vill be identified.as controllers by vearing red arm bands.

2.2.4 Evaluators are qualified personnel who are assigned to judge . the effectiveness of participating organizations, personnel, and activities. Selection of Evaluators is based on their expertise'and qualifications to evaluate an assigned acti-vity or area. Persons designated as Controllers for a given function vill usually be assigned as Evaluators. Evaluators vill record their observations-using the evaluation forms provided and make recommendations to the Lead Controller in their facility. They vill evaluate performance on the basis of standards or requirements contained in the emergency Plan, Implementing Procedures, Exercise messages, and appro-priate evaluation criteria. . Toledo Edison Evaluators vill be identified by wearing red arm bands. NRC Evaluators will be issued yellow arm bands. 2.2.5 Players include all personnel assigned to perform emergency functions as described in the Emergency Plan and procedures. Players vill be identified by vearing blue arm bands. Rev. 2

4 > 2-3 2.2.6, observers from Toledo Edison Company and'other organizations j may be authorized, on a limited basis, to participate in the Exercise for the purpose of observing. Exercise activity.for. personal education. Onsite Observers vill report initially to the DBNPS Emergency Preparedness Manager for credential review and authorized admittance. .They vill be provided with orientation information and appropriate exercise publi-cations. Onsite Observers vill be identified by vearing green arm bands. Offsite observers vill report to the Lead Exercise Controller for the respective-facility and vill.be.

                              'identifie(. by vearing green arm bands.

Requests to participate as an Observer should be made in

                              -vriting and contain the.0bserver's full name, home address.

and phone number, and organizational affiliation. Requests to participate as Onsite Observers'must~be submitted to the DBNPS Emergency Preparedness Manager no later than one week before the Exercise. 2.3 Emergency' Response Facilities During the Exercise, the following facilities vill be activated to manage, assess, and support emergency response activities. 2.3.1 Onsite Facilities. The Toledo Edison Company emergency response facilities are:

1. . Control Room The DBNPS Control Room, located on the 623' elevation of the Auxiliary Building (see Figure 2.1), is the facility from which the routine operation of the plant is conducted. During abnormal or emergency conditions, when the Emergency Plan is implemented, the Shift Supervisor is given additional responsibilities as the Emergency Director. In this capacity, he is respon-sible for the coordination of the Toledo Edison /DBNPS response to the emergency until relieved. The initial response to this scenario, and any emergency condition, is managed by the Operating Shift Crev in the Control 1

Room. Once the Shift Supervisor is relieved of the responsibilities of Emergency Director, the Operating Shift Crev retains responsibility for operation of plant systems and equipment.

2. Technical Support Center (TSC)

When emergency conditichs escalate to an Alert status or higher, coordination of the operations aspects of the emergency response vill shift from the Control Room to the TSC, located in the Davis-Besse Administration Building (see Figures 2.3 and 2.4). The primary func-tion of the TSC is to support an organization that pro-

                                                                                                       )

i Rev. 2 j i i c --- -

s 2-4 vides technical assistance to Station personnel during emergency. conditions. The TSC provides direct' voice and data communications. contact with.the Corporate. . Emergency Response (CER) organization. Control Room I instrumentation can be observed using closed-circuit television (CCTV)'from the TSC. The TSC also contains the DADS (Data Acquisition and; Display System) and the SPDS (Safety Parameter Display System): to enable the q TSC staff to acquire plant data in support of. technical evaluations needed to mitigate emergency conditions and-recovery operations. The TSC contains work space for up to 25 people. A " Satellite TSC" immediately adjacent to the control Room, provides work space for the Emergency Assistant' Plant Manager. '(This location allows better coordina- . tion of the' emergency response functions-by being.  ! closer to problems needing attention.

3. Operations Support Center (OSC) l The OSC, is located in the second. floor lunchroom of the Personnel Shop Facility (PSF) (see Figure 2.2). It provides a location for assembly and coordination of emergency response teams during an emergency. ..The OSC-is activated at Alert or higher emergency conditions, -)

and may be activated for an Unusual Event at the dis-cretion of the Shift Supervisor / Emergency Director. The purpose of the Operations Support Center is to pro-vide a pool-of skilled manpower from which emergency response teams are assembled (e~.g. First Aid, Opera-tions, Fire Brigade, Emergency Maintenance and Reentry teams). Also, it provides an assembly area for desig-nated plant personnel who are not on shift. i

4. Emergency Control Center (ECC)

The ECC, located in the Davis-Besse Administration Building (see Figures 2.4 and 2.5), is activated at Alert or higher emergency conditions. The ECC's pri-mary function is to provide a centralized location for i management of protective action planning, and con-tinuous coordination and control of onsite and offsite emergency activities. The ECC staff evaluates the impact of actual or poten-tial radioactive releases, and provides management assistance in the decision-making process to protect the public health and safety. Recommendations to State and County authorities are based on Station conditions as well as radiological and meteorological data. The Rev. 2 l 1

s

.. 2-5 ECC contains advanced systems'to establish and maintain.

communications.with state, federal', and local offi-cials, and to enable coordination and control of Radia-tion Monitoring Teams (RMTs). The ECC provides space for occupancy of at least 16' people.

5. Dose Assessment Center A section of the ECC that controls the operation of the Field Radiation Monitoring to gather radiation data for evaluation of the impact of actual or potential radio-active releases. Provides technical assistance in the
                 ' decision to protect the public health and safety. The Dose Assess =ent Center contains communication and com-
                 .puter equipment to contact-RMT's and project radiation doses offsite.
6. Radiological Testing Laboratory (RTL)

The RTL's primary function is to provide a location-near the ECC and TSC (see Figure 2.4) for radiological analysis of low level environmental samples. The RTL contains work areas for 4 people and additional space allotted for temporary occupancy by field personnel. Major equipment components in the RTL are designed to be easily removable for potential use in the field.

7. Joint Public Information Center (JPIC)

The JPIC, located in the Energy Education Center (EEC) at the Davis-Besse Administration Building, functions as the interface during emergencies (see Figures 2.4 and 2.6) to the news media, the general public, Toledo Edison employees, and other groups. The JPIC is stcffed by Toledo Edison, local, state and federal officials. It may be activated at an Alert by Toledo Edison personnel. However, the JPIC vill be activated no later than a Site Area Emergency. The staff is augumental by federal, state, and local officials. At l a Site Area Emergency or General Emergency, JPIC pro-o vides a location for press gatherings and briefing for approximately 200 individuals. Equipment and offices are available to support timely communications and information dissemination on plant conditions and current emergency operations. The JPIC is the primary emergency news center for the Davis-Besse Station and the location from which joint press briefings vill be held by Toledo Edison, NRC, FEMA and state and local. spokespersons. Rev. 2 ( l 4 _ -_- _a

1 j 2-6

8. Emergency Support Center (Corporate Support)

The Toledo Edison Plaza, located in Toledo, Ohio serves

 =

to house the Corporate Emergency Response (CER) Organi- l

            ,                          zation when activated. The Emergency Support Center consists of several key areas within the Plaza.

l

a. Planning Center (16th floor) I
b. Public Information Area (8th Floor) i c. Various other locations throughout the Plaza which support the emergency response organization (e.g., 4 Procurement, Financial, and Legal). '

From here, the CER Organization conducts activities in support of the onsite emergency organization. In the Planning Center, Corporate Executive Management main- - l tains an overview of the emergency response and its impact on Toledo Edison operations, responds to support requests, and acts as a focal point for contact with government and industry officials. Processing of non-Toledo Edison emergency support personnel is conducted in the Human Resources area on the 2nd floor. Notifi-cation and mobilization of the CER occurs through the Edison Plaza Telephone Operators. During this Exercise, the CER vill not be activated. 2.4 Exercise Conduct i 2.4.1 Overview The Exercise vill simulate an abnormal radiological incident at Davis-Besse which vill escalate to a General Emergency. The simulated emergency vill then terminate and then the Recovery Phase vill be initiated. Day two activities vill involve state agencies conducting ingestion pathway activi-ties, and post accidents sampling by Station personnel. The conduct of the Exercise vill demonstrate the effective-ness of participating organizations, personnel, and activi-ties in support of the Emergency Plan and associated pro-cedures. 2.4.2 Actions Emergency response actions during the simulated emergency vill includes recognition and classification of emergency conditions; assessment of onsite/offsite radiological con-sequences; alert / notification and mobilization of the emer-gency response organization; implementation of in-plant corrective actions; activation / operation of emergency Rev. 2

2-7 [; response facilities and equipments preparation of reports, y s messages, and recordkeepingt and recommendation and simu-l- lated implementation of protective actions, as well as-ingestion pathway evaluations by state agencies. l 2.4.3 Communications The Exercise vill also demonstrate the effective use of communications systems. 2.4 4 Players The success of the Exercise is largely dependent upon player reaction, knowledge of the Emergency Plan and Emergency Plan and objectives of the Exercise. Initial conditions which.

                      . vill affect player action or reaction' vill be provided to the players at.the time the Exercise begins. However, most of the elements of the Exercise vill be. introduced through
                      .the use of " Cue Cards". Players, therefore, are. responsible for initiating actions in accordance with exercise instruc-tions, responsibilities, and procedures for their particular duties. Each Player vill advise his/her Controller prior to performing emergency response actions, to ensure that the Player is credited for those actions.
1. The Control Room vill be the central point for distri-bution of exercise cue cards, and is the key to ensuring that the Exercise is on schedule. Simulated plant parameters will be provided to the Control Room operators using plant data and status sheets. The Control Room Operators are responsible to relay perti -

nent plant drill data to other emergency facilities. The Safety Parameter Display System (SPDS) and the TSC Plant Status display vill exhibit specific parameters. Due to the fact that exercise data is presented in discreet (usually 15-minute). intervals. SPDS trends vill display gradual trend changes in plant parameters. The TSC will have point value and group displays avail-able to monitor the current plant status. A redundant SPDS system vill continue to provide actual SPDS para-meters and alarms. In the event of an actual emergency resulting in the termination of the exercise, real-time SPDS will be restored to the TSC vithin minutes. The plant computer vill not be used for the exercise.

2. In order to develop a sequence that exercises the entire emergency response organization, it is necessary to sappose incredible situations. The Players accept j the exercise messages as written. Time shall not be spent discussing why a situation could not occur.

Players shall react as though it did. If corrective  ! Rev. 2

2-8 actions are proposed that vould terminate the emer-gency, they should be identified to the Lead Con-troller, so that he can acknowledge the corrective actions, but continue the scenario progress as ' designed. The Exercise Players are expected to " free play" the scenario to the extent practical. Notifica-tions of, and contact with supervisors, plant manage-ment, and offsite agencies vill be made in accordance with plant procedures. Players are reminded not to be excessively concerned with the mechanics or cause of the simulated malfunc-tions. This Exercise is designed to evaluate the Emer-gency Plan, Implementing Procedures, and Emergency Pre-paredness Training Program; not the probability, feasi-bility, or detailed isechanics of the simulated acci-dent. Players should note any needed improvements to Emergency Response Pacilities and equipment, Emergency Procedures, or Emergency Preparedness training that come to their attention during the Exercise. Players shall submit recommendations to the appropriate Con-troller at the conclusion of the Exercise. 2.5 Precautions and Limitations This section provides guidance on the conduct of this Exercise. Prior to initiation of the Exercise, a' briefing vill be held to review the Exercise process with all Controllers and Evaluators identified in this manual. 2.5.1 Should, at any time during the conduct of this exercise, an actual emergency situation arise, all activities related to the Exercise may be suspended by the Lead Exercise Control-1er. It is the responsibility of any Exercise Controller who becomes aware of an actual emergency to suspend exercise activities in his/her immediate area and to inform the Lead Exercise Controller of the situation. Upon notification of an actual emergency, the Lead Exercise Controller shall notify all Lead Controllers. The Lead Exercise Controller shall make a determination at that point whether to con-tinue, place a temporary hold on, or terminate the exercise. 2.5.2 Should, at any time during the conduct of this exercise, an Exercise Controller witness any participant undertake any action which would, in the opinion of the Controller, place either an individual or a component in an unsafe condition, the Controller is responsible for intervening and terminat-ir;g the unsafe activity immediately. Upon termination of the activity, the Controller is responsible for contacting  ; the Lead Exercise Controller and informing him of the situa- l tion. The Lead Exercise Controller shall make a determina-tion at that point whether to continue, place a temporary hold on, or terminate the exercise. Rev. 2 l

1 2-9 2.5.3 Manipulation of any plant operating systems, valves,- breakers, or controls (with the exception of the Post Acci-dont Sampling System [ PASS]), in response to this exercise is to be simulated. There shall be no alteration of any plant operating equipment, systems, or circuits during the response to this exercise. The PASS will be operated as required to obtain a sample for analysis. 2.5.4 All telephone communications, radio transmissions and public address announcements related to the exercise shall begin and end with the statement, "This is a drill". Controllers are reminded not to " coach" Players, but shall ensure that exercise communications are clearly identified as such, to avoid canfusion with other activities. Repeated failure to identify that communications are part-of an exer-cise shall require intervention by a Controller. 2.5.5 Care shall be taken to prevent any non-participating indivi-duals who may observe exercise activities from believing that an actual emergency exists. Any Exercise Controller who is aware of an individual or group of' individuals'in the immediate vicinity who may have become alarmed or confused about the situation, should approach that individual or group and explain the natore of the exercise and its intent.. 2.5.6 Any motor vehicle response to this exercise, whether it be ambulance, fire fighting equipment, police / security vehicles or field monitoring teams, shall observe all normal motor l vehicle _ operating laws including posted speed limits, stop lights / signs, one way streets, etc. 2.5.7 Should any onsite security actions be required in response to this exercise, exercise participants are to cooperate as directed by the Security Force. Security representatives are to be prudent and tolerant in their actions. 2.5.8 vhile exercise participants are to inject as much realism into the exercise as possible, the safety of the plant and personnel shall not be jeopardized. 2.6 Evaluation and Critique The Exercise vill be evaluated by individuals who have expertise in the activity in their assigned location. These Evaluators and Con-trollers vill evaluate exercise performance on the basis of require-ments contained in the Emergency Plan Implementing Procedures, and

                    " Cue Cards". Evaluators and Controllers shall prepare evaluation forms and provide recommendations to the Exercise Coordinators.

I Rev. 2

l l 2-10 ' 3 After the Exercise is completed, the Exercise Coordinators shall con-duct a post-Exercise critique. ' Deficiencies.in the Emergency Plan,

                  -1.aplementing Procedures, the emergency preparedness training program, facilities, equipment, and/or other areas shall be identified through                  l the critique process.-- The deficiencies shall be documented by the
                                                                                                           .l Exercise Coordinator and corrected by the individuals who have.respon-sibility in the area of the identified deficiency.

The schedule for the critiques is included in Section 5.0.. J l l l, i 1 L 1 1 Rev. 2 i

t

         ~D.                                                                                          .

h Shift Supervisor's Office NA I I Computer Room

                                                                                                                                               ~

1 I N \ , '6 J J

                                                                                                                           ,     ;             e i

l-2  %

                                                                                                        -                        n d

g ( thc lab ) J[ 'y N Ltchen Control Room Satellite TSC Proper FM.2-1 , l l Rev. 2 ) _ _ _ _ _ - - - _ _ - _ _ _ . _ - - _. l

3 2-12 O O O O O O one- u e  ; A-oSC Manager payqwg ggqNg 8-oSO Commumesar C-Charssons AsMeer o-03l:Tsem Sne2r O O O O O O '%cTe7 G-AAo Loop commumcmor O O O O O O -osca concoor.n , i- nre =c.on or DEBREFNG DE5WNG a-asetoso. , K-Assistant oSC Manager { i L-Corenuous Senaca Foremen M-NC O O O O O O 1 g ELLow/ ggow 3 N

                                                                                                    @                                       g A ,T i

O N e g gas Bl  ! 0 M A ,,, veu.ow @ -- auE A ce rej rax .cp S 8 , A %^8* A i g O voaow S E d

           ]R                                     O                                          9 g                                O          A "?
                                                          'ac u g

si 6 O YELLOW d nial pmeu - 1  !: _g Carc Reeoer i Core Assignments Coro 1 Core 2 I l (1) 20 button Smart-set - OSC Manager ' (1) 20 button Smart-set - OSC Communicator l 13 Sin line - Tech Data Loop (3) Single lines - OSC Rad Con Coordinator ! 11 Si e line - Telecopier line - Rad oment Loop l 1J M p!ug-in extenskm cord - Facsimile Core 3 Core 4 (2) Single Enes - NRC Phone n.4f, (1) Gartronics cable

                               - ControRor Phone ' -                    (2) Single I;nes - Administrathre use Eculement Swmbol Key l

l

             . - Cable cores Oocated in floor)                         0 - Galtronics set l

1 - Single line phones 3 - Status boards with wheelt j S - Smart-set phones rAx - Sharp Facsimile on rolung file cabinet i l Rev. 2

2-13 I I i 1 l i DBAS First neer Layeet

                                                                        ~
                                   .                                   =-

I

                    **                                1 8

l

                               "".                J0!NT PUBLIC                           g INFQ1MATION                         I EN                             CENTER                           J maassuf aKA                                                           :

J

                 $            l d us I                           ! uv ruutte                 ,
                     *"*5            2;'Ectff                          otraamt a

LAA . 'JW  ! SE0C cwutu ,,) - awamut Emiraut m

  • M Liesel WU (4RENCY wens
                           --"-                        mg           tetr Cast                                 ENTER                        i.

woum  : tetr ses

                                        ]            'N      _     __

TE0m! CAL t lu

  • uv.L. e I

SUPf3i 8-CENTER

                       =                                     L I       I             -

Re -- '

                           ~(STIC                          l ta
                                                              -          'I            .
                                                           'Em           e             !

FIGURE 2.4 Rev. 2

1 2-14 ouncmcr asent amme

I.. -l I L-i i no O

12 O O O L_I jea n=* l _

                                                    . ..                                               I_rl                 . O          _
                                                              .. U_       L_I

_.i_ Q ._

                                                                              /,O                                         i 2

O - O O

                                                                                                                "      O i    O + 0                                         it O      L_i     **c        Q

_ te*E ceas twt it } etu C O is i* R T O O O O O O

             *                 ' Automated flottlicottee                                              C            C            C
                                $,esee Ceeposer
          " $ tate and Cemety                                                                                  E                -            Q    g 06 servers t Emergeact pseector                            6. Emer l'actittlee Seretces Meenger       il - wir Ceardlester 2 - t:mergescp off.elte Hamager 7 . Eastgency Floosias Adeleet                              II,. Eestroommetal Adviser s Does Aseesseest Caerdiester               13'. Commme6catleen l'4aly Operater 3 - 11% Operettuas Adeleer A . WC Listsee                                  9 Does Assessors                            la - State & Casser Comemoscatot 80 - End Management Leap Casemestater        15 - Polic, riget tamp Ceemusicator 5 - NHC Listson Commuenceter 16 - Statue inuard teepers                   17 4x2 A te Aset.

FIGURE 2.5 Rev. 2 _ _ _ _ _ - - _ _ _ l

(-~ ,nr-n.- - . . _ _ . -

        -s                                                                    2-15 i

Jopff FURLIC INTOR.ATICK curr!1 IrEWs 3r.IEDC AREA Floot PLMr tonertur sec Muut suPurtones Openct3 i QQQC,,,, C Cp CC Q, . Pe0JECftops 8toons I CC' .n.

                               =       C
                                                                    ,/

o C. 5= Q C ' O_ - 1 E~ / sen.a um -

                                                                                         /             3

{& {

                                                                                   /                     n E-
                                ~

E

                                                     \.    .                  /

l ._ G

                                                             \   .
                                                                          /
                                                                                                         ~

q tionnoou l l

                                                ]                                                          ... e-t ricURE 2.6 l
Rev. 2
                           .A
i, '

,. .,. .\ . i . \ '. i s,- , 5 ) J g. i.'*g, d ]- . - ,, <', ' , e <4

                                         ',-\-.                                                                                                                                                                         J r.
                                                        ',r ; '                                                                                                                                                                    f l
), k ,-

N i +,

                                                        ;l              4
                                                                                                                                                                                                   . ji
               , /,J s                                     ^J.-
               - 4 ;, > .q. s{t.,         ,                    - ,
                             \

J b 1 T 4 5

Ii tii 2 .

I.) 4. ',

                       ,                                                                                                 4 J        $

r I g I'

     . k,:,  -

1 i'4 p...,< t s g.

                                      .._.JJ.

9 I i

                                      <f.
 ': .1 l                  q
   ';y.'

r I f. i ' l.. u I 2 i

                                                                                                                                                              --         - - - - - - - _ - - - . -       _-_____,_._n.,                 _   _

SECTION

3.0 REFERENCES

, ABBREVIATIONS AND DEFINITIONS l l l-1

3 1

    ' 3.1 References
           -3.1.1    DBNPS Emergency Plan - Toledo Edison Company,-(Rev. 12, 12/88) 3.1.2    DBNPS Emergency Plan Implementing Procedures 3.1.3    DBNPS Emergency Plan Station Support Procedures 3.1.4    10 CFR 50.47, 50.54 and Appendix E 3.1.5    DBNPS Radiation Protection Manual 3.1.6    DBNPS, Unit 1, Technical Specifications 3.1.7   DBNPS Piping and Instrumentation Drawings 3.1.8   Toledo Edison Corporate Emergency Response (CER). Plan 3.1.9   Toledo Edison Corporate Emergency Response Plan (CER)

Implementing Procedures 3.2 List of Abbreviations AFP Auxiliary Feed (Vater) Pump

          .ALARA    As Low As Reasor. ably Achievable ARM      Area Radiation' Monitor ARTS     Anticipatory Reactor Trip System ATMOS    Atmosphere ATVS     Anticipated Transient Vithout Scram AUX      Auxiliary AVG      Average                                                                             '

BAAT' Boric Acid Addition Tank BKVSH Back Wash ' BRKR Electrical Circuit Breaker BVST Borated Water Storage Tank CAB Cable CAS Central Alarm Station CCTV Closed Circuit Television  ! CCW Component Cooling Vater System CER Toledo Edison Corporate Emergency Response Organization CFT Reactor Core Flood Tank CFR Code of Pederal Regulations CNDS Condensate System COND Condenser ~l CPM Counts Per Minute l CS Containment Spray System i CST Condensate Sterage Tank l CT Circulating Vater System CTNT Reactor Containment Building CTRL Reactor Control Room DADS Data Acquisition and Display System DBAB Davis-Besse Administrative Building DBNPS Davis-Besse Nuclear Power Statirn DEI Dose Equivalent Iodine Rev. 2 I l _--- _-_ i

3-2 DEM Demineralized DEMIN Demineralized DH Decay Heat Removal System DHR Decay Heat Removal System DISCE Discharge DP Differential Pressure DS Decay Heat Removal System DSL Diesel DVS Demineralize Vater System EAL Emergency Action Level ECC Emergency Control Center EEC Energy Education Center EFP Emergency Feed Vater Pump EOC Emergency Operations Center EOF Emergency Operations Facility EPZ Emergency Planning Zone EVAL Evaluated FAT First Aid Team FEMA Federal Emergency Management Agency FLT Filter FT Feet FV Feed Vater GPM Gallons Per Minute HDR Header HLCVT High Level Cooling Vater Tank HLD Hold HPI High Pressure Injection System HVAC Heating Ventilation and Air Conditioning System HX Heat Exchanger I&C Instrument and Control Department IN Inch INST Instrument JPIC Joint Public Information Center KI Potassium Iodide LP Low Pressure LVL Level MARG Margin MID Middle . MISC Miscellaneous MSIV Main Stern Isolation Valve MTR Motor MU Makeup System NI Nuclear Instrumentation NRC Nuclear Regulatory Commission OTSG Once Through Steam Generator 00S Tagged Out of Service OSC Operations Support Center PA Public Address System PASS Post Accident Sampling System PC Protective Clothing PI Pressure Indication PMP Pump PORV Pressurizer Power Operated Relief Valve PR Public Reist>ons Rev. 2

F. >+ a '} E .3-3 l' l PSF Personnel Shop Facility

   ' PSIA   Pounds Fer Square Inch Absolute PEIG   Pounds Per-Square Inch Gauge o     PT    -Periodic. Test PVR    Pressurized Water Reactor PVST   Primary Water Storage Tank PZR    Pressurizer RCA'   Radiologically Controlled Area RC-  . Radiological Controls RCP    Reactor Coolant Pump RCS. Reactor Coolant System RE     Fixed Radiation Instrument RLF     Relief Valve RM      Radiation Monitor RMT-    Radiation Monitoring Team RS      Reactor System-RTL     Radiological Testing Laboratory Rx      Reactor SAS     Secondary Alarm System
  - SFP     Spent Fuel' Pool SFAS    Safety Features Actuation' System STRCS   Steam and Feed Vater Rupture Control System SG      Steam Generator SJAE   Steam Jet Air Ejector SKMR   Skimmer SPDS-  Safety Parameter Display System SPF    Spent Fuel SRST'  Spent Resin Storage Tank ST     Surveillance Test STA    Station STRG   Storage STRNR , Strainer SV     Service Vater System SVfD   Switch Yard SYS    System Tc      Reactor Coolant System Cold Leg Temperature TC      Thermal Couple TDG     Total Dissolved Gases Th      Reactor Coolant System Hot Leg Temperature TK      Tank TPCV    Turbine Plant Cooling Water TRBL    Trouble TSC     Technical Support Center TSS     Total Suspended Solids VOM     Volt Ohm Meter VGST    Vaste Gas Storage Tank VK      Veek VR      Vide Range Instrument VTR     Vater XPER    Transfer XMIT    Transmit Rev. 2

3-4 3.3 Definitions

3.3.1 ALERT

The level of emergency classification which indicates that events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant. 3.3.2 ANTICIPATED TRANSIENT VITHOUT SCRAM (ATVS): Failure of the  ;

             . reactor control rods to insert into the core upon a scram signal                                 {

from the Reactor Protection System or the failure of said system 1 to initiate a SCRAM when Reactor Protection System trip limits have been exceeded. 3.3.3 ASSESSMENT ACTIONS: Those actions taken during or after an accident to obtain and process information that is necessery to make decisiens to implement specific emergency measures. 3.3.4 CONTROL ROOM (CTRM): The principle onsite location from which the reactor is controlled and from which emergency control is initially exercised. The CTRM is located on the 523' elevation of the Auxiliary Bunding.

3.3.5 50NTROLLER

A member of the Exercise control group, assigned to one or more activities or functions for the purpose of keeping the action going according to a scenario, resolving scenario dis-crepancies, and supervising the actions of the players. 3.3.6 CORRECTIVE' ACTIONS: Those emergency measures taken to improve or terminate an emergency situation.

3.3.7 DECONTAMINATION

The process by which the body or an object is relieved of radioactive substances (contamination). 3.3.8 DOSE ASSESSMENT: The process of estimating the amount of radia-tion a person vill potentially receive as a result of exposure to a radiological release. 3.3,9 DRILL: A supervised event aimed at evaluating, developing, and maintaining skills in a particular operation. 3.3.10 EMERGENCY ACTION LEVELS (EALs) - Radiological dose rates; speci-fic contamination levels or airborne, waterborne, or surface-deposited concentrations of radioactivity; or specific plant con-ditions that may be.used as thresholds for initiating specific emergency measures. 3.3.11 EMERGENCY CONTROL CENTER (ECC): The Toledo Edison emergency response facility from which overall direction and control are exercised for emergencies at DBNPS. The facility also provides a central point of contact for communier.tions and external (non-Toledo Edison) organizations, and is fully activated for emer-gencies classified as an Alert or higher. Rev. 2

1 p l

                                                      '3-5 l                                                                                                    1 3.3.12     EMERGENCY OPERATIONS CENTER (EOC)4 An emergency response faci-lity from which government officials exercise direction and con-trol. The EDCs are located as follows:

Ottava County: Basement of the Ottava County Courthouse Madison Ave.  : Port Clinton, Ohio 'i Lucas County Subbasement of'the Lucas Couaty Correction Facility 1622 Spielbush Ave. Toledo, Ohio State of Ohio: Barement of the Robert B. Beightler Armory 2825 Vest Granville Rd. Vorthington, Ohio State of Michigan Emergency Management Division Suite 300 3005 Vashington Square Lansing, Michigan 48913 3.3.13 . EMERGENCY PLANNING ZONES'(EPZs): The land areae encompassed i vithin approximately 10 and 50 mile radii of the DBNPS, in which protective actions may be necessary to protect the public in the  ; event of a nuclear. plant accident. The 10 mile zone is referred -! to as the Plume Exposure EPZ; the 50 mile zone is termed the ': Ingestion Exposure EPZ (IPZ).

                                                                                                   <l 3.3.14    EMERGENCY-RESPONSE FACILITY: Any of several onsite and offsite l

centers which are activated to coordinate emergency actions. ' Included in this' category are the Control Room, Technical Support Center, Operations Support Center, Emergency Control Center, Joint Public Information Center, and State and local Emergency Operations Centers. i 3.3.15 EVALUATOR: A member of the exercise evaluation group, assigned j to one or more activities or functions for the purpose of evalu- ' ating and making recommendations for improvement. An evaluator may serve in a dual capacity as both a Controller and Evaluator. i 3.3.16 EXCLUSION AREA: The area surrounding the DBNPS in which the Toledo Edison Company has the authority to determine all activi-ties including exclasion or removal of persons and property from the area during accident conditions. 3.3.17 EXERCISE: An event which tests the overall functions and capa-bilities of organizations involved in responding to an emergency situation. An exercise vill usually simulate an emergency that j results in offsite radiological releases which requite esponse ' by offsite authorities. i Rev. 2 1

3-6 1 3'.3.18 GENERAL EMERGENCY: The most severe level of' emergency classifi-

                                    . cation which indicates that events are-in progress or have             {

j occurred which involve actual or imminent substantial core degradation or. melting with potential for loss of containment. integrity. ' Release of radioactive material can be reasonably  ! expected to exceed PAG exposure levels offsite. l 3.3.19 INGESTION PATHVAY: The exposure mode for which the zone of con-I l cern encompasses an area of approximately 50 mile radius around DBNPS. The principle exposure in this area would be from inges-tion of contaminated water or foods; such as milk or fresh vege-tables. The period of potential exposure could range in length l from hours to months. 3.3.20 JOINT PUBLIC INFORMATION CENTER (JPIC): An emergency response facility, located in the Davis-Besse Administration Building, which is staffed by Toledo Edison Company, local, State, NRC,and FEMA official #. The JPIC provides a forum'and point of contact  ! i for a coordinated release of news and information to he' news media, general public, Toledo Edison Company employees and the special interest groups. 3.3.21 OBSERVER: Any individual who is authorized to observe the Exer-cise, but is not authorized to interact with the players. 3.3.22 GFFSn3 1 All land and water areas outside the Owner-Controlled Area fence su nounding the DBNPS.  ! 3.3.23 9NSITE: irea fence All land and cne surrounding water areas within the Ovner-Controlled DBNPS. 3.3.24-OPGA? TONS SUPPORT CENTER (OSC): An onsite emergency respon:,e facility vt.ich provides a location where emergency res can be asse abled end coordinated during an emergency. ponsr teams { 3.3.25 OVNER-CONTROL C AREA: The area around the DBNPS that is owned / i and to which the access controlled, by the Toledo Edison Company. 3.3.26 PARTICIPANT: An individual who has some part in the Exercise, whether as an Evaluator, Controller, Player or Observer, 3.3.27 PLAYERS: i All individuals (DBNPS, Toledo Edison Company person-  ! l nel, and individuals from offsite organizations and agencies) who  ! l are assigned to perform functions of the emergency response 1 L organization, as described in the appropriate Emergency Plan and Emergency Plan Implementing Procedures. 3.3.28 PLUME EXPOSURE PATHVAY: The exposure mode for which the zone of concern encompasses an area of approximately a 10 mile radius  ; around DBNPS. The principle exposure sources in this area are: '

1) whole body external exposure to gamma radiation from the plume and deposited material, and 2) inhalation exposure from the passing r.dioactive plume. The period of potential exposure could range from hours to days.

Rev. 2  : 1

c-r- - --, - l 1 3-7 , b I 3.3.29 POPULATION AT RISK: Those persons for whom protective actions i vould be taken. { 3.3.30 PROTECTED AREA: The area within the Site Boundary encompassed by physical barriers and to which access is controlled for security purposes. 3.3.31 PROTECTIVE ACTION: Those emergency measures taken after an acci-dent or an uncontrolled release of radioactive materials has occurred, for the purpose of preventing or minimizing radiologi-cal exposures to personnel that would otherwise occur. 3.3.32 PROTECTIVE ACTION GUIDES (PAGs): Projected radiological doses to individuals in the general population which warrant protective action following a release of radioactive material. 3.3.33 RADI0 LOGICALLY CONTROLLED AREA (RCA): Any area in which the - general area radiation level is equal to or exceeds 0.25 mrem /hr or radioactive loose surface contamination is equal to or exceeds 1000 dpm/100 cm3 beta-gamma, or 20 dpm/100 cm3 alpha activity. A general REP is required for entry to this type area. 3.3.34 RADIOLOGICAL HONITORING TEAMS (RKrs): Two-person teams respon-sible for monitoring radiation levels in the environment and collecting soil, air, vegetation, snow, and water samples fec laboratory analysis. 3.3.35 SITE AREA EMERGENCY: The level of emergency classification which indicates that events are in progress or hnve occurred which involve actual or likely major failures of plant functions needed for protection of the public. any releasts of radioactive material are not expected to exceed Protection Action Guide (PAG) exposure levels, except within the Site Boundary. 3.3.36 TECHNICAL SUPPORT CENTER (TSC): An onsite emergency response facility for use by technical and management personnel in support of the command and control functions executed in the Control Room. 3.3.37 UNUSUAL EVENT: The lowest level of emergency classification, which indicates that events are in progress or have occurred which indicate a potential degradation of the level of safety of < the plant. Rev. 2 _ _ _ _ _ -__w

9 e SECTION 4.0 CONTROLLER / EVALUATOR INFORMATION

 ,                                                  4            4.0 CONTROLLER AND EVALUATOR INSTRUCTIONS Each Controller and Evaluator should be familiar with the following:
1. The objectives of the Exercise.
2. The assumptions and precautions being taken.
3. The Exercise scenario, including the initiating events and the expected course of action to be taken.
4. The various locations that vill be involved and the specific items to be observed at those locations.
5. The evaluation checklists provided herein.

4.1 Controller Instructions 4.1.1 Controllers shall position themselves at their assigned locations 30 minutes prior to the activation of the facility for which they have responsibility. (See Table 4.1.) 4.1.2 Controller communications shall be tested prior to Exerciso commencement. All watches and clocks shall be synchronized with the Lead Exercise Controller's as part of the communi-cations testing. 4.1.3 All Controllers shall comply with instructions from the Lead Exercise Controller. 4.1.4 Each Controller shall have copies of the cue cards control- j ling the progress of the exercise scenario. No cue cards .I shall be delivered out of sequence or other than as written unless specifically authorized by the Lead Exercise  ! J Controller. 4.1.5 Cue cards controlling the progress of the scenario are noted with a number. Contingency cue cards are noted with a num- . ber followed by the letter "X" (e.g., 10X). Contingency cue i cards are only delivered if certain conditions indicated on ' ) the card are met. 4.1.6 Each onsite Controller shall have copies of plant data i sheets. Data sheets shall be distributed only in the Con-trol Room. , ( 4.1.7 Controllers vill ny provide information to the Players regarding'seenario progression or resolution of problems ' encountered in the course of the simulated emergency. The Exercise participants are expected to obtain information through their own organizations and exercise their own i judgement in determining response actions and resolving problems. I Rev. 2 l 4 (. 1 _ _ _ _ _ _ _ _ _ _ _ _ _ ______________-_D

4-2 ' 4.1.8- Some Players'may insist that parts of the scenario are } unrealistic. The Lead controllers have the sole authority- l to clarify.any questions regarding scenario content. 4.2 Evaluator Instructions l Each Evaluator shall take detaf'.ed notes regarding the progress of the Exercise and the response of tne Exercise participants at their assigned locations. j Each Evaluator should carefully note the arrival ' and departure times of participants, the times when major activities or milestones occur, and problem areas encountered.

The standards below should be used by the controller / Evaluator to i

evaluate assigned areas pertaining to the emergency response. A dual I purpose vill be served by this rating system. First, the capability of each facility or response area vill be evaluated, and second, the system scale is vill as provide follows: a vehicle for directing improvement. The rating , j J Satisfactory ted. - Personnel and equipment generally performed as expec-Any errors noted were not severe and could be corrected without undue labor or expense. Unsatisfactory - Personnel and equipacht generally performed below-expectations, and there was several significant deficiencies noted. The area's ability to carry out its functions was diminished. N/A - Not Applicable to the situation. 1 ' i N/0 - Not Observed. ll 1 I As appropriate, Evaluator comments should consider the demonstration i of the following facility and team evaluation elements: 4.2.1 Facility 1. Accurate and timely determination of emergency action levels. 2. Timely activation and staffing for each emergency action level. i 3. Familiarity of personnel with appror.riate emergency procedures, duties and responsibilnia.

4. Timely notification of Toledo Edison, local, state and federal personnel / agencies (information updates performed).  !

5. Adequacy of internal information systems (e.g., message handling, displays, status boards and maps).

6. J Properly controlled documentation and accurate, timely record keeping.

Rev. 2

r _ _ __ - - _ _ 4-3

7. Use of correct' communications procedures and techniques.
8. Capability of facility managers to interface with per-sonnel and coordinate facility activities.
9. Consideration for personnel safety (e.g., exposure control).
10. Adequacy of interface between emergency response facilities.
        .11. Adequacy of equipment and supplies.
12. Timely initiation of onsite protective / corrective actions.
13. Development of offsite protective action recommenda-
  • tions.
14. Radiological surveys and assessment of plant damage and hazardous conditions performed.
15. Timely requests for emergency support services.
16. Coordinated, accurate and timely dissemination of information-to the news media.-

4.2.2 Emergency Teams

1. Timely notification and activation.
2. Adequacy of staffing.

i

3. Familiarity with appropriate emergency procedures, duties and responsibilities.  !
4. Availability and utilization of proper equipment.
                                                                                   .l S. Performance of contamination control / decontamination.
6. Proper interface with emergency support personnel.
7. Use of correct communications instructions and techniques. l'
8. Adequtcy of briefing sessions per the dispatch.
9. Direction and control by team leaders.
10. Timely requests for additional assistance.
11. Coordination and interface between emergency response s team members. I Rev. 2
                                                                    -____ 0

4-4

12. . Proper interface with plant supervisory personnel.

13.' Availability of reference' documents.

       ,   14. . Utilization of proper radiological control practices
                 -(e.g., access control, protective clothing, shielding, stay time).
15. Assessment of radiological conditions.
16. Timely and proper damage assessment.
17. Properly-maintained records.

Evaluators vill record their comments and prepare a vritten evaluation of the Exercise. Refer to Evaluation forms pro-vided herein for more specific evaluation criteria. . 4.2.3 Personnel Assignments

  • Figure 4.1 lists the Lead Controller for each of the major Emergency Response Facilities. Table 4.1 lists the person-nel assignments.for the onsite organization.

4.2.4 Evaluation Packages The following Evaluation packages will be provided to the appropriate Controllers and/or Evaluators at the Pre-Exer-cise Briefings l Control Room Operations Support Center Repair Teams Technical Support Center Emergency Control Center Joint Public Information Center . I Dose Assessment Center Fire Brigade { First Aid Team f Radiation Monitoring Teams (' L Security Radiological Testing Laboratory 1 I Rev. 2 i

  ,t.

4 , 4.2.5 Evaluation Process: All evaluators shall maintain an exercise chronology, simi-L l' lar'in format to Attachment'4A. This chronology shall be of sufficient detail to enable subsequent completion of the appropriate evaluation form. It should contain a synopsis l of significant exercise events, actions taken (or not taken) by players, questions noted, and positive as well as nega-tive assessments made by the evaluator. .This chronological record may be used to corroborate critique items that are questioned by participants. Each Evaluator shall also complete an evaluation form for the facility or function to which they are assigned.

            -Esch Lead Controller shall de-brief the evaluators for whom they are responsible and compile an Exercise Evaluation Report Sheet (Attachment 4B) for the facility. This Evalua-tion Report Sheet shall reflect an overall. assessment of the performance of that facility, and of five (5) specific cate-gories. Significant weaknesses or deficiencies shall be itemized in the " Report" section to ensure adequate follow-up attention is devoted to resolution of the problem.                    .

Significant positive items shall be included here as well. The formal Post-Exercise Critique shall be conducted by the Exercise Coordinator, with each Lead Controller providing an evaluation of their facility. Offsite player critiques will be conducted by the FEMA Evaluators. i Rev. 2

i 4-6 i FIGURE 4.1  ! EXERCISE CONTROLLER ASSIGNMENTS i CONTROL' ROOM D. R. Blakely' Senior Engineer - Nuclear 3105- -, J. E. Blay- Control Room 2103

  • J. J. Johnson (Lead) TSC Operations Engineer 3387 T. L. Lehman SRO 8586 Osc V. G. Haney (RC) OSC RC Coordinator 1029
  • T. R. Isley (Lead) Asst. OSC Manager 1036 D. S. Jarviecki (RC) OSC RC Coordinator 1029' E. V. Johnson OSC E&C Engineer 1056 D. P. Jones OSC Communicator 1036 J. A. Kalmbach (RC) OSC RC Coordinator 1029  !

R. V. Strauss Fire Protection Advisor 2103 i J. G. Madison OSC Communicator 1002 ) i I ASSEMBLY AREAS l

  • J. C. Troknya Assembly Area Coordinator 3245
                                                                                                                             )

i ISc L. A. Bonker Emergency RC Manager 1029 i

  • I. M. Borland (Lead) Dose Assessor Coordinator 3360 D.-G. Kuhtenia Assoc. Engineer - 0.5.E 3105 RCC
  • D. L. Miller (Lead) Emergency Asst. Coordinator 3387 B. J. Musico (Dose Ass.) Dose Assessor Controller 3360 q V. S. Schum (Emerg. Dir.) ECC Controller 3360 )

P. J. Smith (CANS) CANS Controller 3360 RTL J. M. Less RMT 3360 J

  • J. L. Ferguson (RTL Lead) TSC Chemical Advisor 1041 l J. G. Podach (RMT) RMT 5100 R. C. Vollmar (RMT) RMT 3085 l- A. S. Vilson (RMT) RMT 1045 ,

L

  • Indicates Lead Facility Controller Rev. 2 l I

4-7  ; 4 FIGURE 4.1 (continued) I i EXERCISE CONTROLLER ASSIGNMENTS '! l SECURITY 1 1 R. L. Buehler .(PPF) Emergency Security Manager 4000 C. L. DeTray (DBAB) DBAB Access Security Sup. 4000

  • F. J. Pitzer (CAS/PA) . Nuclear Security Sup. 4000 D. M. Ruff (Rover) Technician III 3360 {
                                                                                                          .G. A. Skeel      (TSC)                                                               Emergency Security Manager.                                       4000              l C. E. Woods      (VPF)                                                               Security Controller                                               4000              1 CONTROL CELL G. V. Anderson                                                                      Control Cell Controller                                            3360 C. L. Lyons e                                                                      Control Cell Controller                                             3360 J. A. Shible                                                                       Control Cell Controller                                             3360 P. V. Smith                                                                        Control Cell Controller                                             3065 JPIC
  • J. D. Basa JPIC Controller 3360 C. B. Eggert Media Relations Sup. 3360 J. M. Kalmbach JPIC Controller 3360
                                                                                                         .P. A. Kraps                                                                        JPIC Controller                                                      3360 T. J. Kec-                                                                        JPIC Controller                                                       620 CORPORATE
  • R. Klein Corporate EP Advisor 520 STATE RMT P. M. Harkins RTL Coordinator 5176 J. C. Smith RMT 5177 T. M. Szydlovski RMT Coordinator 2105 UTHER
  • T. L. Almendinger OSC Controller 5178 V. E. Comings OSC Controller 3360
  • B. V. Cope OCA Controller 3360 R. L. Dielman OSC Controller 3360 J. R. Rollins OSC Controller 3360
  • C. E. Upchurch P/A Controller 3360
  • B. P. DeMaison Roving Controller 1

Rev. 2  ! l 1 i _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . - - . - - - . - - - - - - - - - - . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - ' ~ ~ ~ ~ - - ~ ~ ~ ~ ~ ~ - ~ -

                  .,.. . . . , , - _ _ , - - - , - - - - - ~ - -

SECTION 5.0 SCHEDULE OF EVENTS

c 5-1 i Davis-Besse Nuclear Power Station 1989 Annual Emergency Preparedness Exercise Schedule of Meetings Date/ Time Where What i August 2, 1989 Energy Education Center Utility Controllers 12:30 - 4:00 PM DBNPS Administration Building l Briefing August 7, 1989 Room 209-210 Offsite Controllers 12:00 - 1:30 PM DBNPS Administration Building Briefing August 7, 1989 Energy Education Center Utility Controllers Final I 1:00 - 2:00 PM DBNPS Administration Building Meeting . August 7, 1989 Room 209-210 NRC Briefing 2:00 - 4:00 PM DBNPS Administration Building August 7, 1989 Comfort Inn Conference Room FEMA Briefing 2:30 - 5:00 PM Oregon August 7, 1969 Energy Education Center Utility Players Briefing 3:00 - 4:00 PM DBNPS Administration Building August 8, 1989 All Facilities Exercise All Day August 9, 1989 Limited Station Involvement Exercise All Day August 9, 1989 Rooms 168 & 169 Offsite Controllers 9:00 AM - 12:00 PM DBNPS Administration Building Debriefing August 10, 1989 Energy Education Center Utility Controllers 8:00 AM - 12:00 PM DBNPS Administration Building Debriefing August 10, 1989 Energy Education Center Utility Player Critique 12:00 - 2:00 PM DBNPS Administration Building August 10, 1989 Energy Education Center NRC Critique 2:15 - (TBD) PM DBNPS Administration Building August 11, 1989 Ottava County EOC FEMA Critique 10:00 AM - (TBD) August 11, 1989 Ottava County EOC Public Critique 2:00 PM - (TBD) l l l l Rev. 2 l

e, , l l 1 ( SECTION 6.0 EXERCISE SCENARIO l l t l

6-1 6.1 Narrative Summary The 1989 Annual Exercise vill be a two day event. The first day vill encompass the accident scenario involving both the Station and the offsite agencies. The offsite activities may not be conducted in sequence with the Station simulated events. Second day activities vill focus on the States of Ohio and Michigan conducting an analysis of radioactive material deposited by the release from the Station, demonstrating sampling tech-niques and providing Ingestion Pathway Zone related information/ advisories through the JPIC. There vill be a time jump of three days involved with the second day activities. This vill allow for both the decay and the transport of the radioactive material. In addition to the states involve-ment in.the second day activities, the Station vill draw its Post Accident Sample on the second day of the exercise which vill provide more realism in the conduct of the exercise. The scenario vill begin with the plant operating at 100% power by heat balance. The electrical lineup is normal, and the Makeup Tank level is 70". Component Cooling Vater Pumps 1-1, 1-2, and Service Vater Pumps 1-1 and 1-2 are running. A monthly load test of Emergency Diesel Generator #2 is in progress (it was started at 0530) in accordance with ST 5081.01. During the conduct of a test run of HPI Pump #2 during the midnight shift, a major oil leak was found. The ilPI Pump #2 is in the process of being repaired. (LCO 3.5.2 Restore in 72 hours or be shutdown in the not 12 hours.) Unknown to the operators the stem and disc have separated on DC-79 the BVST suction isolation valve. This vill cause HPI and Makeup pump failure when they are called upon to start later in the scenario. Also unknown to the operators is the failure of one of the Containment

                          . Vacuum breakers. At the SA shutdown the isolation valves for all Vacuum Breakers vill close properly. . One vill open due to an electrical short later in the exercise, setting up the release path for the radioactive material that is released from the core.

At the onset of the exercise the control Room staff and the Continuous Service personnel vill be briefed and vill discuss the initial plant conditions for the exercise. The Lead Exercise Controller vill have the Drill Code "9696969696" sent out on the ERO Pager System. Ten minutes after the exercise has commenced, a fuel line on the running diesel generator vill fail causing a fire in the space. The operator vill stop the engine on his vay out of the generator room and vill notify the Control Room of the fire. The Control Room vill sound the alarm and call away the fire brigade. This fire affecting safety related equipment is the basis for the declaration of l an Alert. (EAL 7.A.2 Fire affecting plant equipment.) Offsite Notifications will be made and the Emergency Response Organization vill be activated. The security force vill restrict access to the station at this time (for 5 minutes only). When the fire brigade arrives at the scene of the fire, offsite assistance vill be requested and a local fire company vill respond to the station. After the arrival of the offsite assistance, the fire vill be put out and de-smoking of the area vill take place. Rev. 2

1

                                                                                                               .e 6-2 i]

The activities involving _the' fire vill last approximately an hour. After  !

                         - which the responding personnel vill'be involved'in establishing the. extent of the damage and what further actions are required.

At 0900 a spurious Radiation Alarm on RE 8707 vill be received.- This alarm is to add some activity for the team to think about and investigate. The area radiation vill not change until~after the release areas. ) l At approximately 2 hours and 40 minutes into the scenario the 2-2 RCP seal vill fail with a leak rate of approximately 250 GPM. .In response to the leak the operators will start the second Makeup Pump. As the level in the Makeup Tank decreases, the operators vill shift suction to the BVST. This vill occur at the same time as the low pressure trip comes in on the reactor protective system. The operable HPI pump will start at approximately the same time that the suction is shifted to the BVST. This will result in the failure of both Makeup Pumps and the only operable HPI Pump due to loss of suction. This leak combined with the HPI and Makeup pump failures meet the conditions of EAL 3.D.2 requiring the declaration of a Site Area Emergency. i Vith the declaration of a SAE, Protected Area Evacuation vill be required 3 and will be accomplished. Owner Control Area Assembly will be simulated. As the Protected Area Evacuation is nearing completion, a Maintenance Man on his way out will see a CO2 bottle north of the BVST that is not properly secured. He vill attempt to secure the bottle, and in the attempt, the bottle vill fall over breaking the valve assembly off the top. The bottle vill fly off into the BVST making a hole at approximately ground level. The man attempting to leave the area vill run into an obstruction and vill  : injure his head. The water coming out of'the BVST vill contaminate the man I as he stumbles through it. He vill fall down outside of the pool of water that is rapidly accumulating in the area. i The mans failure to badge out of the Protected Area vill cause Security to inform the OSC of his' missing status. Additionally another individual vill l fail-to badge and he vill be missing. Search and Rescue operations should be conducted. When he is lo,cated, the first aid team will be called to assist the injured man. The OSC vill also be required to handle the spill of contaminated water arotmd the BVST. (The leak rate is approximately l 12,000 GPM.) The BVST will empty approximately 30 minutes after the bottle creates the hole. Approximately three hours and forty minutes into the scenario, fuel failure vill water. occur. This is due to the loss of coolant and the inability to inject At approximately the same time, the simulated NRC incident response team is expected to arrive at the site. Four hours into the exercise tho RCP's vill be started in response to procedure. Shortly after this the Core Flood Tanks will discharge into the Core. At four hours and forty-five minutes into the drill the vacuum breaker isolation valve controller will short and fail the vacuum breaker isolation l valve to open. A release to the atmosphere is now in progress. l Rev. 2 L________-_-- - _ -

6-3 A General. Emergency should be declared IAV EAL 1.D.5, 1.D.6, or 1.E.1. The RMT teams will track the plume as the Dose Assessment personnel evaluate the release information. This information vill be provided to the state and counties for their information, evaluation and action. Expected protective action recommendations should include, as a minimum, the evacuation of EPZ subareas 1, 2, 10 and 12; and sheltering within subareas 3 and 11. Protective action recommendations developed by the players may, however, be more conservative. At five hours and fifteen minutes into the exercise the BVST vill be repaired. Once the BWST is repaired filling can commence from whatever source of water the operations personnel can locate. Six hours and fifteen minutes into the event the TSC and OSC personnel vill be successful in the repair of the vacuum breaker isolation valve that failed and vill terminate the release. Injection of water and continued core cooling vill' be conducted as water - becomes available to the operators. Six hours and thirty minutes into the event the Emergency Phase of the exercise vill be terminated. At which time critiques of the facilities and restoration of the facilities will be accomplished. Approximately seven hours and fifteen minutes after the commencement of the exercise reentry / recovery discussions will be held. Day two activities vill begin with a briefing of the individuals involved to be held at approximately 0730. The events for the day are scheduled to commence at 0800 at which time OSC  ! personnel vill be directed to obtain a PASS Sample. The States of Ohio and Michigan vill be dealing with the postulated deposi-tion problem in accordance with their respective plans and information as provided by th; Davis-Besse station and their controllers. As appropriate the Joint Public Information Center vill release information  ; to the media regarding plant activities and radiological ingestion information. Three hours after the Emergency Plant Manager directs a PASS sample to be obtained, the sampling vill be complete. l The states vill continue to resolve the deposition problems until the i exercise is terminated at approximately 1500. 1 { Rev. 2

6-4 1989 Annual Emergency Preparedness Exercise 6.2 Initial Conditions

1. Plant.in Mode.1 at 100% by heat. balance.

Makeup tank level 70"

2.- Electrical Status normal.
3. CCV pump 1-1 running, CCV l-2-running, SV pump 1-1 running, SV' pump 1-2 running.

4 HPI pump #1-2 00S for maintenance.- Has been 00S since'0400 hours. Problem vith-the lubricating oil system. 3 i

5. Performing a load test on #2 EDG, ST 5081.01 started at 0530.' '
6. Unknown to the operators, the stem and disc of the BVST suction valve have separated. DH-79 0 a

7.. Also unknown to the operators is the failure of one of the Containment Vacuum breakers. At the SA shutdown the isolation valves will.close properly, one isolation valva vill open when we desire the release to 1 start, that is when they vill discover the leaking vacuum breaker.

                                                                                                                                  -l i

i 4 Rev. 2 _ _ . . . _ . . _ . . - . . . - - ~ - - - - - - - - - -

  • 6-11 Initial conditions n

Day 2

                             < 0800       Personnel from the' Chemistry Section and the Radiological Control Section assemble in the 2nd Floor PSF lunchroom for a briefing.

The OSC RC Coordinator takes charge and coordinates the PASS sample. NOTE:

                                                                       ~

The TSC Chemistry Advisor who nor~mally'is located

                                                    .in the TSC will be in the OSC.for purposes of this activity. No other personnel vill'be involved.

The JPIC receives an update from the Drill Controllers as to current plant status and activities and press related ac'ti-vities which occurred. . 1100 The PASS analysis is complete and the data is collected by the Controller. The Lead Controller conducts a debrief of the individuals involved in the PASS activities. - JPIC activities continue until all day 2 objectives have been completed. Approx. 1400 All objectives have been met. The Exercise has been-completed. G Rev. 2

                                                                   , _ - . _ _ , , . - . _  .-,.-m,-   .-  __     -- , - - _ , - _m,.- , -

p__..

                                        ^

j-s U'$s.(,8t t',Y'.' Ti,. . i }."', i. i e i.N.

                         ~'[.'.

' I F , li t,' f i l' 'I h.: W q-' <

                                                                                                                                                                                               -l l--.

q h'

                                                                                                                                                                                               'j  <
                                                                                                                                                                                            ^
          ;.i.

l 9-.-. , t <! r j.

                                                                                                                                                                                         ?

I v i a 4 I l l-l l l i

  .                                                                                                                   4

[. 1 1% I- . 1 I i 1

                                                                 .e
         't

_s,-.-. ,... .__,.. _ , . _ . , _ . __ __, ,. __ , .,_ _ ,_ w----.-. m_ m , _ _ '- --- "--------___._-2.,___._ ,_

                                   -- Sequence of Events for 1989 Exercise                                        07/11/89l TIME            T:          NUMBER               TO'                            INFO 07:00:00        -00:30            001  Control Room                Initial Conditions 07:00:00        -00:30            002  Public'                    Call the Edison Plaza Operator.
                                   .      Relations Duty.             Identify your location and phone Officer                    extension.

07:00:00 -00:30 003 Edison Plaza Respond to Corporate Emergency

                                -         Operator                   Preparedness Advisor Notification Call 07:30:00        00:00             004  Control Room               Drill Announcement 07:30:00        00:00             005  Continuous                 HPI pump 1-2 is out of service Service                    because of a lube oil problem.
                                 -~       Supervisor                 Return to service is anticipated
                           .I                                        around Noon today. Oil sump is
empty and the pipe is removed to the shop.

07:40:00 00:10 006 EO Running Call the Control Room and inform Diesel ST them a fuel line broke on the diesel and a fire started. You have left the DG room. You shut down the diesel on your way out. 07:40:00 00:10 007 Control Room The following annunciators have been recieved in the Control Room. Unit Firec Radiation Trouble. Computer fire and radiation monitoring panel printout indicates a fire in Room 309. 07:40:00 00:10 008 Ottawa County When you receive a call from Sheriff's Davis-Besse requesting fire

                                  -       Dispatcher                 assistance, the Carroll Township Fire Department is not available.

Obtain assistance from Portage Fire Department. 07:40:00 00:10. 009 Oak Harbor This is a drill' Attention Portage _. P.D. Dispatcher Fire Department. Carroll Township

.- is requestijng mutual aid and are
                          ~

requesting that you respond to a

re reported fire at the Davis-Besse Nuclear Power Station. Actual response to Davis-Besse is
                            .r.8.                                    requested. Obey all traffic laws.

Use of lights and siren is not

                                     ~-

warranted. This is a Drill. Repeat 07:45:00 00:15 010 Fire Brigade Door 315 is hot to the touch. Responder 07:50:00 00:20 011X Control Room Declare and Alert based on EAL 7.A.2 Station Fire. 08:00:00 00:30 012X Fire Brigade Pre-action sprinkler system valve Responder is tripped but the system is not working. 08:00:00 00:30 - 013X Fire Brigade Request offsite fire assistance. Captain 08:00:00 00:30 014 Control Cell Questions 08:10:00 00:40 015 Fire Brigade Flex line on diesel fuel supply

t l

                        ~ '-- Sequence of Events for 1989 Exercise                      07/11/89 TIME        T:        NUMBER        TO                               INFO Responder               system is broken. Fuel oil on the skid and floor is on fire. Fuel oil is draining from the broken line.

08:15:00 00:45. :016 Security at Five minutes after restricting OCA

           .            :- :'      DBNPS Access            access, open the barrier and allow Gate                    normal access.

08:15:00 00:45 017 Public Questions Relations Duty Officer 08:20:00 00:50 019 Emergency For scenario purposes please Director direct the control room to announce that personnel are to return to work and stay alert for further messages. OSC teams are to remain in the OSC or continue with repair team assignments initiated prior to assembly. 08:30:00 01:00 019 Fire Brigade Fire is out, there is heavy smoke Captain in the area. 08:35:00 01:05 020 Control Cell Weathe: Information 08:40:00 01:10 021 Control Cell Questions 08:45:00 01:15 022 Control Cell Questions , 08:50:00 01:20 023 Control Cell Questions 08:55:00 01:25 024 Control Cell Questions 09:00:00 01:30 025X Company Activate JPIC Facilities Spokesman 09:00:00 01:30 026 Control Cell Questions 09:05:00 01:35 027 Control Cell Questions 09:15:00 01:45 028 Control Cell Questions 09:20:00 01:50 029 Control Cell Questions 09:25:00 01:55 030 control Cell Questions . 09:30:00 02:00 031 Control Cell Questions 09:40:00 02:10 032 Control Cell Questions 09:45:00 02:15 033 control Cell Questions . 09:50:00 02:20 034 Control Cell Questions 09:55:00 02:25 035 Control Cell Questions 10:00:00 02:30 036 Media Actors Questions 10:07:00 0237'1 037 Control Room The following annunciators have been received in the control room.

                         ~~

F741 - RC MU Flow Hi, F 856- RCP 2-2 Seal RTN Flow Hi, L 854- RCP 2-2 Seal Standpipe LVL 10:09:00 02:39 038 Control Room Makeup tank level has decreased from 70' to 53' in the last 2 minutes. 10:10:00 02:40 039 Control Room Reactor Trip Indications (several alarms are listed on card) 10:10:00 02:40 040 Control Room You may not initiate Containment Spray at this time even if a water source becomes available. 10:10:00 02:40 041 Control Room Make the following announcement

i p ~ ; '. i: Sequence of Events for 1989 Exercise 07/11/89-l~ L TIME T: NUMBER TO INFO over the Gai-tronics system: This

                                                                     ..                                           is a drill. Attention All I                                                          .                                                       Personnel, attention all personnel. A Site Area Emergency
                                                            - - .       . :a                                      has been declared. Protected Area
                                                                   ;;;;;                                          Evacuation is required, Owner Controlled Area Assembly is NOT required. Repeat this message once.

10:10:00 02:40 042 Emergency For the purposes of this exercise, L Director Owner Controlled' Area Assembly is not desired. Direct that Owner Controlled Area Assembly be simulated. All actions up to actual assembly are to be carried out. 10:12:00 0242 043 Control Room Both Makeup Pumps indicator lights are green and MU Flow is Zero gpm. Seal Injection-Flow is Zero. 10:13:00 02:43 044 Control Room The following alarms have been received, SFRCS Trip, SFRCS CH1 Lo LVL/RCP TRIP, SFRCS.CH2 Lo LVL/RCP TRIP, CTMT PRESS Hi SFAS CH1, CTMT PRESS Hi SFAS CH2, Tsat meters indicate -1 and -3 degrees F. 10:16:00 02:46 045 Control Room The following annunciator has been received: SFRCS SG2 Lo Press Half / Full Trip 10:16:00 '0246 046 Control Room Lock out the Low Pressure Injection Pumps due to no water supply. . 10:25:00 02:55 047X Centrol Room PORV Block Valve cannot be reopened after closing. 10:25:00 02:55 048 OSC Team You cannot open the PORV Block Investigating Valve from its. local controller. PORV Block  :. _:_; 10:25:00- 02:55 049X Emergency Declare a Site Area Emergency in Director accordance with HS-EP-01500, EAL 3.D.2 10:25:00 02:55 050 Control Cell Questions. 10:30:00 03:00:- 051 Control Cell Questions. - 10:30:00 03:007 052 Media AStors Questions. 10:30:00 03:00- 053 control Room The following annunciators have been received: CTMT Norm Sump LVL Hi 1546A, CTMT Norm Sump LVL Hi 1546B 10:34:00 03:04 054 Control Room The following annunciator has been received: SPAS CTMT Press >18.4 PSIA Trip. 10:35:00 03:05 055 Injured You are workijng in the BWST area

                                                                      -- :_        Individual                     attempting to secure a CO2 bottle.

The bottle falls, breaks and fies off under pressure. You fall while

i 1

                               - ; Sequence of Events for 1989 Exercise                                                                                                               07/11/89  j TIME              T:      NUMBER                               TO                            INFO                                                                                            ;
                                       --                                        attempting to run and hit your                                                                                  I head onthe concrete. Unconscious,                                                                               j you have a bleeding head wound and
                                ...                                              are lying in water from the BWST.                                                                             {

10:35:00 03:05 056 centrol Cell Questions 10:35:00 03:05 057 Individual You find the victim lyijng face finding down in the BWST area. He appears i

::s Injured Person unconscious, he has a laceraton on i

_2- the left side of his forehead that

is bleeding moderately. Victim is wet from a large hole in the BWST.

Water is rushing ut on the North side of the BWST. 10:37:00 03:07 058 Control Room The following annunciators have been received: BWST LVL Lo SFAS CH1, BWST LVL Lo SFAS CH2 10:40:00 03:10 059 Control Cell Questions 10:45:00 03:15 060 First Aid Team You find the victim apparently unconscious with a bleeding head wound. He is wetted with water from the BWST. 10:45:00 03:15 061 Secondary Magruder Hospital is not involved Alarm Station in this Exercise. Do Not make call to Magruder to inform of the contaminated injured victim being transported offsite. 10:50:00 03:20 062X First Aid Team Call SAS for an Ambulance 10:50:00 03:20 063X OSC Manager Conduct Search and Rescue Operations for person (s) that are missing from the accountability l roster. 10:50:00 03:20 064 Missing You are to stay in the assigned Individual area after evacuation is ordered. _ If your name is called ont eh Gai-tronics you are not to answer.

                                   -.-                                           Do not attempt to hide or evade

_ discovery. 10:55:00 03:25 065 Ottawa County When ycu recieve a call from Sheriff's Davis-Besse Nuclear Power Station Dispatcher ree.;nsting an ambulance. Carroll Tevaship ems is not available. Obtain assistance from Mid County EMS. 10:55:00 03:25 066 Oak Haibor Page out Mid County EMS and read P.D. Dispatcher the following: This is a drill, Attention Mid County EMS, Carroll Township EMS has requested mutual aid and are requesting that you respond to the Davis-Besse NPS for an injured possibly contaminated worker. Actual response to Davis-Besse is requested. Obey all

                                   -- Sequence of Events for 1989 Exercise                                                       07/11/89 TIME              T:      NUMBER                 TO                                  INFO traffic laws. The use of lights 10:59:00         03:29          067       Control Room                 The following annunciator has been received: BWST LoLo LVL Xfer to Emergency Sump 11:00:00         03:30          068       Emergency                    Return Evacuated personnel to
                                   +           Director                     work. Simulate They are assembled for all future activites that would be required by the conditions as they occur.

11:00:00 03:30; 069 NRC Incide * , Inform the DBAB Security Guard Response team that you are the NRC Incident

                                   -                                        Response Team and proceed to the locations as directed.

11:10:00 03:40 070 OSC Team Jumper the CCW interlocks for Working on RCP RCP's. Interlocks 11:16:00 03:46 071 Control Room Start RCP's 1-1, 2-1 after bypassing the interlocks. 11:30:00 04:00 072 Mid County EMS Transport the victim to Fremont Driver Memorial Hospital. Magruder cannot accept the patient. 11:30:00 04:00 073X Missing If you have not been located by Individual this time use the Gai-tronics and call for help. Tell them you are lost and can't find your way out. Temm them your location in general terms. 11:35:00 04:05 074 Control Room Core Flood Tank Discharge Indications 11:45:00 04:15 075 Control Cell Questions 11:45:00 04:15 076X TSC Ops. Eng. Recommend to the Emergency Plant Manager, a lineup of LPI #1 pump from the spent fuel pool. l 12:00:00 04:30 077 Control Cell Questions 12:00:00 04:30 078 Media Actors Questions. 12:10:00 04:40=- 079 Hospital Information will be provided as Personnel activites are performed. 12:15:00 04:45: 080 Control Room Make the following Gai-tronics announcement: Attention All L Personnel, a General Emergency has been declared. All Emergency Response Personel go to your assigned facilites. Protected Area Evacuation is NOT required. Owner Controlled Area Assembly and Evacuation are NOT required. Repeat this message once. 12:15:00 04:45 081X Emergency Declare a General Emergency IAW Jirector HS-EP-01500, EAL 1.E.1, 1.D.5, or 1.D.6 12:15:00 04:45 082 Control Room Greem light for CV 5074 goes out on Panel C5717, and approx. 15

I

                                                                                      ~ 11 Sequence of. Events for 1989 Exercise                      07/11/89 TIME                                       T:        NUMBER.              TO.                       INFO secs later teh red light comes on.

SAM light is flashir.J.

             '12:15:00                                                       04:45 - 083               CSC team         Local. switch manipulations have no
                                                  .                              -.:e;                 Investigating    effect. Breaker BE1141 is tripped.
                                                                                 . .-                  CV5074           It continues to trip approx. 15
                                                                                 - :                                    sec. after releasing.the switch.
                                                                        .-            i~                                Light at the local swi'-ch C5717 does come on for the li Sec.

12:20:00 04:50- 084 Emergency Simulate the evacuation of the

                                                                                   - iti               Director         station. Do not actually evacuate the station. Perform all actions up to actual velocation of non-essential personnel.

12:20:00 04:55 085 Control cell Questions 12:30:00 05:00 086 Control Cell Questions 12:30:00 05:00 087 Control Room You are now lined up to the spent . fuel pool with LPI pump 1-1 start LPI pump 1-1, 12:30:00 05:00 088 Team Working You have completed repairs to DH-79 on DH-79 12:40:00 05:10 089 Control Cell Questions 12:45:00 05:15 090 control Cell Questions 12:45:00 05:15 091 OSC Team You have successfully completed i working on the repairing the BWST. It is now ~ 2 BWST Holo, ready to be unisolated and refilled.  ; 13:00:00 05:30 092 control Cell Questions 13:15:00 05:45 093 Control Cell Questions 13:30:00- 06:00 094 control Cell Questions 13:30:00 06:00 095 Control Cell Questions 13:45:00 06:15 096 Contrcl Cell Questions 13:45:00 06:15  : 097 OSC Tea >n You have completed repairs to the , Working on Containment Isolation Valve for  ! Containment Vacuum Breaker CV 5074. The , j

s Isolation Valve is Closed and the 1

release has been stopped. 14:00:00 06:30 098 Emergency Final Conditions, Drill

                                                                                   -                   Director         Termination, Schedule provided.             3
         - 14:00:00                                                          06:30:        099         Control Room     Make the following Gai-tronics announcement: ' Attention all                ;

personnel, the 1989 Emergency Preparedness Exercise has been completed. There will be no further drill announcements. I Regard all Gai-cronics  ! announcements.' Repeat this announcement once. 08:00:00 24:30 100 PASS RC Tester Review the attached results of pre-PASS sample area survey, 08:30:00 25:00 .101 PASS RC Tester Uce the attached area survey data. 11:00:00 27:30 102 Chemistry PASS Analysis Results Tester

                                                                                                                                          ~. z
    . . . _ _ _ .._     _ ._ _ ._. _ . _ _ . . . _ _ _ ~ _ . _ _ _ . , _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ __-.__________._._____ _. _ _ _ . _ _ = _ _.

t. t

                    ~.-

O SECTION 7.0 CUE CARDS

0 0 0 0 0 0 0 0 0 0 0 1 8 6 4 2 O T - - O , I 0 H T Y04 I 1 I I T ' 0 T ,

                                                                    ~    3:

3 O

                                                                   '     1 H
                                                         -       " 00              T m,
                                                                  ~
                                                                 " 3 O

TESI g - 1 H T

                                                                 ' 0 dC                                          %-                     3:       :

nR I 2 aEX 1 e E 0 m S S P - 0 2 : T i S E SE 1 R P E 9 - '

                                                                  ' 0             S R89                           +                    -       '
                                                                  ' 3:

1 C R P1 1 j ' S - ' 0

                                                                 ' 0      :

C 1 1 i \- - ' R S

                     -   :                                       ' 0
                                             -                   '      3 S

E p -

                                                                 ' 0 1

R P - - S ' C -

                            -                                           0 R      -         -
                                                                 ' 0:

0 0 0 0 0 0 10 0 0 0 0 0 0 5 0 5 0 3 2 2 1 1

1):i 0 2-

                                             -      -             1 1

T R ' O H ' S 5 1 _\ 1 N I ' 1 G RYL y ' ANO ' MES , 1 s LU 0 e OERL ' 1 i r e OL 1 1 S COR ' BTN ' UO SC ' a E ' S I 5 0 C ' 1 R ' 1 E X = ' E Y L N O 0 E 0: M 0 0 0 0 0 0 0 01 1 A 0 0 0 0 0 0 0 R 1 F 1 2 3 4 5 6

                              -     -      -      -    -      -            E M

I T De9 ee, F T R _ O H S l!l l

i

                                                                                                       ;RI-027 .':

i CHEMICAL ANALYSES' STATUS DRILL PURPOSES ONLY

                    ' BORON ANALYSIS                       TIME.        DATE RCS                                                               l PRIMARY CHEMISTRY 53c ppa 0400           5-/3/19          l TIME '/4//[           DATE 9/7/i-9 i

PZR I'/O ppm g 30  ;/f/p9 l 0, 5[ ppb I BWST 2 /o 9 ppa - /336 fh/99 ii l C1' _ $ [C ppm PWST A~ ppm 4 900 f/7/f9 l F' 4_ 2 o ppm i BAAT 1-1 /O,J9.s~ ppm./tco 'f/7/&9 /, g A

                                                                                                       ~

l Li' ppm y BAAT 1-2 /0 fro ppm . #foo 6/7/#9 l pH [. 9d~ I CWRT l-1 A/ A ppm 36, f'C l H, cc/Kg i CWRT l_2 yA ppm N,' [,6 s~ l cc/Kg I CFT l-1 3/01 ppm /N]O FN/P9 l TDG 3d.f'd ~ cc/Kg i CFT 1-2 J/ff__ ppm /88 8/.5ff1 l DEI /,o 2 8 ' cc/Kg frP )/4 O ppm /d/[ 8/3/#9-li Specific Activity /,)d" uCi/ml COVER GAS ANALYSES Time //34 Da tef///ff I l H, 0, N, j l WGST 6, Yb d, /9 99 f/ l 1 CWRT l-1 6, (( C. ;) f ~ M Po l l CWRT 1-2 /. 6[ 8, / d 9 f, Pd' l SECONDARY CHEMISTRY Daily FW Time 6 .1 ] C Date S-/P/9 9 i / 0, __s d~ ppb Fe(ss) $ /0 ppb N, H, 33 ppb pH 9.8d' S iO, 6 /C ppb H* C, 3 / 7 umhos/cm Na* C, */[ ppb Quarterly FW C1' O.fC ppb Pb b/ ppb Date 7-/9-89 Monthly FW Cu 6/ ppb Date 7-/9-PY DRILL PURPOSES ONLY lle u. / 7/? J/H

7-1 DBNPS. EMERGENCY PREPAREDNESS EXERCISE CUE CARD. SCENARIO NO. 1989 Exercise CUE CARD NO. 1 TO: Control Room Staff TIME: 0700 T: -00:30

         *********************************************i+*******************************

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: DBNPS Unit #1 is at 100% power (277) EFPD on this fuel cycle). HPI pump 1-2 is Out of Service, since 0400 this morning. There is a problem with the lube. oil system (broken veld at flange). Estimated time of repair around Noon today. Performing a load test ST 5081.01 on diesel generator 1-2. i l

         **********************************************************************k*******

THIS IS A DRILL Rev. 2 I I ~ _ _ - - _ _ - _ _

                                                           .7-2
                                      .DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)'

C'UE CARD,NO.- ~1 [: TO:- Control' Room Staff- TIME:: 0700' T: -00:30

                   ' ANTICIPATED RESPONSE:

N/A

  'Y 2
                    . INSTRUCTIONS'                                                                                           .

l -- -- Provide'this card;thirtyfminutes before exercise initiating event. .Also provide

                    . the P.O.D., chemistry and plant data sheets. Ensure an-operator is sent to the.
                     #2 Diesel Room..

1. COMMENTS: f. I Rev. 2

1

 ;- ,'                                                                                                                        {

i L 7-3 ) DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 2 TO: Public Relations Du'ty Officer TIME: '0700 - 0800 T: -0030 - 0030 1 THIS IS A DRILL D0_ NOT initiate actions affecting normal plant operations. INFORMATION: . Call the Edison Plaza Operator. Identify your location and phone extension.

                       "This is a Drill."

l l l L. l THIS IS A DRILL Rev. 2

v- ~ - _ y. . i i

                                                   .l7_4 -
                                                                   ~

1 i DBNPS EMERGENCY. PREPAREDNESS CUE CARD (Cont'd)- CUE CARD NO. 2-

                                                                                                     .j
          .TO: Plaza Op'erator Controllers                           TIME:     -0700 - 0800 T:    -0030 -'0030 ANTICIPATED RESPONSE:                                                                     !.

Call'from PRDO.,to Plaza Operator.' INSTRUCTIONS:

          . Ensure operator retains call back numbers from PRDO.
                             ~

COMMENTS: Rev. 2 __d - -_:___-____-___ - __- -_____-- _-__

p-1 7-5 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 3 TO: Edison Plaza Operator . TIME: 0700 - 0800

                                                                                  - T:     -0030 - 0030 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

INFORMATION: Respond to Corporate Emergency Preparedness Advisor notification call.

                    -    Inform Corp. EP Advisor that Mr. Edelman has directed him to report to the Corporate Planning Center - 16th floor.
                    -    All Communication with the company president or other corporate officers from the CPC must be done through the Plaza Operator.

i l

               ********************************A*********************************************

THIS IS A DRILL l

               ***************************************************************=**************

Rev. 2 _-_ ____- --__ _O

m. . . _ . _ _ _ . . . _ _. __ _ __ _ _ _ __ __

re 7-6 g

                                                 'DBNPS EMERGENCY PREPAREDNESS CUE' CARD (Cont'd)

CUE CARD NO. 3 TO: ' Plaza. Operator Controller ' TIME: 0700 - 0800 T: -0030 - 0030 ANTICIPATED RESPONSE

                              --Corp. EP~ Advisor,follows company president directive.
                               ' INSTRUCTIONS:
Issue this card when the Corp. EP Advisor contacts the. Plaza' Operator.

i COMMENTS: Rev. 2 _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ - _ =

- ~ -                 ---

i 7-7 L. DBNPS EMEEGENCY PREPAREDNESS EXERCISE CUE CARD i SCENARIO NO. 1989 Exercise CUE CARD NO. 4 TO: Control Room Staff TIhEs. 0730 T: 00:00

                          *******************************************************e,m********************

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: . Turn on the outside speakers and make the following announcement:

                          " ATTENTION ALL PERSONNEL, ATTENTION ALL PERSONNEL. DAVIS-BESSE IS NOV COMMENC-ING THE 1989 NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE. ALL ANNOUNCEMENTS PRECEDED BY 'THIS IS A DRILL' ARE FOR DESIGNATED EXERCISE PARTICIPANTS ONLY. IF AN ACTUAL EMERGENCY OCCURS, AN ANNOUNCEMENT VILL BE MADE THAT THE EXERCISE HAS BEEN SUSPENDED UNTIL FURTHER NOTICE. ALL PERSONNEL ART, REQUESTED TO MINIMIZE THE USE OF THE GAI-TRONICS UNTIL THE EXERCISE HAS BEEF TERMINATED."      Repeat l'                         this announcement once.

THIS IS A DRILL Rev. 2 _ _ _ _ _ _ _ _ -_-. . i

7-8 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 4 TO: Control Room Controller TIME: 0730 T: 00:00 ANTICIPATED RESPONSE: Control Room Staff should turn on the outside speakers and make the announcement. 4 INSTRUCTIONS: . Ensure the Lead Controller is informed and has the " Drill Code" sent on ERO pagers. 1 I l COMMENTS: Rev, 2

7. l 7-9 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 5

                      'TO: Continuous Service Supervisor                              TIME:       0730-T:      00:00'
                       ***********************************************u******************9***********

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: . HPI pump #1-2 is out of service because of a lube oil problem (pipe flange veld broken). Return to service is anticipated around Noon today. Oil sump is empty and the pipe is removed to shop. THIS IS A DRILL

                        ***************************************.Y**************************************

Rev. 2

7-10 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 5 TO: Continuous Service Supervisor Controller TIME: 0730 T: 00:00 ANTICIPATED RESPONSE: None INSTRUCTIONS: None COMMENTS: Rev. 2

n. e:' l l 7-11 l DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 6 TO: EO Running Diesel'ST' TIME: 0740 T: 00:10 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call the Control Room and inform them a fuel line broke on the diesel and.a fire started. You have'left the DG Room. You shut down the diesel on your way out. THIS IS A DRILL Rev. 2

       'a     4'      l                                                                                               ,

ll' > 7-12~ DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 6 j '# TO " EO Running Diesel Controller' i TIME:- :0740 Ts. 00:10, t . ANTICIPATED RESPONSE:-

                                  .' Call'out the' fire brigade to the; fire in the DG 1-2 Room.'

n a 1 INSTRUCTIONS:- Coordinate with the Control Room in passing out this card., COMMENTS: p. 1 Rev. 2 _ = _ _ _ _ _ _ -

                 -.                                                   7-13 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD l

SCENARIO NO. 1989 Exercise CUE CARD NO. 7

                            'TO: Control Room Operator                                  TIME:      0740 T:      00:10 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.
                             ***********************************s.******************************************

INFORMATION: , The following annunciators have been received in the Control Room: Unit Fire, Radiation Trouble Computer fire and radiation monitoring panel printout indicates a fire in Room 309. THIS IS A DRILL Rev. 2

7-14 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 7 TO: Control Room Controller TIME: 0740 T: 00:10 ANTICIPATED RESPONSE: Sound initiate emergency procedures alarm, call away fire brigade. INSTRUCTIONS: Coordinate with Fire Controller in passing out this card. COMMENTS: l

                                                                                                                             }

1 l l l Rev. 2 i I 4 i

7-15 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD - l SCENARIO NO. 1989~ Exercise CUE CARD NO. 8

T0s Ottava County Sheriff's Dispatcher TIME: 0740 T:- '00:10 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

INFORMATION: When'you receive a call from ":fis-Besse requesting Fire Assistance, the Carroll Township Fire Department is not available. Obtain assistance from Portage Fire Department.

                                                                                                                    .1 I

l l i i THIS IS A DRILL 4

                         ***************************k**************************************************

1 i Rev. 2

7-16 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. _, 8 TO: Ottava County Sheriff's Controller TIME: 0740 T: 00:10

                     . ANTICIPATED RESPONSE:

Call Portage Fire Department. INSTRUCTIONS: Provide this card when Fire Assistance is requested. COMMENTS: 4

                                                                                                          )

1 1 l i i l I l l l Rev. 2 1 l

7-17 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE-CARD NO. 9 TO: Oak Harbor P.D. Dispatcher TIME: 0740 T: 00:10 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Page Portage Fire Department ~and provfde this message

                   '"This is a Drill. Attention Portage Fire Department. Carroll Township Fire-is requesting mutual aid and are requesting that you respond to a reported fire at the Davis-Besse Nuclear Power Station. Actual response to Davis-Besse is requested. Obey all traffic laws. Use of lights and siren is not warranted.

This is a Drill." Repeat message once. I l THIS IS A DRILL i Rev. 2 l L-______

7 10 . DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD No. 9 TO: Oak Harbor P.D. Dispatcher Controller TIME: 0740 T: 00:10 ANTICIPATED RESPONSE: Portage Fire Department should be paged out and the previous page's message should be read to them.

                             ** Use of "This is a Drill" before and aftet message is mandatory.

INSTRUCTIONS: Give the first page of this cue card to the Dispatcher and instruct her to act according to the message. COMMENTS: I I i Rev. 2

                                       '7-19 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise                              CUE CARD NO.      10 TO: Fire Brigade Responder                              TIME:      0745 T:      00:15 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

INFORMATION: Door (315) is hot to the touch. l 1 l THIS IS A DRILL f Rev. 2 L .------_________a

7-20 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. _ _10' TO: Fire Brigade Controller TIME: 0345 T: 00:15 ANTICIPATED RESPONSE: Responder should inform the Control Room and fire brigade captain of the condition of the door. INSTRUCTIONS: Person should react to the sign on the door that says it is HOT. COMMENTS: Rev. 2

7-21 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 11X 1 TO: Control Room Staff TIME: 0750 T: 00:20 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

 - INFORMATION:

Declare an Alert based on EAL 7.A.2 " Station Fire".

  ****************************************************+*************************

THIS IS A DRILL Rev. 2

                                      .;                      s p f'd
u. a /
                %                    'c       .

jl 9 .,

                                                        >              1        t                      ,                                   L-

> n , I l #

                                                                ,.'[        j
                <t...              , /,
  • S , -

7 .n '

                                                                         - DBNPS EMERGENCY! PREPAREDNESS CUE CARD:(Cont'd)'

d , 1

                                                                                                                . CUE CARD NO.'            11X         *
        ,                                     (T0s.! Control'P60m Controller'                                     TIME:        0750-
                                                                                                                             '     ~

T:l =-- 00 : 20 ANTICIPATED RESPONSE: e.

                                                'Make.the announcement over:the Gai-tronics systems.

3 INSTRUCTIONS:

Provide this . card only if an Alert has not. been cieclared. Contingent upon a
                                                -Lead Controller Evaluation of Control Room activity.

t COMMENTS: h

                                                                                                                                                          )

p

                                                                                                                                                        -j 1

i 1 I i 1 Rev. 2

                                                                                                                                                  . . _j

4 7-23

                            'DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD
       ' SCENARIO NO. 1989 Exercise CUE CARD NO.                      12X TO: Fire Brigade Responder                                  . TIME:    0800 approx.

T: 00:30 approx.

          *************************************************************+****************'

THIS IS A DRILL DO NOT initiate actions affecting normal' plant operations. INFORMATION: , Pre-action sprinkler system. Valve is tripped, but system is not working.

          ****************************************************h*************************

THIS IS A DRILL l l Rev. 2

i.

      ;n:                                                        7 24' DBNPS EMERGENCYLPREPAREDNESS CUE CARD (Contd)

CUE CARD NO. 12X'

                       'TO: _ Fire Brigade Responder Controller                   TIME.. 0800 approx.

1 T: 00:30 approx. M ' ANTICIPATED RESPONSE:

                        ' Captain'should now realize that there'is in' fact a fire.

i (:r w INSTRUCTIONS: 1 Give this cue card only in the event the responder asks if.the sprinkler sys' tem = is tripped. COMMENTS: J Rev. 2

1

                                            '7-25                                                                                  !

i I i DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD , i

  . SCENARIO NO. 1989 Exercise                                             CUE CARD NO.                     13X TO: Fire Brigade Captain                                                TIME:            0800                                   )

1 T: 00:30 j l

    ******************************************************************************                                                 j
                                                                                                                                 .i THIS IS A DRILL                                                                             !

DO NOT initiate actions affecting normal plant operations.-

    ********************************************************++********************

INFORMATION: Request offsite fire assistance. THIS IS A DRILL

     *********************************s********************************************

I-Rev. 2

c-D-1";jp

                                                 '                 7-26~

l._ : , , r a DBNPS EMERGENCY PREPAREDNESS: CUE CARD (Cont'd) <

                                                                                                                                ~
   '                                                                                                                CUE CARD NO.,          e,.d.3X'
                                               ~
                     .TO : Fire Brigade Captain Controller                                                        TIME:          0800' T-        '00:30
                     , _ ANTICIPATED RESPONSES-                                                                               b
                   ,  ' Request'offsite assistance.from the Control. Room.
                     . INSTRUCTIONS:-

Provide ~this card only if the Fire' Brigade Captain has not requested offsite assistance.

                     .' COMMENTS:

v. e Rev. 2

7-27 < c DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO.'1989 Exercise CUE CARD NO. 14 TO: Control Cell. TIME: 0800 '0830 T: 0030 - 0100 l THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Plaza Operstor at ext. 5000. Inform operator you are V. Becker from station VBER (PM 100, the most listened-to station'in NV Ohio). You want to talk to someone in charge at the plant. Your information source was UPI. When connected with PRDO or Public Affairs, ask the following:

                                   -       I've got a news broadcast at 8:45 and want-to include the Davis-Besse-story, vill you ansser a few questions?

What's happened this time?

                                   -      Is the reactor still running?
                                   -      Is anyone exposed to radiation and what are you doing for them?
                                   -      What does the classification mean?

Does the public need to evacuate and where should they go? THIS IS A DRILL I Rev. 2  : , . i ,. .. . . . .. .

                                                                                                                                 ..._._.,,,,,3,,)

7' 4

                                    ,m                                    o M..;f                                 ,

i

       .;.gw                                                                                                                              _

) ch;g ,

                                                                              .7-28I
 ,c~                                                                                                                                      n j

DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)'

                                                                                                                                            'l h              r
                   .c         ,

CUE CARD NO. ' 14

il
                                    ' TO: ' Con' trol Cell                                                TIME:'  :0800 :0830--
       ?                  .

9: T:: 0030 - 0100-

                                    . ANTICIPATED RESPONSE:                                                .

Operator should; transfer call to PRDO. l 1 1 INSTRUCTIONS: Record call'- state':"This is a Drill". Ask questions to open ended ansvers from PRDO or other persons who you' talk.to. COMMENTS:. Rev. 2 i

u.? j ' 7-29 'I DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD'

 <          SCENARIO No. 1989 Exercise                                 CUE CARD NO.          15' TO:' Fire Brigade Responder                                TIME '     081'O T:      00 40
            *************w****************************************************************

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

           -INFORMATION:

Flex line on fuel supply system is broken. Fuel oil on the skid and floor is on' fire. Fuel oil is draining from the broken line. THIS IS A DRILL i Rev. 2 '

c [. 7 , DBNPS EMERGENCY. PREPAREDNESS _l CUE CARD.(ConOd) CUE CARD NO. 15 TO: Fire Brigade, Responder Controller- TIME: '0810 ' T: 00:40

                      ,       ANTICIPATED RESPONSE:
                            , Isolation of fuel line at DO 57'or at.the Day Tank.

!i, i INSTRUCTIONS: To be given to morber that fitst goes through-the door. COMMENTS: i i Rev. 2-ii.___._-___. ___ ._. ._ _ )

i i l' 7-31 j i l DBNPS EMERGENCY PREPAREDNESS EKERCISE CUE CARD i i SCENARIO NO. 1989 Exercise CUE CARD NO. 16 TO: Security at DBNPS Access Gate TIME: 0815 d T: 00:45 l l '- 1 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Five minutes after restricting OCA access, open the barrier and allow normal access. THIS IS A DRILL Rev. 2

g;7--- ' l ; 32

              ..g 1     >
                                                                                'DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) i CUE CARD NO.--                                -16 4
                .i
                                    .TO: -Security-at DBNPS access Gate Controller
                                                                                                  ~
                                                                                                                    ' TIME:                         0815'-

T: 00:45 ,

                                   ' ANTICIPATED RESPONSE .

The security, guard will open the cooling tower gate. INSTRUCTIONS: , Give this to the security officar at the Owner Controlled Area access guard gate. l l I COMMENTS: Rev. 2 1

                     .___l___Em.__      _ . _ _ _ _ _ . . . _ _ _ . - - . _ _ . -

7-33 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENAF.IO NO. 1989 Exercise CUE CARD NO. 17X TO: Public-Relations Duty Officer TIME: 0815 - 0830' approx. i s T: 0045 - 0100 approx. THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Ottava County, Lucas County and State of Ohio Public Information' Officers. LInform'PI0's,of plant conditions. Request'information in the closure of subareas 10 and 12. Call the primary media contacts. Use 8361 for all media phone numbers. . Include information on closing Subareas 10, Crane Creek State Park, and 12, La':.e aear the D-B Station.

       "This is a Drill."

l i 1

       **************+t.c*************************************************************                           j THIS IS A DRILL                                                          I
       ***************************w**************************************************                            j 1

l Rev. 2

r .. . .. 7-34

                                                               ~DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)'

1: k- ' CUE CARD NO. 17X

  ?                                                    .                                                           .

i.c TOs.<PRDO Cr>ntroller TIME: 0800 - 0830 T~ 0045 - 0100

                                            ' ANTICIPATED RESPONSE:

Calls made~from PRDO.to.PIO's and media. INSTRUCTIONS: , l Provide' card only if calls have not been made. Initial statement must be prepared prior to callouts to media.

                                                                                                  ~

l l. COMMENTS's 1 1 Rev. 2 [

w  ! V 7-35

                                 'DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD.

SCENARIO NO. 1989 Exercise. . CUE CARD NO. 18' TO: Emergency Director TIME: '0820 approx. T: 00:50

                             ~

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

            ,INFORMATION::

For scenario purposes please direct the Control Room to announce.that personnel are'to return to work and, stay alert for further messages. OSC teams are to remain in the OSC or continue-vith repair team assignments initiated prior.to assembly. i THIS IS A DRILL Rev. 2

7-36 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

                          .                                                                                                   CUE CARD NO. 18 TO: Emergency Director                                                                                                     TIME:    0820 approx.

l T: 00:50 ANTICIPATED RESPONSE: Return people to work. INSTRUCTIONS: Give this cue card to the Emergency Director when he receives the report of the number of people assembled in all three assembly areas inside the Protected Area. COMMENTS:

                                                   ,                                                                                         Rev. 2

7-36A v DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO No. 1989 Exercise CUE CARD NO. 18A

     . .TO : Control Room                                           TIME:                       0820 approx.

T: 00:50 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: ,. Make the'following Gai-tronics announcement:

       " Attention all personnel, attention all personnel. All assembled personnel are to return to work. Stay alert for further announcements over the Gai-tronics system. All OSC Teat,1 are to remain in. the OSC and continue with repair. team
                             ~

assignments." Repeat this message once.

       *********************************************<,e*******************************

THIS IS A DRILL I i Rev. 2

7-36B DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD.NO.- 18A TO: Control Room Controller TIME: 0820 approx. T: 00:30 ANTICIPATED RESPONSE: ( Make the announcement. l' , [ INSTRUCTIONS: Provide this card when the ED tells the CR to return protected area people to work following the Alert. COMMENTS: e w 4 s l. Rev. 2 -

                                                                                                                                                                                                                           -ew
         . _ ____ _ _ ~ - _ . _.--                                                                                                          _ _ _ .

3 i

   -   e i

[l.: > 7-37  ! r j j H DBNPS EMERGENCY PREPAREDNESS EXERCISE' CUE CARD-SCENARIO NO. 1989 Exercise -CUE CARD NO. 19 TO: Fire Brigade Captain. TIME: 0830 approx. l

                                                                                                                                                    -i
i. . T: . 01:00 THIS IS A DRILL I-DO NOT initiate actions affecting normal plant operations.

INFORMATION: Fire is out, there is heavy smoke in the area.

                                   ******************************************+***********************************

THIS IS A DRILL Rev. 2

                                                    '7                                 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)
                                                                        . CUE CARD NO.      19 T02- Fire Brigade-Captain Controller-                       TIME:     0830 approx.

T' 01:00'

            ~ ANTICIPATED RESPONSE:

Request ventilation from the Control Room or do it. manually. INSTRUCTIONS: When ventilation has been established for a short period of! time, remove'the signs that say smoke lin order to finish this portion of the exercise. Provide this card only after the offsite fire department arrives at th'e fire-scene. COMMENTS: i i V Rev. 2 b l

                                                                                                 .1

7-39

                                       .DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise                               CUEfCARD NO. 20 g

TO: . Control Cell TIME: 0835

                                                     ,                            T:      01:05
                      ***************************sw***************************************w*********

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

                      ******************************************************++++*+******************.

INFORMATION: Provide information from Figure 9.1 when a call by Station personnel is made to the National Weather Service. Provide information from Figure 9.2 for extended forecast if asked. THIS IS A DRILL Rev. 2 r __i.__m.__ _ _ _

7-40 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 20 l_ TO: Control Cell TIME: 0835 T: 01:05 ANTICIPATED RESPONSE: l Dose Assessors vill input the forecast into dose assessment considerations. l l INSTRUCTIONS: Give the appropriate information whenever the forecast is requested by a Dose Assessment staff member. l l l l COMMENTS: 1

                                                                                                        \

l l l l' Rev. 2 i L _ 2___

7-41 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD

     . SCENARIO NO. 1989 Exercise                                 . CUE CARD NO.             21        .

TO: ' Control. Cell TIME: 0840

                                                                       'T:    '01:10 THIS IS A DRILL D0_ NOT initiate actions affecting normal plant operations.

INFORMATION: Call the NRC Liaison in the ECC and tell them you are the NRC.- It. form them that an Incident Response Team from Region III is in the area and vill arrive at approximately 11:00'AM' consisting of 11 people. 1 THIS IS A DRILL 1 Rev. 2

 . .-      4

(',, 4

                                                        '7-42 s -                              DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

CUE CARD NO.- 21 TO:- Control Cell 0840-

f. ' TIME :

T: ~01:10 ANTICIPATED RESPONSE

                  - None INSTRUCTIONS:

None COMMENTS: i Rev. 2

g- - ,  ;

  • l e

7-43 . L

                                                                                                                                          ')

DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARI0'NO. 1989 Exercise CUE CARD NO.- 22 1' l TO: Control-Cell TIME: 0845 T: 0115

             ***********v******************************************************************

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Plaza Operator at ext. 5000. You live near the DB Station. When connected, say the following:

                   "I live real close to the Besse plant. This morning I heard some loud speaker over there talking about some kind of emergency. Then I heard some sirens and saw a fire truck out there. I just heard on the radio about your problem. What's going on, do I need to evacuate?"

THIS IS A DRILL Rev. 2

7-44 l DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 22 TO: Control Cell TIME: 0845 T: 0115 ANTICIPATED RESPONSE: Operator should transfer call to PRDO. INSTRUCTIONS: Record call - state "This is a Drill". COMMENTS: Rev. 2

l g' ;7-45 k DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD 6 SCENARIO NO. 1989 Exercise CUE CARD NO. __ 23 TO: Control Cell TIME: 08. rl - T: 0120

             *******************************3**********************************************

THIS IS A DRILL DO NOT. initiate actions affecting normel plant operations.

             *****************o************************************************************

INFORMATION: , Call Plaza Operator at ext. 5000.

            -You ere a marine evner near Devis-Besse.

When connected, say the following:

                  "I'm looking for someone who is responsible for my lost business. People are coming back with equipment they bought and vant their money back.

The rengers are sending folks away from Crane Creek and now the radio says stay away from here too. Hov long is this going to go on? Who out there is going to pay for my lost business because of your disaster? THIS IS A DRILL Rev. 2 u _- _ _

     ';jd ,           .19

, ,1 7-46 M DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD No. 23 7 TO:' Control Cell TIME: 0850 T: 0120 _ _ . i rf ANTICIPATED RESPONSE:

                                . Operator should transfer call-to PRDO.

PRDO may inform caller to contact the Ottava Cou:ay EMA. W

                                -INSTRUCTIONS:

Record call - s' tate "This is a Drill". COMMENTS: l l Rev. 2 L

         ~- - .           . -         _- -_ -.____ _ _ _ _.       _   __ _
 't h.?

p i 7-47 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD-SCENARIO No. 1989 Exercise CUE QARD NO. 24 ,, TO: Control Cell TIME: 0855 T: 0125 THIS IS A DRILL-DO NOT initiate actions affecting normal plant. operations. INFORMATION: Call' Plaza Operator at ext. 5000. You are.a relative of a DENPS vorker, When connected, say'the following:

                                                                 "I'm R. Cooper. My brother is an electrician at Davis-Besse and I want to
                                                               -find out if he's all right. I heard on the radio that you've had.an accident. .His name is Tim. I can't get to him on the phone because of the emergency or something like that. Please get him to call home so mom von't be vorried."

t THIS IS A DRILL Rev. 2

7-48 DBNPS EMERGENCT PREPAREDNESS CUE CARD (Cont'd)

                                                                                                         ,      CUE CARD NO.       24 TO: ' Control' Cell ~                                     TIME:       0855
                                                                                                                 . T:       0125 ANTICIPATED RESPONSE:

Operator or PRDO may request call back number. Call may be directed to Rumor Control. Call back may occur for further information.

                                                     . INSTRUCTIONS:

Record call - state "This is a Drill". There is no site worker named Tim Cooper at Davis-Besse. l- If call back is received, inform PRD0/ Rumor Control that your brother is a part-time contractor.

                                                     ' COMMENTS:

l l l l' l Rev. 2 L

  ._m___a-        _ . _ - _ _ . _ _ _ _ - _ _ _ - -_

(( 7-49' DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO No. 1989 Exercise CUE CARD NO. 25X TO: Company Spokesman _ TIME: 0900 T: 0130 THIS IS A DRILL DO NOT. initiate actions affecting normal plant operations.

                           *A****************************************************************************

INFORMATION: Activate JPIC Facilities. THIS IS A DRILL Rev. 2

r 5,, - , _ (l:g: f

        .;e . -. , .

7 3,;. -- 7-50 s -. l4 DBNPS ENERGENCY PREPAREDNESS CUE CARD (Cont'd)- Fa CUE CARD NO. 25X:

              ',.l                 TO L JPIC' Controller                                                                                                     TIME:                0900 T:. '0130-ANTICIPATED RESPONSE
                                 'CompanyiSpokesman activates JPIC Facilities.

4. i M

                                 , INSTRUCTIONS:

Do not issue if JPIC is 'already activated.

                      . e r

COMMENTS: O Rev. 2

l :. l '. l1 .. . DBNPS EMERGENCY PREPAREDNESS EXERCISE-CUE CARD SCENARIO No. 1989 Exercise CUE CARD NO. 26 ~ L: l- TO: Control Cell TIME: 0900 l T: 0130 l-THIS'IS A DRILL DO,NOT initiate actions affecting normal plant operations. INFORMATION: Call Plaza Operator at ext. 5000. You live in Oregon and want to know why you vere kicked out of Crane Creek. When connected, say the following:

                      "I'm Rick Clark from Oregon. Every Tuesday since I retired I go out to i-                    valk on the beach at Crane Creek. This morning they told me I couldn't go valking because of some problem you have. Why should I not be allowed to do what I want to because of some problem you have?"

THIS IS A DRILL l Rev. 2 L

o lA r 'l s' e 7-52

       ?

3.. 1 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd);

                                                                                              ' CUE CARD NO.               26:

JTC:!. Control cell TIME: 0900 T: 0130: ANTICIPATED RESPONSE: Operator shOuld transfer call to PRDO or Rumor Control.

                                      . INSTRUCTIONS:                                                                                1 Record call - state "This is a Drill".

COMMENTS: i s Rev. 2

7. .

52A DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO 1989 Exercise: CUE CARD.NO. 2M TOsl' Control Rcom Operator TIME: 0900 h' T: 01:30 THIS IS A DRILL

                      ' DO iMT initiate actions affecting normal plant operations.
         'INFORMATION:

The following annunciators have been received in the Control Room: Unit Fire, Radiation Trouble Computer fire and radiation monitoring panel printout indicates an alarm on RE 8407. THIS IS A DRILL

          ********************************************************e*********************

l Rev. 1

7

   ,.e                     ,

c 1 1' l

                             ...)    1
                                                  .c y                                                                           7-52B.

[ ,' ., 7

                                                                                                                                              .a DBNPS EMERGENCY PREPAREDNESS' CUE CARD (Cont'd)

CUE CARD.NO.- ;26A

                                           ;/

y '

                                                 ' TO: l Control. Room Controller                            TIME:            0900 T:            01:30
                                             '--ANTICIPATED RESPONSE: '

Read the RE panel for the-level. INSTRUCTIONS: None - This is a red herring for the ERO. c7 r i 1

                                                -. COMMENTS:                                                                                        '

1 l k 1\ . l

                                                      .                                                                                             4 i

i l J Rev. 1 l i

7-53 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 27 TO:' Control Cell TIME: 0905 T: 0135 THIS IS A DRILL DO NOT initiate actions affecting norn,al plant operations. INFORMATION: , Call Plaza Operator at ext. 5000. You are a hotel owner in Port Clinton. When connected, say the following:

        "I want the guy who's gonna pay for my lost business. My hotel is quickly
      ;becoming a ghost town. People are checking out, reservations are being l        cancelled and my boat ramp is crammed with people taking their boats out of l
       'the water.- Who's in charge, I want to talk to him right now.

l THIS IS A DRILL Rev. 2 L- - - _ _ _ _ _ _ _ _ _ - _ _ - - _ _ _ _ _

0 1: ,

   .-                                                                                                                              7-54 i-
 )., .>',

DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd). i e

     '!'                                                                                                                                            CUE CARD NO.-    27-
                                                                                          'TO: . Control Cell'                                      TIME:-     0905 T:-     0135
j. ANTICIPATED RESPONSE:

L Operator should transfer call to PRDO or Rumor Control. h . - j Call back number should be requested. 1 INSTRUCTIONS: Record call - state "This is a Drill". 1 i' COMMENTS: 1- j 1 1 l Rev. 2 l _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ . i

7-55 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 28 TO: Control Cell TIMES- 0915 T: 0145 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Plaza Operator at ext. 5000. 1 L You are from radio station VACK (AM 1260, the voice of the great northcoast). When connected, say the following: l l "I'm Rick Dell from VACK, AM 1260. I'd like to get a phone interviev vith a company official for the 9:30 news.

                      - Vhats wrong with the Reactor?
                      - Who's been contaminated?
                      - How long vill the problem last?
                      - Could you say something to our listeners about what they need to do?

Ask for a call back number if speaking to the PRDO. i THIS IS A DRILL Rev. 2 l \ _ - - _ _ _ -

m,_ 7-56 DBNPS EMERGENCY PREPAREDNESS CUE CARD'(Contfd) CUE CARD NO. 28 TO: Control Cell TIME: 0915 T: 0145 ANTICIPATED RESPONSE: . Operator should transfer call to PRDO or Rumor Control. INSTRUCTIONS: Record the call - state "This is a Drill". COMMENTS: l l I Rev. 2 \. .- . _ _ _ _ _ _ _ _ _ _ _ _ _  !

t j, . 7-57 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD-SCENARIO No.:1989 Exercise CUE CARD NO. 29 L TO: ' Control Cell TIME: 0920 T- 01:50 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Plaza Operator at ext. 5000. You are from TV-22 News. You are Chuck Star. When connected, say the following:

                                "I'd like to get an interviev vith a Davis-Besse official and some videa footage for the noon news. I'll be'out in about 2 hours, where vill your spokesman be for the interview? Your company president gave use the "0K" to shoot the plant."

THIS IS A DRILL Rev. 2 _ - _ _ - _ = _ _ - _ - - _-- _ _

t... 1 b l-7-58 p . DBNPS EMERGENCT PREPAREDNESS CUE CARD (Cont'd) . CUE CARD NO. 29

                                                                       - TO:           Control Cell                                            TIME:      0920           !
                                                                                                                                                  .T . 01:50 l

ANTICIPATED RESPONSE: i Operator should' transfer call to PRDO or Rumor Control, j l Call back number may be requested. l

                                                                                                                                                                      -i
                                                                         ' INSTRUCTIONS:                                                                                 ;

l Record call - state "This is a Drill". l l l-COMMENTS: i l i i Rev. 2

                                                                                                                                                                           )

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ i

7-59 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 30-TO: Control' Cell ' TIME: 0925 T: 01:55 l l l ****************************************************************************** THIS IS A DRILL l DO NOT initiate actions affecting normal plant operations. i-l ****************************************************************************** INFORMATION: Call' Plaza Operator at ext. 5000. You are from the free press. Your Tom Haskins. When connected, say the.following:

                      '"I'm from the Baltimore Free Press. I'd like to feature your disaster in tomorrows paper. Who's in charge? When vill he be able to comment?. Can you provide some stock photos for the story? Can I have. copies of all your stock records and financial statements for the last three years?

THIS IS A DRILL Rev. 2

in o Il r - i ' ,'- 1

                                                                      ~7-60                                                  i l

4 DBNPS' EMERGENCY.PR*.!!. REDNESS CUE CARD-(Cont'd) )

                                                                                 . CUE CARD NO.e-                30-
 .,                    TO: : Control Cell                                          TIME:                  0925             .)

1 ,' T:- 01:55 .j ANTICIPATED RESPONSE: Operator'.'should transfer call to PRDO or Rumor Control.

                      ' Call back' number should be requested.

l I i

                      ~ INSTRUCTIONS:

Record call - state "This is a Drill". L COMMENTS:

                                                                                                                            .]

1

                                                                                                                             )

1. Rev. 2

7-61 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 31 tot. Control" Cell TIME: 0930 - 1030~ T: 0200 - 0300

  ***=**************************************************************************

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Plaza Operator at ext. 5000. You are various people from towns / townships in the area near Davis-Besse. Place calls approximately 3 to 4 min. apart. Repeat calls using a different name.each-time. Continue this line of questioning until 10:30. l I heard the radio say you have a problem, some places are evacuated, why haven't the sirens gone off? If there's an emergency, why isn't the public supposed to take some kind of protective action? What is this going to do to my property value? What are the effects of radiation to my kids from your accident? What should I do if I need to protect myself from radiation? What is a REM 7 How many have you let out from Davis-Besse? What is going to happen to the animals living in your marsh? When vill the company give use varning if we need to do something? j l- Vill the radiation affect my garden? I' THIS IS A DRILL l Rev. 2 l

 . ;,y .

7-62 DhNPS' EMERGENCY. PREPAREDNESS. CUE' CARD (Cont',d)- CUE CARD NO. 31

                 -TO - Control Cell TIME:        0930 - 1030 T.        0200 -'0300
                  ' ANTICIPATED RESPONSE:
                 . Calls should be transferred'to Rumor Control.
                  ' INSTRUCTIONS:
                  ' Record calls - state "This is a Drill".

COMMENTS: p l Rev. 2

       =__ :__          :_      . _ ~ .

b 7-63 L

                                                      .DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO No. 1989 Exercise                                     CUE CARD NO.-                                                  '

TO: Control Cell TIME: 094'O T. 0210

                               ***c ***.s&********************************************************************

THIS IS A DRILL

                                              'D0'NOT initiate actions affecting normal plant operations.

INFORMATION: . Call Plaza Operator'at ext. 5000. Ask to speak to someone.about the Davis-Besse emergency. Message: "This is a Drill

                                            , Hello, this is Lan Vinson of VGON TV-News Channel 77. I'm calling about the emergency at Davis-Besse. Can you explain-what'an " Alert" emergency classification means?

Does ALERT mean people should be on ALERT that radiation is coming out of the nuclear plant? Will your president be available for.a live interview on our 6 0' clock news 7:

                                             -This is a Drill."
                              -Provide the caller your telephone extension if he offers to call you back with additional information.

THIS IS A DRILL Rev. 2

                 -                                                                             1 7-64 L{

DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 32 TO: Control Cell TIME: 0940 ;l T: 0210 ANTICIPATED RESPONSE: The Public Relations personnel in the D-B Administration Building vill respond to.tha questions vith the information that is available and has been approved. f If the'JPIC is activated the reported vill be informed that there is a facility-where reporters may attend briefings on the emergency developments. INSTRUCTIONS: Record call - state "This is a Drill". . COMMENTS: l j: . i' Rev. 2 l I

w, 65 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD'NO.: 33 TO:' Control Cell . TIME: 0945 T: 0215 THIS IS A DRILL DO N3T' initiate actions affecting normal plant operations. INFORMATION: Call.Plass Operator at ext. 5000. You are a studunt at Toledo Junior High. When connected, say the following:

            "I'm John Bond. .I'm a student interested in science and I'd like some information about Davis-Besse.
            - How much of the plant is damaged?
            - Is anyone dead from radiation?
            - Can you send me some free booklets on nuclear pover?
            - Will my family be ok if ve go to Put-in-Bay this weekend?

l 1 l THIS IS A DRILL Rev. 2 t _ _ - _ _ _ _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

7-66 F DBNPS EMERCENCY FREPARECNESS CUE CARD (Cont'd) CUE CARD NO. 33 TO: Control cell TIME: 0945 T: 0215 ANTICIPATED RESPONSE: Call should be transferred to' Rumor Control. INSTRUCTIONS: Record call - siete "This is a Crill". COMMENTS: l 1 I Rev. 2 l

r k 4 ( 7-67

    +

DBNPS EMERGENCY PP.EPAREDNESS EXERCISE CUE CARD'

      .g         SCENARIO NO. 1989 Exercise                                                                                      CUE CARD No.                                                     '34' TO: Control Cell                                                                                               TIME:                                                        0950 T:                                    0220
                 *****************************************w.***********************************.

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Rumor Control. Message: "This is a Drill. Hello, I saw this number on my television and thought I should call. My name is Sheila Clemmens and I live in Toledo. What is the latest. on the emergency at Davis-Besse? Do you think ve are safe here in Toledo? What is the difference between an ALERT emergency and a SITE AREA EMERGENCY 7 This is a Drill." Provide the player.your telephone number if he offers to return your call. Note the time, if he returns your call. l. THIS IS A DRILL Rev. 2 L_.. .i. _ _. __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _

  . ";.                             s            -
                                                                           ;.r o --                                                ,-

u ,

                                                    ~

7 lY ' . v; 3;, DBNPS EMERGENCY PREPAREDNESS CUE' CARD'(Cont'd) CUE CARD No.- 34' j ,

                                                              'TO: ' Control' Cell:                                            TIME:                     0950

( ;. T: 0220 ANTICIPATED RESP 0!sSE: 1 ' l, . ., l Call back number requested.

s ,

INSTRUCTIONS: Record call - state "This is a Drill". COMMENTS: Rev 2

7-69 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 35 _ TO Control Cell TIME: _ 0955 T: 0225 .

                                            ~THIS IS A DRILL DO NOT initiate actions affecting normal plant eperations.
      *****************************************************************,*e**********

INFORMATION: Call Plaza Operator at ext. 5000. You are a doctor and vant to help answer questions. When connected, say the following:

            "I'm Dr. Ralph Bowler. I am the dean of radiology at Minstate University.

I'm available to assist you if needed. My fee for this service is quite reasonable, $5000.00 per day, 5 days minimum,-plus travel expenses. When vould you like me to arrive and where should I go!" THIS IS A DRILL Rev. 2

7-70 DENPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

                                                                                    . CUE CARD No. 35 TO: Control Cell                                       TIME:      0955 T:      0225 ANTICIPATED RESPONSE:

Call should be transferred to Rumor Control. INSTRUCTIONS: Record call - state "This is a Drill". l COMMENTS: l Rev. 2

i l i 7 71 DBNFS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 36 F ~ TO ' Media Actors TIME: _, 1000 - 1100 ' T: 0230 - 0330 ' THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION. l As Simulated news media, your responsibility is to ask questions of the spokespersons.- The purpose is to assure that each spokesperson present demonstrates the ability to brief the news media in a timely manner. Below are just sample questions, but you should develop your.own based on their statements. If real news media are present and are asking sufficient questions, your role vill be less active. ESTATE OF 0H10 SPOKESPERSON:

1) When did the Governor declare the SITE AREA EMERGENCY?
2) Have other states with nuclear plants offered Ohio assistance?

3)- Vill the State reimburse farmers for their losses? OTTAVA COUNTY SPOKESPERSON:

1) How many people live in the evacuation zones?

2)- How many people must be evacuated? 3)' What directions do you have for people in Ottava County? LUCAS COUNTY SPOKESPERSON:

1) Are any of the commissioners available for intervievs?
2) Is Lucas County in contact with Ottava County?
3) Vhat does the Main Feedvater System do at Davis-Besse?

TOLEDO EDISON SPOKESPERSON:

1) How does Toledo Edison decide when to escalate the level of the emergency?
2) Is Toledo Edison or the Nuclear Regulatory Commission now in charge of the plant?
3) Have other utilities with similar plants been contacted to assist Toledo Edison?

THIS IS A DRILL

       ******************************************************++**********************

Rev. 2 ________J

J 7-72 DBNPS EMERGENCY PREPAREDNESS' CUE CARD (Cont'd) CUE CARD NO.- 36 TO: JPIC Controller: TIME: 1000 - 1100

                                                                                         .T:     0230 - 0330 ANTICIPATED RESPONSE:                                                             ;

Each spokesperson should address only those questions that apply to his agency-or company. The spokespersons should not speculate. j INSTRUCTIONS:.

                               . State "This is a Dr'ill."

l COMMENTS: l i i 1

                                                                                                                 .l

{ Rev. 2 L _ _ - - - - - - - -  !

l' 7-73 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 37' _,

      - TO: Control Room Operators                              TIME:       1007 T:       0237 THIS IS A DRILL DO NOT initiate actiona affecting normal plant operations.

INFORMATION: .. The following annunciators have been received in the Control 1oom:

            .F 741    RC MU Flow Hi F 856 -~RCP 2-2 seal RTN Flov Hi L 854 - RCP 2-2-seal Standpipe LVL THIS IS A DRILL Rev. 2

h 7-74 f DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 37

                                                  .                                                                l TO: Control Room Controller                             TIME:. 1007 .
                                                                                                                 .]

1 T: 0237- 1 l

                             ' ANTICIPATED RESPONSE:                                                              {

Refer to AB 1203.29 and possibly AB 1203.21 consider S/D due'to leak > T.S. limits. I

1) Isolate letdown via MU 2B, start the second make up pump.
2) Start batching to make up tank.

INSTRUCTIONS: j J l Provide the'following information only if specifically asked for: M/U TK LVL is decreasing, tave constant, PZR LVL slowly decreasing, RCS pressure a decreased to 2120 psig - now steacy, normal I

                                                                                                                 .i PZR LVL dropping slowly MU 32 is fully open.

I 1 I

l. COMMENTS:

i i t' l t l l l i i I Rev. 2  ; i . . . . . . . . . , ,  !

Y 7-75 h DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 38 TO: Control Room Operators TIME: 1009 T: 0239 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Makeup tank level has decreased from 70" to 53" in the last 2 minutes. THIS IS A DRILL Aw**************************************************************************** Rev. 2 l

7-76 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 38 TO: Control Room Controller TIME: 1009 T: 0239 ANTICIPATED RESPONSE:

1) Calculate leak rate i

Change in level 17" 17" x 30 gallon = 255 gpm Ieak 2 min inch

2) Shift suction of the makeup pumps to the BVST.

INSTRUCTIONS: 1 Provide this information only if specifically asked. ] i NOTE: If the suction is not changed manually, it vill automatically change l at 10" makeup tank level 1.e. 5 min. Makeup pump discharge pressure 2460 psig. Use of the alternate injection line is not allowed at this time. i Throttling MU 32 does not affect MU pump flov.  ! .i

   ~

COMMENTS: i j Rev. 2

l L 7-77 l DBNPS EMERGENCY PREPAREDNESS EXERCI53 CUE CARD' SCENARIO No. 1989 Exercise CUE CARD iiO. 39 TO: Centrol Room Operator TIME: 1010 T: 0240 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: The following annunciators have been received: CRD Trip Confirm RC PRZR Rif.VLV open RC Loop 1 ELg Press RC Loop 2 HLg Press RC Przr Lvl RC Przr to Lvl Htr Trip SFAS RC Press <1650 Trip RPS RC Lo Press Trip RPS CHI CH Trip RPS CH2 CH Trip RPS CH3.CH Trip . RPS CH4 CH Trip HP Inj 1-1 Flow Lo HP Inj 1-2 Flow Lo HP Inj 2-1 Flow Lo HP Inj 2-2 Flow Lo THIS IS A DRILL O Rev. 2

7-78 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) l' CUE CARD NO. 39 TO: Control Room Controller . TIME: 1010 T: 0240-ANTICIPATED RESPONSE: 'L Carry out DB-PF-02000 Rx Trip. !. Perform immediate-action, and supplementary action. INSTRUCTIONS:; Sub cooling margin info will be available at 0244. MU 2B closes when operator attempts this action. All Rods are fully inserted except APSRs, Rx power is decreasing on the Intermediate Range, Turbine SVs and CVs are closed, NNI and ICS power is available, A and B busses are aligned to-the expected.suxfmr and voltage is normal a air compressor is running and pressure is 110#. l COMMENTS: l' l i Rev. 2

                                                                                                     )

1 o

l l, 7-79 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989, Exercise CUE CARD NO. 40 X ' f TO: Control Room Operators TIME: 1010 T: 0240

             ***************w**************************************************************

THIS IS A DRILL M NOT initiate actions affecting normal plant operations. INFORMATION: You may not initiate Containment Spray at this time even if a water source becomes available. THIS IS A DRILL Rev. 2

        \ r l-g. -

h 7-80 1 l DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) j :-

i. CUE CARD NO. '40k 7
TO: . Control Room Controller TIME: 1010-l: T: 02:40 l4
                     .. ANTICIPATED RESPONSE:.

None-1 , INSTRUCTIONS . Give this. card to the operators to prevent CTMT spray initiation. t-COMMENTS:

                                                                                                                              .ii l

I l l I I Rev. 2  ! I l 1

 . =__:.-____---_ _-__- . _ _   _ _ _

l; 1-j .: 7-81 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD. SCENARIO NO. 1989 Exercise CUE CARD NO.. 41 TO: Control Room TIME: 1010 T: 02:40 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Have the following announcement made ever the Gai-tronics system:

               "This is a Drill.

Attention all personnel, attention all personnel, a Site Area Emergency has been declared. Protected Area Evacuation is required, Ovner Controlled Area Assembly. is NOT required." Repeat this message once. THIS IS A DRILL Rev. 2

                                                                                    '7-82 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)              .;

CUE CARD NO.- 41 TO: Control Room Controller TIME: 1010 T' 02:40- l ANTICIPATED RESPONSE: Have announcement made,' Simulate Owner' Controlled Area Assembly. INSTRUCTIONS: Provide this card when a Site Area Emergency has baten declared. 4 u i e Rev. 2

                                                                                                                                  'l 7-82A

_{ l DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD.NO. 41A TO: Control. Cell TIME: 1010' T: 02:40 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations'. INFORMATION:' . NOTE: 35. minutes following the Protected Area Evacuation OR . 25 minutes after being notified by the ECC. Which ever is earlier provide the following information. Make individual call to either of the following telephone Emergency Facility Services Manager ext. 8374 or ext. 8471. Assembly Area Number of Assembled Personnel Project Manager 48 Varehouse 34 Training Center 1st Floor 65 Training Center 2nd Floor Protected Area + 38 DBAB Annex 73 DBAB 1st Floor 27 DBAB 2nd Floor 108 PPF 2nd Floor 22 THIS IS A DRILL Rev. I

l, Y_' 7-82B DBNPS EMERGENCY PREPAREDNESS CUE' CARD (Cont'd) CUE CARD.NO. 41A'

                           ; TO : ' ' Control Cell-                                    TIME:        1010
                                                                                         - T:       02:40 ANTICIPATED RESPONSE:

t. None' INSTRUCTIONS: None-- 4 F 1 COMMENTS: l

                                                                                                                      -1 i

l l

                                                                                                                      ] ,

Rev. 1 L________-_ _-

7-83 DBNPS EMERGENCY PREPAREDNESS EXERC7,SE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 42 TO: Emergency Director TIME: 1010 T: 02:40 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

        ************************************+*****************************************

INFORMATION: For the purposes of this Exercise Owner Controlled Area r.ssembly is not required. Direct that Owner Controlled Area Assembly be simulated. All actions up to~ actual assembly are to be carried out. THIS IS A DRILL I Rev. 2 I

l 7-84 DBN?S' EMERGENCY PREPAREDNESS CUE CARD (Cont'd) 4 CUE CARD NO. 42

                                                    ' TO: ED Controller                                       TIME:        1010 T:        02:40 ANTICIPATEDRESPONSE: .

Inform Security and Emergency Facilities Manager and EPH'of the simulation. INSTRUCTIONS: . Provide this card when a Site Area Emergency.has been declared. COMMENTS: Rev. 2

r

                                                                                                           'l i

l 7-84A j 1 i DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD { l SCENARIO No. 1989 Exercise CUE CARD NO. 42A i 4 TO: Emergency Facility Services Manager TIME: 1010 T: 02:40 i; THIS IS A DRILL DO NOT initiate' actions affecting normal plant operations. i

  ******************************************************************************                             4 INFORMATION:

Owner Controlled Area Assembly is to be simulated. Contact the Assembly Area Coordinator in the Control Cell at ext. 8361 for information on the simulated assembled personnel. THIS IS A DRILL

  ******************************************************************************                             j Rev. 2
 ,i 7 7-84B DBNPS EHERGENCY' PREPAREDNESS CUE CARD (Cont'd)

CUE CARD NO.. 42A

                            .TO:l ECC Controller                                  TIME:       1010 T:      02:40-                   ,
                           -ANTICIPATED RESPONSE:
                           . Contact Control Cell.

INSTRUCTIONS: None COMMENTS: h 1 1 1

                                                                                                                            )

Rev. 2

i 7 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 43

T0s Control Room. TINE: -1012 T: 0242
                  ****************************************************************************w*

THIS IS.A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Both make up pumps indicator lights are green and MU flow is zero gpm. Seal' injection flow is zero. THIS IS A DRILL Rev. 2

7-86 l DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 43 TO: Control Room Controller TIME: 1012 T: 0242 ANTICIPA1ED RESPONSE: Close MU 19 l Verify suction lined up to BVST. Attempt to restart both MU pumps. l INSTRUCTIONS: l At this point both M/U pumps are burned up due to lack of suction. Neither pump . can be restarted. 1 I i COMMENTS: i l l l l Rev. 2 l . . .. .

                                                                                                                    '1 I

7-86A DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD 5 SCENARIO No. 1989 Exercise CUE CARD NO. 43A TO: OSC Team Investigating HPI & M/U TIME: 1012

                           -Pump Breakers T:        0242 1

i l- ******************************************************************************.  ; a I THIS IS A DRILL D_0 0 NOT initiate actions affecting normal plant operations.

                   '1NFORMATION:

Both Makeup Pump Breakers and HPI Pump #1 Breaker have overcurrent trip

                 ' indications and-the breaker "open" lights are lit.

l l j ****************************************************************************** THIS IS A DRILL i

                      *******************f**********************************************************                 1 l

Rev. 2

i n L

y i 4 868
         !/ '                                    DBNPS' EMERGENCY PREPAREDNESS CUE CARD (Cont'd)_

CUE CARD NO. 43A-TO: OSC Team Controller- TIME: 1012 T: 0242

      ;;                        ANTICIPATED RESPONSE:
                              - Report findingslto'the'OSC.

INSTRUCTIONS:

                                                                                                             'I None 1
                                ~ COMMENTS:

l l l Rev. 2 [- I

i 7-87 l DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 44 TO: Control Room TIME: 1013-T: 0243 L ******************************************<*********************************** THIS I$ A DRILL

                       @ NOT initiate actions affecting normal plant operations.

INFORMATION: , The following alarms have been received. 0963 - SFRCS Trip L886 - SFRCS CH1 Lo LVL/RCP Trip L896 - SFRCS CH2 to LVL/RCP Trip P310 - CTMT Press Hi SFAS CH1 P311 - CTMT Press Hi SFAS CH2 Tsat meters indicate -l'F and -3*F THIS IS A DRILL l Rev. 2 l

1 h.. . ,. , 7-88 i ' l l' , ' DBNPS ENERGENCY PREPAREDNESS. CITE CARD (Cont'd) 4

   ,'                                                                                                        CUE CARD NO.      44-TO: . Control Room                                              TIME: l    *013-l                                                                                                                T:      0243 ll                                          '

', ' ANTICIPATED RESPONSE:

                                          . Verify'SFAS 1 & 7 responded.-

Close'PORY block. Close spray; block. l- . Trip RCPs due to less of subcooling margin. Carry out specific rules. l' l INSTRUCTIONS:

                                           -HPI pump burns up at this point 0 flow.

When attempted neither Makeup pump vill start. HPI pump von't start. Both CCW pumps are running. COMMENTS: 1 l Rev. 2 E_2__________________

7-89 DBNPS EMERGENCY PREPAREDNESS EXERCISE CI'E CARD SCENARIO NO.1989 E::ercise , CUE CARD NO. 45 _ TO - Control Roca TIME: 1016 T: 0246

                               ************************As****************************************************

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: The following annunciator has been received: SFRCS SG2 Lo Press Half / Full Trip l l l l l l THIS IS A DRILL

                                *********r********************************************************************

Rev. 2 I

c. _ _ _ _ . _ _ _ . _ _ _ _ _ - _ _ - _ _ - - _- __-_ _- -
            .$        ,P
         ~

i

        9 5;.

s ,

                         ,+
                      ""                                                                   7-90:                                                                   .

y E.

                                                             -DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)
                   . . ..                                                      ,                                                                                     CUE CARD No.. 45
                  , .y .
                                           -'TO:  Control Room Controller                                                                                            TIME:      1016 T:     '0246'
                          ,      1,

ANTICIPATED RESPONSE: INSTRUCTIONS: When operator attempts.to bump RCP's they vill not start, the interlocks.cannot be bypassed. COMMENTS: I J t Rev. 2 L____ _

                                                                                                                                                                                            ..'j

7-91 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 46X TO: Control Room TIME: 1016 T: 0246 THIS IS A DRILL l' DO,NOT initiate actions affecting normal plant operations. l INFORMATION: Pull the close power fuses on BOTH LPI pumps to prevent a SPAS start. THIS IS A DRILL Rev. 2

                                                   'i j 7-92 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

CUE CARD.NO. 46X TO: Control Room Controller TIME: 1016 T: 0246 ANTICIPATED RESPONSE: INSTRUCTIONS: Provide this card if LPI pumps are disabled already, COMMENTS: l l l 1 l l ? l l l l l l < l Rev. 2 i ! i L__ _ _ _ _ _ _ _ J

?

      !}o',

i g 7-93 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE. CARD )

            -SCENARIO No. 1989 Exercise                               CUE CARD NO.                                  47X    ;

i TO: Control Room TIME: 1025 a r T: 0255 I l THIS XS A DRILL DC WOT initiate actions affecting normal plant operations. l l

            -******************************************************************************                               j INFORMATION:

PORV Block Valve cannot be reopened after closing, t i l J i i s 1 I i i l i i l

            *******************w**********************************************************                                j THIS IS A DRILL                                                              )

1 Rev. 2 I j

_n ., _ _ _ _ - - .-. . ._ Lpj , ' -

                      -j 

e ., s e < 1 7 1, - , 4 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)- CUE CARD NO., 47X TO: Control Room Controller TIME:: _ 1025 T:' 0255 W ANTICIPATED RESPONSE: Send out OSC Team to.dttermine cause.

t:
                                                       =

INSTRUCTIONS:: M-i COMMENTS: 1 Ny COMMENTS:

  • l
      .p                                                                                                                                                   j
                                                                                                                                                           'l l

1 i I [. Rev. 2 i [- _.__._-.m.-_._____________._____.___

7-95 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. ~48 TO: 'OSC Team Investigating PORV Block Valve TIME: 1025 T: 0255 THIS IS A DRILL DO NOT initiate actions affecting normal plant opert' ions. . INFORMATION: You cannot open the PORV Block Valve from its local controller. THIS IS A DRILL Rev. 2

l\ 3; 1- [ 7-96 [ 1 l DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO.- 48 l E TO:'.0SC Team Controller TIME: 1025 .

i. 'T: 0255 ANTICIPATED RESPONSE:

Inform the-OSC of the inability to open block valve. l INSTRUCTIONS:- Provide this card when the repair team attempts to open the block valve locally. The valve vill not open. After isolation of PORV the block valve is closed and can not be opened due to , the opening torque switch bypass contact not closing when the valve closed. The valve closed "hard" and.the non-bypassed torque switch prevents the valve from opening.

                                                                          .                                                   j Note:      This contact is located at the motor and is inaccessible.                                  j j

i i COMMENTS:. i 1 1 I l Rev. 2 1' _ _ _ . _ - _ _ _ _ - -

7-97 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise' CUE CARD NO. 49X TO: Emergency Director TIME: 1025 T: 02:55 THIS IS A DRILL DO N0f initiate actions affecting normal plant operations. INFORMATION: Declare a Site Area Emergency in accordance with HS-EP-01500 EAL 3.D.2. THIS IS A DRILL

      ***********************>***********************+******************************

l Rev. 2

7-98 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 49X TO: Emergency Director Controller TIME: 1025 T: 02:55 ANTICIPATED RESPONSE: Declare a Site Area Emergency, evacuate the Protected Area and simulate assembly in the Ovner Controlled Area. Implement HS-EP-01500. Direct Control Room to make announcement. l l l INSTRUCTIONS: Deliver this card if a Site Area Emergency has not been declared within 15 minutes of the conditions requiring such a declaration. If conversations are taking place that are expected to result in declaration of Site Area Emergency, then hold this card. COMMENTS: Rev. 2

1 1-7-99 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD 1.. [ SCENARIO NO. 1989 Exercise CUE CARD NO. 50 TO: Control Cell TIME: 1025 T: 0255 TIIIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Plaza Operator at ext. 5000. Message:

             "I'd like to speak to your corporate organization. I'm Dr. John Blake, M.D., from Upper States University.       I'm the director of radiological medicine. I'm the regional American Medical Assn., Nuclear Medicine representative. My assistance to Toledo Edison is available by arrangement with INPO.
        **********************************+*******************************************

THIS IS A DRILL Rev. 2 _ _ _ _ _ _ _ _ _ m._

z. -__

3,r +:

               %g
                                .c.

7-100-

   ;f .          TL   '

-@: . DBNPS EMERGENCY PREPAREDNESS CUE CARD'(Cont'd)' CUE CARD NO. '50

                                    'TO:>. Control Cell TIMES-       1025-i
                                                                                               .T:       0255
                                    " ANTICIPATED RESPONSE :

Call back number' requested. INSTRUCTIONS:

                                    = Record' call   state "This is a Drill".

COMMENTS: ' l l- 1 Rev. 2

1 l 7-101

                                                                                                                           .]

DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD f SCENARIO NO. 1989 Exercise CUE CARD NO. 51 1 TO: Control Cell TIME: 1030 - 1200 l' T: 0300 - 0430

            ****************=*************************************************************

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Cell Rumor Control at ext. 5616, 5450 or 5668. You are various people from towns / townships in the area near Davis-Besse. Place call approximately 3 to 4 min. apart. Repeat calls using a different name each time. Continue this line of questioning until 1200.

            - Can I go outside to take care of my animals? Vhat should I do?
            - What should I do if things get vorse?
            - If I have to evacuate, where should I go and who vill take care of my horse?
            - Vhat is a Site Area Emergency? Vhat does it mean?
            - How ruch radiation has been blown out of the reactor? Where did it go?
            - Hov long until the reactor melts?
            - Vill there be any chance that I can get cancer from this emergency?
            - What vill happen to the contaminated animals? Vill they be killed? Can they spread the radiation to Canada?
            - Vhat is this going to do to the people in Toledo?

l THIS IS A DRILL 1

            *********************************************************w********************

l-l l Rev. 2 l t l^ - _ _ - - - _ _ _ _ _ _ ~

i 7-102 .i DBNPS EMERGENCY PREPAREDNESS cur, CARD (Cont'd) - CUE CARD NO. 51 TO: Contml Cell TIME: 1030 - 1200 4 T: 0300 - 0430 ANTICIPATED RESPONSE: i Call back numbers may be requested. INSTRUCTIONS: j Record calls - state "This is a Drill". COMMENTS: I i I i l 1 { 4 1 i l Rev. 2

l' 7-103 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD No. 52 TO: Media Actors TIME: 1030 - 1200 T: 0300 - 0430 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: As SIMULATED news media, your responsibility is to ask questions.of the spokespersons. The purpose is to assure that each spokesperson present demonstrates the ability to brief the news media in a timely manner. Below are just sample questions, but you should develop your own based on their statements. If real news media are present and are asking sufficient questions, you role vill be less active. STATE OF OHIO SPOKESPERSON:

1) Has the State activated it's emergency center?
2) Has the Governor made a statement?
3) Has Toledo Edison kept the State briefed?

OTTAVA COUNTY SPOKESPERSON:

1) Do you know the status of the injured man?
2) What hospital was the man taken to?
3) Has Toledo Edison requested assistance from Ottava County? i LUCAS COUNTY SPOKESPERSON:
1) Have you evacuated any of Lucas County?
                   - 2)    What kind of training have the Lucas County employees received to prepare for this emergency?
3) Vhat actions has the Lucas County Sheriff taken?

TOLEDO EDISON SPOKESPERSON:

1) Did the reactor trip by itself or did the operators make the reactor trip?
2) Has Toledo Edison evacuate the site?
3) Are there enough people left at the site to stop this emergency from progressing to a meltdown?

THIS IS A DRILL Rev. 2

                                      '7-104 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

CUE CARD NO. 52 TO: Medla Actors- TIME: 1030 - 1200 T: 0300 - 0430. ANTICIPATED RESPONSE: Each spokesperson'should address only those tuestions that apply to his agency or company. The spokesperson should not speculate. INSTRUCTIONS: COMMENTS: l l. I l Rev. 2

ie

         ,                                             7-105 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD i

SCENARIO NO. 1989 Exercise CUE CARD NO. 53 f TO: Control Room TIME: 1030 T: 0300 I' THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: The following annunciators have been received: CTMT Norm Sump LVL Hi 1546A CTMT Norm Sump LVL Hi 1546B THIS IS A DRILL l Rev. 2

j

   .g        >

Ii

i. -m 7-106 i.

D8NPS EMERGENCY PREPAREDNESS. CUE CARD (Cont'd) s-4 i .:

                                                    .                              ' CUE CARD No..    '53
                           .T0s. Control Room.                                     TIME:      1030 i

i o T: 0300 i ANTICIPATED RESPONSE

                                          ~
                             .' None .

1 , d L. y ..

                                                                                                               -i
                             ' INSTRUCTIONS:

None i l. 1

                                                                                                               .. g l

l> COMMENTS: l:: 1. l-l i-

                                                                                                               'i 1

i i l i

                                                                                                                -l 1

i 1 l l. l Rev. 2-J

7

y. 1 3 .-

7-107' DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO.'1989 Exercise CUE CARD No.- 54 TO: Control Room TIME: 1034 T: 0304 i THIS IS A DRILL-DO NOT initiate actions affecting normal plant operations.

                                                                                                                                                                      .             l INFORMATION:                                                                                                                                          '
  • 1 The following annunciator has been received: j P896 - SFAS CTMT Press > 18.4 PSIA Trip
                                                                                                                                                                                 ~!

l l l l l  :

                                                                                                                                                                                   )

1

                                                                                                                                                                                 .i
                             ******************************************************************************                                                                        ]

1 THIS IS A DRILL

                             ******************************************************************************                                                                         )

Rev. 2 1 v _m_-m-_ _ _ .-

             ,, . .i ;

7-108-

    )I
                   ,g                          ~DBNPS' EMERGENCY PREPAREDNESS CUE: CARD (Cont'd)'                ,

CUE CARD NO.- - St. T01.. Control Room Controller-- , TIME: 1034 T: 0304

                             , ANTICIPATED RESPONSE:

None. INSTRUCTIONS: None. 1 COMMENTS: Rev. 2

7-109 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD

          -SCENARIO NO. 1989 Exercise                                 CUE CARD NO.                                                55 TOs   Injured indiv! dual                                  TIME:                                                 1035 T:                                  0305
           ***************************w**************************************************

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: You are working in the BVST area attempting to secure CO2 bottle. Bottle falls, breaks and takes'off under pressure. You fall while attempting to run and hit your head on concrete. Unconscious, you have bleeding head vound and are lying in water from BWST. l l THIS IS A DRILL Rev. 2 I L _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ - . _-

m" g: m ,- -

                                                 .       -) .

7-110-n- b

DBNPS EMERGENCY PREPAREDNESS CUE CARD.(Cont'd) e , CUE CARD NO. 55
t. . .

l' ' TO: Injured. individual- TIME . . 1035 T: 030S' 1

                                                   -ANTICIPATED' RESPONSE:

l-Lie face down 'no movement. l INSTRUCTIONS: Remain-.. unconscious until first aid team arrival. p. COMMENTS:

                                                     ~1. . Victim has sprained left knee, laceration on left side of forehead and-concussion from hit on head.

1

2. Water from BWST is contaminated (see Body Maps).

l Rev. 2

7-111 h I DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD

                                     . SCENARIO NO. 1989 Exercise                                CUE CARD NO. 56" TO: Control Cell                                          . TIME:    '1035 T:     0305 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

INFORMATION: Call Rumor Control at ext. 5616. Messages I just beard an EBS message for a disaster at Davis-Besse. Answer a few questions, Ok?

                                             -  What is the condition of the reactor? Did it explode?
                                             -  What should people do if the situation gets worse?
                                             -  Is this just like Chernobyl?
                                             -  Is the NRC in charge out there?
                                                                                                                                           )

I 1

                                        ******************************************************************************                     ]
                                                            .                                                                              i THIS IS A DRILL                                                  ,

I Rev. 2 l

        ,m                      *
                                                                                                                   ,j g-                                                                                '
    - S                                                                                                            .i

, 1 l; 7-112- 1 1 .. 1 .<- A 'DBNPS EMERGENCY PREPAREDNESS CUE CARD-(Cont'd) l4 i l'

                   .- ;-                                                                 CUE CARD NO. 56      n!

4, e i 1: .TO: Control' Cell. TIME:- 1035 .j T: l 0305 ANTICIPATED RESPONSE:  !

                                                                                                                 . I Call back number may be requested.                                                       j i .'

i- . l-INSTRUCTIONS: 1 1 Record call - state "This is a' Drill". i l- ., 1 l l- j [- , l  : COMMENTS: .j l 1 e i i 1,. 1 s l l, l i Rev. 2 l

                                                                                                                     .l-

7-113 I DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO.'1989 Exercise CUE CARD NO. 57 i TO: Individual Finding Injured Person TIME: 1035 T: 03:05 THIS IS A DRILL DO NOT initiate actions affecting normal plant operaticns. INFORMATION: You find victim lying face down in the BVST area. He appears unconscious, has laceration on left side of forehead, bleeding moderately. Victim is vet from a large hole in the BVST. Vater is rushing out on the north side of the BVST. THIS IS A DRILL Rev. 2

            ,                        g.          .

g 1 f 7

                                                                          '7-114
-s;c .
                                                      'DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

CUE CARD No. 57 T0: ~ First Aid Controller ' TIME: 1035

                                                                                              .T:      03:05           -

I ANTICIPATED RESPONSE . 1.. Inform Control Room., j

                             - 2.,        Assist victim.

INSTRUCTIONS: COMMENTS: 1 1 1 L j i 1 ! )

  ,                                                                                                                   i l

l l 4 Rev. 2 i i k '. .

r; - - - - _ _ _ (L-- 7-115 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 58 TO: Control Room TIME: 1037 T: 0307

    *************************************s****************************************

i THIS IS A DRILL j DO NOT initiate actions affecting normal plant operations. INFORMATION: The following annunciators have been received: LOSO - BVST LVL Lo SFAS CHI LO61 - BVST LVL Lo SFAS CH2 THIS IS A DRILL Rev. 2

r. . . . . . .

y ,

                          'i
                                           ;y-
                                          ,_     i ..

!J 7-116-li DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 58' T00 , Control ^ Room Controller TIME: 1037 T: 0307 ANTICIPATED RESPONSE:~ , Investigate level-loss. INSTRUCTIONS: I Indication of hole. i i-i

                                               ' COMMENTS:

l' i s l

                                                                                                                                                                                         -a 3

! 1 l ' i i l . Rev. 2 -)i I a_ - - - _ _ - - - - - - - - - - - - - - . _ - - - - - - _ - _ - - _ - - - - - _ - - - - - - - _ - - .

7-117 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD l SCENARIO NO. 1989 Exercise CUE CARD NO. 59

  .TO: ' Control Cell                                         TIME:-                1040 L                                                                 T:                 0310 t

l-L ***********************++***************************************************** THIS IS A DRILL-DO NOT initiate actions affecting normal plant operations.

   ********************************w*********************************************

INFORMATION: Call Rumor Control at 5450. Message:

         "Ve are preparing an indepth report on Davis-Besse for national coverage on tonights 6 o' clock news. This is Jan Bear from ABC. I need video footage of the Control Room. My camera crew should be there in Toledo by noon.
        'Vhat are the directions to the plant from the airport?

THIS IS A DRILL Rev. 2

L I 7-118 L DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 59 TO: Control Cell TIME: 1040 T: 0310 l ANTICIPATED RESPONSE: Call back number may be requested. INSTRUCTIONS: Record call - state "This is a Drill". To be delivered after EBS has been simulated. COMMENTS: Rev. 2 l u

7-119 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO No.'1989 Exercise CUE CARD NO. 60 TO: First' Aid Team TIME: 1045 T: 03:15 THIS IS A DRILL' DO NOT initiate actions affecting normal plant operations. INFORMATION: You find victim apparently unconscious with bleeding head vound. He is vetted' with water from BVST. l *********************************&******************************************** r l THIS IS A DRILL Rev. 2

5 fA ' ^ -> 7-120 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

                                                                                                                         ' CUE CARD NO.      60 l-                                  -TO: First Aid Team' Controller.                                                        TIME:      1045 T:      03:15 ANTICIPATED RESPONS3:

E

                                   .' l . Initial assessment   i
2. Call for offsite im>. lance assistance.
3. - Treat injuries at le.el of training.
4. Rad con assistance request.

p I INSTRUCTIONS: Patient initially unconscious. g Moderate bleeding from head wound. l- ! ' Vitals -. depressed due to patients condition (laceration on forehead, concussion, sprained left knee, mild shock) i

1. Original Vital Signs 2. Af ter Treatment (EMS arrival)

Blood Pressure: 100/60 . Blood Pressures 114/74 Pulse: 120 bpm, weak Pulse: 96 bpm, stronger Respirations: 8 rpm, labored Respirations: 12 rpm, normal Give other assessment data as proper assessment is performed. COMMENTS: When first aid team touches victim, victim vill become semi-conscious. Vill complain of pain. (See Radiological Data Body Maps) Controller may vary vitals at his discretion depending on conditions and treatment. Rev. 2 C__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

7-121 Initial Contamination - Clothing On At Scene 10,000 10 0 0

                                                                                                      /                                                                                                       \

0

                                                                                                              .O Area of fjj                                                                      -
                                                                                                                                            ,           00 CCPM Il                                                C
                                                                                                                           \d               $f                                            -

fl - i L 10

                                                                             ,,000
                                                                                                    ~,
                                                              -(                                                           (

v ,000 k 5,0  ::7 V , l , 5,000 W , f '3,' Y

  • Spraine f' *hl Pfshprained Knee.71 "j f

5,0$ ih / I g e

  • It Knee
                                                                  \ 20,000 20,000. 1
                                                       ]

f)[f , a f6 NOTE: Except as noted, clothing reads NOTE: All Readings are in CCPMs. 200-1000 CCPM l 1 s 4 Rev. 2

[ 7-122 Contamination-- Clothing Removed i

                                                                                                                                             -l

[ Laceration I 10,000

                                                                .$ l  l J                                 \
                      ~                                                               .+, A:' '

10,000 f \ (U lu h E: I

                            ~

3,000 s I 5,000 ' Vd 1:./ 5,000 v ' f \1 3, A 'N

            .         I
                          .         3 00                             O'     .
                \             {               .,                            \l1)
                  -fi                                                g 3,000        .L
                      ,}                                                                               ,
                    !     [i    10,000                               [-

10,000 e NOTE: Except as noted, all other areas of body are clean. NOTE: All Readings are in CCPMs. Rev. 2

                                                       '7-123 i                       DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise                               CUE CARD NO.                                                    61 TO: 'SAS                                                 TIME:                                                     -1045
                                                                  . T:                                                   0215 L

1 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: l Magruder Hospital is not involved in this Exercise. Do not make call to Magruder to inform of contaminated injured victim being transported offsite. l. i l 1' l l l THIS IS A DRILL 1 i l Rev. 2 i 1 l L - - - - - - _ _ _ _ - - - - _ _ _ - - _ _ _ _ _ _ .l

k

 .3

{ 7-124. 1 DBNPS~ EMERGENCY PREPAREDNESS CUE CARD (Cont'd) / CUE CARD N0. 61 >

                                                                                                                                                      .j TO:    SAS Controller                                      . TIME:       1045-T:    '0315 ANTICIPATED RESPONSE:

Normally Magruder vould be called as soon as contaminated victim being transported offsite is recognized to give them time to set up, i

                                                                                                                                                       -l INSTRUCTIONS:
                                               -Magruder is not playing in this exercise. Do not call them.                                           _

l COMMENTS: i 1 l L Rev. 2 __ _ _ _ _ . _ _ . _ - . __ _ ._. _- _ _ )

4 7-125 l !: .DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD l l- SCENARIO NO. 1989 Exercise CUE CARD NO. 62X l l TO: -First Aid Team . TIME: 1050

T
0320 l-l 1.

THIS IS A DRILL M NOT initiate actions affecting normal plant operations. INFORMATION: Call SAS for an ambulance. THIS IS A DRILL Rev. 2

                                                                 ~7-126 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

CUE CARD NO. 62X _ TO: First Aid Team Controller TIME: 1050 T:' 0320 ANTICIPATED RESPONSE: Contingency card if Control Room does not call for' ambulance. INSTRUCTIONS: If the Control Rsia staff has not called SAS for an ambulance, give them this card. COMMENTS: s Rev. 2

7-127 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD CUE CARD NO. 63X SCENARIO No. $989 Exercise TO: OSC Manager TIME: 1050 T: 03:20 J

            ******************************************w***********************************

THIS IS A DRILL DO NOT initiate actions atic: ting normal plant operations. INFORMATION: Conduct Search and rescue operations for person (s) missing from accountability roster. THIS IS A DRILL Rev. 2

                    .g.                                                                                                           ,

7-128 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd). CUE CARD NO. 63X-TO: OSC Manager Controller ~ TIME: 1050 T: 03:20-ANTICIPATED RESPONSE: Direct Search'and Rescue operations for missing person (s). INSTRUCTIONS: The missing. individual is intended to be one exercise controller. COMMENTS: i 9 Rev. 2 bi__._._____________..________________.______

r-., i 7-129 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD.NO. 64 TO: Missing Individual TIME: 1050

                               ,                               T:        03:20 THIS IS A' DRILL DO NOT initiate actions affecting normal plant operations.

INFORMATION: . You are to stay in the Lov Voltage Switch Gear Room area after evacuation is-ordered. If your name is called on the Gai-tronics you are not to answer. Do not attempt to hide or evade discovery. l I l l l THIS IS A DRILL Rev. 2

. . ,'*                                                'I
                                                                '7 130 -

DBNPS EMERGENCY PREPAREDNESS CUE CA'tD (C7.ht'd) CUE CARD NO.- 64

                 .TO: Missing-Individual                                                  TIME:-                                                          1050 T:                                                      03:20
                 ANTICIPATED RESPONSE None-INSTRUCTIONS:                                                                                                                                          1 None 1

COMMENTS:- l 1 I l

                                                                                                                                                                            )

i i l . + y u; l Rev. 2 , . i w... _ _ _ _ .

l 4 I 7-131 l DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD j SCENARIO NO. 1989 Exercise CUE CARD NO. 65 TO: Ottava County Sheriff's Dispatcher TIME: 1055 T: 03:25 THIS IS A DRILL D0_ NOT initiate actions affecting normal plant operations. INF0RMATION: When you receive a call from Davis-Besse Nuclear Power Station requesting ambulance, Carroll Township EMS is not available. Obtain assistance from Mid County EMS. THIS IS A DRILL Rev. 2 ____-_______________-_a

P

                                                        '7-132
                                   .DBNPS EMERGENCY. PREPAREDNESS CUE. CARD (Cont'd)

CUE CARD NO. E65

              . TO: -Ottava County Sheriff's Dispatcher Controller        TIME:.       1055 T:        03:25
               ' ANTICIPATED RESPONSE:
               - Dispatch Mid' County EMS.
                . INSTRUCTIONS:

Normal EMS would be Carroll Township - they are unavailable and Hid County.must-be' dispatched. i COMMENTS: Mid County EMS must be dispatched. 1 i l , f -' i l L L Rev. 2 i

7-133 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise - CUE CARD NO. 66 TO: Oak Harbor P.D. Dispatcher TIME: 1055 T: 03:25 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

   *****e***********************************************************w************

INFORMATION: Page Mid County EMS out and read the following:

   "This is a Drill. Attention Hid County EMS, Carroll Township EMS has requested mutual aid and are requesting that you respond to the Davis-Besse Nuclear Power Station for an injured possibly contaminated worker. Actual response to Davis-Besse is requested. Obey all traffic laws. The use of lights and siren is not varranted. This is a Drill."

THIS IS A DRILL Rev. 2

7-134 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 66 TO Oak Harbor P.D. Dispatcher TIME: 1055 T: 03:25-ANTICIPATED RESPONSE: Mid County EMS should be paged out and the previous page's message should be read to them.

                  ** Use of "This is a Drill" before and after the message is mandatory.
                . INSTRUCTIONS:

Give the first page of this cue card to the Dispatcher and instruct her to act according to the message. COMMENTS: l. Rev. 2

7-135 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 67 J TO: Control Room TIME: 1039 T: 0329 I THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: The following annunciator has been received: L862 BWST LoLo LVL Xfer to Emergency sump l l l l l l I l THIS IS A DRILL l-. Rev. 2

_ A,

                                                                                                                                 )        ,

7-136

                                                          'DBNPS' EMERGENCY PREPAREDNESS CUE CARD (Cont'd).                             j CUE CARD NO. 67
                                                                                                        ;s.

(TO -Control Room Controller

                                              ;                                                     TIME .'   1059
                                                     -t T:     0229 i:                              .        ANTICIPATED RESPONSE :
                                       ~None-1
                                                                                                                             .    -l INSTRUCTIONS:
                                       -None-                                                                                    .f 1

a 1 c0MMENTS: 1 t' l 1

1. n 4

1 Rev. 2

                    -__ - -                -_                                                                                             l

1' l' 7-137-DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD )

    ,. SCENARIO NO. 1989 Exercise'                                        CUE CARD NO.                         68 TO: Emergency Director                                             TIME:            1100 approx.

T: 0330 approx. , THIS IS A DRILL

                    'DO NOT initiate actions affecting normal plant operations.
       **w***************************************************************************

INFORMATION: Return evacuated people to work. Simulate they are assembled for all future activities that would be required by the conditions as they occur. 1

 .I
       ***************1;***************A**************************k***************A***

THIS IS A DRILL Rev. 2 l

v g 1. 138' a DBNPS EMERGENCY P' PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 68'

                            ;TO:' ED Controller
  • TIME: 1100 approx.

T- 03:30 approx. ANTICIPATED RESPONSE: INSTRUCTIONS: Provide this' card after PA evacuation is complete and missing persons have been located.-

                            ' COMMENTS:

4 k

       .                                                                                                          -{

o q y i e ,  ! a

                                                                                                                   'd
                                                                                                                     )

p  ; i L 1 Rev. 2  : 1 i i

l J

                                                           , -l38 4                                                                                               I 4

_2,684 - ] l DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD -) i SCENARIO NO. 1989 Exercise CUE CARD NO. 68A TO: Emergency Security Manager TIME: 11:00 T: 03:30 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: . Allow non-essential personnel that are assembled outside the PIA to return to work in the protected area. Now simulate that they are assembled in the training area for any future activities that they would be involved vith. i i i

                   ***********t**6****t********************************************k*************

I T!!IS IS A DRILL Rev. 2 i L _ _ _ _ _ _ _ . . _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

y- _ _ - - _ . _ _ _ _ - - , - - - - - - _ M I

                                                            ,DBNPS EMERGENCY. PREPAREDNESS CUE CARD'(Cont'd)                                                       .
                                                                                                                                                                   ,I CUE CARD NO.                                               68A TO: .TSC Controller                                        TIME:                                                 -11:00
          '                                                                                          T:                                                  03:30 ANTICIPATED RESPONSE:

Allow non-essential persons to re-enter the protected area. INSTRUCTIONS: 1 Provide this card after coordinating with the ECC Controller. i l COMMENTS:

 ?

Le p , Rev. 2 i i

( .. i 7-139 (7-DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO No. 1989 Exercise CUE CARD NO.- 69 TO: NRC Incident Response Team TIME: 1100 approx. T: 0330 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

           ***************************************************************w**************

INFORMATION: Inform the DBAB Security Gusrd that you are the NRC incident Response Team and-proceed to the locations as directed. i

           ********************r m **************+e*****r***+*+4****a********************

THIS IS A DRILL

           **************************************************+***************************

Rev. 2

7. ~
 ~

7-140 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

                                                                    ' CUE CARD NO.                  69 b

TO . NRC Incident Response Team TIME: 1100 approx. T: 0330 ANTICIPATED RESPONSE:

       'NRC Liaison should get them from security, take them'to the NRC vork area in the.

ECC and provide current briefing on conditions and activity. l INSTRUCTIONS: None l COMMENTS: I .I Rev. 2 I J

Ys 7-141 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 70X TO: Control Room TIME: 1105 T: 0335 THIS IS A DRILL D0_ NOT initiate actions affecting normal plant operations. INFORMATION: i 1. Inform I&C to be ready to bypass the RCP interlocks. l

2. Re-establish CCV flow to the RCPs in preparation to start RCPs if required.

l l l l l l I

    +

l. THIS IS A DRILL f 1 1 Rev. 2

e 7-142

                                          .DBNPS EMERGENCY PREPAREDNESS CUE CARD.'(Cont'd)

CUE CARD.NO. -70X

                       .. TO:L' Control Room Controller-                         TIME:           1105-T:           0335
                       . ANTICIPATED RESPONSE:

OSC will prep'to' bypass interlocks. INSTRUCTIONS:-

                       .The time of'RCP. starting'is critical. Coordinate with OSC Controller on this activity.
                                                                                                                          .j i

d l l COMMENTS: i

    .                                                                                                                   y s                                                                                                                         !

l l 4 i y

                                                                                                                        '1 i.-

1

                                                                                                                        -l V                                                                                                                          ;

(! 4 hev. 2 s I \f .-. . _ - _ - - _ -

L-l l 7-143 n DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIC NO. 1989 Exercise CUE CARD NO. 71 TO: Control Room TIME: 1120 T: 0350 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

                                                           **********************************+*******************************************

INFORMATION: Start RCP's 1-1, 1-2 and 2-1 after bypassing the interlocks. l i h

                                                            **********************************************k*******************************

THIS IS A DRILL

                                                            *********************************************m********************************

Rev. 2

  's     ,
o  ;,'
                                                                              '7-144; DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)
 ., i :;  ,
                                                                                                                                                            ' CUE CARD NO.-         71-
.TO: ! Control Room Controller- TIME: 1116 T: 0346
                     '_ ANTICIPATED RESPONSES.
                     - Reestablished CCV Flov and bypass interlocks, start RCP's INSTRUCTIONS:

This time is critical, RCP's must start.at.this time. l h COMMENTS: J l-l-

                                                                                                                                                                                                                                       -)

i

                                                                                                                                                                                                                                        )

l.r I a l, i i Rev. 2 l l I I o _m_--_-_________-__-.--_-_---_.-__-.___-___.__--_---.--___-____---- _ _ - - _ - . - _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - - - . _ _ _ _ _ _ - - _ _ - - _ _ _ - - _ - ..-__s

                                                                                                                  .l 1

1 7-145  ! DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD 4 SCENARIO NO. 1989 Exercise CUE CARD NO. 72 TO: Mid County EMS Driver TIME: 1130 T: 04:00  ; 1 THIS IS A DRILL DO NOT' initiate actions affecting normal plant operations. INFORMATION: Victim is loaded into ambulance and EMS is ready to leave site. Transport victim to Fremont Memorial Hospital. Magruder cannot accept the patient. l j_ ****************************************************************************** THIS IS A DRILL L l l l Rev. 2 \ . --_ . -- - - _-_ ___ -

l' 4

.Y                                                                       7-146 i,                                                     DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) 1.

l .' CUE CARD NO. 72 iL TO: 'Mid County EMS Driver Controller TIME: 1130 T: 04:00-i1- ANTICIPATED RESPONSE: l~ . Transport to appropriate medical facility. p INSTRUCTIONS: Magruder. Hospital.cannot accept victim. Victim must be transported to Fremont Memorial Hospital. 1! l COMMENTS: l, F.nsure Fremont. Memorial is transport hospital. o Rev. 2

 ~

L.- - - _ - - - __ - - -

[- 7-147 j.. L L DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise. CUE CARD NO. 73X s. TO: Missing Individual TIME: '1130 T: 04:00 THIS IS A DRILL t DO NOT~ initiate actions affecting normal plant operations. INFORMATION: , If you have not been located by this time use the Gai-tronics and call for help. Tell them you are lost and can't find your way out. Tell them your location in general terms.

*********************it*******************************************************

THIS IS A DRILL l Rev. 2 l

3 3 ,;, 3 = --- ;;;5 , - - -. jf , l;K -

      ,-,e -      4 s 7,9          ,

W ,' ll

                *- b;-                                                         7448 r   ,      [  ,t >                           DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)
            , .,. .) :' i "i.                                                                                 CUE CARD NO.-       73X-
                  .I
 \                     -

TO: Missing. Individual ' TIME: 1130 T:. 04:00 ANTICIPATED RESPONSE:- OSC Team will. find'you. INSTRUCTIONS: None-COMMENTS: 1

             'f.-
                                                                                                                           ~

Rev. 2

                                                                                                                            ,I

_ _ = _ _ -_-- ____ .

i 1 7-149 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD q SCE :ARIO No.1989 Exercise CUE CARD NO. 74 TO: Control Room TIME: 1135 T: 0405 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. k***************************************************************************** INFORMATION: The following alarms have been received: CFTK 1 LVL Lo CF3B1 CFTK'1 LVL Lo CF3E2 CFTK 2 LVL Lo CF3Al-CFTK 2 LVL Lo CF302 CFTK 1 Press Lo CF4B1 CFTK 1 Press Lo CF4B2 CFTK'2 Press to CF4A1 CFTK 2 Press Lo CF4A2 SFAS RC Press < 450 psig Trip THIS IS A DRILL Rev. 2

p; . f L e 7-150

                                                .DBNPSEMERGENCT.PREPAR$DNESSCUECARD(Cont'd)

CUE CARD NO.1 74

                            .TO      Control Room Controller.                    TIME:     '1135 l-                                                             ,                     T:      0405' ANTICIPATED RESPONSES-None.

INSTRUCTIONS: None I-COMMENTS: l 1 l l l l

                                                                                       .          Rev. 2
    , _ = _ _ _ _ _ _ - . _ _ _ _ .                                                                   -. _ _ _

V' 7-151 F i DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 75 TO: Control Cell TIME: 1145 T: 0415 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Rumor Control at 5668. I live on Duff-Washa Road near Highway 19. People are leaving the plant in a hurry, the sirens have gone off; where should I go? The radio said no action is required but people are leaving, what's really going on? i THIS IS A DRILL i Rev. 2 s

l > i;. tn

                                                                                .'7-252
                                                            .DBNPS EMERGENCY PREPAREDNESS CUE CARD'(Cont'd).
 ,      o CUE CARD No.                                ~75 TO: Control Cell'-                                      TIME:                         '1145 T:                      0415             i
                                        ' ANTICIPATED' RESPONSE Call back number may be requested.

INSTRUCTIONS:- Record call - state "This is s' Drill". COMMENTS: i i I u.

l. 1 l
    ' /.

Rev. 2

7-153 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO No. 1989 Exercise CUE CARD NO. 76X TO: TSC Ops. Eng. TIME: 1145 T: 0415 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Recommend, to the Emergency Plant Manager, a lineup of LPI #1 pump from the spent fuel pool. l THIS IS A DRILL Rev. 2

4 L '~ '7-154

DBNPS EMERGENC7 PREPAREDNESS' CUE . CARD (Cont'd)-

l CUE CARD NO. 76X' TO:.;TSC. Ops. Eng. Controller TIME: 1145 T: 0415

                                     ' ANTICIPATED RESPONSE:
                                      ' Provide recommendation to Emergency Plant Manager.

INSTRUCTIONS:

                                     - Provide this' card'if'this action has not been taken 1

COMMENTS: i \ l l-1. 4 Rev. 2 l \. - - _ _ _ _ _ - _ _ - _ _ _ - _.

1 1 7-155 i DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD l SCENARIO NO. 1989 Exercise CUE CARD NO. 77 TO:- Control Cell TIME: 1200 - 1400 T: 0430 - 0600 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION:

  • Call Rumor Control at 5616, 5450, 5668. Continue calls until 1400.

Call as often as possible until 1400. You are to be various people from towns / tovnships in the area near DB. - You heard sirens, what do they mean? What should you do if they go off again? - You missed the EBS message, can someone tell you what it vas? - Ask for directions to the closest evacuation center. 1 - Why no protective actions if the sirens have sounded? - What are the State and Ceunty doing to help the public? - Why did the accident happen? - Are the same people who caused the problem still working there? - What should I do with my livestock? THIS IS A DRILL

    • w***************************************************************************

Rev. 2

  .-____ _-                .-.    ~       .   .         . _ .

J

            .p ;

7-156 DBNPS EMERGENCY' PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 77 TO : Control' Cell ^

                                                                          . TIME:    '1200 - 1400   b T:     0430 '0600 g                 ' ANTICIPATED RESPONSE -

Rumor. Control Team may request call back numbers or direct caller to State and County Rumor Control. . Follow up calls are appropriate if time. permits.

                 = INSTRUCTIONS:

i Record calls - state "This is a Drill". 1 Use Control-Cell name and address lists when questioned on residence information F by~ Rumor Control. . . 1 i COMMENTS: P l 6 I i i Rev. 2 i Ci___ ___ _ _ _ _ . . l

1 1 7-157 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO.:1989 Exercise CUE CARD NO. 78 TO: Media Actors TIME: 1200 - 1400 T: 0430 - 0600-THIS IS A DRILL DO NOT' initiate actions affecting normal plant operations. INFORMATION:- As Simulated news media, your responsibility is to ask questions of the spokespersons.

  • The purpose is to assure that each spokesperson present demonstrates the ability.

to brief the news media in a timely manner. Below are just sample questions, but you should develop your own based on their statements. If real news media are present and are asking sufficient questions, your role vill be less active. STATE OF OHIO SP0KESPERSON:

1) Do you have a copy of the latest EBS Message?
2) How much radiation has the state detected?
3) Has the state requested assistance from the Federal Government?

OTTAVA COUNTY SPOKESPERSON:

1) How many people have been evacuated?
2) Has anyone refused to leave their home or business?
3) How many people have registered at evacuation centers?

LUCAS COUNTY SPOKESPERSON:

1) How much will this cost Lucas County?
2) Vere people cooperative when told to evacuate?

TOLEDO EDISON SPOKESPERSON:

1) Why was Davis-Besse operating with so many pieces of equipment broken?
2) Have you personally been to the Control Room to discuss the emergency with the operators?
3) Vould improved operator training have prevented this emergency?

THIS IS A DRILL Rev. 2

c.

             - .-- =;-

7-158

  /

DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)~ l CUE CARD NO. 78-

                                ' TO: Media Actors                                        TIME:       1200 - 1400 T:'     0430 - 0600

_ ANT 3CIPATEDRESPONSE: H Each spokesperson should address only those questions that apply to his agency-or company.- The spokespersons should not speculate. l

                                 ' INSTRUCTIONS:

None COMMENTS: I k i l i

                                                                                                                       )

l l i Rev. 2 -{ =_ _ _ _ - - _ _ _ _ _

7-159 1 1 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD f:0. 79 TO: Hospital Personnel TIME: 1210 T: 04:40 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: None Information vill be provided as activities are performed. THIS IS A DRILL Rev. 2

7-160 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 79 T0: Hospital Personnel Controller IIME: 1210 i T: 01: 40 j ANTICIPATED RESPONSE: i

1. Place victim in Radiation Emergency Area (REA)
2. Treat medical condition.
3. Decontaminate.

I INSTRUCTIONS: i Give assessment data as assessment is performed.

             '.'itals (upon transfer from EMS)                                                 JII Blood P essure: 114/74                                                                  l Pulse: 40, strong e

Respirations: 12 rpm, normal COMMENTS: (See Radiological Data Sheets) Controller may vary vitals at his discretion depending en conditions and treatment. l l l l l l l l l 1 l Rev. 2 l L____ _ _ _

7-161 Contamination - Clothing Removed After 1st Decon at Ilospital Laceration 3,000 _.

                                ,         .9
                                                               ~@              Y' Area face of
                   *}\

f [ 9 j 3,000 1i [" #

                   . f'                         )2.                       ?f' g1,000            -
                                                              -                 ~

MWQ

      ~
                     ,000                 5,00 y,

(j j 4 i )O NOTE: Except as noted, all areas are clean. NOTE: All Readings are in CCPMs. - Rev. 2

. h2 7-162

                         ' Contamination - Clothing Removed After Final Decon at Hospital
                                                           .                                                        b ., 9 Y\                                                                         j         **
                                                                                                                                    .z o                 <    l.

TJ_ L

                                   /      .

y _ d J t g) ' lj(; l

                                                          .                                             .                      +
                                                                                                                             .\ f

{~ (i A

                                                                                                                                    \                            ;

NOTE: All areas of body are now clean of contamination. Rev. 2

7-163 Contamination - After Arrival at Hospital and Patient Removed

  /

STRETCHER / BACKBOARD CONTMiINATION y HEAD l l 1 I I I I I I I . g i i t i I I I ,  ! _ 2 1- s i l I I .I I I

                                         +                   1 1                  1 I                   I I                   I l.

l-l l 1 I

                              .           I                   l i                   I I                  I I                  I I                   I root

( 1 - Handle of stretcher - 1,000 CCPM (small area) 2 - Backboard - 2,000 CCPM (small area) Rev. 2 l ( _ _ __ _________________ ___ _ _-

1 i L 7-164, DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD' l SCENARIO NO. 1989' Exercise CUE' CARD'NO. 80 1 T0 s . Control Room TIME: 1215 approx. T: 0445 apprcx.

                                                   **************************************************w***************************

THIS IS A DRILL

                                                               -DO NOT initiate actions affecting normal plant operations.

INFORMATION: Make the following Gai-tronics announcement:

                                                   " Attention All Personnel, a General Emergency has been declared. All Emergency
                                                 - Response Personnel go to your assigned facilities. Protected Area Evacuation is
                                                                                   ~
                                                 - Not required. Owner Controlled Area Assembly and Evacuation are Not required."

Repeat this message once. THIS IS A DRILL I Rev. 2 -___._m.__ _-_m_._ ___ -. _ _ _ . . . _ . . _ _ _

w

    ',                                                                                   7-165' DBNPS EMERGENCY PREPAREDNESS CUE _ CARD (Cont'd)

CUE CARD NO. 80

                                     - TO: Control' Room Controller-                                              TIME:        1215 approx.

T- 0445 approx. ANTICIPATED RESPONSE: Make announcement. i l l INSTRUCTIONS: Provide-this card when a General Emergency is declared. j

                                                                                                                                                       'iJ l

i COMMENTS: i d j I 1 l

j. Rev. 2

_._.___.__________m.-___. _ . _ . _ _ . _ . -

L-7-166 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD L SCENARIO NO 1989 Exercise CUE CARD NO. 81X TO: Emergency Director TIME: L310 /5225 C)

                                                                                                                       . T:        0500 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

INFORMATION: Declare a General Emergency IAV HS-EP-01500 EAL 1.C.1, 1.D.5, or 1.D.6. THIS IS A DRILL r L l Rev. 2 , i . . _ _ _ _ _ _ _ . - - - - _ _ _ __ _ _ _ _ . _ _ _ _ _ . __ _. _ . _ _ . _ _ - _ _ _ ______________________--______________-____________1

g -

               ~ ll{;         ,

r,- ;;;- n ,. ?: _ @ t.J , 7-167-

                                                            -DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd).

Y m. , CUE CARD NO.' 81X

.TO: Emergency Director TIME: .1 2431/d3S T: 94r23 ' o 70d
        ^

ANTICIPATED' RESPONSE: Declare a General' Emergency. INSTRUCTIONS: Provid'e this card only if no action is taken or reported informing the'Emergen'cy

                     . Director of the Offsite Release..

COMMENTS: Rev. 2 ==-___x______-_____ _ _ _ _ _ _ _ _ _ _ _ _

 ;)

( 1 7-168. DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO No. 1989 Exercise CUE CARD NO. 82 TO: Control Room TIME: 1215 T: 04:45 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION:

        - Green light for CV 5074 goes out on Panel C5717,'and approx. 15 secs later the red light comes on.

SAM light is flashing. The following annunciators come into alarm: L 9-6-A: Unit Vent Rad HI 4598BA 9-6-B; Unit Vent Rad HI 4598AA l 1 l l l l THIS IS A DRILL

         ***++*************************************************************************

Rev. 2 l

c-7-169 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 82 TO: Control Room TIME: 1215 T: 04:45 ANTICIPATED RESPONSE:

1. Local switch manipulations have no affect.
2. The associated valve breaker, BE1141 is tripped. If closed, it vill trip again after 15 secs. Note that the red light at the local svitch and CR pane) C5717 comes on for these 15 secs.
3. Verify RE4598 AA & BA readings.
4. Check RE4598AB & BB readigns.
5. Reverify SFAS isolation.

INSTRUCTIONS: After indicating lights go out, attempts to manipulate the valve from CR are unsuccessful. Trouble shooting should be directed toward the valve breaker / local switch. At 0447 the red light goes out - neither green / red is on. CV 5074 - both indicating lights are out. l COMMETRS: l l l l l Rev. 2 w_ _- -

. ) i 7-170' DB!sPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 83 l TO: OSC Team Investigating CV 5074 TIME: 1215 T: 04:45 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Local switch manipulations have no effect. Breaker BE1141 is tripped. Tt continues to trip approx. 15 secs. after releasing the switch.- Light at r eal switch C5717 does come on for the 15 secs.

 ******************************************************************************             l THIS IS A DRILL I

Rev. 2 o

 ,                                                        7-171 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

CUE CARD NO. 83 TO OSC Team Investigating CV 5074 Controller TIME: 1215 T: 04:45 ANTICIPATED RESPONSE: Trouble shooting should occur. DO NOT allow repair to take place until 1345. At which time the valve must function. It is important that the repairs be i completed at 1345. I The fault can be discovered if the breaker cover is taken off. A loose test lead has dropped across breaker connections 6 and 16A. If this lead is removed and-the breaker reinstalled, valve operation vill return to normal (red light back on, able to close locally and from CR). In lieu of this, a spare breaker could be installed. q l i INSTRUCTIONS: When the. breaker case for BE 1141 is removed, it is found that a loose test lead has dropped across breaker connections 6 and 16A. If the lead is removed valve J generation-will return to normal. )

                                                                                                     .j It may not be repaired until 1345 however.                                         j j

COMMENTS: l I i i l Rev. 2

I I 7-172 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO.'1989 Exercise CUE CARD NO. _84 TO: - Emergency Director TIME: 1220 T: 04:50-THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: l Simulate the Evacuation of the site. Do not actually evacuate the site. L . Perform all actions up to actual relocation of non-essential personnel. l l l THIS IS A DRILL Rev. 2

7-173 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 84 TO: Emergency Director Controller TIME: 1220 _ T: 04:50 ANTICIPATED RESPONSE: Simulate the evacuation. INSTRUCTIONS:  ; Provide-this card only if and when the Emergency Director, orders a site evacuation. 1

                                                                                                                                 )

i COMMENTS: i Rev. 2 1 L __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

7-172A DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO No. 1989 Exercise CUE CARD.NO. 84A TO - Control Cell TIME: 1220 T: Ola 50 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: NOTE: 55 minutes after being directed to evacuate to the offsite assembly area provide the following information. Call the Emergency Facility Services Manager at ext. 8471.- I am the Offsite assembly Area Coordinator at Lindsey Services Center. There are 415 + Protected Area non-essential personnel assembled here. Ve have no indication of any contamination ce personnel or a vehicle. .Vhat should I do with them? i THIS IS A DRILL

                    ******************************************++**********************************

Rev. 1 L___________-_______________________-______-_-__________-_---- ---- -- - - - - - - - - - - - - - - - - - - - - - - - - -

7-172B DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD.NO. 84A-TO: Control Cell TIME: 1220 T: 04 50 ANTICIPATED RESPONSE: None INSTRUCTIONS:

                                 'None i

COMMENTS: 1

                                                                                                                      .i I

i 1 i j q l 1 1 l

1 Rev. 1 j

i k_i_.__________.___ _ _ ._

7-174 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 85 TO: Control Cell TIMER 1225 T: 0455

       *****.e*+**********************************************************************

THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

       ***********+******************************************************************

INFORMATION: Call Rumor Control at 5668. Message: "This is a Drill. Hello. .This is Paul Fenton. I live about 12 miles south of Oak Harbor. I'm outside yoitr emergency zone, I know, because I just saw the map on TV. I'm still vorried because no line on a map is going to l keep me safe frem radiation. Should I be doing anything special like going to the basement or filling containers with vater, or just what are ve supposed to do? This is a Drill." Provide the player your telephone number. Note the time if the player returns

      'your call with addition information.

l l THIS IS A DRILL i Rev. 2

p. r i. ,

        ' [' ,,                          .
                          ~

7-175'. ,s ,' : DBNPS EMERGENCY PREPARED"ESS CUE CARD (Cont'd). %s ,'V . l: " , CUE CARD.NO.- 85- %" y < j TO: Control Cell TIME:- 1225' 4 ,. T: 0455 ANTICIPATED RESPONSE:

                            . Call ~back number requested.
                                                                                                                                                                                                                                                                                                             '1
                                                                                                                                                                                                                                                                                                            .l INSTRUCTIONS:
                            . Record call --state "This~is a Drill".

I -{

                                                                                                                                                                                                                                                                                                                 )

COMMENTS: ) ! s ti il

                                                                                                                                                                                                                                                                                                            -l 1

l q i l I

                                                                                                                                                                                                                                                                                                              .i Rev. 2 l

2.__n__._____.______._____._'___._______._____._________._______

7-176 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 86 TO: Control Cell TIME: _ 1230 T: 0500 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Plaza operator at ext. 5000. Message:

                                                                     "I'm Terry Black from UPI in Philadelphia. I need your corporate statement on the company position of the Davis-Besse accident.

THIS IS A DRILL Rev. 2

[; ~

, 5 "j p l .,. , 4 7-177 b

E DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) s, CUE CARD NO. 86 t- ,

                                                                                                           , TIME:       1230-t gTO: Control Cell T:       0500 ANTICIPATED RESPONSE:

Call back number requested.

                                 ' INSTRUCTIONS:

Record call - state "This is a Drill".

                                                                                                                                                             .i l

l. COMMENTS: i i l 1 I 1 l l

                                                                                                                                                                )
                                                                                                                                                            'j.

i J l

l. -- ]

l Rev. 2

                                                                                                                                                             .i
            " - - - - - - - - s---a------a..-__   , _ , _ , _ _ _ _ _ ,

1.. > 7-178. L DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 87 TO: OSC Team Lining up LPI Pump TIME: 1230 T: 0500-THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: You are nov lined up to the spent fuel pool vith LPI pump 1-1. Inform the Control P.oom to start LPI pump #1.

     -*****A************************************************************************

THIS IS A DRILL Rev. 2

i 'j ;- {

q. 7-179 DBNPS EMERGENCY PREPAREDNESS' CUE CARD (Cont i d)

CUE CARD NO. 87

       \

TO L OSC Team Controller TIME: 1230 T: -0500 ANTICIPATED RESPONSE: 1000-Maintain approx. M GPM from SFP vater. Go to large break LOCA procedure. INSTRUCTIONS: Establish LPI to come from SFP. This time is critical. Do not allow clean vaste receiver tanks to be aligned to SFP (Hi rad levels). If asked about emergency sump indicating light, it is off. . Level in CTMT is not high enough for recire. COMMENTS: i i a i l 1 l

    +                                                                                                !

Rev. 2 (

7-180 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD CUE CARD NO. 88 SCENARIO NO. 1989 Exercise TO: Team Vorking on DH-79 TIME: 1230 T: 0500 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: You have repaired DH-79. l \ THIS IS A DRILL Rev. 2

     ;m . ,                                         - -             -                     -                         -
                                                                                                                      .1 q    ,8

,.,. l

                             -w I
                                                                           '7-181 n

DBNPS EMERGENCY PREPAREDNESS' CUE CARD (Cont'd) !1 CUE CARD NO.. 88 4 3. TO: DH-79 Team Controller' TIME: 1230 T:- 0500 i 1

                            -ANTICIPATED' RESPONSE:~

Inform Control Room of: repair. INSTRUCTIONS:-

                            . Provide this card to allow BVST restoration at 1215.

COMMENTS: L' l l Rev. 2 u_ --- _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ - _ _

sa 7-182 - DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE' CARD NO. 89' TO: Control Cell TIME: 1240 T: 0510 THIS IS A DRILL 1 i DO NOT initiate actions affecting normal plant operations. l INFORMATION: Call the Edison operator at ext. 5000 and deliver the following message: THIS IS A DRILL. Hello, this is Bob Leonard from ABC. Ve vant to interviev your corporate representatives. Could you transfer this call to their offices please? If transferred to corporate, request information concerning effects of the accident on the nuclear industry. THIS IS A DRILL. THIS IS A DRILL Rev. 2

7-183

    ^

DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)

  ,                                                                                 CUE CARD NO.       89 TO: . Control Cell Controller                            TIME:       1240 T:     0510 ANTICIPATED RESPONSE:
                          . Call could be forwarded to Rumor Control. The caller should be' referred to-INPO.'

INSTRUCTIONS: Record call ---state. "This is a Drill".

                         ' Request .to speak to a corporate rep. to get' an interview. ' Ask questions concerning-the effects this accident could have on the nuclear industry.
                         -COMMENTS:

I Rev. 2 _ _ _ = _ _ - - - - _ _ . _ _ -

7-184 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 90 TO: Control Cell TIME: 1245 T: 0515 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Rumor Control at 5450. I heard the sirens again and this time I'm leaving. Which way is the radiation headed. THIS IS A DRILL Rev. 2

         .4                           >

i<,

 '   4 7-185

!5 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) l -l CUE CARD NO.. 90 0 TO:' -Control' Cell' TIME: 1245 T:- 0515

                              ~ ANTICIPATED RESPONSE:

Rumor Control team may direct caller to county rumor. control. t.,., .. l O INSTRUCTIONS:

                                                          ~

l f. >

                              ' Record call - state "This is a Drill".

W Caller lives.in Graytown. COMMENTS:

                                                                                                                                      .)
i
                                                                                                                                          .I a

1 i l 1 I Rev. 2 i l

7-186 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD , SCENARIO NO. 1989 Exercise CUE CARD NO. 91 TO: OSC Team working on the BVST hole. TIME: 1245 T: 05:15

                                                          .THIS IS A DRILL-D0_ NOT initiate actions affecting normal plant operations.

INFORMATION: You have successfully completed repairing the BVST. .It is now ready to be unisolated and' refilled. I 1~ l l THIS IS A DRILL 1 Rev. 2 1 . . . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ - _ .

                                                                           ~

I,C > <

                                                                       'A.

3

                             \

7-187-

                             -   a
g. - .n
     . 2'?                                                   DBNPS" EMERGENCY PREPAREDNESS CUE CARD (Cont'd)'
                                                                                                                              .s
         .        ,1 CUE CARD'NO.       91 T                        ' j .:
                                     'T0: -.OSC Team vorking on the BUST hole.                    TIME:-      1245'
                     '. i .-

T: 05:15' o

                                     '. ANTICIPATED RESPONSE:
                                     ' Inform the.0SC'of'the Repairs..

l INSTRUCTIONS:: None 1 s

                                                                                                                                  ~I
                                      ' COMMENTS:
                                                                                                                                      ]

k I l

                                                                                                                                    .i i

i Rev. 2 E___.z___._.._._ _

7-188 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 92 TO: Control Cell TIME: 1300 T: 0530 THIS IS A DRILL DO NOT initiate actions affecticg normal plant operations. INFORMATION: Call the Rumor Control at 5616. Message: "This is a Drill. Hello, this is Clyde Toutan from Detroit, Michigan. I'm calling to find out if we are in danger. Can you tell me what started the emergency? Then what happened? Do you think they have things under control out there? This is a Drill." Provide the player your telephone number if he offers to return your call. Note the time, if he returns your call. THIS IS A DRILL l Rev. 2 I ________ - _ - -

<j: l 4 7-189'

                                                         ..DBNPS EMERGENCY' PREPAREDNESS CUE CARD'(Cont'd)

CUE CARD NO. 92 TO:'. Control Cell- . TIME: 1300

                                                                                                   ' T : .. 0530' ANTICIPATED RESPONSE:

Caller may be referred to County Rumor. Control.

                                      ' INSTRUCTIONS:-

Record: call -' state "This'is a Drill". COMMENTS: i

                                                                                                                        .k
                                                                                                                          )

l l i. i ); Rev. 2 4 1 I { . . . . . . . . . .

                                                                                                                          ]

1

                                                        ;7-189A
                                    ~DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise                             CUE CARD.NO.                                      92A TO ' Emergency Director                                 TIME:                                   1300 T:                                 05:30 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations, c*****************************************************************************

INFORMATION: Have a relief roster completed. Record the actual contact with relieving personnel. Do not have them come to the facilities. 1 i l THIS IS A DRILL Rev. 1

[{lt;f . _ 1

        ,m, ,

1 ,

                                                                                      '7-189B

&:.il-y.? n DBNPS, EMERGENCY PREPAREDNESS CUE CARD (Cont'd).' 'l CUE CARD.NO. 92A J TO:;. Emergency' Director. 4 TIME: > 1300 L  ;, e, i, T: - 05:30-p; ' ANTICIPATED RESPONSE:  ; l: ' ^ .a,; Have' roster made and. personnel contacted.

                                                                                                                                                             -i
   ~_
                                                                                                                                                              -)

l ';. ' '. f

                                                                                                                                                             .Ia INSTRUCTIONS::
                                                                                                                                                             -J Do Not allow contact of relief RMT members T '-

1 l- s H 1 COMMENTS:

                                                                                                                                                               -]
                                                                                                                                                              .j
             .,_                                                                                                                                             l 1;
                                                                                                                                                              -)

1 1 i j J i 1 i Rev. 1 i

    - = .         ..n_____       __m. _ _ _ _ _ _ _ _ _ . _ .                           ._

r 7-190 L DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 93 TO: Control Cell TIME: 1315 l T: 0545 THIS IS A DRILL DO NOT initiate actions affecting normal plaat operations. INFORMATION: Call the Edison Rumor Control Center at 5450, and deliver the following message: THIS IS A DRILL. Hello, this is Ron Christian from USA Todt.y. I'm calling about the nuclear emergency. What's the 1stest developments? Have they gone-to a General Disaster or are things getting better? 'Jhat's the latest on the people taken to the hospital this morning with radiation burns? Is this the same as the Chernobyl accident? THIS IS A DRILL.

     ***********************w******************************************************

THIS IS A DRILL Rev. 2 _ - _ _ _____________- _ _ m

                  \

7-191 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd). CUE CARD NO.-- 93 TO: Control Cell TIME: 1315 L T:- 0545 ANTICIPATED RESPONSE: Rumor Control should confirm questions about' approved news releases. Caller? should be' asked for telephone nunber so that he/she can be called back. INSTRUCTIONS: Record call - state "This is a Drill". Provide the person who ansvers_this call with your telephone number.so that you-can be called back. COMMENTS: N/A Rev. 2

7-192 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 94 TO: Control Cell TIME: 1330 T: 0600 THIS IS A DRILL. DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Rumor Control'at ext. 5668. I live in Genoa. My kids are at a day care center in Oak Harbor and I work in Port Clinton. I'm a single parent and can't get over to pick my kids up because of the traffic jam. If you move my kids, where vill I be able to find them? I'm really worried, what should I do? l l l' THIS IS A DRILL Rev. 2 l _ _ _ _ _ _ _ . _-

7-193 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 94 TO: Control Cell TIME: 1330 T: 0600 ANTICIPATED RESPONSE: Rumor Control vill request call back number. Caller may be transferred to County EMA. INSTRUCTIONS: Record call - state "This is a Drill". Your kids are at Tiny-tots Play School. You have two sons, ages 3 and 5. I COMMENTS: I I. Rev. 2 e _ _- __- _ .

l 7-194 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO No. 1989 Exercise CUE CARD NO. 95 TO: Control Cell TIME: 1330 T: __, 0600 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

 ***********************************+ee++**************************************

INFORMATION: Call Plaza operator at ext. 5000. Request Corporate Planning Center. Mr. Zack Pate of the Institute of Nuclear Power Operations telephoned to tell you that he is aware of the incident at Davis-Besse and that his organization is ready to help as needed. He offered to dispatch one of his principal staff members to serve as liaison if you so desire. i l THIS IS A DRILL Rev. 2 j

7 -; l 7-195 l .. DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO.. 95 i TO: Control Cell TIME: 1330 T: 0600 h l' ANTICIPATED RESPONSE:

                           ~

Assignment of a person to' respond'to INPO should be made. I l~ INSTRUCTIONS Record call - state "This is a Drill". l l :' COMMENTS: l Rev. 2

r 7-196 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 96 TO: Control Cell TIME: 1345 T: 0615 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Call Rumor Control. Message: "This is a Drill. Hi, this is Quinton Adams from the Chicago Times. I understand that your nuclear plant is near meltdown. Is that true? According to a spokesman from Commonwealth Edison this is the most serious accident in the United States since Three Mile Island. Vould you comment on that statement? How many people have been evacuated so far' What is the status of the employees who vere injured when the emergency started? This is a Drill." Provide the player your telephone number if he offers to return your call. Note the time, if he returns your call. THIS IS A DRILL Rev. 2

1 7-197 1 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) l CUE CARD NO. 96 TO: Control Cell TIME: 1345 __ T: 0615 ANTICIPATED RESPONSE: l Call back number may be requested. l l INSTRUCTIONS: Record call - state "This is a Drill". I COMMENTS: 1 l 1 l 1 I 1 l l Rev. 2 u______-__

7-198 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 97

                            - TO: OSC Team Vorking on Containment                      TIME:     1345 Isolation Valve T:     06:15 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations.

INFORMATION: Tou have completed repairs to the Containment Isolation valve for Vacuum Breaker

                            .CV 5074. The Isolation Valve is closed and the release has been terminated.

l l l ****************************************************************************** l I' l THIS IS A DRILL 1 l l l Rev. 2

1

               -} /* [
                         ',-,[
                                                                                              ..7 199 er ' ,

DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)'

 s ,.-
                   ,                                                                                            IE CARD NO.-                                   97-
       # '-                            TO:' OSC Team'Vorking'on containment-                                  TIME:                                     1345 Isolation Valve Controller l-                                                                                                                 T:                                    06:15'
                                     ' ANTICIPATED RESPONSE:

Inform'the'OSC of.the. repairs. l '( _ INSTRUC"10NS: S ' Provide this card to:sto'p the' release-to the atmosphere.

                                                ~

COMMENTS: , 4 4 g( ' 3-Rev. 2 L:_--__________-_,________ . _ - _ _ _ _ _ _ _ _ _ _ . _ __ __ }

y p. 7-200 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 98 __ TO:. Emergency Director TIME: 1400 T: 06:30

  ***************A****************************************************w*********

THIS IS A PRILL DO NOT initiate actions Effecting normal plant operations.

  ************************w.w***************************************************

INFORMATION: , The Plant is now in a stable condition. The BVST has been repaired and is filling. There are pumps available to cool the core and spray down the building interior. The valve that fafled open has been repaired and no further le .'ege to the atmosphere is expected.- The pressure in the containment building is at atmospheric and no release is expected from any condition. Brief the offsite facilities as to status of plant prior to terminating the drill. The Emergency Phase of.the Exercise is Terminated. Inform all Stations and Offsite Facilities that the Emergency Phase is complete. Make up a Recovery Team from players that contain as a minimum the following players: Emergency Director, Emergency Director Advisor, Emergency Plant Manager, Emergency Assistant Plant Manager, TSC Manager, Emergency Offsite Manager, Recovery Advisor, Company Spokesman, Emergency Radiological Controls Manager, OSC Manager. Include other players as you desire. The following sequence of events is established: 1400 - 1415 - Break 1415 - 1445 - Toledo Edison Facility Critiques 1510 - 1530 - Recovery Team Briefing, Room 209 & 210 1530 - 1730 Approx. - Recovery Discussion, Room 209 & 210 THIS IS A DRILL Rev. 2 _______--__--- __-__ _ -___ _ _ O

y ,m-ms

                ,,                                                                                                       ,i q aq L                                          .                                                                                   a b                                                                                                                              !

D  ! J 1 17-201- 1

k. ; -;. .

o E - i (l* DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) CUE CARD NO. 98

                             .TO's -Emergency Director                                    TIME '      1400'                   j a                                                                                                 .
    ,                                                                                     T-    '06:30
                         .   (ANTICIPATEDRESPONSE:

l L _. None l-1< i '\ i

I INSTRUCTIONS:

Lead Controller should take charge of each ERF and' perform the following: l Provide short.. facility' critique..

  • Collect: comments from players. '
  • Collect: documentation generated.during the' Exercise. -
  • Ensure all' players have signed the Attachment' Sheet.
  • Restore the facility'to pre-exercise status with player assistance.
                                '-    Identify'any, material differences to the Lead Exercise Controller.

l' 1. COMMENTS: 1 l -'

                                                                                                                           ]

1: 1 l 1 l -. I l-I' Rev. 2 1 <

7-202 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 99 l l TO: Control Room TIME: 1400 l T: 0630 THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: Make the following Gai-tronics announcement:

                     " Attention all personnel, attention all personnel. The 1989 Emergency Preparedness Exercise has been completed. There vill be no further drill announcements. Regard all Gai-tronics announcements."

Repeat this announcement once. THIS IS A DRILL Rev. 2

  ..g.            **      ,
                                                                                             . .r.        >

y .. y ,

                                  'A..),.

['? ,a

                      ,                                                      ,        7-203L l '\

l':-. . , .-~ - >

                                                                'DBNPS EMERGENCY PREPAREDNESS ~ CUE CARD:(Cont'd).                                           H I, ?-                  ,

CUE CARD NO.- 99 JTO: Control. Room Controller TIME ' 1400 l:' T:- 0630 l.

                                           ' ANTICIPATED JRESPONbE li-lf o:

Make announcessent. 9; . lt l' l l 1 - . l: . l' INSTRUCTIONS:. l l.

i. ' Provide this card with Lead Controllers approval'only.

l

                                          -COMMENTS:.

l \ l' 1 , 1 l' ) l l-l l. l Rev. 2

f 7-204 l-EXERCISE DAY 2 SCENARIO DAY 4 i t Rev. 2

y,--- ----_

                                                                                   =
                                                                      .I',. l'
                        'v.   '

l 9 r'

                        ,.p. =

p.3

g. r. *. ,

f N - 1' a. '). y t .5 s

                                        'I n

[ 'i f ..

i. . ,

e L

                                    .)i
                                                                                       ..\'
                                                                                                -1 i

1 1 1

                                                                                                  )
                                                                                              . l 4
                                                                                                'l r

I

                                                                            '               ~
                                                                                                .l

7-205 1989 DAVIS-BESSE ANNUAL EXERCISE DAY TWO BRIEFING SHEET TODAY (actual August 9) is Day 2 of the Exercise. The simulated date for today's activities is August 11, 1989. Three simulated days have passed follow-ing the nuclear accident and radioactive release. Plant Update: As you are aware the station suffered a large RCS break, with insufficient core cooling to prevent fuel damage. Totally independent of the accident but contri-buting to the release, a containment vacuum breaker valve was stuck open and the electrically operated isolation valve for it shorted. This caused the isolation valve to open allowing radioactive materials to escape from the containment to the atmosphere via the plant stack. k The plant equipment that was out of service at the end of the Day on activities included, #2 Emergency Diesel Generator, #1 High Pressure Injection Pump, aad both makeup Pumps. A large portion of the station was contaminated from the damage to the Borated Vater Storage Tank. When the exercise was terminated on day one the isolation valve to the failed vacuum breaker was closed, core cooling was reestablished, and the Borated Vater Storage Tank vas in the process of being filled. There have been no release since day one. Over the last two days the unit has been cooled down to ambient temperature. The plant is presently on Containment Recirculation Cooling main-taining the damaged core in a satisfactory condition. Due to the very high radiation levels in the areas involved, the Makeup and High Pressure Injections pumps have not been repaired. These pumps are not required while the plant is in the accident recovery phase; therefore, this condition is not a problem. The contamination from the BWST leaks has been controlled and access is available in the area of the spill. Several contaminated areas remain roped off. Repairs have been completed to the #2 Emergency Diesel Generator. A Post Accident Sample is to be drawn today in an effort to determine the extent of the damage to the core. This information vill provide valuable information for he long term recovery of the plant. There is a sufficient supply of borated vater to ensure that the core does not suffer any additional damage. The station personnel are in the process of identifying needed recovery equipment and locating that equipment. Arrangements have been made for the transportation of personnel involved in the recovery activity. The NRC incident response team has returned to its normal activity and the work at the station is being observed by the normal NRC inspectors at this time. A plan for return of non-essential TE and contractor personnel to work is being formulated. Rev. 2

l l f 7-206 'i l I State / County Update:  ! Due.to the prevailing easterly vinds, the States of Ohio and Michigan vere impacted.

                                                                                                           )

In addition, a " Restricted Zone" was established downwind from Davis-Besse as a I result of initial exposure projections from deposited radionuclides. 'l The States of Ohio and Michigan have both initiated' collection of a variety of { food pathway items; i.e., soil, vegetation, animal feeds, milk, meats, fish,  ! poultry, water and miscellaneous food crops. Samples were collected on August 10 (yesterday--simulated second day following radioactive release). Laboratory data sheets, indicating analysis results, vill be available.today. In Ohio, all protective actions (evacuation and sheltering) remain in place until monitoring and sample analysis identifies levels, concentrations and areas of deposition of contamination.- A precautionary advisory has been issued against the consumption of food and vater with local origins. I l The Ohio Department of National Resources with assistance from the Ohio Depart-ment of Transportation and Ohio National Guard are nintaining perimeter control for Subarea 12. The Ohio State Highway Patrol and the Ohio National Guard are assisting local safety officials in access control into areas that are under a protective action recommendation. Rail traffic in the area is still restricted. Air traffic is restricted to all aircraft except those involved in emergency response / radiological monitoring  ; activities. .j Federal response teams have been arriving since the second day following the accident. The Federal Response Center (FRC) from which federal agencies with  ! non-technical responsibilities (FEMA,.U.S. DOT, USDHHS, HUD, etc.) operate has i been established at the General Beightler National Guard Armory in Vorthington, near the State EOC in Fremont. As soon as preparations for long-term response are completed to a facility at the Plumbrook NASA in Sandusky, both center vill re-locate there. The Aerial Measuring System (AMS) Program of U.S. Department of Energy has been performing extensive aerial monitoring over the past two days to identify areas of deposition. This information vill be used to help determine areas where the public may return.

 ^

Three EMA monitoring teams have been conducting gross gamma surveys. Ohio EPA has been collecting soil samples to determine (through lab analysis by the Ohio L Department of Health Lab'in Columbus) concentration and isotopic mix. State and  ! federal monitoring and sampling teams are using the Emergency Worker Monitoring i l-and Decontamination Stations established at Port Clinton Fire / EMS Station and Jerusalem Township Fire Station. J Rev. 2 l i i _ _ _ _ _ _ _ _ . _ _ _ _ ._ i

l l 7-207 L The State EOC has switched from full activation to adequate staffing for the L, Recovery Phase, primarily through the Ingestion Zone, Recovery and Reentry Advisory Group which formed at the State EOC in the later stages of the emer-

                 .gency.. This Advisor Group, chaired by the Ohio Department of Health, is com-posed of representatives from the followings
a. Ohio Department of Health

, b. Ohio Department of Agriculture l- c. Ohio EKA

d. Ohio EPA L e. Ohio Department of Natural Resources
f. Public Utilities Commission of Ohio
g. Cooperative Extension Service of the USDA
h. Agriculture Stabilization and Conservation Service of USDA i 1. Ohio Emergency Management Association (County Directors) 1 All thirteen Ohio counties within the 50-mile radius Ingestion Zone have been notified and provided with.information on an on-going basis, starting at the Site Area Emergency level. These counties includes
a. Crawford e. Henry. i. Ottava
b. Erie f. Huron J. Sandusky
c. Fulton g. Lorian k. Seneca
d. Hancock h. Lucas 1. Wood
m. Wyandot l

The advisory from the Ohio Departments of Health and Agriculture to shelter farm animals downwind out to the projected PAG boundary is still in effect. In addition to the Ohio EPA and EMA, sampling teams from Ohio Department of Agriculture, Ohio Department of Health and the Ohio Department'of Natural Resources have been dispatched to the Field Team Center in Fremont. In the State's sample collection program, these agencies are responsible for the

                  'following:

Ohio EMA - gross gamma measurements, air sampling Ohio EPA - soil, water, vegetation sampling Ohio Department of Agriculture - meat, poultry, eggs, honey, feed, grain, produce, fruit, Grade "B" milk sampling Ohio Department of health - Grade "A" milk sampling Ohio Department of Natural Resources - fish /wi'ldlife sampling Both Ohio and Michigan must now evaluate these sample results, recommend short-and long-term actions that must follow, and respond to questions concerning the contamination of the environment and the impacted food pathways. l l Rev. 2 L

                                                                                                -        -a---.-                     9-,-                  ,                                            ' ' ' ' ' ' ' " ' - ' ' " " - ' ' ' ' ' " " - - ' ~ " ' ' ' - ' -                                                                    '

s- - i, ' / 4j / _ ' r :,;, ?. : g,, 5

                                             >                          ii
                                                                                                                                                                      >   J.                                                                                                                                                                                    -

g',s ;' 4

                                                                                                                                                                                                                                                                                                                                                              .-l,
                                     .,                                                                                                                                                                                                                                                                                                                               J l                                   ,-l                                                                                                                             i t'-
   } .h ' J                   .
                                                                                                                                                                                                                                                                                                                                                                    ),

e :.n, -

                                                                                  ,                                                              9s
                                                                                                                                                   , ,r ia i                                                                               /                                                                                  i l

l s ~ I. 1 I' ' l .a 1c l' l ,. ? 'n l g.3 ' T L5 i q')I,

          .Nu*M  /-
                                                                                                                                                                                                                                                                                                                                                              ~

I, I ,

                                       , .i t

l' 1 1z i l ;- l l; I ' l 1 L l. l 1 -! 1-t

    .                                                                                                                                                                                                                                                                                                                                                  .i d '

l.J j ._ t 1, ' r I I' t l l l'> 1 !p , <

      ?}'
 ; . .v        .

7-208 DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD SCENARIO NO. 1989 Exercise CUE CARD NO. 100 I TO: PASS RC Tester TIME: Day 2 0800 T: 0030 \ THIS IS A DRILL DO NOT initiate actions affecting normal plant operations. INFORMATION: , Review the attached area surveys, closed-vindov radiation levels are shown. Assume open and closed vindov readings are the same. If air samples are collected and analyzed, results are: None reported. If smears are collected and counted, results are <1000 dpm/100 cm8 THIS IS A DRILL Rev.$

 )

i L 7-209 I l'

                                    .DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) .

CUE CARD NO. 100 l- TO: PASS RC Tester Controller' ' TIME: Day 2 0800

                                                                                  .T:                     0030 I                  ANTICIPATED RESPONSE:
               .- Information included.in the survey should be relayed to the OSC RC Coordinator,.

if' playing. INSTRUCTIONS: Issue this card and its accompanying completed survey map if a pre-PASS sample survey is performed..

                                                                   .b COMMENTS:

N/A Rev. 2

          ;=           -.     .. --            .

p .,-

                                       .. v.'-

i,i "q .  ! _7-210.

,1-l' Radiation Survey Before PASS Sample- Qp N-
           ').                                            -

SAMPLE LAB SKID HOOD 1 _ [OO mikh i f(IO % NORTil I SHIELD 1 I DOOR

                                                                   'y                                                                     4 101              ,

i ,..,,ggm i som4h 35 mR.Ik - Doo - 30$*A

' ' ~ --
                                                                                                                                                             . ,3 c/k
l. O CRANE D RILL .

BENCH PRESS U GRINDER LATHE Rev. 2 _ _ - _ _ - _ - - - _ _ - _ _ _ _ _ - - _ ~

        .;                                                           7/O Y                               545' ELEV.                                                         .
                     \\\\\\          3%                         \ ,x ,x \ \ \ \ \ \ \ \ \ \ \ \ \ \ \                                                OA p ogge
                     \
\__\ \ox x \ \N1 ~ \ =
                                                                                                                      \

s & N sd:  :

                                                               \                         N i               8o      \

o Nsuus

                     \\u\\\ .:\                                N t

w O s \

                                                  "            \g !

(j]*N S: rmm::\ E

                                                               \
                                                                                        \' ".N' q +xd\
                                                                                                                      \
                                                                                                                                                                       <1 gs s u s\          g i x x x \x x x
                     \s N    s~s i:s: s-: \s
:msF .\. x
                                                  . h.x. . x
                                                           ..x  . . .x: x s \ s
                                                                                        \                 -
                                                                                                                      \

cc F

                               'i\        o .5 % ;/:i *:\

5 . s

                                 -\ ! S ""                           !\ !W                            Ws E\ j
                                 ~

E i  ::: M s

                                   \i Assssssssssss\ssTss           9D                             '

s s\ i!! (- s@::.\1;,:

                                                                                                  .         x         s 0

x, . s u m. m: _J i:e:s\

                                                                                                                 =:\                                                     o o

z

                                                                   \g::::.:::.Q;:::::;;;ds-ii                                                                           2 o;t* d ',\\ \\\\\\'e?\\\ \(3
                        .:=

scr *t! 7E J\ eo xr ; m

                                                                                                                   \

x\ o . \N \ \ m . O k:

! N

(\\\s \\\\1m \\ s

                                                                                                                                                                        ~

o 2 m; 0  ;; O31'%c: o m O t V c s\\\\'s\\\\\

                                                                   . ..              s        .

d i: s\ s s $ i u  ! 'i N iW2 \ .o l 3 i "EN N \ $ T H ANNN

=
                                                                      ~
                                                                           \,\
                                                                            \xx\sx
                                                                                           \

c E i 4 \ \ M \ \ l a \ \ .::.::::.- c \ \  ::.:. t N N , I \ N _

                                                                           \                                ,-                                                           e
                                                            \                                               ::                                                         o s              \                                ro i                                                             .                                   -                                                         o
             ;                                              \               N                               5 '<                                                         c C

l i

                                                            \     _       \                           :> E ?.

i

                                                                  ;-      s                           N _3                                                               e i                                             \                                         -
                                                                                                        .7=                                                              a
                                                                  =                                         -                                                            '
                                                                          \                                                                                            <
                                                            \     E                                   h-o s             \                           - 5 :;

s

                                                                        ,s                                  o 7                                                                                                   ___
?

s 210 ~ 0 i 565'ELEV. 1 OQ atos

    .. ss s s.s x x x xx                                      s x N s s ss s ss xxxxuxx su u 4                                                                  s 4                                s                        i
                                                                                                                            ,                                            s   x      :
                                 .                            s                             s                             .                            -                 s   r s'~        ' ',              s                             s                             ,;                         ; m                     z    j s                        =   s                             s                             s                                                  s    -
s s s s s s f

l_ , s - s s s s . , s - m ~ x ,. , s a m m s sA N N N x N xy x x x x NNNNN ss M ,x ..'x ( P. D 4E

s. .
                                                ;o:

e o s s e=s=s Q s ss s qx x s e-c: hl s a:s

s
                                                                          -s                                                m                  :          s
                                                        * ;                                            ' us ds                                    lrEE:

s 9 ; c vs p

                                                                                                                                           .=2 s            ==       ,
                                                                                                                         .j                    '                        '

i$ 8.'. . .'. N'N'N'N'N'N'N'NNNS

. 8 x x o!.a ::::::::::: x s .:::::::::

x . x ss a e

                        >    >                s                                   ::::::::::                                                                          ss   e N       l              l              .........
    )                                         N                                     ::::::::: N                                                                       h    t NNNNNNNNN                                                       N s   d
    \-                                    U                                           !!!!!!!k                                                   S                    N
R' D N  !!!!!!!! stNxs'scsdNxd s g \\\

w y -- :s h - Q $ n s

                                   -s.          x x x w x x xM s ' s su;                                                                                   <               c s   s                                     t_s.                   2                 s_._                        3           a.

s s s s s s E 2

                                                                                                                    --N s 2EN 4

Wo c g u Zs q gj - - s' x _x x x x x x x x s. x x x xs w< < D

s. s 4 e ,

s  % QC U h _ _ _ _ _ _ _ _

                                                                                                                                                         ~

216-4 585' ELEV' g NAbt<Ws la M/H O/w 2 osco fI ///I ////o FE Q M1 / / / / /I Kf/ //I f f ll I oc i-s an / p

                                                                                                                                                    '    =                       ' l =c"
                                                                                                     )            (so                   l I f/ ////////l l

0 3 w i-i au / 460 / f

                                                    .\..                                                         t70                  i/                                         /

e/p e/, e i Vf ////// i

                                                                                                                                                                \/ ////
                                                                                              /////////Sittlt///
                                                                                                                                                                             /
                                                                                      //
                                                                                      /

h

                                                                                                             /
                                                                                                                            /
                                                                                                                            /
                                                                                                                                                   /

l

                                                                                                                                                                             /
                                                /
                                                                                      /                      /              /                                                /

i i , i < i, 1

                                                                                                                            /                      /                         /
                                                                                      /                      /
                                                       'M                                                                   /                      /                         /
                                                                                                             /
                                                       /                                                                    /
                                                       /

t//////////////////// [

                                                                                                             /                                                    " " "
                                                                                                                                                                             /
                                                                                                                                                                             / @
                                                       /
                                                       /
                                                                                                              /             /                5                               / E 7000                                        /             /                                                /

l i.,,,,,,,,2* /iiiiiib 8 7ooo &/ ,

                                                       /      gg==mc         /         As -                                           1,.  . A7                         -/
                                                       /
                                                                             / .           .

s7 /

                                                                                 . , , , , , (,R, ,/

w/ %c, , gg b , ,o , ,,, ,,, , , , , W i , I l / c & / i,f ii w . v i , , , , , , , , , , , ,, ,g ,/

                                                       /

IED*H+4G / s e uct.,j, , , V _WX

                                                                                                                                                        , ,[

f

                                                                                                                                               // B                     D
                                                       /      n' m ..' '
                                                                                                                  '/          /
  .                                                    /    :uw.='f  '

e

                                                                                                      /              j/
                                                                                                                     /
                                                                                                                              /                /                        b,
                                                                                                                                                                             /
                                                                                                                                                                             /

l d*' /

                                                                                                                     /        /                l s
  • lood / j / b ,,,,
                                                                                                                                                                             /
                                                       ? , $ ~ su                                     / ii                                     /,                    ~2 E,@ l
                                                                                                              .         ,, ,i/
                                                                                                      /

E'J/i / /

                                                                                                      /     ...o     /                                c_         . .         /
                                                               <//!ii      i ii i iii ii ii /iii i,                   ///////////iln d ,K II                .,

N, ,{ .. a s~ (- t _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_____________m i 7-211 I / l9$9 hkYAC15&"

 '/                                    4                               ,

orm m2

                                /*                                                     -
    //

bob, an. s l 1

    /
    /////             ,
                                                                                                                                                                \

1

    /                                                .-                  ,             /                                                                        (
    ,                                PERS.                                -
                                                                                       /

TC

                                                                                       /
    /                                                                     W 's
 /                                                                        #

Y 9*g ,

                                                                              //,
                                                                                                                                      ~
                                             / ///                                                             ~

l cw ' cAus 7 *: ',' , ao - au

                                                                   /
                               ,3                30 0                                   /

1 r

                                                '            C;    'y77y//////

L~ 7' MT

                                                                                ~
                                       -.                          3-                                     -

1 5~ 2gomRlL "' ,w V / /, gy

               / / / \_ !.

l

                                                                                    ^^         /   30eb L

j , g -

                                          ,    .EIOT ue
                                                           ~
                                                                  ,j
                                          ,              i 1 21                 ,

cm "E h. d % -

                                           -m                               .
                                ,      Y                                                                             .
. n ___

dp.upup*N" j =

                                                      '-A
                                                        ,--          C
                                             '                                           j l

l .,

                                                                                                 =-

11

                                  ~

M'  ! i:. N

                                     @,4

__ y ,,,n llll//// /f,,"r" , , O Mb I Rev. 2

2ll- A e 603' ELEV.. 0%towe hY Y ,

                                                                                                                                                              *C*

cucn

                                                                                                       /                                           ,

} /

                                                                                                       /                                                                               /
                                                                                                      /                                                                                #
                                                                                                      /                                          ,

e up / , o y o * *- j %@ gi [ t F C12C d #

                                                                  ///// ////
                                                #f// /

PCNET ' nuss -

                                                                                                                               \                                              s f/
                                                /                                                     46                                                                     $
                                                '                                                3
                  /
                                        ,       3              p#                                :: A                                                                     -
     ,                15[3 ELEC
                                                $                            h                   /-
  • g6 s

PENET

                                                        ///
                                                               /             l                                                                                          '
                                                                               // /.                                                                                 /
                                                               /                                  PERE.

V/

                                                     -         ;            .:                                      ,                                        m:
                        ////,                                  / // / //
                     -            /

toute Cu ggy l _  ;, , ,,z t s / / J 7g COLD # CAUS Y

  • l

[ [oo,[ ",":,

                                                                          ~

so $00.' . dO

                                                /$$$                           5                                                                                                               '

c07 ,

                    .l           g//n             r/// ///2                     <

g l 300 < 30 ,

                                                                                                                                                                                                   ,M d16 j                                                                    M O.         "87 t^s Q     _d                ,       X ,g ,

I uni in 7 / *l l1: H ~ 1 1 2', - . . p P! H! ! i $ .

                                                                                                    ,j l

f IEEE b .H / es a ,a == l <= c==r -

                                                                                                                                                                                                  ,b L

a

                       //////////////////////           -

Q .,so

                                                                                   ///

w

                                                                                                                                                                                     -.,                    j l                                            .

I C T M T R a,d S FA S

  • Area Rad Det
  • Area Rad Readout 9 l _ _ _ _ . _ _ _ _ _ . __ _ _ _ ____ _ _ _ _ - - - - -

J

1 21(- $ J Dast L- osso i J 623' EEEV. 1 TLTSINE SLDG VENTILATION

                                                                                                                                                        /
                                                                                                                                                        /
Gotra - -

Ath 2Mbid6L. W  : -

                                                                                                                                                        /
                 .     . .             */H                                     !                             !
                                                                                                             -        23                                s/

h  %, ytyy STA.

                                                                                                                 // /                        //-
                                                                                                                                                        !s
                                                                      '                                  ,a
                                         ///,
                                                     /

ll

                                                               /
                                                     /         /
                                    /                          l
                                    /                '         l              /                          /
                                    /                          l              /                          '

h p l

                                                     /         /
              '                                              l              /
           "                        /                h         ,                                         -
                                                     ,         /              /

l / / $ l /// f///

                                                                                                       /
            -               FAN
            -               ALLEY
                                                               /                                         g
                                                               /

J 1000  : l 70DD - 5g ,,- E

A4 eA AS  :  :

T

                                                                                                 ////g                           C             C;;C:;3;;

if / / / / / / / / / / / / / / / / / / / /D

looC  : bd SO ge
           ; m'Tm :-
[
           -                                                               -               e                                                       g f                                                            ;
  • gg 6* y
           '                                                               /                                                                       .   ,.
                                                                         /                                CONTROL                                ,"
           #                                                               /                       3        noou                                  ,
/  : 9
, o _
                                                                                                                                                  ,    L
                                                          --             / n,/,n///-                                                                 /

Area Rad Det

  • Area Rad Readout S Process Monitor b

c 2.11 - C - D5L o8dc 643' ELEV.

                                                                                                                     ,siii////////<in
                                                                                                                     /

b h$ , hQ b IN NGlH  ; ,

                                                                                                                     /

C$ f s #A p ,

                                                                                                                                            /
                                                                                                                                            /
                                                                                                                                            /
                                                           /////                        /////                                               ,
                                                                                         /
                     /.                                /        /                        /                          /               23 cz,
                                                                                                                                            /
                    /                                  /        /                        /

u / / '/ i b

                         ' ' ' ' ')
                         ,                             h        h
                                                                /
                                                                                                                    .h                      '
                                                                /                        h                                                  /

p

                         /                                 /////                        !/////                                              '

1 l 7000 A - 2 l l 2 5 =u= = 700oh 5"'S

                          ,                  A                                                                               t
                                                                                                                                             ,////1            , ,
                  ~       ,

uunnum ptu Soas /

                                                                                                                                    ,//////////
                          ,r / / / / / / / / / / / / / / / / / / / / / / / / / / l /@ Q r_lflHf f

I /

                                                                                                                 /                                           .m
                          /                                                                          '
                                                                                                                 /                                           ",
                          /                                                                          s
: $ Soo  :

h se taune

                          /                                                                                 -

j noou

                                                                                                      ,          ///          //

s

                           /
                                                                                     ////1 1 /                  //,//////,,i////                              W
                           'issi////////////////,

Process MNTR f

n _- __ ___ 211- b OAVIS-8 ESSE NUCLEA3 POWER ST ATION TU$BtNE CUtLDING 585' AND GENER AL SURVEY MAP PARTIAL 567' ELEVATION ED 6550 Sheet 7 og to

                                            --                  i c==a                  c g                          D%% 9BDD 4

0 I l \0 l l

                                                                                                            <?
                                                                                          \0 0                   .

g.....- lHL FAAbtnis w pglg , b 0 I II I

      ]                                                                         0 (0                            .

360 4_ 5 ' . Il l BWRT 1 i .. A 2 (4 (06 f n E 0 J - A d 3 L:= c==. __ OTMT Rad SFAS

  • Area Rad Det G Area Rad Readout A f

l

Q)l.{

                                         . DAVIS-BESSE NUCLEAR POWER ST ATION                TUASINE BUILDING-602' ELEVATION NER AL SURVEY MAP                                                 Sheet 8 of 10 One osee
                                                            .:;. c -

16 0 7 6 - W An Rkkotus Me/H t t' b . qos l 1 O*1 O ' O . O' 1o o . O i l l Area Rad Det

  • Area Rad Readout e

{

7.\t- F ) '- OAVIS-BESSE NUCLEAR POWER ~ STAT 10N Tu28:NE SUlt. DING"623' O.EVATION W * *' 'O D aw t ose  : mIm m eo - h - I 9 2 6 _Ji J [

                                               -)sc                          -            -

9kAblMS h

                                                  /5 25.--

1I ii 0 g I

P23CEDURE CONTINUATION SHEET ED71?tA y l ., g SWSJGCT tr2.Elst.N LI MG UNCsAN17.ATION' E F F ECTIV E D ATE F#4 E h

 .                          ACTIVATION AND RESPONSE           '

M 22 $88 15' , 19 HS-EP-026M R2

   ,                                                                                           ATTACHMENT 2 Page 1 of 4 PASS CHECKLIST y                            CHECKLIST TOR PASS LIQUID SAMPLE l                             NOTE                                             l l                                                                              l l     Refer to HS-EP-0264' 0, Emergency Exposure Control                       l I     and KI Distribution, if the decision to take the                         l l     sample results in operator exposure                                      l l_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3,1250      _ _ _ _area. _ _ _ _ _l The TSC shall determine the radiological hazards associated with obtaining a PASS liquid sample in accordance with DB-CH-06000, Post Accident Radiological Sampling and Analysis and DB-CH-00007, Post Accident Radiological Sampling and Analysis,.by:

1

1. Requesting the OSC to obtain current radiological conditions in appropri-ate areas.
2. Performing an evaluation based on projected dose rates after sampling.
3. Determination of operator dose shall be made as follows:

Area Dose Rate Time Cale. Dose Activity (mres/hr) (hrs) (mrem)

a. Dress out in preparation for h (x) 0.5 , ti n (

obtaining the liquid PASS samples, including briefing.

b. Transit to PASS skid from id (x) .04 &.A-Chem. Lab.
c. Initial PASS system checkout 25 (x) 0.57 14 25 and lineup.
d. PASS system sample purge up h (x) 0.17 9C to ample cave isolation.
e. Sample isolation in sample 2i (x) 0.12 3 cave and demineralized water flush.

I

f. Degas sample, collect gaseous 2 oe-(x) 0.17 34 and liquid samples in vials and put vials in transport containers.

l l

                                       +
                                         ,. .g .... ........ ~..........              pg                                                        !

svenct . EFIERGENCY RC ORGANIZATION -. . - :Tsv t c At t *Ast W. 4 ACTIVATION AND RESPONSE . M $ $ l$${ 16. ,, 19 RS-EP-02610R2 ATTACHMENT 2 Page 2 of 4 PASS CHECKLIST (Cont.)  ! CHECKLIST FOR PASS LIQUID SAMPLE (Cont.)  !

v. y Area l

Dose Rate Time Calc. Dose  ! Activity (crem/hr) (hrs) (mrem)'

g. Demineralized water flush of I ? T (x) i sample cave'and sample 0.07 87f i I

needles. I

h. PASS skid and mimic board '2. 6 (x) 0.03 t% .~T i sample valve lineup check.
i. Transit to lab with transport l*.5'D (x) 0.07 id.s container.

J. Preparation of liquid and L so (x) 0.07 14 gaseous gamma spectroscopy samples.

k. Gamma spectroscopy samples 3 6 e (x) 0.17 st analysis.
1. Boron analysis. b (x) 0.83 i t. L -
            ,                                             m. Store remaining samples and         to o (x)           0.03            L r

waste. L Total 7 9 L mrem If the total projected calculated dose to the operator from area dose rates is less than 1250 mres, recommend a sample be taken and obtain the Emergency Plant Manager's approval to draw the sample. If the projected calculated dose exceeds 1250 arem, recommend a sample not n y be taken until the dose rates are reduced. l L y _ _ _ , , _ ._____.__-_.-.m._-- -

l 7-212-DBNPS EMERGENCY PREPAREDNESS EXERCISE CUE CARD l SCENARIO No. 1989 Exercise CUE CARD NO. 101 l

1. , 1 TO: RC Tester TIME: Day 2 0830 approx.  !

T: 0100 approx. THIS IS A DRILL L DO NOT initiate actions affecting normal plant operations.  ! l

                                ******************************************************************************                          j 1

INFORMATION: 1

                                                                                                                                        )

Use the attached area survey data. l l l i i .I l j 1 l l 1 l I I i l l  : J l l l l' THIS IS A DRILL

                                                                                                                                        ]

1~ 1 Rev. 2 i

                                                                                                                                        )

1 J

i 7-213 DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd)' CUE CARD NO. 301-TO: PASS Team Controller- TIME: Day 2 0830 approx. T: 0100 approx. ANTICIPATED RESPONSE: Continue with drawing the PASS sample. INSTRUCTIONS: The attached survey maps represent the results of the area surveys simulated to have been performed while the PASS sample was being drawn, and after the sample was complete and the system had been flushed.

                               . Issue each of these maps to the RC Tester assigned to monitor the PASS sample at the appropriate time.

COMMENTS: N/A f l Rev. 2 ) i _ _ _ _ - _ _ _ _ _ _ . . _ - 1

  '.:~               ,
                                            ,-:. 7 s                                                                                r
                 ,7.-

{ '" h_ , , , . , _ \,' 3 ll__  :' Y .-' )

                     , ,, ,--' ,sf.; ,

T-  :.1 9.l (-2l. 7-214' r LL ,,,-

! -l?                                            '                                         '. Radiation. Survey During PASS Sr.mple U;.

4 g,, I. ' L i: h-ic Q' . 9-: pc L , saurtz

              .y
              .                                                            LAB                   SKID                                                                                                                                  ,
                                ,                                         HOOD r <

t? s.

                                                                                   ~-
                                                                ;. i .

f.6 , j i g. I /V

                                                                       ?7
                                                                                           ^& l%          V L' NORTH l      SHitt D     l I

t ao I. DOOR' 7,4mQh I ras,gro' J 50 mAlk "'8 coon ba M k  :,y -s IO O 4lC CRANE IS DRILL BENCH PRESS f:-

~

CRINDER

                -4.

l LATHE t: i'.: Rev. 2 c , ;. 1 t . - - . - . .

R i~ E' 7-215 ' Radiation Survey After PASS Sample-

  ).

a h5 n ss sa mw i? g ,s. Q ll') u, 5;gy I b >+ Ehc+  % tcw HOOD _ cptn c{cgec) Mpert closec\

 ~                                                                                                                                2,0CO l%        l7o    l?OO   lleo                _;

_ .800 mRS . . _ y I

                                                                    '                   n I)5 m Alb -

N0ftTH l SHIELD l 35 mAlk ' Yo," f 5 m/2/A ooo, IOI-A lo x ' 0 #Uk Grae E-- DRILL BENCH PRESS U CRINDER LATHE Rev. 2

{::

     's .                                                7-216 DBNPS EMERGENCY PREPAREDNESS ETERCISE CUE CARD-
                 . SCENARIO NO. 1989 Exercise                             CUE CARD NO.                 102 LTO: -Chemistry Testers                                  TIME: Day 2 1100 approx.

T: '0330 THIS IS A DRILL

                            .DO NOT initiate actions affecting normal plant operations.
                  ***************************w**************************************************

INFORMATION:. j-, PASS ANALYSIS RESULTS l RCS CTMT

                   .14.7    14.7                Sample Pressure PSIG 100'F   100*F               Sample Temperature 'F 1234      19.9                Sample Pressure PSIG 520     150                 Sample Temperature 'F 1500      1500                Time 3.7052    7.10E-1             I-131 pCi/cc 5.37E2    1.03E0              I-133 uCi/cc 0      3.96El              Xe-133 pCi/cc 0      6.51E0              Kr-88 pCi/cc 1.97E-4   7.82E-9             Ba-140 pCi/cc 1.6% vol.           Hydrogen Concentration Sump Level THIS IS A DRILL
                  ******************************+++*********************************************

Rev. 2 __ _ _ _ _ _ _ - - _ _ _ _ _ ~

? 7-217 l' g DBNPS EMERGENCY PREPAREDNESS CUE CARD (Cont'd) l CUE CARD NO. 102 TO: ' PASS Controller TIME: 1100 approx. T: 0330 approx. ANTIGPATED RESPONSE: h The data on the' attached' sheet would be relayed to the TSC Core / Thermal.

                    . Hydraulics Engineer if he vere playing for use in determining the extent of core
                     ' damage.- The PASS Team, if still drawing a sample should continue with that
                                                                                                     ~

l task. INSTRUCTIONS: N/A l COMMENTS:

                   'N/A~

l. I.~ l j .. Rev. 2 l i .. .. 4

e g g* n m e ii i p h ss3 tg S pp. 8f 0 h . 0 0 at 0O5 p99 .m 2_0 tf . - 1 p2 0p w Y: a // M 0/g M A8 D . ./g /40 MMMM a 2 .i 0t 0 RRRR 0 D_0 i .r5 nnns .f/0 . OOOO . _ sFo5 iiip 0 0 NNNN 0

p* t/ d /59 ////

ET i5 0050e 02 . MMMMMMM M 83n. ....s . 0 . RRRRRRR I . .o0 0000o 044 w OOOOOOO) T 46M4 2250l o NNNNNNNs 17 5 2216c l s n . F o o ) ) ) r i) 2 2e2 p G

                                                                    /r/                                                   (

tR / e m . aW 1 r 1u1 u nt i/ ( u s( P os r dl .. s ps ii e N eaa ss s Eoe d e tD u t e O rRm Sss e Tor I u r Ree.r alp e bC m T eteo OrrpP S( / wF iA t N l o rV t A T raeH urS( TPPm.n A//e o Ewe ln t s5 W a ST Tse( RllTri Dov Fe E Nsp l Eee dt Nl e v L i2 r RE Eemne NvvlHi OFLldi A 22 D1 EH Mreov Eeel s C eer C CD IB//2CCAt

                                                                                                              /Co WS             NPTie                  GLLeeo                        WlveD                                                 a O-             I           tL                    hnP             &FleF                     R/11/AA PR             A     .  .a            M12Si                             eL           r     TACD1VV                    .r          R E          Tttip                  A                bV        Dnw               .o      C                       .te            E RT             Nuadm                  EGGGrI                     EitTxt                    ESSSG00sn                              H AE             Ottau                  T///uS                     EaoSuo                    LUUUD8$ ne                             T RM             CCCRS                  SSSSTM                     FMHCAM                    EBBBE42IG                              O T   A CR                                                                                                              g UA                                                                                                           igg NP                                                                                      s                       sii ET                                                                                      p                       pss SN                                                                                       m                           pp SA                                                                                       a                    0 EL                                                                                                                  64 BP                                                                                      1                     0       . .
   -                                              d                      g               1                    366 S                                                  e              mmi pps                   E
                                                                                          -      F
                                                                                                              /

8800) I sd

  • V oe ggp s0 //)) (

A ls p1%%4 n 22//g D co 005 c/ . itt- - h l ) 2 1009 m ff125 p p c L 41//4 p0 g 00//280 (( A / /- 001 0 . . M T12t 4E m e O- f 0 0811000) Fp 5v T22 1 . _

  • p .l e ( 5 .
                                                                                                                              ))

_ g 8av . )))) ss11 _ i 67 ^ 2Vlmm 8 2468 ss- -) _ R sF5 . Fn/ app - - ee121## E p* 11 F

  • i2kVggmm IIII rr(((

X /5* 5c ppe NNNN ePP E 0069 83 .ok00ggr //// r// u 525 ,2657lc .. 1357) ull 9 15116114Bo0000s - - - - G see 8 l s IIIIV svvw eeeo e NNNNA B 9 1 r ((((( rLLl _ n ) d 12P P F _ o. 2e - - / le /12 ig /so 11l eg e l##e tr 1 ot e vn l S e n

          .      T                aa               lu                     v            ea          p     C       vkki O        N                rM            pca             s         e           LR           u     C       ennL N        A                t             o               w        L                         o     E       Laa
              . Le               n.            o eol wo           k Eee Rgt e c

o Dwk TTn o O Or el .lL N Ou cope ( vlF n Onag m Nonddi _ O Cs nomv lF a Cain r e Alaoot ID Re s oceew a l Vna T R Rda er h P FTooc lle RR CbTLo we U p pF F j jx AA h Oem T NC Or TPgcnS u..l rr F yoS c n Tcrr Cree e

                                                                                                         - uu EeeeoI n

E - C vTo Vad r CE ASA/rSzzSRrtP e Autw Kkkrr - SU EC hoCrrCOpeC u Eono o AaaooP C RRTTBRPPRPSLR Q RSIP C MMMCCH - !l

S 33 . 00 004 h800 w 00 03 a't tf 993 5 p . p2 5 0 p

                                                                              ..m                                         M
         /0                   a           //            g           M       4/g                                           9 70                  D    .               /i                    /       0                MMM                           .

0 - a 8 s 7t/ 0 RRRN 2 iFr3 nnnp .f 0 . OOOU 5 s* o5 iii 5 ' 0 0 NNNR 9

: p t/ 8 / 50 / /// '

ET ' 0i0 3546' 72 . MMMMMMM M 8 .n. .

                                                  ...N                . 5            .

RRRRRRR I 5o8 5343E 544 w OOOOOOO) T 40M3 8837P o NNNNNNNs 11 5 1158O l - s n

                                                                                                                 ~

F o o- ) ) ) r i) 2 2e2 p G tR /e /r/ m . ( aW 1 r u 1 u1 s( u nt i/ ( s ps P os r dl . . ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u' r Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n N o T Tse( urS( TPPm.o A//e RllTri Ewe Dov l ln Fe rV t t W a S FI. Nsp l Eee dt Nl e v L ' s5 i2 RE Eemne NvvlEi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL - hnP &FleF R/11/AA a P R' A . .a M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o C .te E RT Nmadm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA CR gg UA gii NP iss spp ET p SN s%% 22 SA p 0 . 00mP EL m77 99 . . p* BP g sa.. p 09900g

    -                                                                                         00                 355 S                                                             mmi pps c500F                                         ))0 I                                               N                                          11*                ///22 V                                               E             ggp               0E//                       m                    - - 09 A                                               PN                                      0778               pntt12 D                                               OE        )  885                01 . . .                   gi f f (() 8/

h P L 2 // 006 //2 p O p A 05000 1888 ( P T / . 116 . . . 00/90 g

  • M O12t 0E 5822 . .

i e T- - f 0 1611000)) s . 7v (22 1 p 8m .le 5 )) 0## F5p Fn2avmm . )))) ss11 0* 5pF* i7Vlpp 8 2468 ss- -)11 R . / * / agg - - - - ee121## E 8590 064kV mm IIII rr( (((( X 7 ..5 . 7c 20ppe

                                                           ..ggr NNNN                          ePP E          1260               59 .ok                                      ////                          r//
                      ,8030492lc52                                      u          1357)                         ull 9          25654617,Bo4388s                                                - - - - G                    see 8

9 l B s e IIIIV NNNNA svvw eeeo w o 1 r ( (( (( rLLl l n ) D 12P - P F F

o. 2E - - / le /12 ep ig /SO 11l eg e l##e tr 1OT e v

vn l S e n nm

           . T              aa                 LU                               ea                 p C       vkki                   i e O       N              rM              pCA           s         e          LR                  u   C     ennL                   LT N       A              t               o            w          L                            o     E     Laa
               . Le             n.              o         wo                    Eee                    c o

TTn o nt oe O Or el .lL eol k Rgte Dwk N Ou cope ( vlF n Onag m Nonddi i l O Cs nomv lF a Cain r Alaoot tnr ID RR s oceew CbTLo a l Vna T R Rda er h e P FTooc lle cI e AA Re. Or u l we h c Oem T U p pF F j j

                                                                                                            - uu                  n      nH NC      TPgcnS                 . .F          yoS                       Tcrr E       C       vTo           rr          Vad                  n       Cree                   e   EeeeeI                       I CE      ASA/rSzzSRrtP                                          e       Autw                 r     Kkkrr SU      EC         hoCrrCOpeC                                  u       Eono                 o     AaaooP                       PH C   RRTTBRPPRPSLR                                          Q       RSIP                 C     MMMCCH                       LD
                                                                                                                           ,llI

n

                  ,h
                                         .a.

3; EMERr:FNCY ~ PLAN DRILL ll AND EXERCISE PROGRAM l ? SCENARIO NO. 1989 EXER' TIME: -0030 l. 1; CUE CARD:NO. T: 0700

                                                 ~ DAVIS-BESSE NUCLEAR POWER STATION ~

EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT. STATUS-COMPONENT: . . STATUS-Reactor Coolant Pumps #1-1............................. ON.

                                                         #1-2............................             ON
                                                         #2-1.'...........................            ON
                                                         #2-2............................             ON.

LMakeup Pumps #1...............................:....... STBY

                                               #2.......................................              RUN HPI Pumps #1.......................................... .STBY
                                       #2.......................................... OOS -

c Decay Heat Pumps #1.............-...................... STBY

                                                   #2...................................              STBY'
l. ' Decay Heat Removal Coolers'#1......................... AVAIL-l #2......................... AVAIL
                        . Containment' Spray Pumps #1............................                     AVAIL                 "
                                                              #2............................          AVAIL Containment H2 Dilution Blowers            #1....................         .OFF L.                                                                     #2....................          OFF Containment Recirculation Fans #1.....................                     ON

, #2..................... ON 1i , 1 l Containment Air Cooler Units #1....................... RUN-FAST

                                                                   #2.......................          RUN-FAST
                                                                   #3.......................          SPARE 1

i Component Cooling Water Pumps #1...................... RUN l #2...................... RUN l #3...................... SPARE Component Cooling Heat Exchanger #1................... RUN

                                                       ~
                                                                       #2...................          RUN
                                                                       #3...................          SPARE Service Water Pumps #1................................                     RUN
                                                       #2................................             RUN
                                                       #3................................             SPARE Backup................................              DILUTION Auxiliary Feedwater Pumps #1..........................                     OFF
                                                                #2..........................          OFF
                       -Motor Driven Feedpump.................................                        OFF
            = -      _ _             _       _             ___           _         _                   _

e 32 ifp h . 3 g S 33 . 00 004 h800 w 0 30 at tf 993 5 p .. p2 5 0 p

                                                                                 .m                                    M
      /0                 a                 //            g          M       4/g                                       9 70                D        .                  /i                  /     0               MMM-                     .

00 a 8 ' s 7t/ 0 RRRN 2 iFr3 nnnp .f 0 . OOOU 5 s* o5 iii 5 0 0 NNNR 9

p t/ 8 /50 ////

ET 0i0 3546 72 . MMMMMMM M 8 .n. . ...N . 5 . RRRRRRR - I 5o8 5343E 544 w OOOOOOO) T 40M3 8837P o NNNNNNNs 11 5 1158O l s n F o o ) ) ) r i) 2 2e2 p G tR /e /r/ m . ( aW 1 r 1 u1 u nt i/ ( u s( P os r dl . . s ps ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n N o T ST Tse( urS( TPPm.o A//e RllTri Ewe Dov l ln rV t t a

  • E Nsp l Eee dt Nle Fe v L s5 i2 W

RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP R/11/AA a PR A . .a M12Si & F eL l e F 'r TACD1VV .r R RT E Tttip Naadm A EGGGrI

                                                ~

bV nnw .o C - te E AE KitTxt ESSSG00sn H Ottau T///uS R aoSuo LUUUD85ne T RM CCCRS SSSSTM PMHCAM EBBBE42IG O TA - CR gg UA gii NP iss spp ET p SN s%% 22 SA p 0 . 00mF EL m77 99 . . p BP sa.. 09900g- p

  -
  • g p 00 355 S mmi c500F )) 0 I N pps - 11* ///22 V
  • E ggp 0E// m - - 0 A PN 0778 pntt12 D OE ) 885 01 . . giff( ()

h P L - 2 //006 //2 p O A 05000 1888 ( F p T / . 116 . . . 00/90 g

  • M O12t 0E 5822 . .

i e T- - f 0 1611000)) s . 7v ( 22 1 p 8m .le 5 ))0## F5p Fn2avmm . ) ))) ss11 0* 5pF* i7Vlpp 8 2468 ss- -) R . / * / agg - - - - ee121## E X 8590 064kV mm IIII rr( ((( ( 7 ..5 . c 20ppe NNNN ePP E 1260 59 7. o k ..ggr //// r//

                  ,8030492lc52                                          u         1357)                        ull 9         25654617Bo4388s                                                    - - - - G                   see 8

9 l B s e IIIIV NNNNA svvw eeeo w o 1 r ( (((( rLLl l n ) D 12P . P F F _ o. 2E - / l e /12 ig /SO 11l eg e l##e e T tr aa 1OT LU e v vn ea l p S C e vkki n n ie O N rM pCA s e LR u C ennL L _ N A t o w L o E Laa

n. o wo Le Eee c TTn n O

_ Or el .lL cope ( eol k Rgt e o Dwk o o N Ou vlF n Onag m Nonddi il _ O C ss' nomv lF a Cain r Alaoot t ID RR oceew a l T R Rda er e FTooc c Re. CbTLo Vna h P ll e e _ AA NC Or TPgcnS u l we h Oem T U p pF F j jn _ . .F yoS c Tcrr - uu n E CE C vTo rr Vad n Cree e EeeeeI I ASA/rSzzSRrtP e Autw r Kkkrr SU EC hoCrrCOpeC u o - C RRTTBRPPRPSLR Q Eono RSIP C AaaooP MMMCCH PH LD

EMERGENCY PLAN DRILL i-AND EXERcTSE PROGRAM 1 SCENARIO NO. 1989 EXER TIME: 0000 , 1 1: CUE CARD NO. T: 0730

      ~

l DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE' EQUIPMENT STATUS 1 1 COMPONENT: STATUS: 1 Reactor Coolant Pumps #1-1............................ ON i

                                 #1-2............................ ON l                                 #2-1............................ ON j                                 #2-2............................ ON l        Makeup Pumps #1.......................................        STBY I
                      #2.......................................       RUN HPI Pumps  #1..........................................       STBY
                   #2..........................................       OOS Decay Heat Pumps #1...................................        STBY                                   j
                         .#2...................................       STBY Decay Heat Removal Coolers #1.........................        AVAIL-
                                       #2......................... AVAIL                                   l 1

Containment Spray Pumps #1............................ AVAIL l

                                   #2............................ AVAIL l

Containment H2 Dilution Blowers #1.................... OFF

                                            #2.................... OFF 1

Containment Recirculation Fans #1..................... ON l

                                           #2..................... ON                                   .)

1 Containment Air Cooler Units #1....................... RUN-FAST

                                         #2....................... RUN-FAST
                                         #3....................... SPARE Component Cooling Water Pumps #1......................        RUN
                                          #2...................... RUN                                     )
                                          #3...................... SPARE                                   I l

Component Cooling Heat Exchanger #1................... RUN

                                             #2................... RUN
                                             #3................... SPARE Service Water Pumps #1................................       RUN
                               #2................................ RUN                                     j

, #3................................ SPARE J DILUTION Backup................................ Auxiliary Feedwater Pumps #1.......................... OFF

                                      #2.......................... OFF Motor Driven Feedpump ................................       OFF 1

l l I i Q =. ' __ - - - l

h . 3 g S 33 . 00 004 h800 w 5-45 at tf 993

                                             ' 5 p.

p2 5 0 p

                                                                            .m                                M
      /1                  a            //- g                  M       4/g                                     9 70                 D      .
                                               /i                 /       0              MMMP                   .

00 a 8 s 7t/ 0 RRRI 2 iFr3 nnnp .f 0 . OOOR 5 s* o5 iii 5 0 0 NNNT 9

: p: t/ 8 /50 ////

ET 0i0 3546 72 . MMMMMMM M 8 .n. .

                                              ...N              . 5         .

RRRRRRR - I 5o8 5343E 544 w OOOOOOO) T 40M3 8837P o NNNNNNNs 11 5 1158O l - s n F o o ) ) ) r _ i ) 2 2e2 p G tR /e /r/ m . ( - aW 1 r 1u1 u nt i/ ( u s( P Gs r dl . . s ps ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree.r alp e bC m T eteo OrrpP - - S(/ wF iA t A raeN N o T ST Tse( urS( TPPm.n A//e o Ewe l ln t rV t a RllTri Dov Fe s5 W E Nsp .l Eee dt Nle v L i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP &Fl eF- R/11/AA a PR A . .a M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o C . te E RT Naadd n EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T CCCRS SSSSTM FMHCAM EBBBE42IG O MMA CR gg UA gii NP iss spp ET p SN s%% 22 SA p 0 . 00mF EL m7 99 ..p* BP

  -                                                                g sa.7 p      00 09900g 355 S                                                          mmi               c500F                               )) 0 I                                             N            pps                    - 11*              ///22 V                                             E            ggp              0E//                 m                - - 0 A                                             PN                                 0778            pntt12 D                                             OE       ) 885                01       . . .       giff(()8/

h P L 2 //006 //2 p O A 05000 1888 ( F p T / . 116 . . . 00/90 g ' M O12t 0E 5822 .. i e T- f 0 1611000) s . 7v (22 1 p 8m .le 5 ))0## F5p Fn2avmm . ) ))) ss11 0* 5pF* i7Vlpp 8 2468 ss- -)1 R . / * / agg - - - - ee121## E X 8590 7 . 5 . 064kV c 20ppe mm IIII NNNN ePP rr( (((( E 1260 59 7. o k ..ggr //// r//

                    ,8030492lc52                                   u         1357)                     ull 9          25654617Bo4388s                                              - - - - G                see 8

9 l B s e IIIIV NNNNA svvw eeeo w o 1 r ( (((( rLLl l n ) D 12P P F F

o. 2E / le /12 e

ig /SO 11l eg e l##e T tr aa 1OT LU v e vn ea l p S C e vkki n n i O N rM pCA s e LR u C ennL L N A t o w L o E Laa Le n. o wo Eee c TTn n O Or el .lL cope ( eol k Rgte o Dwk o o N Ou vlF n Onag m Nonddi i O Cs nomv lF a Cain r Alaoot t ID RR s oceew CbTLo a Vna l T R Rda er e P FTooc c e AA NC Re. Or u..l we h Oem h T UppFFj j x lle TPgcnS F yoS c Tcrr - uu n n E C vTo rr Vad n Cree e EeeeeI I CE ASA/rSzzSRrtP e Autw r Kkkrr SU EC hoCrrCOpeC u Eono o AaaooP P C RRTTBRPPRPSLR Q RSIP C MMMCCH L

EMERrmMCY' PLAN DRILL AND EXERCISE PROGRAM SCENARIO NO. 1989 EXER TIME- 0015 CUE CARD NO. T: 0745 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY' PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS: Reactor Coolant Pumps #1-1............................ ON

                                                            #1-2............................              ON
                                                            #2-1............................              ON
                                                            #2-2............................              ON Makeup Pumps #1.......................................                      STBY
                                                  #2.......................................               RUN HPI Pumps #1..........................................                      STBy
                                               #2..........................................               OOS Decay Heat Pumps #1...................................                      SIBY
                                                       #2...................................              STBY Decay Heat Removal Coolers #1.........................                      AVAIL
                                                                    #2.........................           AVAIL Containment Spray Pumps #1............................                      AVAIL
                                                               #2............................             AVAIL Containment H2 Dilution Elowers              #1....................        OFF
                                                                            #2.............*.......       OFF Containment Recirculation Fans              #1.....................        ON
                                                                           #2.....................        ON Containment Air Cooler Units             #1.......................         RUN-FAST
                                                                        #2.......................         RUN-FAST
                                                                        #3........................        SPARE Component Cooling Water Pumps #1......................                     RUN
                                                                         #2......................         RUN
                                                                         #3......................         SPARE Component Cooling Heat Exchanger #1...................                     RUN
                                                                              #2....................      RUN
                                                                              #3...................       SPARE Service Water Pumps        #1................................              RUN
                                                           #2................................             RUN
                                                          #3................................               SPARE Backup................................               DILUTION Auxiliary Feedwater Pumps #1..........................                      OFF
                                                                   #2..........................'           OFF Motor Driven Feedpump         ................................              OFF l.
 .___.___-_-_u-_._-.-_..____m         __. __

e 32 ifp h . 3 g S 33 . 00 004 h800 w 0 00 at tf 993 5 p .. p2 5 0 p

                                                                            .m                               M
        /3 80 00        a Da. 8
                                    //
                                           /i g

s M 7t/

                                                                 /

4/g 0 0 MMMP RRRI 9 2 iFr3 nnnp .f 0 . OOOR 5 s* o5 iii 5 - 0 0 NNNT 9

p t/ 8 /50 //// -

ET 0i0 3546 72 . MMMMMMM M 8 .n. . . ..N . 5 . RRRRRRR I 5o8 5343E 544 w OOOOOOO) T 40M3 8837P o NNNNNNNs 11 5 1158O l s n F o o

                                           ~
                                           )                )        )                                        r i)                2                2e2               p                              G tR                / e             /r/                m                         .    (

aW 1 r 1 u1 u nt i / dl . . (

                                               .us           ps s(         P                    os ii r

e N eaa ss s Eoe d tD .t O r R'mr Sss e Tor e u e I u Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n N o T ST urS( Tse( TPPm.o A//e RllTri Ewe Dov l ln Fe t rV s5 t W a RE E Nsp- l Eee dt Nle v L i2 Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP &FleF R/11/AA a PR A..a M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o C te E RT Naadm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA ' CR gg UA gii NP iss spp ET p SN s%% 22 SA p 0 . 00mF EL m77 99 ..p* BP g sa.. p 09900g

    -                                                                                00              355 S                                                     mmi pps cS00F                                ) ) 0 I                                       N                                       - 11*             ///22 V                                       E             ggp                 0E//                m 0

A PN 0778 pntt12 D OE ) 885 01 , . . giff(() 8/ _ h P L 2 //006 //2 p O A ' 05000 1888 ( F p T / . 116 . . . 00/90 g

  • M O12t 0E 5822 ..

i e T- f 0 1611000)) s . 7v (22 1 p 8m .le 5 )) 0## F5p Fn2avmm . )))) ss11 0* 5pF* i7Vlpp 8 2468 ss- -) R . / * / agg - - - - ee121## mm E 8590 064kV IIII rr((((( X 7 ..5 .7c 20ppe NNNN ePP E 1260 59 .ok ..ggr //// r//

                    ,8030492lc52                                 u           1357)                   ull 9         25654617Bo4388s                                                          G         see 8

9 l B s e IIIIV NNNNA svvw eeeo w o _ 1 r i((( ( rLLl l _ n ) D 12P P F F

o. 2E / le /12 e

ig /SO 11l eg e l##e _ tr 1OT e vn l S e n n T aa LU v ea p C vkki i O N pCA s e u rM LR C ennL L o N A t w L o E Laa O

             . Le Or n  .

el .lL o wo eol k Eee R gt e c o Dwk TTn o n o cope ( n N Ou vlF Onag m Nonddi i nomv _ O Cs lF a Cain r Alaoot t ID RR Re s oceew CbTLo a l Vna T R Rda er h e P FTooc lle c e AA we h Oem T U p pF F j j X Or NC E TPgcnS C vTo u..l rr F yoS c n Tcrr e

                                                                                               - uu                n       n

_ Vad Cree EeeeeI I _ CE ASA/rSzzSRrtP e Autw r Kkkrr _ SU EC hoCrrCOpeC u Eono o AaaooP P C RRTTBRPPRPSLR Q RSIP C MMMCCH L

EMERc.ENCY PLAN DRTL2., ' AND EXERCISE PROGRAM SCENARIO NO. 1989 EXER TIME: -0030

CUE CARD NO. T: 0800 DAVIS-BESSE NUCLEAR POWER STATION
                         ' EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT:                                                     STATUS:

Reactor Coolant Pumps #1-1............................ ON

                                            #1-2............................ ON
                                            #2-1............................ 'ON-
                                            #2-2............................ ON Makeup Pumps #1.......................................            STBY
                                #2.......................................         -RUN EPI Pumps #1..........................................            STBY
                             #2..........................................          OOS Decay Heat Pumps #1...................................            STBY
                                    -#2...................................         STBY     ,

Decay Heat Removal Coolers #1.......................... AVAIL

                                                   #2......................... AVAIL Containment Spray Pumps #1............................            AVAIL
                                               #2............................      AVAIL Containment H2 Dilution Blowers       #1.................... OFF
                                                        #2.................... OFF Containment Recirculation Fans       #1..................... ON
                                                       #2..................... ON Containment Air Cooler Units       #1....................... RUN-FAST
                                                     #2....................... RUN-FAST
                                                     #3....................... SPARE Component Cooling Water Pumps #1......................           RUN l
                                                      #2...................... RUN
                                                      #3...................... SPARE Component Cooling Heat Exchanger #1...................           RUN
                                                         #2................... RUN
                                                         #3................... SPARE Service Water Pumps #1................................           RUN
                                           #2................................      RUN.
                                           #3................................      SPARE Backup................................         DILUTION Auxiliary Feedwater Pumps #1..........................           OFF
                                                  #2.......................... OFF Motor Driven Feedpump ................................            OFF E-.... _ __--

e 32 if p h . 3 g S 33 . 00 004 h800 w 5 15 at tf 993 5 p .. p2 5 0 p

                                                                             .m                                M
      /4                  a            //          g           M       4/g                                    9 80                  D      .             /i                  /       0             MMMP                    .

00 a - 8 s t/ 0 RRRI 2 iFr3 nnnp 7. f 0 . OOOR 5 s* o5 iii 5 0 0 NNNT 9

p t/ 8 /50 ////

ET 0i0 3546 72 . MMMMMMM M 8 .n. . . ..N . 5 . RRRRRRR I 5o8 5343E 544 w OOOOOOO) T 40M3 8837P o NNNNNNNs 11 5 1158O l s n F o o ) ) ) r i) 2 2e2 p .G ( tR /e /r/ m . aW 1 r 1 u1 u nt i/ ( u ps s( P os r dl . . s ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree .r alp e bC m T eteo OrrpP S(/ wF iA t A T ST Tse( raeN urS( TPPm.on A//e RllTri N Ewe Dov l o ln Fe rV t s5 t W a E Nsp l Eee dt Nle v L i2 r RE Eemne NvvlHi OFLldi A 22 D1 EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP &FleF R/11/AA a PR A . .a M12Si eL r TACD1VV . r R E Tttip A bV Dnw .o C te E RT Nmmdm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA gg CR gii UA iss NP spp ET p SN s%% 22 SA p 0 . 00m EL m77 99 . . BP sa.. p 09900g

  -                                                                 g                 00              355 S                                                           mmi pps c500F                               ))

I N - 11* ///22 V E ggp 0E// m - - A PN 0778 pntt12 D OE ) 885 01 . . giff((

                                                                                                                   //2 h       P      L        2          //006 p O p

A 05000 1888 00/9 F T / . 116 . . . g

  • M O12t 0E 5822 . .

i e T- f 0 1611000) s . 7v (22 1 p 8m .le 5 ) )0 F5p Fn2avmm . )) )) ss11 ss- - 0* 5pF* i7Vlpp 8 2468 R . / * / agg - - - - ee121## E 8590 064kV 20ppe mm IIII NNNN ePP rr( (( X 7 . . 5 .7c

                                                            .ggr                                      r//

E 1260 59 .ok . ////

                    ,8030492lc52                                    u         1357)                   ull 9          25654617Bo4388s                                               - - - - G             see 8                                           l                s          IIIIV                   svvw 9                                           B                e          NNNNA                   eeeo 1                                                            r         ( ((((                   rLLl n          )    D            12P                                      P            F
o. 2E / le /12 ig /SO 11l eg e l##e

- . T tr aa 1OT LU e v vn ea l p S C e vkki n O N rM pCA s e LR u C ennL N A t o w L o E Laa Le n. o wo k Eee Rgte c o Dwk TTn o O Or el .lL eol N Ou cope ( vlF n Onag m Nonddi O Cs nomv lF a Cain r Al aoot ID RR Re s 'oceew CbTLo a Vna l T R Rda er h e P FTooc ll e AA Or . u..P l we h Oem T UppFFj jx

                                                                                                 - uu               n

- NC E TPgcnS C vTo rr Vad yoS c n Tcrr Cree e EeeeeI CE ASA/rSzzSRrtP e Autw r Kkkrr u Eono o AaaooP - EC SU hoCrrCOpeC C RRTTBRPPRPSLR Q RSIP C MMMCCH

EMERGENCY PLAN DRILL AND EXERCISE PROGRAM SCENARIO NO. 1989 EXER . TIME: 0045 CUE CARD NO. T: 0815 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS: Reactor Coolant Pumps #1-1............................ ON

                                                                        #1-2............................ ON
                                                                        #2-1............................ ON
                                                                        #2-2............................ ON Makeup Pumps #1.......................................                            STBY
                                                     #2.......................................               RUN HPI Pumps #1..........................................                            STBY
                                                  #2..........................................               OOS Decay Heat Pumps #1...................................                            STBY
                                                          #2...................................              STBY Decay Heat Removal Coolers #1.........................                            AVAIL
                                                                              #2......................... AVAIL Containment Spray Pumps #1............................                            AVAIL
                                                                          #2............................ AVAIL Containment H2 Dilution Blowers                         #1.................... OFF
                                                                                   #2.................... OFF Containment Recirculation Fans                        #1..................... ON
                                                                                  #2..................... ON Containment Air Cooler Units                        #1....................... RUN-FAST
                                                                                #2....................... RUN-FAST
                                                                                #3....................... SPARE Compcnent Cooling Water Pumps #1......................                           RUN
                                                                                 #2...................... RUN
                                                                                 #3...................... SPARE Component Cooling Heat Exchanger #1...................                           RUN
                                                                                    #2................... RUN
                                                                                    #3................... SPARE Service Water Pumps #1................................                           RUN
                                                                      #2................................ RUN
                                                                      #3................................ SPARE Backup................................              DILUTION Auxiliary Feedwater Pumps #1..........................                           OFF                  i
                                                                             #2........................  . OFF                 j 1

l Motor Driven Feedpump ....i........................... OFF j 1 i i

                                                                                                                                  )

l _ __ _ __ A

e - ntm _ e 32 . ify _ h .3 g S 33 . 00 . 004 h800 w 0 at 993 p. .

                                                                                             .m                                    M 30                     tf                          5                p2 5 0 p
           /0                                      //             g             M      4/g a      ..                                                                                       9 81                     D                          /i                    / . 0                  MMMP                      .

00 a 8 . . s 7t/ 0 RRRI 2 iFr3 nnnp .f s 0 . OOOR 5 s* o5 iii - 5 0 0 NNNT 9 p

t/ 8
                                                                               / 50                       ////

_. ET 0i0 3546 72 . MMMMMMM M 8 .n. . . . .N . 5 . RRRRRRR I 5o8 5343E 544 w OOOOOOO) T 40M3 8837P o NNNNNNNs 11 5 1158O l s L .n - F o L o ) ) ) r i) 2 2e2 p G tR /e /r/ m . ( aW 1 r ( u 1u1 s( u nt i/ s ps P os r dl .. ii e N'. eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n N- l o rV t T ST urS( Tse( - A//eTPPm.o Ewe l n' t a RllTri Dov Fe s5 W E Nsp l Eee dt Nle v L - i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I . tL hnP EFleF R/11/AA a PR A . .a M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o r te E RT Naadm EGGGrI EitTxt RSSSG00sn H AE Ottau T///uS EaoSuo r UUUD85ne T RM CCCRS SSSSTM FMHCAM RBBBE42IG O f A CR gg UA gii NP iss spp ET p SN s%% 22 SA p 0 . 00mP EL m7 99 ..p* BP

      -                                                                             g sa.7 p       00
                                                                                                            .             09900g 355 S                                                                       mmi pps c500F                                   )) 0 I                                                        N                                      - 11*                ///22 V

A E PN ggp 0E// 0778 m. pntt12

                                                                                                                                        - - 0 D                                                        OE         )885                 01 . . .                 giff(() 8/

h P L 2 //006 //2 p O A 05000 1888 (9 F p T '/ . 116 . . . 00/90 g

  • M O12t 0E 5822 ..

i e T- - f 0 1611000) s v (22 7.l'e 1 p 8m 5 -))0## F5p Fn2avmm . ) ))) ss11 0* 5pF* .i 7 V l p p agg 8 2468 ss- -)1 R . / * / - - - - ee121## E X 8590 7 ..5 064kV

                                                  ' 7c L

2Oppe mm IIII NNNN ePP rr(((( E 1260 59 -.ok ..ggr //// r//

                          ,8030492lc52                                              u         1357)                       ull 9           25654617Bo4388s                                                         - - - - G                   see 8                '
                                        '                        l                  s e

IIIIV svvw eeeo w o B NNNNA 9 1 r ((((( rLLl l n ) D 12P P F F

o. 2E - / l e /12 e

ig /SO 11l eg e l##e tr 1OT e vn l S e n n T aa - LU v ea p C vkki i O N rM pCA s e LR u C ennL L N A t o w L o E Laa Le n. o wo Eee c TTn n O Or el .lL cope ( eol k Rgte o Dwk o o N Ou vlF n Onag m Nonddi i O Cs nomv lF a Cain r Alaoot tn ID RR s oceew CbTLo a Vna l T R Rda er e P FTooc c e AA Re. Or u l we h Oem h T lle U p pF F j j NC TPgcnS . .F yoS c Tcrr - uu n nH E C vTo rr Vad n Cree e EeeeeI I CE ASA/rSzzSRrtP e Autw r Kkkrr SU EC hoCrrCOpeC u Eono o AaaooP PH C RRTTBRPPRPSLR Q RSIP C MMMCCH LD l

i EMERGENCY PLAN DRTLL AND EXERCISE PROr g SCENARIO NO. 1989 EXER TIME: 0100 CUE CARD NO. T: 0830 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS: Reactor Coolant Pumps #1-1....................:....... ON

                                                                   #1-2............................      ON
                                                                   #2-1............................      ON
                                                                   #2-2............................      ON Makeup Pumps #1.......................................            STBY
                                                        #2.......................................        RUN HPI Pumps #1..........................................            ~STBY
                                                  #2..........................................           OOS Decay Heat Pumps #1...................................            STBY
                                                            #2...................................        STBY Decay Heat Removal Coolers #1.........................            AVAIL
                                                                          #2......................... AVAIL Containment Spray Pumps #1............................            AVAIL
                                                                     #2............................      AVAIL Containment H2 Dilution Blowers #1....................            OFF
                                                                               #2.................... OFF Containment Recirculation Fans #1.....................            ON
                                                                              #2..................... ON Containment Air Cooler Units #1.......................            RUN-FAST
                                                                            #2....................... RUN-FAST
                                                                            #3....................... SPARE Component Cooling Water Pumps #1................. ....             RUN      !
                                                                             #2...................... RUN
                                                                             #3...................... SPARE Component Cooling Heat Exchanger #1...................            RUN
                                                                                #2................... RUN
                                                                                #3................... SPARE Service Water Pumps #1................................            RUN
                                                                #2................................        RUN
                                                                #3................................        SPARE Backup................................         DILUTION Auxiliary Feedwater Pumps #1..........................            OFF
                                                                         #2.......................... OFF Motor Driven Feedpump ................................            OFF

e

  • ntm e 32 ifp g

h . 3 S 33 . 00 . 004 h800 w 5 at 993 p. p2 5 0 p

                                                                              .   .m                               M 45                .tI                      5 -
        /1                 a              //           g           M        4/g                                    9 81                 D       .            - /i                   /        0            MMMP                    .

00 'a 8 s t/ 0 RRRI 2 iFr3 nnnp 7. f 0 . OOOR 5 s* o5 iii 5 0 0 NNNT 9

p t/ 8 /50 ////

ET 0i0 3546 72 . MMMMMMM M 8 .n. . . ..N . 5 . RRRRRRR I 5o8 5343E 544 w OOOOOOO) T 40M3 8837P o NNNNNNNs _ 11 5 1158O l s n - F o o ) ) ) p r i) 2 2e2 G ( tR /e /r/ m . aW 1 r 1 u1 u nt i/ ( u ps s( P os r dl . . s ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u .r Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN TPPm n N- l o . rV t

  • T urS( A//e.o Ewe ln t a ST Tse( ' -

RllTri Dov Fe s5 W E Nsp- l Eee dt Nle v L i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel - s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP &FleF R/11/AA a PR A . .a M12Si eL r TACD1VV .r R E Tttip A . bV Dnw .o C te E RT Naadm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T CCCRS SSSSTM FMHCAM EBBBE42IG O WM CR A gg UA gii NP iss spp ET p SN s%% 22 SA p - 0 . 00mF

                                                                                                                          ..p*

EL m77 99 BP sa.. p 09900g

    -                                                                   g                 00               355

- S mmi pps c500F )) 0 - I N 11* ///22 V E ggp 0E// m - 0 A PN 0778 pntt12 D OE )885 01 . giff( () h P L 2 //006 -

                                                                                                                       //2 p O p

A 05000 1888 ( F* T / .- 116 . . . 00/90 g

  • M O12t 0E 5822 ..

_ i e T- f 0 1611000)) _ s . 7v (22 1 p 8m .le 5 ))0## F5 p Fn2avmm . )))) ss11 ss- - ) 0* 5pF* i7Vlpp 8 2468 R . / * / agg - - - - ee121## E X 8590 7 . . 5 064kV

                                        .       7c         20ppe mm               IIII NNNN                     ePP rr( ((((

E 1260 59 .ok . .ggr ////' r// u

                       ,8030492lc52                                                1357)                    ull 9           25654617Bo4388s                                                - - - - G               see

_ 8 l s IIIIV svvw eeeo 9 B e NNNNA _ 1 r ( ( ((( rLLl l _ n ) D 12P P F

o. 2E / le /12 ig /SO 11l eg e l##e

_ tr 1OT e vn l S e n

            . T                aa                LU                  v          ea           p  C       vkki e                       u O       N                rM            pCA           s                    LR              C       ennL o

N A t o w L E Laa wo

               . Le               n.            o                               Eee             c             TTn o

O Or el .lL eol k Rgte o Dwk _ N Ou cope ( vlF n Onag m Nonddi O Cs nomv lF a Cain r Alaoot _ ID RR s oceew CbTLo a Vna l T R Rda er h e P FTooc lle - AA Re. Or u..l we h c Oem T UppFFj jx

                                                                                                     - uu               n NC      TPgcnS                         F .yoS                          Tcrr E       C      vTo            rr           Vad                 n       Cree            e  EeeeeI CE      ASA/rSzzSRrtP                                          e       Autw            r  Kkkrr SU      EC        hoCrrCOpeC                                   u       Eono            o  AaaooP C   RRTTBRPPRPSLR                                         Q        RSIP           C   MMMCCH

j H , l EMERGENCY PLAN'DRTEL AND EXERCISE PROGPAM E *

                        -SCENARIO NO.              '1989 EXER                                                                                            TIME:' O115 L                          CUE CARD NO.-                                   ,_

T: 0845 DAVIS-BESSE-NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: . STATUS! Reactor Coolant Pumps #1-1............................ ON e

                                                                #1-2............................ ON                                                                       -4
                                                                #2-1............................ ~ON
                                                                #2-2............................ ON Makeup Pumps #1.......................................                                                                              STBY
                                                #2........................'...............                                                                     RUN HPI Pumps.#1..................................:.......

STBY

                                             #2..........................................                                                                      00S Decay Heat Pumps'#1...................................                                                                              STBY
                                                      #2...................................                                                                    STBY Decay Heat Removal Coolers #1.........................                                                                              AVAIL ~
                                                                       #2.........................                                                             AVAIL ContainmentLSpray Pumps.#1............................                                                                              AVAIL
                                                                    #2............................                                                             AVAIL.

Containment H2 Dilution Blowers #1.................... OFF

                                                                                #2....................                                                         OFF Containment Recirculation Fans                      #1.....................                                                         ON
                                                                               #2.....................                                                         ON Containment Air Cooler Units                     #1.......................                                                         RUN-FAST
                                                                             #2.......................                                                         RUN-FAST
                                                                             #3.......................                                                         SPARE Component Cooling Water Pumps #1......................                                                                             RUN
                                                                              #2..........o...........                                                         RUN
                                                                              #3......................                                                         SPARE Component Cooling Heat Exchanger #1...................                                                                             RUN
                                                                                 #2...................                                                         RUN'
                                                                                 #3...................                                                         SPARE Service Water Pumps #1................................                                                                             RUN
                                                               #2................................                                                              RUN
                                                               #3................................                                                              SPARE t

Backup................................ DILUTION l I. Auxiliary Feedwater Pumps #1.......................... OFF

                                                                      #2..........................                                                             OFF Motor Driven Feedpump ................................                                                                             OFF

[.

      = _ - _ _ _ _ _ _ _ _ _ _ _ _ _ __

e nta e 32 ifp h .3 g S 33 . 00 004 h800 - w 0 00 a' t tf 993 5

p. ..m p2 5 0 p M

a

            /3                                    //               g          M        4/g                                           9 91        ~

D /i / 0 MMMP . 00 a' 8 s t/ 0 RRRI 2

7. f iFr3 nnnp 0 .

OOOR 5 s* o5 NNNT e..  :: p t/ iii

                                                                ' 8 5
                                                                             /50 0       0
                                                                                                          ////

9 ET '0i0 3546 72 . MMMMMMM M 8'.n. .. .N . 5 . RRRRRRR I 5o8 5343E 544 w OOOOOOO) T 40M3 o

                                                                                     ~

8837P 1' NNNNNNNs 11 5 1158O l s n F o o

                                                               )              )       )                                               r i)                             2              2e2              p                                     G tR                            /e            /r/               m                               .     (

aW 1 r u 1 u1 u nt i/ ( ps s( P os r dl .. s ii e i l eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN TPPm n N l o rV t T urS( A//e.o Ewe ln t a ST Tse( RllTri Dov Fe s5 W

         .E        Nsp l                       Eee                dt       Nle                 v       L         -

i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD- /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL . hnP &FleF R/11/AA a PR A..a M12Si eL .r TACD1VV .r R E Tttip A - bV Dnw .o C  : - te E RT AE Naadm EGGGrI EitTxt ES'SSG00sn H Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA . CR gg UA gii NP iss spp ET ' p SN s%% p 2 2' SA 0 . 00mF EL m7 99 ..p* BP

       -                                                                          g sa.7 p       00 09900g 355 S                                                                     mmi pps c500F                                     ))0 I                                                         N                                     - 11*                   ///22 V                                                         E -         ggp                0E//                      m          .
                                                                                                                                          - - 0 A                                                         PN                                   0778                pntt12 D                                                         OE       )  885                01        .        .      giff((                  )

h P L 2 //006 //2 p O p A 05000 1838 ( F T / . 116 . . . 0 0' g

  • M O12t 0E -

5822 .. i e T- f 0 1611000)) s . 7v (22 1 p .8m .le 5 ))0## F5p Fn2avmm . )) )' ) ss11 0* 5pF* i7Vlpy agg 8 2468 ss- -)1 R . / *  : / - ee121## E X 8590 7 ..5 064kV

                                                .        7c          20ppe mm                 IIII NNNN                            ePP rr((           ((

E 1260 59 .ok ..ggr //// - r//

                         ,8030492lc52                                             u           1357)                          ull 9        25654617Bo4388s                                                                           G              see 8                                                     l               s           IIIIV                           svvw               w 9                                                     B               e r

NNNNA eeeo o 1 ((((( rLLl l n ) D 12P P F F

o. 2E / le /12 e

ig /SO 11l eg e l##e tr 1OT e vn l S e n n T aa LU v ea p C vkki i O N rM pCA s e LR u C ennL L N A t o w L o E Laa

                 . Le                     n.             o           wo                    Eee                 c o

TTn o n o O Or el .lL cope ( eol k Rgte Dwk N Ou vlF n Onag m Nonddi i O ID Cs s nomv oceew lF a l T a Cain Rda r e Alaoot FTooc t c RR Re. CbTLo Vna R er h P lle e AA NC Or TPgcnS u..l F yoS we h c Oem Tcrr T U p pF F j j x

                                                                                                                      - uu               n      n E      C          vTo              rr              Vad               n         Cree                e     EeeeeI                     I CE     ASA/rSzzSRrtP                                                  e        Autw                r     Kkkrr SU     EC           hoCrrCOpeC                                       u         Eono                o     AaaooP                     P C  RRTTBRPPRPSLR                                                 Q         RSIP                C     MMMCCH                     L

EMERGENCY PLAN DRILL AND EXERCISE PROGRAM SCENARIO NO. 1989 EXER TIME: 0130 CUE CARD NO. T: 0900 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS: Reactor Coolant Pumps #1-1............................ ON l #1-2............................ ON

                                               #2-1............................            ON
                                               #2-2............................            ON
                    -Makeup Pumps #1.......................................                STBY
                                     #2.......................................             RUN HPI Pumps #1..........................................              STBY
                                 -#2...........................................            OOS-  -

Decay Heat Pumps #1................................... STBY

                                         #2.  .................................            STBY Decay Heat Removal ~ Coolers #1.........................            AVAIL
                                                        #2.........................        AVAIL Containment Spray Pumps #1............................              AVAIL
                                                   #2............................          AVAIL Containment H2 Dilution Blowers          #1.................... OFF
                                                                #2.................... OFF Containment Recirculation Fans #1.....................              ON
                                                              #2.....................      ON Containment Air Cooler Units #1.......................              RUN-FAST
                                                           #2.......................       RUN-FAST
                                                           #3.......................       SPARE Component Cooling Water Pumps #1......................              RUN
                                                             #2......................      RUN
                                                             #3......................      SPARE Component Cooling Heat Exchanger #1...................              RUN
                                                                  #2................... RUN
                                                                  #3................... SPARE Service Water Pumps #1................................             RUN
                                             #2................................            RUN
                                             #3................................            SPARE g                                        Backup................................             DILUTION Auxiliary Feedwater Pumps #1..........................             OFF
                                                       #2..........................        OFF Motor Driven Feedpump ................................             OFF

e 32 ntm ifp h . 3 g S 33 . 00 004 h800 w 5 15 at tf 993 5 p p2 5 0 p

                                                                       . .     .m                                    M
      /4                 a            //           g           M         4/g                                         9 91                D     .                *
                                                 .i                 /        0                MMMP 00         a          8                      s           7t/               0            RRRI                   2 iFr3                  nnnp                       .f          0      .

OOOR 5 s* o5 iii 5 0 0 NNNT 9

: p t/ 8 / 50 ////

ET 0i0 3546 72 . MMMMMMM M 8 .n. . . . .N . 5 . RRRRRRR I 5o8 5343E T 40M3 544 w OOOOOOO) 11 5 8837P o NNNNNNNs 1158O l s n F o o ) ) ) r i) 2 2e2 p G tR / e /r/ m . ( aW 1 r 1 u1 u nt i/ ( u s( P os r dl . . s ps ii e N eaa ss s Eoe d tD t Q rRm Sss e Tor e u e I u r Ree .r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n N o T ST urS( Tse( TPPm.o A//e RllTri Ewe Dov l ln Fe rV t s5 t W a E Nsp l Eee dt Nle v L i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C - eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP &FleF R/11/AA a PR A ..a M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o C te E RT Naadm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA CR gg UA gii NP iss spp ET p SN s%% 22 SA p 0 . 00 .p*mF EL m77 99 . BP sa.. 09900g

-                                                                   g           p        00                 355 S                                                           mmi                  c500F                                   ))       0 I                                              N            pps                         - 11*                ///22 V                                              E            ggp                  0E//                     m               -       09 A                                              PN                                      0778              pntt12 D                                              OE        ) 885                   01        . .  .        giff((                   )

h P L 2 //006 //2 p O A 05000 1888 ( F p T / . 116 . . . 00/90 g

  • M O12t 0E 5822 . .

i e T- f 0 1611000) 7.lv e s . ( 22 1 p 8m 5 ))0## 0* F5p 5pF* i7Vlpp Fn2avmm . )))) ss11 R .' / ' / agg 8 2468 ss- -)

                                                                                - - - -                          ee121##

E X 8590 064kV mm IIII rr((((( 7 . . 5 . c 20ppe NNNN ePP E 1260 59 7. o k ..ggr //// r// 9

                 ,8030492lc52                                      u           1357)                        ull 25654617Bo4388s                                                  - - - - G                   see 8

9 l B s e IIIIV NNNNA svvw eeeo w o 1 r ((((( rLLl l n ) D 12P P F F

o. 2E - / le /12 ig /SO 11l eg e l##e ep T

tr aa 1OT LU e v vn ea l p S C e vkki n nm O i N rM pCA s e LR u C ennL LT N A t o w L o E Laa O Le n. o wo Eee c TTn nt N Or Ou el .lL cope ( eol k Rgte o Dwk o oe vlF n Onag m Nonddi il O Cs nomv lF a Cain r Alaoot tn ID RR s oceew a l T Rda e FTooc cI Re. CbTLo Vna R er h P ll e e AA NC Or TPgcnS u .l we h Oem T U p pF F j jx E C rr F yoS c Tcrr - uu n nH CE vTo Vad n Cree e EeeeeI I ASA/rSzzSRrtP e Autw r Kkkrr SU EC hoCrrCOpeC u Eono o AaaooP PH C RRTTBRPPRPSLR Q RSIP C MMMCCH LD

t l EMERf:ENcv PLAN DRTLL I AND EXERCISE PROGRAM l-SCENARIO NO. 1989 EXER __ TIME: 0145 CUE CARD NO. T: 0915 DAVIS-BESSE NUCLEAR POWER STATION L EMERGENCY PREPAREDNESS. EXERCISE EQUIPMENT STATUS COMPONENT: STATU.S t Reactor Coolant. Pumps #1-1................r ............ ON

                                           #1-2............................        ON l                                           #2-1................~............       ON
                                          '#2-2............................        ON Makeup Pumps #1.......................................            STBY
                                #2.......................................          RUN HPI Pumps #1..........................................            STBY
                             #2..........................................          OOS Decay Heat Pumps #1...................................            STBY
                                     #2...................................         STBY Decay Heat Removal Coolers #1.........................            AVAIL
                                                 #2.........................       AVAIL Containment Spray Pumps #1............................            AVAIL
                                             #2............................        AVAIL Containment H2 Dilution Blowers #1....................            OFF
                                                        #2.................... OFF Containment Recirculation Fans #1.....................            ON
                                                       #2.............*.. .... ON Containment Air Cooler Units #1................... ...            RUN-FAST
                                                     #2..................   ... RUN-FAST
                                                     #3....................... SPARE Component Cooling Water Pumps #1......................           RUN
                                                      #2...................... RUN
                                                      #3...................... SPARE Component Cooling Heat Exchanger #1...................           RUN
                                                         #2................... RUN
                                                         #3................... SPARE Service Water Pumps #1................................           RUN
                                         #2................................        RUN
                                         #3................................        SPARE Backup................................         DILUTION Auxiliary Feedwater Pumps #1..........................           OFF
                                                #2..........................       OFF Motor Driven Feedpump ................................           OFF 1

i 4 I m________.._ ._ . . _ _

_ e 32 ifp h . 3 g S 33 . 00 004 h800 w 0 30 at tf 993 5 p . p2 5 0 p

                                                                           ..m                                       M
     /0                  a              //          g            M       4/g                                         9 92                 D       .
                                               /i                     /      0                MMMP 00          a            8                     s            7t/             0            RRRI                   2 ipr 3                   nnnp                       .f        0      .

OOOR 5 s* o5 iii 5 0 0 NNNT 9

: p t/ 8 / 50 ////

ET 0i0 3546 72 . MMMMMMM M I 8 .n. .

                                              ...N                 . 5          .

RRRRRRR 5o8 5343E 544 w OOOOOOO) T 40M3 8837P o NNNNNNNs 11 5 1158O n l s F o o ) ) ) r i) 2 2e2 p C tR /e /r/ m ( aW 1 r 1 u1 u nt i/ ( u s( P os r dl . . s ps ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n N o T ST urS( Tse( TPPm.o A//e RllTri Ewe Dov l l n Fe rV t t a E Nsp l Eee dt Nle v L s5 i2 W RE Eemne NvvlHi OPLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP &FleF R/11/AA a PR A ..a M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o C te E RT Nmadm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85 ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA CR gg UA gii NP iss spp ET p SN s%% 22 SA p 0 . 00 mF EL m77 99 ..p* BP sa.. 09900g

-                                                                     g         p        00                 355 S                                                             mmi                c500F                                    )) 0 I                                              N              pps                       - 11*                ///22 V                                               E             ggp                0E//                     m                - - 0 A                                              PN                                      0778               pntt12 D                                              OE         )  885                 01         . . .         giff((                 )

h P L 2 //006 //2 p O A 05000 1888 (9 F p T / . 116 . . . 00/90 g

  • M O12t 0E 5822 ..

i e T- - f 0 1611000) s . 7v ( 22 1 p 8m .le 5 )) 0## 0* P5 p 5pF* i7Vlpp Pn2avmm . ) ))) ss11 R . / * / agg 8 2468 ss- -) E - - - - ee121## X 8590 7 064kV mm IIII rr(((( ( E 1260

                     ..5             .

7c 59 .ok ..ggr 20ppe NNNN ePP

                                                                               ////                         r//

9

                 ,8030492lc52                                        u         1357)                        ull 8

25654617Bo4388s - - - - G see 9 l B s e IIIIV NNNNA svvw w 1 r ( (((( eeeo o n rLLl l

                                          )   D             12P                                             P           F      F o.

ig 2E - / le /12

                                          /SO               11l                 eg               e          l## e               e T

tr aa 1OT LU e v vn ea l p S C e vkki n i n O N rM pCA s e LR u C ennL LT N A t o w L o E Laa O Le Or

n. o wo Eee c TTn n N Ou el .lL cope ( eol k Rgt e o Dwk o o vlF n Onag m Nonddi il O Cs nomv lF a Cain r Alaoot tn ID RR Re s oceew CbTLo a l T Rda e PTooc cI Vna R er h P lle e AA NC Or TPgcnS
                    .             u
                                        .l F        yoS we           h       Oem                 T     U p pF F j jx E       C      vTo rr                               c     Tcrr                       - uu              n      nH CE                                        Vad                   n      Cree                 e    EeeeeI                    I SU ASA/rSzzSRrtP                                            e     Aut w                r    Kkkrr EC        hoCrrCOpeC                                    u      Eono                 o    AaaooP                    PH C   RRTTBRPPRPSLR
  • Q RSIP C MMMCCH LD

EMERGENCY PLAN DRTLL AND EXERCTSE PROGRAM SCENARIO NO. 1989 EXER TIME: 0200 CUE CARD NO. T: 0930 i DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS 1 STATUS! I COMPONENT: Reactor Coolant Pumps #1-1............................ ON

                                              #1-2............................ ON                                '
                                              #2-1............................             ON
                                              #2-2............................             ON i

Makeup Pumps #1....................................... STBY j

                                    #2.......................................              RUN                   j HPI Pumps #1............-..............................                STBY
                                 #2..........................................              OOS Decay Heat Pumps #1...................................                 STBY
                                         #2...................................             STBY                   q g
                                                                                                                 ]

Decay Heat Removal Coolers #1......................... AVAIL'

                                                       #2.........................         AVAIL Containment Spray Pumps #1............................                AVAIL
                                                 #2............................            AVAIL Containment H2 Dilution Blowers #1....................                OFF
                                                                 #2.................... OFF Containment Recirculation Fans            #1..................... ON
                                                               #2..................... ON Containment Air Cooler-Units          #1.......................       RUN-FAST
                                                           #2.......................        RUN-FAST
                                                           #3.......................        SPARE Component Cooling Water Pumps #1......................                 RUN
                                                             #2......................       RUN
                                                             #3..............:.......       SPARE L                     Component Cooling Heat Exchanger #1...................                 RUN

! #2................... RUN

                                                                   #3................... SPARE Service Water Pumps, #1................................                RUN
                                            #2................................              RuN                   4 J
                                             #3................................             SPARE Backup................................              DILUTION Auxiliary Feedwater Pumps #1..........................                 OFF
                                                      #2..........................          OFF Motor Driven Feedpump    ................................             OFF I
    - _ _ - _ _ _ .        .   -                                                                                 i
       )      . j'                            1I                                   ;i            l il l
                                  ))i                                     ,i                                !            j!l]il iij]lll
     .-                                                                                                                                                                         J gg                                                                                                      F ii                           g                                                                          *
                                            )             ss                           H' t             ppF                                                                                                     0 e
  • ntm .

e 32 ifp 2 h . 3 g 0

                                           .S             33 .                         00                                                                         1 004                     h800                                                       w               M/nF 5

4 5 at tf 993 5 p. p250p

                                                                                            ..m                                             M                Rti*
                         / 1                 a*           //

g Of M 4/g 9 N= 25

     ,                   9 2                D .                   /i                  / 0                         MMMP                        .              /559 0 0           a           8                   s               t/           0             RRRI                      2                0 . //

iFr3 s* o5 nnnp 7. f 0 . OOOR 5 1315 p iii 5 0 0 NNNT' 9 1259 i: t/ 8 ./50 //// ET 0.in.0 72 . MMMMMMM M 8 354.i.N t 5 . RRRRRRR

                                                                                                                                                                       ))

22 I 5o8 5343E 544 w OOOOOOO) // T 40M3 8837P o NNNNNNNs p11 11 n 5 1158O l s m(( o ) F o r re i) 2

                                                                                  )       )

p iT 2e2 G A/ tR~ /e /r/ m . ( l aW 1 r u 1u1 s( u nt eel i/ dl ( s ps P os r cve N eaa ss s ii e ievp Eoe d tD t vLem O rRm Sss e Tor e u e r Le I u r Ree.r alp e bC .m el T

  • T eteo OrrpP S(/ wF iA t Sok A raeN TPPm n N .l o rV t ont T urS( A//e.o Ewe ln t' a &Pae S T Tse( - RllTri Dov Fe s5 .W Tl -

R E E Nsp l Eemne Eee dt Nle v L i2 tl t NvvlHi OFLldi A 22 D1 r neeu E H WS Mreov NPTie Eeel s C eer C .CD' /Co eugO GLLeeo WlveD IB//2CCAt mFr O P R I tL hnP &FleF R/11/AA a u ux E A..a M12Si eL r TACD1VV .r R rtSH Tttip A bV Dnw .o C te E tn' R T Naadm EGGGrI EitTxt ESSSG00sn H seWW A E Ottau T///uS EaoSuo LUUUD85ne T npCC M CCCRS SSSSTM FMHCAM EBBBE42IG O ISCC M A C R gg U A gii N P iss spp E T p S N s%% 22 S A p~ 0 . 00mFp* E L m7 99 . . m B P

                    -                                                                  g sa.7 p 00 09900g 355                      8g p

S mmi c500F .

                                                                                                                                                ))0            .

I .N pps 11* ///22 90 V E ggp 0E// m 09 . A PN 0778 pntt12 ./0 D OE )885 01 . giff(()8/ h P L 2 //006 //2 0 p O p A 05000 1888 (9 . F T / - 116 . . . 00/90 g

  • M O12t 0E 5822 . .

i e T- f 0 1611000)) s . v (22 1 22 p 8m F5p Fn2avmm

7. le 5 ))0##

t

                                                                                        .          ))))                                  ss11                //

R 0* 5pF* i7Vlpp agg 8 2468 ss- -)11 f

                                        .   / *               /                                     - - - -                              ee121##

E mm IIII - .rr((((( X E 8 7 . 1260 5 9 0.559064kV.

7. co k 2 0. ppe ggr NNNN
                                                                                                   ////

ePP r// 5 1

                                        ,8 0 3 0 4 9 '2 l c 5 2                       u            1357)                            ull                                   4 9            25654617Bo4388s                                               - - -           G               see 8

9 l B s e IIIIV NNNNA svvw eeeo w o 1 r ((((( rLLl l n ) D 12P P F F

o. 2E / le /12 .

i g /SO 11l eg e l##e ep T tr aa 1OT LU v e vn ea l p S e n nmw C vkki ieo O N

  • rM pCA s e LR u C ennL LTl N A t o L o E Laa F O
                              . Le               n.          o         wow                  Eee                   c                   TTn              nt oey Or               el .lL cope (             eol             k       Rgte                  o   D wk                    o N    Ou                                  vlF             n       Onag                  m   N onddi                         i l a             l O        Cs               nomv               lF              a       Cain                  r   A laoot                         tnr                e ID RR s            oceew CbTLo a l             T R

Rda er e FTooc cIp e v e AA NC Re. Or u..lF Vna we h Oem h T P U ppFFj lle jx. S L TPgcnS yoS c Tcrr - uu n nH E C vTo rr Vad n Cree e EeeeeI I t T CE ASA/rSzzSRrtP e Autw r L kkrr Rm S

                        'SU  C EC        hoCrrCOpeC RRTTBRPPRPSLR u

Q RSIP Eono o C MaaooP HMMCCH PHt LDC W B

EMERGENCY PLAN DRILL AND EXERCISE PROGRAM SCENARIO NO. 1989 EXER TIME: 0215 CUE' CARD NO. T: 0945 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY-PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS: Reactor Coolant Pumps-#1-1............................ ON

                                   #1-2............................ .ON
                                   #2-1............................ ON
                                   #2-2............................ ON Makeup Pumps #1.......................................                       STBY~
                        #2.......................................                      RUN HPI Pumps #1..........................................                       STBY
                     #2..........................................                      OOS Decay Heat' Pumps #1...................................                      STBY
                            #2...................................                      STBY Decay Heat Removal Coolers #1.........................                       AVAIL
                                         #2.........................                   AVAIL Containment Spray Pumps #1............................                       AVAIL
                                     #2............................                    AVAIL Containment H2 Dilution Blowers #1....................                       OFF L                                              #2....................                   OFF l          Containment Recirculation Fans #1.....................                       ON
                                             #2.....................                   ON Containment Air Cooler Units #1.......................                       RUN-FAST
                                           #2.......................                   RUN-FAST
                                           #3.......................                   SPARE Component Cooling Water Pumps #1......................                       RUN L
                                            #2......................                   RUN
                                            #3......................                   SPARE
Component Cooling Heat Exchanger #1................... RUN L #2................... RUN
                                               #3...................                   SPARE

!- Service Water Pumps #1................................ RUN ! #2................................ RUN l

                                #3........................*.......                     SPARE Backup................................                      DILUTION Auxiliary Feedwater Pumps #1..........................                      OFF
                                        #2..........................                   OFF Motor Driven Feedpump ................................                      OFF

1 1 i! i i) ' gg F ii~ g *

                                   )           ss ppF H

_ t 0 e ' ntm . e 32 ifp 2 h . 3 g 0 S 33 . 00 1 004 w M/nF 0 0 0 at tf 993 5 h800.m p. p250p M Rti* Of a.

                   / 3                         //              g        M      4/g                                 9            N           25 0 2             D                       /i              /                   MMMP                                         59 1 0        a        8 nnnp s           t/ 0. 0
7. f RRRI 2 /5.//

0 OOOR iFr3 0 . 5 1315

                   ~: :

a* o5 p .t/ iii 5 0 0 NNNT 9 1259 8 /50 //// ET 0. ni 0 3546 MMMMMMM )) N 8 . . .N 7 2.5 . RRRRRRR 22 I 5o8 5343E 544 w OOOOOOO) // T 40M3 8837P o NNNNNNNs p11 a 11 5 1158O l s r(( _n F o re o ) ) .) p r iT i) 2 2e2 G ( A/ tR /e /r/ m . l aW i/ 1r ( u 1u1 s( P u nt os r eel cve dl . . s ps ii e ievp N .eaa ss s Eoe d tD .t vLem O rRm Sss e Tor e u e r Le I .u r Ree.r alp e bC m el T T eteo OrrpP S(/ wF iA t Sok A raeN TPPm n N l o rV t ont T urS( A//e.o Ewe ln t a &Pae ST Tse( RllTri Dov Fe s5 W Tl E Nsp l Eee dt Nle v L i2 tl neeu t RE Eemne NvvlHi OFLldi A 22 1 r EH Nreov Eeel s C eer C CD D./ Co eugO WS NPTie GLLeeo WlveD IB//2CCAt mFr O I tL hnP &FleF R/11/AA a u ux PR A..a M12Si TACD1VV .r R rtSH E Tttip A bV Dnw eL .r o C te E tn RT Naadm EGGGrI EitTxt ESSSG0'0sn H seWW npCC AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O ISCC LA gg CR UA gii NP .iss spp ET p SN s%% 22 SA p 0 . 00mF

                                                                                                                       ..p EL                                                                             m7                    99 09900g'             p        m BP
             -                                                             g sa.7 p 00                 355                 8g' S                                                          .m   mi          c300F                           ))0        .

I N pps 11* _///22 90 V E ggp 0E// m - - 09 A PN 0778 pntt12 /0 D OE ) 8' 85 01 . giff(()8/ h P L 2 //006 //2 0 p O A 05000 1888 (9 . g F p T / . 116 ... 00/90 ~

  • M O12t 0E 5822 . .

i e T- f 0 1611000)) v s (22 1 22 7.l a v e'm p 8m 5 ))0## F5p F n 2 m . )))) ss11 // .t

0. /'* 5pF* / i7Vlpp agg 8 2468 ss- -)11 f R - - - - ee121##

E 5590 064kV mae IIII rr((((( 5 X 7. co k 2. 0. ype NNNM ePP 5 . . 7 . E 1260 59 ggr .//// r// 1

                               ,8030492lc52                                u         1357)                 ull                                 4 9         25654617Bo4388s                                                     G         see 8                                          l            s e

IIIIV svvw eeeo w o 9 B NNNNA 1 r ((((( rLLl l n ) D 12P P F F

o. 2E - / le /12 ep ig /SO 11l eg e l##e tr 1OT c vn l S e n nmw
                      . T            aa                 LU                       .ea          p C       vkki             ieo O       N            rM               pCA       s       "e        LR          u   C     ennL             LTl N       A           t           .o              w       L                      o  E     Laa                       F O
                         . Le Or n.

el .lL o wo eol k Eee Rgte c o Dwk TTn o nt oey O N Ou' Cs cope ( nomv vlF lF n a Onag Cain m r Nonddi Alaoot il a tnr l e ID s oceew a l T Rda e FTooc cIp v RR Re CbTLo Vna R er h P lle e S e AA Or. u..l we h Oem T U p pF Fj

                                                                                                     - uu             n     jx.

nH L NC TPgcnS F yoS c Tcrr-E C vTo rr Vad n Cree e EeeeeI I t T CE ASA/rSzzSRrtP e Autw r Ekkrr Rm S SU EC hoCrrCOpeC u Eono o AaaooP PHt W C RRTTBRPPRPSLR Q RSIP C NMMCCM LDC B l!(l l

f [_ q t

         . EMRnt:RNCY PLAN DRTLE -

AND EXERCISE PROGRAM 0230 I SCENARIO'NO. 1989 EXER' TIME: CUE. CARD NO. T: 1000 DAVIS-BESSE NUCLEAR POWER STATION. L EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT-STATUS COMPONENT: STATUS!

          - Reactor Coolant Pumps #1-1............................                                                                                    ON
                                     #1-2............................                                                                                 ON
                                     #2-1............................                                                                                 ON
                                     #2-2....................v.......                                                                                 ON~

Makeup Pumps #1.......,............................... STBY

                         #2.......................................                                                                                    RUN-HPI Pumps #1..........................................                                                                                 -STBY-
                      #2..........................................                                                                                    005 Decay Heat Pumps #1................................... .STBY
                              #2................................... STBY Decay Heat Removal Coolers.#1.........................                                                                                     AVAIL
                                          #2.........................                                                                                 AVAIL
          = Containment Spray Pumps #1.............................

AVAIL

                                       #2............................                                                                                 AVAIL-Containment H2 Dilution Blowers       #1....................                                                                               OFF
                                                 #2....................                                                                               OFF-Containment Recirculation Fans       #1.....................                                                                               ON
                                                #2.....................                                                                               ON Containment Air Cooler Units       #1.......................                                                                               RUN-FAST
                                              #2.......................                                                                               RUN-FAST
                                              #3...................,...                                                                               SPARE Component Cooling Water Pumps #1......................                                                                                    RUN
                                               #2......................                                                                               RUN
                                               #3......................                                                                               SPARE Component Cooling Heat Exchanger #1...................                                                                                    RUN
                                                  '#2...................                                                                              RUN
                                                   #3...................                                                                              SPARE Service Water Pumps #1................................                                                                                    RUN
                                  #2...........................                                               ...                                     RUN
                                  #3................................                                                                                  SPARE Backup................................                                                                                   DILUTION Auxiliary Feedwater Pumps #1..........................                                                                                    OFF
                                         #2..........................                                                                                 OFF Motor Driven Feedpump ................................                                                                                    OFF

e

  • ntm e 32- ify g

h . 3

    ,' n                               S                33'.                              00 004                        h800                                                   w 0                        at                993                         p.

p2 5 0 p

                                                                                                 .     .m                                M 10                       tf                      - 5
              /4                       a-               //              g           M          4/g                                       9 02                       D8                          /i                    ./          0           MMMP                       .

10 a 3 s t/ 0 RRRI 2 iFr5 nnnp 7. f 0 . OOOR 5 s* o/ iii 5 0 0 NNNT 9

: p t0 .

8 /50 //// ET 0i2 3546 72 . MMMMMMM M .8 .n. . . . .N 5 . RRRRRRR I 5o8 5343E 544 w OOOOOOO) T 40M3 8837P - o NNNNNNNs 11 5 1158O. l s n- - F o

                                      .o                            )               )          )

p r i) 2 2e2 ( G tR / e /r/ m . aW 1r 1u1 u nt os i/ dl . . (

                                                                       .us           ps s(           P ii r

e N 'e a a ss s Eoe d e tD u t e O rRm Sss e Tor I u r Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A T ST raeN urS( Tse( - TPPm.on A//e RllTri N Ewe Dov l o ln Fe rV t s5 t a W E Nsp l Eee dt Nle v L i2 RE Eemne NvvlHi OPLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt R/11/AA a O I tL - hnP &FleF PR A..a M12Si . eL r TACD1VV .r R E Tttip A bV nnw .o C ESSSG00sn te E H RT Naadm EGGGrI nitTxt LUUUD85ne T AE Ottau T///uS uaoSuo RM CCCRS SSSSTM FMHCAM EBBBE42IG O LA - gg CR gii UA iss NP spp ET p

  ,      SN                                                                                                 s%%                   22 .

SA p - 0 . 00mF ..p* EL m7 99 BP

          -                                                                          mg sa.7 p                                                                                                                                29900g' 255                        -

S m pi c500F -

                                                                                                                                                ))0 I                                                                        pgs                         11*           m///22 p

V g p 0E// -

                                                                                                                                                   -         0 A

NN 6 0778 gntt12 D EE ) 815 01 . iff(()8/ hPP L 2 //006 1 //2 A ( pOO 05000 388 - P p . T / . 116 0 . . 00/90 g

  • M O12t 0E - 6322 . . .

i T- f 0 1511000) s . 7 ( 22 1 . p 8m F5p Fn2vvmm

                                                                   .ee                     5
                                                                                             .          ))))                      ss11
                                                                                                                                                ))0##

0* 5pF* i7llpp 8 2468 ss- - ) R . / ' ' /aagg - - - - ee121## E X 2590 6 ..5 004VV

                                                       .7                   20ppe mm                   IIII NNNN                   ePP rr(((((

E 1260 58 .kk ..ggr //// r//

                               ,8030492cc50                                                u            1357)                  ull 9           25654617oo4488s                                                             - - - - G             see 8                                -

ll - s IIIIV svvw eeoo 9 BB e NNNNA 1 r ((((( rLLl l n P F

                                                               )                  12P o.

ig 2 / le eg e

                                                                                                                              /12 l##e

_ /NO 11l tr 1ET e vn l S e n

                   . T                     aa                     PU                    v            ea         p   C      vkki O       N                     rM               pOA             s           e            LR         u   C      ennL N       A                     t                o               w          L                        o   E     Laa
                       . Le                    n.               o            wo            k Eee Rgte          o c

Dwk TTn o O Or el .lL eol N Ou cope ( vlF n Onag m Nonddi

                 'O       Cs                   nomv                      lF                 a         Cain           r e

Alaoot ID RR Re s oceew CbTLo a l Vna T R Rda er h P FTooc lle AA Or u

                                                        .'.F l             we            h c

Oem Tcrr T U p pF F j jx

                                                                                                                        - uu                       n NC      TPgcnS                                         yoS E       C         vTo                rr             Vad                   n         Cree           e  EeeeeI CE      ASA/rSzzSXrtP                                                     e         Autw           r  Kkkrr SU      EC              hoCrrCOpeC                                        u         Eono           o  AaaooP

- C RRTTBRPPRPSLR Q RSIP C MMMCCH - l l

l. EMERGENCY PLAN DRTLL {

/~ AND EXERCISE PROGRAM SCENARIO'NO. 1989 EXER TIME:_ 0240 j CUE CARD NO.- T: 1010 ' DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS 1 COMPONENT:- STATUS: Reactor Coolant Pumps #1-1............................ ON L

                                  #1-2............................ ON
                                  #2-1............................ ON
                                  #2-2............................ ON Makeup Pumps #1.......................................        STBY
                       #2.......................................       RUN HPI Pumps-#1..........................................        STBY
                    #2..........................................       OOS   .

Decay Heat Pumps #1................................... STBY

                            #2...................................      STBY
Decay Heat Removal Coolers #1......................... AVAIL
                                        #2......................... AVAIL Containment Spray Pumps #1............................        AVAIL
                                    #2............................ AVAIL Containment H2 Dilution Blowers     #1.................... OFF
                                             #2.................... OFF-Containment Recirculation Fans     #1..................... ON
                                            #2..................... ON Containment Air Cooler Units     #1...............~....... RUN-3 LOW
                                          #2....................... RUN-SLOW
                                          #3....................... SPARE Component Cooling Water Pumps #1......................        RUN
                                           #2...................... RUN
                                           #3...................... SPARE Component Coolin'g Heat Exchanger #1...................       RUN
                                              #2................... RUN
                                              #3................... SPARE Service Water Pumps #1................................       RUN
                                #2................................ RUN
                                #3................................ SPARE Backup................................      DILUTION Auxiliary Feedwater Pumps #1..........................       OFF
                                       #2.......................... OFF Motor Driven Feedpump ................................       OFF

e .p p* Htg e 1 f ' h S 255 n 3

                                                                                                 ' i0 .
                                           ~

111 .h - 87 5 at 334 p8 8m 15 tI 7. 7 5 p.4/p w

                     /4                      a .             .

M245g M

      +              02                     D       .          ///g                          ,

MMM 10 a- 9 . .i 0//30 RRRP 0 iFr3 s* o5 .n ni p ns .t 8 . OOOI .

p t/ ii 0f0
                                                                                               /        8 0            NNNR                            0 ET           ~ 2i2                                                                                          ///T 54 -               03                                MMM/MMM M            6 .n.                        6' 5 . .N                          . . 4                 .

RRRNRRR I 5o9 . 16E 044 w OOOUOOO) T 61M3 7843P o NNNRNNNs 5 3357O 1 1'n .o r - l F

                                                                                                                                                      ~

s o i)

                                                                            )

2

                                                                                               )        )

p r 2e2 G tR / e /r/ m ( aW 1 r 1 u1 u nt i/ ( u s( P os r

dl . . s ps ii .e N eaa .ss s Eoe d tD t O rRm Sss e Tor e u e
 -          I                          u        r          Ree.r                          alp                        e                           bC            .m T                     eteo                                                     S(/               wF                                  iA               t A                     raeN                     TPPmO r r p P 'n               N         l        o                                     rV             t T                     urS(                     A//e.o                         Ewe                ln                                   t               a ST                Tse(                 s RllTri Nle . _Fe E              N s p'                                                      Dov                                                .s5                W Eee l                               dt                                .v         L                   _i 2 RE EH E e m'n e NvvlHi                                            OFLldi                              A 22               D1               r Mreov                        Eeel                      s    C             eer                   C      CD              /Co WS                NPTie                        GLLeeo                              WlveD                         IB//2CCAt O                 I           tL                        .. hnP                &FleF -                            R/11/AA                              a
           .P R E

A . .a Tttip M12Si eL .r TACD1VV .r R RT A . bV Dnw .o C "

te E Naadm EGGGrI EitTxt ESSSG00sn H AE WM Ottau' T///uS EaoSuo LUUUD85ne T CCCRh SSSSTM FMHCAM EBBBE42IG O LA  :

cR gg UA gii NP s iss ps spp ET mm cp p RN pp m 22 MA gg 0a 0 . 00mF-RL . 99 . .p nP 00 81 4 19900g S

            -                                                               D             00g                       61% .                            255 .

I E ..i 3 - '0F -

                                                                                                                                                                       ))0 V                                                                SD            00s                       5E00*                            ///22 A

D OE LS CO 9 p /0 . . . 01009

                                                                                                                      .///.

mntt12 piff(()8/

                                                                                                                                                                        -      09

. L )122 71008 g ' //2k 0 - h p C L- - 61 . 8 488 (9 - F A22/ 3 005 0 . . 00/90 g

  • p T t 5E .322 . . - -

i Me O f 0 0511000) s p 8e v T 1 0le ( 8 ))0## 1* F4p F 5pF* n .Vl m m p p8 0av mm. )))) ss11 R . /* i0 appgg 2468 ss- -)1 E 9188 5 /kVgg

                                                                                                                                -                           ee121##

X 7 . IIII rr( (((( E 3396

                                             .3              00c                         00e                       NNNN                              ePP -
                                  ,673080 7          0ok0000r                                      ////                              r//
                                                                         .lc...u 9

1357) ull 1555 510Bo0000s - - - - G see 8 9 l B s e IIIIV NNNNA svvw eeeo w o 1 - r ((((( rLLl l n ) D 12P P F F o. ig 2E - / le /12

                                                                     /SO                 11l                        eg              e               l##e                       e T

tr aa 1OT LU e v vn ea l p C S e vkki n n O N pCA i N A rM s e LR u C ennL LT t o w L o E Laa O Le Or

n. o wo Eee c -

TTn n N Ou el .lL cope ( eol k Rgte o Dwk o o vlF n Onag m Nonddi il O - Cs nomv lF a Cain r Al aoot tn ID RR s oceew CbTLo a l T Rda e FTooc cI Re. Vna ~ R er h P lle e AA NC Or TPgcnS u .

                                                                .l
                                                                . F .yoS             we           h       Oem                      T     U p pF F j jx E         C       vTo                 rr                                        c n

Tcrr - uu- n nH CE ASA/rSzzSRrtP Vad Cree e EeeeeI I SU EC hoCrrCOpeC e Autw r Kkkrr C RRTTBRPPRPSLR u Eono o AaaooP PH

 .                                                                                                Q       RSIP                     C     MMMCCH                               LD

gg gGENCY PLAN DRILL -

                            - AND EXERCISE PROGRAM SCENARIO NO.       1989 EXER                                                               TIME:    0245 CUE CARD NO.                                                                                  T:    1015 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EU.RCISE EQUIPMENT STATUS COMPONENT:                                                                                     STATUSt Reactor Coolant Pumps #1-1............................                                           OFF
                                                       #1-2............................                                        OFF
                                                       #2-1............................                                        OFF
                                                       #2-2............................                                        OFF Makeup Pumps #1.......................................                                            OFF
                                            #2.......................................                                          OFF HPI Pumps #1..........................................                                            OFF                             .
                                         #2..........................................                                          OOS Decay Hest Pumps #1...................................                                            STBY
                                                 #2...................................                                         STBY                                4 Decay Heat Removal Cooler. 91.........................                                           AVAIL
                                                                   #2.........................                                 AVAIL Containment Spray Pumps #1............................                                           AVAIL
                                                          #2............................                                       AVAIL Containment H2 Dilution Blowers           #1....................                                 OFF
                                                                        #2....................                                 OFF Containment Recirculation Fans           #1.....................                                 ON
                                                                       #2.....................                                ON Containment Air Cooler l' nits #1. . . . . . . . . . . . . . . . . . . . . . .                  RUN-SLOW
                                                                     #2.......................                                RUN-SLOW
                                                                     #3.......................                                SPARE Component Cooling Water Pumps #1......................                                          RUN
                                                                      #2......................                                RUN
                                                                      #3......................                                SPARE Component Cooling Heat Exchanger #1...................                                          RUN
                                                                         #2...................                                RUN
                                                                         #3...................                                SPARE Service Water Pumps #1................................                                          RUN
                                                    #2................................                                        RUN
                                                    #3............................ ...                                        SPARE Backup................................                                        DILUTION Auxiliary Feedwater Pumps #1..........................                                          ON
                                                                  #2..........................                                ON Motor Driven Feedpump ................................                                          OFF

e

  • Htg e 78 f h . 7 n 4 S 53 . i0 .

442 h 68 0 30 at tf 222 p8 p 4/p 6m 5 w

    /0                   a            //                        M248g                                         M 03                  D     .                 /g                          .

MMM 10 a 0 - i 0//60 RRRP 0 iFr4 s* o5 nnns .t 6 . OOOI . p iiip 0f0 - 0 NNNR 0

: t/ D / 6 ///T ET 1i2 3270E 03 . MMM/MMM M 3 .n. . . ..S . 4 .

RRRNRRR I 3o0 1020O 044 w OOOUOOO) T 72M4 1120L o NNNRNNNs 11 5 1156C l ' s n F o o ) ) ) p r

                       .i)                      2               2e2                                           G tR                      /e              /r/            m                         .    (

aW i/ 1 r ( u 1 u1 s( P u nt os r dl . . s ps ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I - u r Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n N o rV T ST urS( Tse( TPPm.o A//e RllTri Ewe Dov l ln Fe t s5 t W a E Nsp l Eee dt Nle v L - i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL - hnP &FleF R/11/AA a PR A .c M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o C: te E RT Namdm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM EMHCAM EBBBE42IG O LA - gg CR UA gii NP s ps iss spp ET SN mm pp cp m p 22 SA gg 0a 0 . 00mF

                                                                                                                    ..p EL                                                                                .                         99 BP                                                            00               91       %               49900g . p
-                                                D           00g              71%                      255 S                                                 E            ..i             5 -      0F                         ))0 I                                                 SD          00s              2E00*                    ///22 V                                                 OE                  p        /0 . .                               - -

A D LS CO 5 01006

                                                                                 .///.

mntt12 piff( ()8 L ) 123 81006 g //2 h C L- - 61 . 6 988 F p A22/ 5 006 0 . . 00/90 g

  • p T t 2E 722 ..

i Me O f 0 0611000) s p 3m v T ( 1 0le 5 )) 0* F3p 5pF* F 0av n.Vlmmpp9 mm. ) ))) 2468 ss11 ss- -) R . /

  • i0 appgg - - ee121##

E 9251 5 /kVgg IIII rr(( X 9 ..3 00c 00e NNNN ePP E 4667 6 0ok0000r //// r// 763010 .lc....u 1357) ull 9 2565 610Bo0000s - - - - G see 8 - l s IIIIV svvw 9 B e NNNNA eeeo 1 r ((((( rLLl n ) D 12P P F

o. 2E / le eg
                                                                                                       /12 ig               /SO             11l                           e           l##e tr               1OT                     e         vn         l      S     e           n
       . T                aa                  LU                 v          ea         p      C     vkki O      N                rM               pCA          s         e        LR          u      C      ennL N       A               t                 o            w        L                     o      E     Laa O
          . Le               n.

el .lL o wo k Eee Rgte c o Dwk TTn o Or eol N Ou cope ( vlF n Onag m Nonddi O Cs nomv lF a Cain r Alaoot ID RR Re s oceew CbTLo a Vna l T R Rda er h e P FTooc lle AA Or . u l we h c Oem T U p pF F j

                                                                                                  - uu            n NC      TPgcnS                   ..F             yoS                  Tcrr E      C        vTo          rr            Vad                  n    Cree            e      EeeeeI CE     ASA/rSzzSRrtP                                            e    Autw            r      Kkkrr SU     EC          hoCrrCOpeC                                   u    Eono            o      AaaooP C  RRTTBRPPRPSLR                                           Q     RSIP            C      MMMCCH

gyERCENCY PLAN DRTLL' AND EXERCISE PROGRAM SCEMARIO NO. 1989 EXER TIME: 0300 , CUE CARD NO. T: 1030 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS- 7 Reactor-Coolant Pumps #1-1............................ OFF

                                    #1-2............................                             OFF
                                    #2-1............................                             OFF
                                    #2-2..  .........................                            OFF Makeup Pumps #1.......................................                                OFF
                         #2.......................................                               OFF HPI Pumps #1..........................................                                OFF
                      #2..........................................                               OOS Decay Heat Pumps #1...................................                                STBY
                              #2...................................                              STBY Decay Heat Removal Coolers #1.........................                                AVAIL
                                          #2.........................                            AVAIL Containment Spray Pumps #1............................                                AVAIL
                                      #2............................                             AVAIL Containment H2 Dilution Blowers #1....................                                OFF
                                                 #2....................                          OFF Containment Recirculation Fans #1.....................                                ON
                                               #2.....................                           ON Containment Air Cooler Units #1.......................                                RUN-SLOW
                                            #2.......................                            RUN-SLOW
                                            #3.......................                            SPARE        I Component Cooling Water Pumps #1......................                                RUN
                                              #2......................                           RUN
                                              #3......................                           SPARE Component Cooling Heat Exchanger #1...................                                RUN
                                                   #2...................                         RUN
                                                   #3...................                         SPARE
           . Service Water Pumps #1................................                              RUN
                                  #2.................................                            RUN
                                  #3................................                             SPARE Backup................................                              DILUTION Auxiliary Feedwater Pumps #1..........................                               ON j                                         #2..........................                            ON l

Motor Driven Feedpump ................................ OFF l 1 E_1___ __ 1

1i gJ1 .

              ~

gg F ii -

                                                   )              ss                             m t             ppF                       g    p                                                     0 e
  • Htg .

e' .03 f 2 h' .7 n 2 0 S 42 i0 . 1 881 h 28 M/nF 5 4 5 at tf 331 5 p8 p.4/p 6m Rti* w Of

                                / 1 0 3 1   0        a Da. 1
                                                                 //
                                                                         /g i

M248g 0//70

                                                                                                    .             MMM RRRP M

0 N

                                                                                                                                                  /559 0 .//

25 iFr4 s* o5 _nnns

                                                                .iii p
                                                                                         .t      6        .

OOOI . 1315 p 0f0 0 NNNR 0 1259

t/ D / 2 ///T ET 9.in.5 9300E 03 . MMM/MMM ))

M 3 ...S . 4 . RRRNRRR 22 I 6 o '0 5520O 044 w OOOUOOO) // T 26M4 2210L o NNNRNNNs p11 21 n 5 1156C l s m(( o F o r re

                                                                       - )             )      )

p iT i) 2 2e2 G A/~ tR /e /r/ m . ( l aW 1 r 1u1 u nt eel i/ (

                                                                           .us          ps s(         P                    os        r            cve dl              ..                                                      ii         e            iev9 N                    eaa               ss         s     E    oe            d                     tD        t            vLe7 O                    rRm           Sss            e     T    or             e                    u         e            r         Le I                    u         r   Ree.r                A   lP              e                   bC         m            el            T T                 eteo             OrrpP                S   (/        wF                        iA         t            Sok A                 raeN                              n   N             o T

S T Tse( urS( TPPm.o A//e RllTri E D we ov l ln Fe t rV s5 W t a &Pae ont Tl R E E Nsp l E e m'n e Eee dt N le v L i2 tl t NvvlHi O FLldi A 22 D1 r neeu E H Mreov Eeel s C eer C CD /Co eugO

                         .OWS            NPTie                GLLeeo                   WlveD                   IB//2CCAt                           mFr              .
                                        .I          tL                   hnP        &  FleF                    R/11/AA                a            u .ux P R           A    .  .a           M12Si                         eL         r       TACD1VV              .r      R      rtSH E          Tttip A                            bV     D nw             .o         C                  .t e      E     tn R T A E Naadm               EGGGrI               E itTxt E aoSuo ESSSG00sn                    H      seWW Ottau                T///uS                                           LUUUD85ne                    T      npCC R M L A CCCRS                SSSSTM               FMHCAM                      EBBBE42IG                    O     ISCC C R                                                                                                     gg U A                                                                                               .gii N P                                                                         s                      iss ps                      spp E rr                                                     mm                 cp                      p S                                                        pp                       m                    82 S  R                                                     gg                0a                      0 .        00mF E

B,M 00 81

                                                                                                                 %            59900g'p p 99         .         m
                            -                                            D                  g         81%                     255                 7. g S

I E SD 0 . 00s 0.i 8 - 1E00* 0F

                                                                                                                              ///22
                                                                                                                                         ))0 90 V                                             OE                 p         /0 . .                                   09 .

A LS 01002 mntt12 /0 D .C O 5 .///. piff(()8/ L )123 91002 g //2 0 h p C L- - 71 5 088 (9 . F A22/ 8 006 0 . . 00/90 g

  • p T t 1E 022 . .

i Me O f 0 0811000)) s p 3m v T ( 1 22 0le 5 ))0## 0* F1p P 5pF* n.Vlmmpp9 0av mm. )))) 2468 ss11 ss- -)11

                                                                                                                                                  //            t f

R . /

  • i0 appgg - ee121##

E X 0023 2 /kVgg IIII rr((((( 5 4 . . 00o NNNN ePP

4. 8 00c-E 2067 0ok0000r //// r// 3
                                              ,753030                  .lc....u                       1357)                    ull                              2 9           2565- 610Bo0000s                                           -            G          see 8                                           l              s e

IIIIV svvw eeeo w o 9 B NNNNA 1 r ((((( rLLl l n )D 12P P . F F

o. 2E / le /12 ep ig /SO 11l eg e l##e tr 1OT e vn l S e n nmw T aa LU v ea p C vkki ieo O . N rM pCA s e LR u C ennL LTl N A t o w L o E Laa F O
                                     . L O  r e            n.

el .lL o eol wo k Eee Rgte c o D wk TTn o nt oey N O u cope ( vlF n Onag m N onddi ila l O C s nomv lF a Cain r A laoot tnr e ID s oceew a l T Rda e FTooc cIp v RR AA NC R O T re. PgcnS CbTLo u..l F Vna yoS we h c R Oem Tcrr er h T P U ppFFj jx

                                                                                                                         - uu lle n

e nH S e L E C vTo rr Vad n Cree e E eeeeI I t T CE A SA/rSzzSRrtP e Autw r K kkrr Rm S SU E C hoCrrCOpeC u Eono o A aaooP PHt W C RRTTBRPPRPSLR Q RSIP C MMMCCH LDC B l!l IlLIill

                ~ EMERGENCY PLAN DRI?1
               - AND EXERCISE PROGRAM SCENARIO NO.      1989 EXER                                                                                                                        TIME:    0315-
               ' CUE CARD NO.                                                                                                                                          T:    1045 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT:-                                                                                                                                            STATUS-Reactor Coolant Pumps #1-1............................                                                                                                   OFF
                                         #1-2............................                                                                                                 OFF
                                         #2-1............................-                                                                                                OFF
                                         #2-2............................                                                                                                 OFF Makeup Pumps #1................................~.......                                                                                                  OFF
                               #2........................................                                                                                                 OFF HPI Pumps #1..........................................                                                                                                   OFF      i
                            #2..........................................                                                                                                  OOS      !

Decay Heat Pumps #1................................... STBY.

                                   #2...................................                                                                                                 .STBY Decay Heat Removal Coolers #1.........................                                                                                                   AVAIL
                                                 #2.........................                                                                                              AVAIL Containment. Spray Pumps #1............................                                                                                                  AVAIL
                                           #2............................                                                                                                 AVAIL Containment H2 Dilution Blowers                       #1....................                                                                             OFF
                                                                       #2....................                                                                             OFF Containment Recirculation Fans #1.....................                                                                                                   ON
                                                                      #2.....................                                                                             ON Containment Air Cooler Units #1.......................                                                                                                   RUN-SLOW
                                                                    #2.......................                                                                             RUN-SLOW
                                                                    #3.......................                                                                             SPARE Component Cooling Water Pumps #1......................                                                                                                   RUN
                                                                     #2......................                                                                             RUN
                                                                     #3......................                                                                             SPARE Component Cooling Heat Exchanger #1...................                                                                                                   RUN
                                                                          #2...................                                                                           RUN
                                                                          #3...................                                                                           SPARE l

Service Water Pumps #1................................ RUN

                                       #2................................                                                                                                 RUN
                                       #3................................                                                                                                 SPARE Backup................................                                                                                                  DILUTION Auxiliary Feedwater Pumps #1..........................                                                                                                  ON
                                             #2..........................                                                                                                 ON Motor Driven Feedpump ................................                                                                                                  OFF

jj ,l l;

   ~                                     gg                                                                                          F ii                                                                                           *
                             )           ss                                m t           ppF                        g      p                                                         0 e
  • Htg .

e* 12 f 2 h . 0 n 6 0 S 97 . i0 . 1 883 h 06 M/nF. 0 0 0 at tf 330 p8 p.4/p 7m Rti* 5 w Of

            / 3 1 3 1 0         a Da. 3
                                       //
                                       ~
                                                /g i

M243g 0//60 MMM RRRP M 0 N 25

                                                                                                                                 /559 0 .//
                      .iFr4 s* o5 nnns                     .t       7 .           OOOI                        .           1315 p

iiip 0f0 0 .NNNR 0 1259 h : t/ D / 0' ///T ET 3i5 9330E 03 . MMM/MMM )) M .n. . ..S .4 . RRRNRRR 22 I . 9. 8 o 0 4530O 044 w OOOUOOO) //

             -        .32 10M4           3300L                                  o        NNNRNNNs                                     p11 n

5 1156C l s m(( o ) )' F o r re 2

                                                                )

p iT ' i) G A/ tR aW ./ 1r e 2e2

                                                                /r/

1u1

                                                                         ~ mu                      nt
                                                                                                              .    (

eel l

                            .i/                 ( u ps s(         P                   os               r             cve dl           . .         s                                           ii                e            ievp N                    eaa            ss           s      Eoe               d                  tD               t              vLem O                    rRm        Sss            .e       Tor                e                  u                e             r       Le I                    u'     r   Ree.r                   alp                e                 bC                m             e'l          T T                  eteo         OrrpP                   S(/           wF                     iA               t
  • Sok A raeN n N l o- rV t ont T

S T Tse( urS( TPPm.o A//e RllTri Ewe Dov ln Fe t s5 W a &Pae Tl E Nsp l Eee dt Nle v L i2 tl t R E Eemne NvvlHi OFLldi A 22 D1 r neeu E H Mreov Eeel~ s C eer C CD /Co e u gO WS NPTie GLLeeo WlveD IB//2CCAt mFr O I tL hnP &PleF R/11/AA a u ux P R A . .a M l' 2Si eL r TACD1VV .r R rtSH E Tttip A bV Dnw .o C . te E tn R T Naadm EGGGrI EitTxt ESSSG00sn H seWW npCC AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O ISCC. L A C R gg U A gii N P s iss ps spp E T S N mm pp cp m p-22 0.9 9 00mF S A gg 0a . E L . ..p* m B P 00 11  % 0 9 9 0 0 g' p D g 21% 355 8g S I E SD 0. 00s 0.i 3 - 1EO0* 0F

                                                                                                     ///22
                                                                                                                       ))0 90 V                                           OE                 p          /0'.       .            -
                                                                                                                        - - 09         .

A " LS 01004 mntt12 /0 D CO 5 ./// pi f f (()8 g

                                                                                                                          /

L )123 41002 f/2 0 h C L- - 51 . 3 088 (9 . F p A22/ 2 005 0 . . 00/90

  • p T t 1E 022 ..

Me O f 0 0811000)) g . v T 1 22 i 5m 0le ( 5 )) 0## sF0p F p* 5pF* n.Vlmmpp9 0av mm. )))) 2468 ss11 ss- -)11

                                                                                                                                 //

t R /

  • i0 appgg - - - - ee121## f E 6408 /kVgg IIII rr(((((

X E 3877

                            ..3      9.0 1

0c 0ok0000r 00e NNNN

                                                                               ////

ePP r// 4 5233030 .lc....u 1357) ull 6 9 8555 - 510Bo0000s - G see 8 l s IIIIV svvw eeeo w o 9 B e NNNNA 1 r ((((( rLLl l n )D 12P P F F

o. 2E / le eg e
                                                                                                     /12 l##e                    ep ig         /SO              11l tr         1OT                     e           vn          l p

S e n nmw

               . T             aa             LU                 v           ea             C      vkki                   ieo u

_ O N rM pCA s e LR C ennL LTl N A t o w L o E Laa F wo

                  . Le            n.         o                             Eee              c                   TTn          nt O  Or            el .lL              eol          k       R gt e            o D wk                    o     oey N  Ou            cope (              vlF           n      Onag              m N onddi                       il a              l e

O Cs nomv lF a Cain r A laoot tnr v ID RR s oceew CbTLo a Vna l T R Rda er h e P FTooc ll e cIp e S e _ AA Re. Or u..l v. e h c Oem Tcrr T U ppFFj j x

                                                                                                - uu                   n     nH L

NC TPgcnS F yoS . E C vTo rr Vad n Cree e E eeeeI I t T CE ASA/rSzzSRrtP e Autw r K kkrr Rm S SU EC hoCrrCOpeC u Eono o A aaooP PHt W C RRTTBRPPRPSLR Q RSIP C MMMCCH LDC B llll!lllll

i I EMERGENCY P?lN DRTLL AND EXERCISE PROGRAM-l: SCENARIO NO. 1989 EXER TIME: 0330

                                                      . CUE CARD NO.                                                      T:                      1100 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS i-                                                       COMPONENT:                                                         STATUS-I' Reactor Coolant Pumps #1-1............................               OFF
                                                                                         #1-2............................ OFF
                                                                                         #2-1............................ OFF
                                                                                         #2-2............................ OFF l

l- Makeup Pumps #1....................................... OFF l

                                                                      #2.......................................               OFF HPI Pumps #1..........................................                OFF
                                                                   #2..........................................               OOS Decay Heat Pumps #1...................................                STBY
                                                                                   #2...................................      STBY Decay Heat Removal Coolers #1.........................               AVAIL l
                                                                                              #2......................... AVAIL Containment Spray Pumps #1............................               AVAIL
                                                                                           #2............................ AVAIL 1

l Containment H2 Dilution Blowers #1.................... OFF l

                                                                                                   #2.................... OFF Containment Recirculation Fans #1.....................               ON
                                                                                                  #2..................... ON 1

l- Containment Air Cooler Units #1....................... RUN-SLOW

                                                                                                #2....................... RUN-SLOW
                                                                                                #3....................... SPARE Component Cooling Water Pumps #1......................               RUN
                                                                                                 #2...................... RUN l                                                                                                 #3...................... SPARE Component Cooling Heat Exchanger #1...................               RUN
                                                                                                    #2................... RUN
                                                                                                    #3................... SPARE                     l Service Water Pumps #1................................               RUN
                                                                                      #2................................ RUN
                                                                                      #3................................ SPARE                     q Backup................................ DILUTION                  ;

1 Auxiliary Feedwater Pumps #1.......................... ON j

                                                                                             #2.......................... ON                        J J

Motor Driven Feedpump ................................ OFF i i

i! gg P ii *

                             )'            ss                             m t             ppF                      g     p                                                         0 e
  • Htg .

e 08 f 2 h . 4 n 2 0 S 97 . i0 . 1 324 h 73 M/nF 5 at 229 p8 8m Rti* 1 5 tf 4 p.3/p w Of

           / 4                a           //                   M243g                                         M                  N 25 1    3            D      ,            /g                         .

MMM /559 1 0 a -4 i 0//00 RRRP 0 0 .// iFr4 nnns .t 8 . OOOI . 1315 s* o5 iiip 0f0 0 NNNR 0 1259

: p t/ D / 7 ///T ET 8i5 7300E 03 MMM/MMM ))

M 3 .n. . . ..S . 3 . RRRNRRR 22 I 3o0 8850O 044 w OOOUOOO) // T 09M4 6690L o NNNRNNNs p11 31 5 1146C l s re m( ( n F o o ) ) ) p r iT i ) 2 2e2 G A/ tR / e /r/ m . ( l aW 1r 1u1 u nt eel i / ( u ps s( P os r cve dl . . s ii e ievp N eaa ss s Eoe d tD t vLem O rRm Sss e Tor e u e r' Le I u r Ree.r alp e bC m el T T eteo OrrpP S(/ wF iA t

  • Sok A raeN TPPm n N l o rV t ont _

T S T urS( Tse( A//e.o RllTri E D we ov ln Fe t s5 W a &Pae Tl E Nsp l Eee dt N le v L i2 tl t R E Eemne NvvlHi O FLldi A 22 D1 r neeu E H Mreov Eeel s C eer C CD /Co eugO W S NPTie GLLeeo WlveD IB//2CCAt a mFr u ux O I tL hnP & FleF R/11/AA _ P R A ..a M12Si eL r TACD1VV .r R rtSH _ E Tttip A bV D nw .o C .te E tn R T Nmmdm EGGGrI E itTxt ESSSG00sn H seWW npCC A E Ottau T///uS E aoSuo LUUUD85ne T E M CCCRS SSSSTM FMHCAM EBBBE42IG O ISCC L A C R gg U A gii N P s ps

                                                                                                     .i s s spp E T S N mm pp cp m

p 22 S A gg 0a 0 . 00mF p* E L . 99 . . m B P 00 71  % 09900g 1 p

       -                                         D          00g               81%                     355                       8g S                                          E           ..i              2 -        0F                      ))0              .

I SD 00s 1E00* ///22 90 V OE p /0 . . - - 09 . A LS 01000 mntt12 /0 D CO 5 ./// . piff(() 8/ g 0 L )123 41001 //2 h C L- - 51 . 9 088 ( 9 . F p A22/ 2 008 0 . . 00/90

  • p T t 1E 022 . .

Me O f 0 0811000)) g .' v T 1 22 i 3m 0le ( 5 ))0## sF9p P p* 4p

  • 0av n.Vlmmpp9 mm. ))))

2468 ss11 ss- -)11

                                                                                                                                //

t R / F i0 appgg - - ee121## f E 8095* 1 /kVgg IIII rr(((( ( X . , . 00c 00e NNNN ePP 0 E 109831 0ok0000r //// r// . 4763 00 .lc....u 1357) ull 2 9 65850510Bo0000s - - - G see 8 .l s IIIIV svvw eeeo w o 9 B e NNNNA 1 r ((((( rLLl l n ) D 12P P F F

o. 2E / le eg e
                                                                                                     /12 l##e                    ep ig          /SO           11l tr          1OT                    e         vn           l   S     e          n           nmw
              . T              aa             LU                v          ea           p C u

vkki i eo O N rM pCA s e LR C ennL LTl N A t o w L o E Laa F

                  . L  e           n.          o       wo                 E ee R gte c

o D wk TTn o nt oey O O r el .lL eol k N O u cope ( vlF n O nag m N onddi i l a l e O C s nomv lF a C ain r e A laoot tnr v ID s oceew a l T Rda FTooc cI p e RR AA NC R O r T e. PgcnS CbTLo u..l F Vna we yoS h c R O T crr em er h T P U ppFFj j

                                                                                                - uu lle n

e nH x. S L E C vTo rr Vad n C ree e E eeeeI I t T CE A SA/rSzzSRrtP e A utw r K kkrr Rm S SU E C haCrrCOpeC u E ono o A aaooP PHt W C RRTTBRPPRPSLR Q RSIP C MMMCCH LDC B llilll

1 1 4 ' EMERGENCY PLAN DRILL j AND EXERCTSE PROGRAM'

                                                                                 -1 SCENARIO NO.      1989 EXER                           TIME:     0345'   1 CUE' CARD NO.                                             T:    1115 f

b DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS;. Reactor Coolant Pumps #1-1............................ OFF

  1. 1-2............................ OFF
                                   #2-1............................ OFF        ',
                                   #2-2............................ OFF Makeup Pumps'#1.......................................       OFF
                         #2.......................................      OFF HPI Pumps #1..........................................       OFF
                      #2..........................................      OOS   ,

Decay Heat Pumps #1................................... $TBY

                             #2...................................      STBY Decay Heat Removal Coolers #1.........................       AVAIL
                                        #2.......................... AVAIL Containment Spray Pumps #1............................       AVAIL
                                     #2............................ AVAIL Containment H2 Dilution Blowers #1....................       OFF.
                                             #2.............~....... OFF Containment Recirculation Fans #1.....................       ON
                                            #2..................... ON Containment Air Cooler Units #1.......................       RUN-SLOW
                                          #2....................... RUN-SLOW
                                          #3....................... SPARE Component Cooling Water Pumps #1......................       RUN
                                           #2...................... RUN
                                           #3................+..... SPARE Component Cooling Heat Exchanger #1...................       RUN
                                              #2................... RUN
                                              #3................... SPARE i

I Service Water. Pumps #1................................ RUN

                                #2................................      RUN
                                 #3................................ SPARE Backup................................      DILUTION Auxiliary Feedwater Pumps #1..........................       ON
                                       #2.......................... ON Motor Driven Feedpump ................................       OFF 1

e 53 f n h . 7 4 S 47 . i0 . 104 h 49 0 30 at tf 779 p8 p 3/p 7m 4 . w

          /0                   a             //                    M243g                                             M 14                  D      .             /g                           .

MMM a 5 i 0//80 RRRP 0 1 0_ ipr 4 s* nnns .t 7 . OOOI . p o5 iiip 0f0 0 NNNR 0

: t/ D / 4 .
                                                                                              /// T ET             0i5                 9770E                 03 .                       MMM/MMM M          6      .n.               .   ...S               . . 3           .

RRRNRRR I 5o0 1250O 044 w OOOUOOO) T 77M4 7790L o NNNRNNNs 21 5 1146C l s n F o o ) ) ) r i) 2 2e2 p G tR /e /r/ m . ( aW 1 r u 1 u1 u nt i/ ( ps s( P os r dl . . s ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree .r alp e bC m T eteo OrrpP S(/ wF iA t A raeN TPPm n N l o rV t T urS( A//e.o Ewe ln t a ST Tse( RllTri Dov Fe s5 W E Nsp l Eee dt Nle v L i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD / Co WS NPTie GLLeeo WlveD IB//2CCAt O I~ tL hnP &FleF R/11/AA a PR A . .a M12Si eL r TACD1VV .r R E Tttip A bV Dnw~ .o C te E RT Nmmdm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA ' gg CR UA gii NP s iss ps spp ET SN mm pp cp m p 22 SA *  ? h gg 0a 0 . 00mF EL "

                                                                                     .                         99          . .

BP 00 71  % 09900g

      -                                            D            00g               61%'                     355 S                                             E             ..i              2 -         0F                         )) 0 I                                             SD           00s               1E00*                    ///22 V                                             OE                  p          / 0       . .                           - -

A LS 01000 mntt12 D CO 5 .///. piff(()8/ h L ) 123 71003 g // 2 p C L- - 61 . .1 088 ( F p A22/ 2 005 0 . . 00/90

  • M T t 1E 022 . .

e O f 0 0811000) g . 0v T 1 i 9m .le ( 5 ))0## sF0p p* 5p F 7av n2Vlmmpp9 mm. )))) 2468 ss11 ss- -) R / F i/ appgg - - - - ee121## E 3042* 8 4kVgg IIII rr( (((( X . ... 06c 00e NNNN ePP E 603902 . .ok0000r //// r// 1213 106lc....u 1357) ull 9 75550514Do0000s - G see 8 l s IIIIV svvw eeeo 9 B e NNNNA 1 r ( ( ((( rLLl l n ) D 12P P F

o. 2E / l e /12 ig /SO 11l eg e l##e tr 1OT e vn l S e n
            . T                 aa             LU                  v           ea             p C       vkki                i O       N                 rM           pCA          s        e          LR              u   C     ennL                 L N       A                 t            o            w        L                          o   E    Laa O

Le Or n. el .lL o eol wo k Eee Rgte c o Dwk TTn o N Ou cope ( vlF n Onag m Nonddi i O Cs nomv lF a Cain r e Alaoot ID RR Re s oceew CbTLo a l Vna T R Rda er h P FTooc ll e AA Or . u l we h Oem T UppFFj j x

                                                                                                      - uu               n NC      TPgcnS                    ..F         yoS            c      Tcrr E      C        vTo             rr      Vad                 n      Cree                e   EeeeeI                     I CB     ASA/rSzzSRrtP                                        e      Autw                r   Kkkrr SU     EC          hoCrrCOpeC                               u      Eono                o   AaaooP                    P C  RRTTBRPPRPSLR                                        Q      RSIP                C   MMMCCH                     L

EMERGENCY PLAN DRILL AND EXERCISE PROGRAM SCENARIO NO. 1989 EXER - TIME: 0400 CUE CARD NO. T: 1130 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS. EXERCISE EQUIPMENT STATUS COMPONENT: STATUSi Reactor Coolant Pumps #1-1............................ ON

                                                                                             #1-2............................                      ON
                                                                                             #2-1............................                      ON
                                                                                             #2-2............................                      OFF Makeup Pumps #1.......................................                             OFF
                                                                                   #2.......................................                       OFF HPI Pumps #1..........................................                            OFF       .
                                                                                                                                                           ~
                                                                              #2..........................................                         OOS Decay Heat Pumps #1...................................                            STBY
                                                                                       #2...................................                       STBY Decay Heat Removal Coolers #1.........................                            AVAIL
                                                                                                  #2.........................                      AVAIL Containment Spray Pumps #1............................                            AVAIL       -
                                                                                               #2............................                      AVAIL Containment H2 Dilution Blowers       #1....................                     OFF
                                                                                                        #2....................                     OFF Containment Recirculation Fans #1.....................                           ON
                                                                                                      #2.....................                      ON Cont.ainment Air Cooler Units #1. . . . . . . . . . . . . . . . . . . . . . . RUN-SLOW
                                                                                                    #2.......................                      RUN-SLOW
                                                                                                    #3.......................                      SPARE Component Cooling Water Pumps #1......................                          RUN
                                                                                                     #2......................                      RUN
                                                                                                     #3......................                      SPARE Component Cooling Heat Exchanger #1...................                          RUN
                                                                                                          #2...................                    RUN
                                                                                                          #3...................                    SPARE Service Water Pumps #1................................                         RUN
                                                                                           #2................................                      RUN
                                                                                           #3................................                      SPARE Backup................................                       DILUTION Auxiliary Feedwater Pumps #1..........................                         ON
                                                                                                 #2...............'...........                     ON l                                                                    Motor Driven Feedpump ................................                         OFF 1

l l

e

  • Htg e 14 f h . 7 n 2 S 72 . i0 .

881 h 00 5 45 at tf 115 p8 p 3/p 8m 4 w a I1 // M243g M 14 D . / g . MMM 10 a 5 i 0//10 RRRP 0 iFr4 s* o5 nnns iiip

                                                                   .t        8      .

OOOI . p 0f0 0 NNNR 0

: t/ D / 0 ///T ET 0i5 6400E 03 .

MMM/MMM M 0 .n. . . . .S . 3 . RRRNRRR I 8o0 5880O 044 w OOOUOOO) T 15M4 1140L o NNNRNNNs 21 5 2246C l s

                        -n                                                        F                             o o                    )               )        )

p r i) 2 2e2 G tR / e /r/ t n . ( aW 1 r 1 u1 u nt i/ ( u ps s( P os r dl . . s ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree .r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n o T ST urS( Tse( TPPm.o A//e RllTri N- l Ewe Dov ln Fe rV t s5 t W a E Nsp l Eee dt Nle v L i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo _WlveD IB//2CCAt O I tC hnP &FleF R/11/AA a PR A . .a M12Si eL r TACD1VV .r R E Tttip A bV nnw .o C te E RT Naadm EGGGrI RitTxt ESSSG00sn H AE Ottau T///uS F aoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA CR UA ggg NP s ps iii sss ET SN mm pp cp m ppp SA gg 0a 06900mF EL . . . . . . BP 00 51  % 08000g

    -                                           D            00g                 41%                   342 S                                            E              ..i               1 -      0F               22)        )  0 I                                            SD           00s                 2E00*                 /           22 V                                            OE                    *p         /0 . .                    //- - 09 A                                            LS                               01006              mn             12 D                                            CO                   5              .///       . pitt(             ()

h L ) 123 41006 g ff//2 p C L- - 31 . 8 0 ( F p A22/ 1 003 0 0000/90

  • M T t 2E 0 . .. .

m e O f 0 0811000)) g .p v T 1 i 1 p 9. l e ( 5 ))0## sF8 p* 38 F 6av n 2 Vl m m p mm. p9

                                                                                 ) )))

2468 ss11 ss- -) R /.F i/ appgg - - ee121## E 9054* 2 9kVgg IIII rr( (((( X . .1 02c 00e NNNN ePP E 206406 . .ok0000r //// r// 528 , 805lc....u 1357) ull 9 15310314Bo0000s G see 8 l s IIIIV svvw eeeo w o 9 B e NNNNA 1 r ( (((( rLLl l n ) D 1 2P P F F

o. 2E / le /12 e

ig /SO 11l eg e l##e tr 1OT e vn l S e n n

           . T             aa                LU                   v            ea         p C       vkki              i O      N             rM             pCA           s          e          LR          u   C     ennL              L N      A             t              o             w         L                       o   E     Laa
              . Le            n    .

o wo Eee c o Dwk TTn o n o O Or el .lL eol k Rgte N Ou cope ( vlF n Onag m Nonddi i O Cs nomv lF a Cain r Al aoot t ID Re s oceew a l T R Rda er e P FTooc c e RR CbTLo Vna h ll e AA NC Or TPgcnS

                        .         u
                                       ..P l

yoS we h c Oem Tcrr T U p pF F j j x

                                                                                                  - uu             n     n E      C      vTo            rr        Vad                  n       Cree            e   EeeeeI                  I CE     ASA/rSzzSRrtP                                         e      Autw            r   Kkkrr SU     EC        hoCrrCOpeC                                 u       Eono            o   AaaooP                  P
         ~ C    RRTTBRPPRPSLR                                        Q       RSIP            C   MMMCCH                  L

l l l

                  ' EMERGENCY PLAN DRILL AND EXERCISE PROGRAM SCENARIO NO.      1989 EXER                           TIME:    0415 CUE CARD NO.                                             T:    1145      J l

i DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS-L Reactor Coolant Pumps #1-1............................ ON i #1-2............................ ON l #2-1............................ ON L

                                            #2-2............................ OFF L                    Makeup Pumps #1.......................................      OFF
#2....................................... OFF hPI Pumps #1.......................................... OFF
                               #2.......................................... OOS Decay Heat Pumps #1...................................      STBY
                                      #2................................... STBY Decay Heat Removal Coolers #1.........................      AVAIL i;
                                                 #2......................... AVAIL Containment Spray Pumps #1............................      AVAIL    -
                                              #2............................ AVAIL 1

l Containment H2 Dilution Blowers #1.................... OFF

                                                      #2.................... OFF Containment Recirculation Fans #1.....................     .ON
                                                     #2..................... ON Containment Air Cooler. Units #1....................... RUN-SLOW
                                                   #2....................... RUN-SLOW
                                                   #3....................... SPARE Component Cooling Water Pumps #1......................      RUN
                                                    #2...................... RUN
                                                    #3...................... SPARE Component Cooling Heat Exchanger #1...................      RUN
                                                       #2................... RUN
                                                       #3................... SPARE Service Water Pumps #1................................      RUN
                                         #2................................ RUN
                                         #3................................ SPARE l                                     Backup................................ DILUTION l

Auxiliary Feedwater Pumps #1.......................... ON

                                                #2.......................... ON Motor Driven Feedpump ................................      OFF 1

l l l l

                                                                                                            '      4   i            ,Ii))

Id f 8 gg F ii * . .) ss' m . t ppF g p 0 . e

  • Htg .
                                                                                                                                                                 =

e 63 f 2 h . 2 n 5 0 S 67 . .i0 . 1 . 555 .h 8 - M/nF

7. 7 m s

0 at 111 p8 Rti* 0 0 tf 4 p.2/p w Of a.

                  / 3                       //                         M245g                                             M                N 25 2 4            D                    /g-                           .           MMM.                                ./559 1 0       a       6                     i            0//70                    RRRP                    0                 0 .//

iFr4 s* o5 nnns .t 7 . OOOI . 1315

                  =                         iiip                       0f0            0         NNNR                    O                1259
p t/ D / ///T ET 1i5 7440E 03 7. ' MMM/MMM ))

M .n. . ..S . 2 . RRRNRRR . 22 I 7. 8 o 0 0230O 044' w OOOUOOO)' .// T' 94M4 9610L o NNNRNNNs .p11 . 11 n 5 1146C l F s o re m(( o .) ) ) p

                                                                                                                     . r               iT' i)                   2                2e2                                               G                A/-
                                 .t R                 /e               /r/             m                       .        (                 ' l aW                  1r               1u1             u                  nt                              eel i/                   (    u            ps s(        P                   os             r                cve
                                . dl            . .        s                                             ii              e                ievp N                   eaa           ss            s      Eoe                 d                  tD              t                vLem O                   rRm r      Sss              e      Tor                  e                  u              e                r         Le I                   u          Ree.r                   alp                  e                 bC              m                el            T T                eteo          OrrpP                   S(/              wF                    iA              t                Sok -

A raeN n N o rV ' t T S T urS( Tse( TPPm.o A//e RllTri Ewe .ln Dov l Fe t' s5 a W

                                                                                                                                          &Pae ont Tl R

E E Nsp l Eemne Eee NvvlHi dt Nle' OFLldi v L A 22 i2 D1 r tl neeu t E H Mreov Eeel s C eer C CD /Co eugO W S NPTie GLLeeo WlveD IB//2CCAt mFr O I tL hnP &FleF R/11/AA a u ux P R A..a M12Si eL r TACD1VV . r R rtSH E Tttip A bV Dnw .o C te E tn R T A Naadm EGGGrI EitTxt ESSSG00sn H seWW npCC E Ottau T///uS EaoSuo LUUUD85ne T R M CCCRS SSSSTM PMHCAM EBBBE42IG O ISCC L A C R U A ggg N P s iii ps sss E S N T mm pp cp m ppp S A gg 0a 01100mF E L . . . ...p* m B P 00 71  % 08800g p D g 81% 399 7g S I E . SD 0 . 00s 0.i 0 - 2E00* 0F

                                                                                                            /

11))0 22 90 V OE p / 0 . . // 09 . A LS 01007 mn 12 /0 D CO 5 ./// pitt(()7./ L )123 71005 g- ff//2 0 h C L- - 81 . 7 (9 . F p p A22/ T t 0- 003 2E 0 0.0000/90 0 . ...

                                   .pa            Me           O f               0             0811000))

g v T 1 22 i sF6 p* 32 5p F 2.lave n 7 Vl m ( m p mm. p9 5

                                                                                      ))))

2468 ss11 ss- -)11

                                                                                                                            ))0##
                                                                                                                                     //

t R / .F i2 appgg - - ee121## f E 7085* /kVgg IIII rr((((( X E

                             ..1          4.0 5 .

7.ok0000r c 00e NNNN

                                                                                      ////

ePP r// 0 9 70540.705lc....u 227 , 15310314Bo0000s 1357) G ull see 2 8 l s IIIIV svvw eeeo w o 9 B e NNNNA - 1 r ((((( rLLl l n ) D 12P P F F

o. 2E / le /12 ep ig /SO 11l eg e l##e tr 1OT e vn l S e n nmw
                    . T            aa              LU                   v           ea          p C       vkki                ieo O      N            rM           pCA          s           e         LR           u   C      ennL               LTl N      A           t             o           w           L                       o   E    Laa                              F                    _

O

                       . Le Or n.

el .lL o wo eol k Eee R gt e c o D wk TTn o nt oey _ N Ou cope ( vlF n Onag m N onddi ila l O Cs nomv lF a Cain r A laoot tnr e v ID RR Re s oceew CbTLo a l Vna T R Rda er h e P FTooc lle cI p e S e AA Or. u..l we h c Oem T U ppFFj

                                                                                                       - uu                 n    jx.

nH L NC TPgcnS F yoS Tcrr E C vTo rr Vad n Cree e E eeeeI I t T CE ASA/rSzzSRrtP e Autw r K kkrr Rm S SU EC hoCrrCOpeC u Eono o A aaooP PHt W C RRTTBRPPRPSLR Q RSIP C MMMCCH LDC B lllli L

      - EMERGENCY PLAN DRILL AND EXERCISE PROGRAM SCENARIO NO.       1989 EXER                            TIME:                                                              0430 CUE CARD NO.                                                                               T:                              1200 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT:                                                                                             STATUS-Reactor Coolant Pumps #1-1............................ ON
                                #1-2............................ ON
                                #2-1............................ ON
                                #2-2............................ ~OFF Makeup Pumps #1.......................................                                                             OFF
                      #2.......................................                                                           OFF HPI Pumps #1..................................:.......                                                              OFF
 +
                   #2..........................................                                                           OOS Decay Heat Pumps #1...................................                                                              STBY
                          #2...................................                                                           STBY Decay Heat Removal Coolers #1.........................                                                            AVAIL
                                     #2.........................                                                         AVAIL Containment Spray Pumps #1............................                                                            AVAIL
                                  #2............................                                                         AVAIL Containment H2 Dilution Blowers #1....................                                                            OFF
                                          #2....................                                                         OFF Containment Recirculation Fans #1.....................                                                          ON
                                         #2.....................                                                        ON Containment Air Cooler Units #1.......................                                                          RUN-SLOW
                                       #2.......................                                                         RUN-SLOW
                                       #3.......................                                                         SPARE Component Cooling Water Pumps #1......................                                                           RUN
                                        #2......................                                                        RUM
                                        #3......................                                                         SPARE Component Cooling Heat Exchanger #1...................                                                           RUN
                                           #2...................                                                         RUN
                                           #3...................                                                        SPARE Service Water Pumps #1................................                                                          RUN
#2................................ RUN
                             #3................................                                                         SPARE Backup................................                                                          DILUTION Auxiliary Feedwater Pumps #1..........................                                                          ON
                                    #2..........................                                                        ON Motor Driven Feedpump ................................                                                          OFF i

_ e

  • tg e 39 nf h . 4 i 4 S 11 . 0 .

333 h811 5 ^at 119 p . 8m 15 tI .- 3 p2 2 / p e

      /4                 a           //                    M-        43g                                     t h

_ 24 D . /g / .- MMM 10 a 6 i 0t/00 RRRP 0 i F r *4 s* o5 nnns .f 8 . OOOI . _  : : p t/ iiip-D 0

                                                           /51 0       0          NNNR                 0 ET             3i5
                                                                                        ///T M          3    .n.

3990E 02 . MMM/MMM I 3o0

                                       . .     ..S              . 2         .

RRRNRRR 4900O 044 w OOOUOOO) T 94M4 0790L o NNNRNNNs 11 5 2136C l s n F o o ) ) ) r i) 2 2e2 p G tR /e /r/ m . ( aW 1 r 1 u1 u nt i / ( u ps s( P os r dl . . s . ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n N o

  • T ST urS(

Tse( - TPPm.o A//e RllTri Ewe Dov l ln Fe t rV s5 W t a E Nsp l Eee dt Nle v L i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I - tL hnP &FleF R/11/AA a PR A . .a M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o C te E RT Naadm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA CR UA ggg NP s iii ps sse ET SN mm pp cp ppp m SA gg 0a 08800mF EL -

                                                                               .                       .   ....p*

BP 00 61  % 09900g

  -                                          D          00g                  51%                     366 S                                           E           ..i                 1 -        0F                11))

I SD 00s 2E00' / 22 V OE p / 0 . . //- - 09 A LS 01009 mn 12 D CO 5 .///. pitt( ( h L )123 51002 g ff//2 p C L- - 31 . . 6 0 F p A22/ 1 003 0 0000/90

  • M T t 2E 0 ....

m

                          .p e      O            f               0               0811000) 3v         T                            1 g 2p                     9le        (            5                                                ))0##

iF5 s* 36 F

                                            .av n7Vlmmpp9 mm.                  ))))

2468 ss11 ss- -) R p /.F i2 appgg - - - - ee121## E 005* 7 /kVgg IIII rr(( X 3 .1 01c 00 e NNNN ePP E 03402 . .ok0000r //// r// 826 ,.606lc....u 1357) ull 9 95310314Bo0000s G see 8 9 l B s e IIIIV NNNNA svvw eeeo 1 r ( (((( rLLl n ) D 12P P F

o. 2E / le eg
                                                                                                     /12 ig             /SO           11l                                e         l##e tr             1OT                     e           vn          l    S      e            n T            aa                LU                   v           ea           p C       vkki O       N            rM              pCA        s           e          LR            u   C     ennL N       A            t               o                      L                        o   E wow Laa Le           n.              o                             Eee               c              TTn O  Or           el .lL                eol              k      Rgt e             o   Dwk                 o N  Ou           cope (               vlF               n      Onag              m   Nonddi O       Cs           nomv                 lF                a      Cain              r   Al aoot ID RR      Re s        oceew                a l               T R

Rda er e FTooc CbTLo Vna h P ll e AA NC Or . u

                                       .l          we             h      Oem               T   U p pF F j j x n

TPgcnS . F yoS c Tcrr - uu E C vTo rr Vad n Cree e EeeeeI CE ASA/rSzzSRrtP e Autw r Kkkrr SU EC hoCrrCOpeC u Eono o AaaooP C RRTTBRPPRPSLR Q RSIP C MMMCCH l!

EMERGENCY PLAN DRILb AND EXERCISE PROGRAM l SCENARIO NO.. 1999 EXER TIME: 0445 LCUE CARD NO.=' .T:_.1215 l

                                                                               -DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONElT:.              .

STATUS: Reactor Coolant Pumps'#1-1............................ ON

                                                                                      '#1-2............................ ON
                                                                                        #2-1............................       ON
                                                                                        #2-2............................ OFF Makeup Pumps #1.......................................            OFF
                                                                             #2.......................................         OFF
                                                           .HPI Pumps #1.......................................'...            OFF
                                                                          #2..........................................         COS
                                                           . Decay. Heat Pumps #1...................................          -STBY
                                                                                 #2...................................         STBY Decay Heat Removal Coolers #1......... ...............            AVAIL
                                                                                             .#2.........................      AVAIL     li Containment Spray. Pumps.#1............................          AVAIL
                                                                                          #2............................      AvAIt.

Containment-H2 Dilution Blowers #1.................... OFF'

                                                                                                   #2.................... OFF        ! !

Containment Recirculation Fans #1..................... ON *

                                                                                                  #2.....................    -ON Containment Air Cooler Units       #1....................... RUN-SLOW
                                                                                                #2........................ RUN-SLOW
                                                                                               #3.......................      SPARE Component Cooling Water Pumps #1......................           RUN
                                                                                                 #2...................... RUN
                                                                                                 #3...................... SPARE Component Cooling Heat Exchanger #1...................           RUN
                                                                                                    #2................... RUN          z
                                                                                                    #3................... SPAPE        ',

1 Service Water Pumps #1................................ RUN

                                                                                    #2................................        RUN
                                                                                    #3................................        SPARE Backup................................        DILUTION h-I                                                            Auxiliary Feedwater Pumps #1..........................            ON
                                                                                            #2..........................      ON u

Motor Driven Feedpump ................................ OFF i i M I

    > l                                                                                                                                         j gg                                                                                       F
                             )              ii                                   m

_ t ssF g p 0

 -                            e             p p*                          Htg                                                          .

e f 2

 -                           h              473                            n     4                                                   0 S                           .                i0                                                         1 225                       h      50                                                  M/nF 0                at            667                        p8        9m                                              Rti*

3 0 tf 3 p.1/p w Of

             / 0              a             //                        M240g                                       M              N 25 2 5             D      .                 / g                         .

MMM /559 1 0 a 6 i 0//20 RRRP 0 0 . // iFr4 s* o5 nnns .t 8 . OOOI . 1315 p iiip 0f0 0 NNNR 0 1259

: t/ D / 5 ///T ET 2i5 8510E 03 .

MMM/MMM )) M .n. . . ..S . 1 . RRRNRRR 22 I 7. 7 o 0 1240O 044 w OOOUOOO) // T 83M4 1070L o NNNRNNNs p11 _ 11 n 5 2236C l F s o re m(( . o ) ) ) p r iT i) 2 2e2 G A/ tR / e /r/ m . ( l aW i/ 1r ( u 1u1 s( P u nt os r eel cve _ dl . . s ps ii .e ievp N eaa ss s E oe d tD t em O rRm Sss e T or e u e v L. L e r I u r Ree.r A lP e bC m el T _ T eteo OrrpP S (/ wF iA t Sok A raeN TPPm n N l o rV t

  • ont .

T urS( A//e.o E w e' . l n t a &Pae T D ov W - S Tse( RllTri Fe s5 Tl E Nsp l Eee dt N le v L i2 tl t R E Eemne NvvlHi O FLldi A 22 D1 r neeu E H Mreov Eeel s C eer C CD /Co eugO W S NPTie GLLeeo WlveD IB//2CCAt mFr O I tL hnP & FleF R/11/AA a u ux . P R A ..a M12Si eL r TACD1VV .r R rtSH E Tttip A bV D nw .o C te E tn R T Namdm EGGGrI E itTxt ESSSG00sn H seWW npCC 1 A E Ottau T///uS E aoSuo LUUUD85ne T E M CCCRS SSSSTM PMHCAM EBBBE42IG O ISCC L A gg C R U A gii N P s iss spp ps m E T mm pp cp p p gF S N gg m 22 S A 0a 00000

  • E L . . . . .0 m B P 00 31  % 00000 8p
         -                                             D           00g              41%                   300              0       .g S                                              E                .i          1 -      0F               11))              9 I                                              SD          00s              2E00*                 /           22)90 V                                              OE                 p         /0          .             //- - 2/ .                           -

A LS 01U07 mn pitt((/ ./ 12(40 D CO 5 ./// h L )123 51008 g ff// 70 p C L- - 41 . 0 0 13 . F p A22/ 1 003 0 0000 .10

  • M T t 2E 0 . ..2
                               .pm e       O         f             0              0811001))

v T 1 022 g 1p iF1 F 2.l 7av e ( mm. 5

                                                                                    )))                       ss11
                                                                                                                      ))2##
                                                                                                                               //
  • n2Vlmmpp9 245 i ss- -)11 t R

E s*005* p / 3 9.3 F i/ 2kVgg appgg IIII

                                                                                              -               ee121##

rr(((( ( f X NNNN ePP 0 E 7.09489 1 0 7. cok0000r 00e

                                             .                                      ////                  r//                                 .

- 9 8 9 520/ 25310314Bo0000s 006lc....u l B s e 1357) IIIIV NNNNA G ull see svvw eeeo w o 2 - 1 n. o

                                                    )

2E D 12P r

                                                                          /

((((( le rLLl P

                                                                                                          /12 F

l F ig /SO 11l e g' e l##e ep tr 1OT e vn l S e n nmw

               . T            aa                   LU                 v          ea           p  C    vkki             ieo O      N            rM                pCA          s        e         LR            u  C    ennL             LTl N       A                              o                     L                       o  E    Laa                       F wow t
                   . L  e          n.               o                            Eee              c           TTn o

nt oey O O r el .lL eol k R gte o D wk N O u cope ( vlF n O nag m N onddi ila l O ID C s s nomv oceew lF a l a T C ain Rda r e A laoot FTooc tnr cI p e v RR AA NC R O T e. r PgcnS CbTLo u..l F Vna yoS we h c T R O em crr er h T P U ppFFj uu lle n e jx. nH S e L E C vTo rr Vad n C ree e E eeeeI I t T CE A SA/rSzzSRrtP e A utw r K kkrr Rm S SU E C hoCrrCOpeC u E ono o A aaooP PHt W C R RTTBRPPRPSLR Q RSIP C MMMCCH LDC B L l llll

t. EMERGENCY PLAN DRILL AND EXERCISE PROGRAM SCENARIO NO. '1989 EXPR -TIME: 0500

                             ' CUE CARD-NO.:                                                                                                     T:                                     1230-DAVIS-BESSE: NUCLEAR POWER STATION-
                                                          ' EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT:                                                                                                                  STATUS:

Reactor Coolant. Pumps.#1-1............................- . ON

                                                                           #1-2............................                                                        ON
                                                                           #2-1..........'..................                                                       ON
                                                                           #2-2............................                                                        OFF Makeup' Pumps #1.......................................                                                                              OFF
                                                                 #2.......................................                                                         OFF HPI Pumps #1..........................................                                                                               OFF
                                                              #2..........................................                                                          OOS                                              -

Decay-Heat Pumps #1................................... RUN'

                                                                     #2...................................                                                          Stay Decay Heat' Removal Coolers ~#1.........................                                                                            AVAIL
                                                                                 #2.........................                                                       AVAIL Containment Spray Pumps #1............................-                                                                             AVAIL
                                                                            .#2...........................'..                                                     AVAIL                                                .

Containment H2 Dilution Blowers #1.................... OFF^

                                                                                              #2....................                                               OFF
                             . Containment' Recirculation Fans                               #1.....................                                               ON
                                                                                             #2.............:.......                                               ON
                             -Containment Air Cooler Units #1.......................                                                                               RUN-SLOW
                                                                                          #2.......................                                                RUN-SLOW
                                                                                          #3.......................                                                SPARE Component Cooling Water Pumps #1......................                                                                              RUN
                                                                                            #2......................                                               RUN i
                                                                                            #3......................                                               SPARE Component Cooling Heat Exchanger #1...................                                                                              RUN
                                                                                               #2...................                                               RUN
                                                                                               #3...................                                               SPARE y                               Service Water Pumps #1................................                                                                              RUN
            <                                                            #2................................                                                        RUN
                                                                         #3................................                                                        SPARE Backup................................                                                         DILUTION Auxiliary.Feedwater Pumps #1..........................                                                                              ON
                                                                                #2..........................                                                       ON Motor Driven Feedpump ................................                                                                              OFF i

t l i

e f h 035 n 3 S . . . i0 . 772 h 42 _ 5 45 at tf 446 p8 p .1/p 8m 3 w

          /1                a            //                     M246g                                           M 25               D      .              /g                          .

MMM-10 a 7 i 0//40 RRRP 0 iFr4 s* nnns .t 7 . OOOI . _ o5 iiip 0f0 0 NNNR 0

p t/ D / 4 ///T ET 3i5 9120E 03 .

MMM/MMM _ M 8 .n. . . ..S . 1 . RRRNRRR I 8o0 4900O 044 w OOOUOOO) T 72M4 2160L o NNNRNNNs 11 5 2236C l s n F o o ) ) ) r i) 2 2e2 p G tR /e /r/ m . ( aW 1 r 1 u1 u nt i/ ( u ps s( P os r dl . . s ii e N eaa ss s Eoe d tD t O rRm r Sss e Tor e u e I u Ree.r alp e bC m T eteo OrrpP S(/ wF iA t A raeN n N o T ST Tse( urS( TPPm.o A//e RllTri Ewe Dov l ln Fe t rV s5 t W a E Nsp l Eee dt Nle v L i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP &FleF R/11/AA a PR A . .a- M12Si eL r TACD1VV .r 8 E Tttip A bV Dnw .o C te g RT Naadm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne I EM CCCRS SSSSTM FMHCAM EBBBE42IG Q LA CR UA g NP u igg ps sii ET SN mm pp cp m pss pp SA gg 0a 0 000* EL . 00 .. . BP 00 31  % 0 . 0008

      -                                          D          00g                21%                      344 S                                           E            ..i              3 -         0F               99)         ))9 I                                           SD         00s                2E00*                    /           22290 V                                           OE                  p         /0        . .                //- - (/

_ A D LS 01000 mn 12/20 _ ' CO 5 .///. pitt( ( h L )123 61009 g ff//980 - p C L- - 11 . 9 0 F p A22/ 3 002 0 0000110 -

  • M T t 2E 0 . ..2
                             .p m                 e      O          f                0               0811009))

g 0v T 1 1 p .le ( 5 ))1## iF9 s* 29 F 7av n 2 Vl m m mm. p p9

                                                                               ))) )

2468 ss11 ss- - R p /.F i/ appgg - - ee121## E 005* 8 3kVgg IIII rr((( _ X E 1 .1 04c 00e NNNN ePP 09492 .

                                                .ok0000r                       / ///                    r//

029 , 006lc ....u 1357) ull 9 25213314Bo0000s - G see 8 9 l B s e IIIIV NNNNA svvw eeeo 1 r ((((( rLLl n ) D 12P P F

o. 2E / le eg
                                                                                                        /12 ig              /SO           11l                                e        l##e tr             1OT                   e          vn             l   S     e           n
            . T              aa               LU                 v           ea             p  C     vkki O      N              rM             pCA        s         e          LR             u   C     ennL N      A             t               o         w          L                          o  E     Laa Le             n.             o       wo                  Eee                 c            TTn

_ O Or el .lL cope ( eol k Rgte o Dwk - o N Ou vlF n Onag m Nonddi _ O Cs ncmv lF a Cain r Alaoot ID Re s oceew a l T Rda e FTooc RR CbTLo Vna R er h P ll e - AA Or . u . l we h Oem T U p pF F j NC TPgcns .F yoS c Tcrr - uu n E C vTo rr Vad n Cree e EeeeeI CE e ASA/rSzzSRrtP Autw r Kkkrr SU EC hoCrrCOpeC u Eono o AaaooP C RRTTBRPPRPSLR Q RSIP C MMMCCH

EMERGENCY PLAN DRTIL AND EXERCISE PROGRAM SCENARIO NO. 1989 EXER TIME: 0515 _ CUE CARD NO. T: 1245 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS

  • Reactor Coolant Pumps #1-1............................ ON
                                  #1-2............................ ON
                                  #2-1............................ ON-
                                  #2-2............................ OFF Makeup Pumps #1.......................................      OFF
                        #2....................................... OFF HPI Pumps #1..........................................      OFF       '
                     #2.......................................... OOS     .

Decay Heat Pumps #1................................... R0N

                            #2'................................... STBY Decay Heat Removal Coolers #1.........................      AVAIL
                                       #2......................... AVAIL Containment Spray Pumps #1............................      AVAIL.
                                    #2............................ AVAIL 1

l Containment H2 Dilution Blowers #1.................... OFF-

                                            #2.................... OFF Containment Recirculation Fans #1.....................      ON
                                           #2..................... ON Containment Air Cooler Units #1.......................      RUN-SLOW
                                         #2....................... 'RUN-SLOW
                                         #3....................... SPARE I          Component Cooling Water Pumps #1......................      RUN

! #2...................... RUN

                                          #3..............:....... SPARE Component Cooling Heat Exchanger #1...................      RUN
                                             #2................... RUN
                                             #3................... SPARE l

Service Water Pumps #1................................ RUN i #2................................ RUN

                                #3................................ SPARE Backup................................ DILUTION l

Auxiliary Feedwater Pumps #1.......................... ON

                                      #2.......................... ON Motor Driven Feedpump ................................ OFF l
,                                                                                                           ,l      ;i              ill           !

gg F

                          )           ii                                 m t           ssF                        g      p                                                         0 e           p p*                      Htg                                                                     .

e f 2 - h 301 n 9 0 S ... i0 1

                                      '1 1 3                 h      41                                                         M/nF 0

0 0 at tI 555 3 p8 p .1/ p 3m Rti* w Of

         / 3               a          //-                     M244g                                            M               N           25 3 5              D      .           /g                           .

MMM /359 1 0 a 8 i 0//30 .RRRP 0 0 . // iFr4 s* o5 nnns .t 3 . OOOI . 1615 p iiip 0f0 0 NNNR O 1159

: t/ D / 4 ///T ET 0i5 5700E 03 .'
                                                                                      .MMM/MMM                                             ))

M 1 .n. . ..S . . 1 . RRRNRRR' 22 I T

                     .1o0             0700O                   044            w         OOOUOOO)                                            //

83M4 2150L o NNNRNNNs p11-11 n 5 2236C l s m((

                          .o F                                  o                re
                                             )               )      )                                           r              iT
                        .i)                  2                2e2            p                                 G               A/

tR /e /r/ m . ( l aW 1 r u 1u1 u nt eel i / ( ps s( P os r cve dl . . s ii e ievp. - N eaa ss s Eoe d tD t vLem O rRm Sss e Tor e u e r Le I u r Ree.r alp e bC m el T T eteo OrrpP S(/ wF iA t Sok A raeN n N l o T S T urS( Tse( TPPm.o A//e RllTri Ewe Dov ln Fe t rV s5 t W a &Pae ont Tl R E E Nsp l Eee dt Nle v L i2 tl t Eemne NvvlHi OFLldi A 22 D1 r neeu E H W S Mreov Eeel s C eer C CD /Co eugO NPTie GLLeeo WlveD IB//2CCAt mFr O I tL hnP &FleF R/11/AA a u ux P R A. .a M12Si eL r TACD1VV .r R rtSH E Tttip A bV Dnw .o C te E tn R T A E Naadm EGGGrI EitTxt ESSSG00sn H seWW Ottau T///uS EaoSuo LUUUD85ne T npCC F M L A CCCRS SSSSTM FMHCAM EBBBE42IG O ISCC C R U A

  • g N P s igg m ps sii p E T S N mm pp cp m

pss pp g F S A gg 0a 0 000* E L . 66 . . . m B P . 00 61  % 0 . 0008p

     -                                       D             00g              51%                       322                        .g S                                        E            . ..i             1 -        0F                 99)))9 I                                        SD            00s              2E00*                     /            22290 V                                        OE                   p         /0            .               //- - (/                      .

A LS 01002 mn 12/00 D hp CO L C

                                                       )123 L-5
                                                                               .///

61005 51 . .1

                                                                                              . pitt((

g 0 ff//410

                                                                                                                                 ./

3 . F A22/ 1 003 0 0000010

  • p T t 2E 0 . . .9 m Me O f 0 0811000))

g 6p

                             .p               v        T

( 1 ,22 5le 5 ))1## iF9 F 0av mm. )))) 2468 ss11 ss- -)11

                                                                                                                              //

t R s

  • 2 9.*F p / i8
  • n.Vlmmpp9 appgg - - ee121## f E 085 2kVgg IIII rr(((((

X E 7.014. 12 9.0 4

                                            /c 1ok0 00e              NNNN
                                                                            ////

ePP r// 0 021 ,0107lc.000r . ..u 1357) ull 2 9 3531 - 314Bo0000s G see 8 9 l B s e IIIIV NNNNA svvw eeeo w o 1 r ((((( rLLl l n ) D 12P P F F

o. 2E / le /12 ep ig / SO 11l eg e l##e tr 1OT e vn l S e n nmw
           . T              aa           LU                   v          ea              p C       vkki               ieo O      N              rM         pCA          s         e         LR               u   C     ennL                LTl N      A              t          o            w        L                  ~

o E Laa F O

               . Le Or n.

el .lL o wo eol k Eee Rgte c o D wk TTn o nt oey N Ou cope ( vlF n Onag m N onddi ila l O Cs nomv lF a Cain r A laoot tnr e v ID RR s oceew a l T R

                                                                           .Rda er e

P FTooc cIp e S e AA Re.~ Or CbTLo u..l Vna we h Oem h T U ppFFj lle jx. L NC TPgcnS F yoS c Tcrr - uu n ,nH E C vTo rr Vad n Cree e E eeeeI I t T CE ASA/rSzzSRrtP e Autw r K kkrr Rm S SU EC hoCrrCOpeC u Eono o A aaooP PHt W C RRTTBRPPRPELR Q RSIP C M MMCCH LDC B

c . _ _ - . - _ _ _ _ _ - - I

 . i .-

EMERGENCY PLAN DRILL H AND EXERCTEE PROGRAM SCENARIO NO. 1989 EXER TIME: 0530 l CUE CARD NO. T: 1300 DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS i COMPONENT: STATUS? Reactor Coolant Pumps #1-1............................ ON

                                   #1-2............................                                 ON
                                   #2-1............................                                  ON
                                   #2-2............................                                 OFF Makeup Pumps #1.......................................                                    OFF
                         #2 ......................................                                   OFF HPI Pumps #1..........................................                                    OFF
                      #2..........................................                                   OOS Decay Heat Pumps #1...................................                                    RUN
                             #2....................................                                  STBY
          -Decay Heat Removal Coolers #1.........................                                   AVAIL
                                        #2.........................                                AVAIL Containment Spray Pumps #1............................                                  AVAIL
                                     #2............................                                AVAIL Containment H2 Dilution Blowers #1....................                                  OFF
                                              #2....................                                OFF Containment Recirculation Fans #1.....................                                  ON
                                             #2.....................                               ON Containment Air Cooler Units #1.......................                                  RUN-SLOW
                                           #2.......................                               RUN-SLOW
                                           #3.......................                               SPARE Component Cooling Water Pumps #1......................                                  RUN
                                            #2......................                              RUN
                                            #3......................                               SPARE Component Cooling Heat Exchanger #1...................                                  RUN
                                               #2...................                               RUN
                                               #3...................                              SPARE L           Service Water Pumps #1................................                                 RUN l                                #2................................                                 RUN
                                #3........................:.......                                 SPARE Backup................................                                DILUTION Auxiliary Feedwater Pumps #1..........................                                 ON
                                       #2..........................                               ON Motor Driven Feedpump ................................                                 OFF

e p p* Htg _ .e . f h 994 n 6 S . .. i0 . 221 h 32

 .            5 15 at tf 555                          p8 p.1/y 3m                                          -

3 w a.

              /4                                     //                          M243g                                               M 35                  D                           /g                              .

MMM 10 a 9 i 0//40 RRRP 0 iFr4 s* o5 nnns iii p

                                                                                    .t      3 .            OOOI                           .

p 0f0 0 NNNR 0

: t/ '

D / 3 ///T ET . 8i5 2390E 03 . MMM/M'.M 4 _ M _4 .n. . ...S . 1 . RRRNRRR I 4o0 0870O 044 w OOOUOOO) T 83M4 2140L o NNNRNNNs 11 5 2236C l s n - F o o ) ) ) r i) 2 2e2 p G tR /e /r/ m . ( _ aW 1 r 1 u1 u nt i/ dl . . (

us ps s( P os ii r

e _ N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree.r alp e bC m T A

                         'e    teo                 OrrpP n

S(/ wF iA t TPPm o raeN N l rV t T urS( A//e.o Ewe ln t a ST T s e (* RllTri Dov Fe s5 W E Nsp l Eee dt Nle v L - i2 _ RE EH Eemne NvvlHi OFLldi A 22 D1 r. WS Mreov Eeel s C eer C CD - /Co _ NPTie GLLeeo WlveD IB//2CCAt O a I tL hnP &FleF . R/11/AA PR A ..a M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o C te E RT Naadm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T _ EM CCCRS SSSSTM FMHCAM EBBBE42IG O _ LA . CR UA g - 9P 1 s ps igg sii m p ET SN mm py cp m pss pp g SA gg 0a 0 000* _ EL .- 36 ... BP 00 81  % 0 . 0008p D 00g 91%

          -                                                                                                               302 S

E ..i 9 - 0F ' 39))) 9 . _ I SD 00s 1E00* / 22290 V OE p _/ 0 . . . //- - ( A D LS CO - 5 01006

                                                                                                   .///.

mn pitt( 12/70 ( h L )123 21000 g ff//890 p C L- - 31 . 0 0 F p A22/ 0 003 0 0000110 M T t 2E 0 . ..2

                                     .p m                        e         O           f              0                0811000) g        1 p 1 v            T

( 1

                                                             .le              -

5 ))1## iP0 . s* 35 F 8av n2Vlmmpp9 mm. ) ))) 2468 ss11 ss- -) R p /.F i/ appgg - - ee121## E 011* 2 5kVgg IIII rr((((( X E 1 020

                               .2 06463 .

01

                                          ,.007lc....u
                                                             .c ok0000r 00e                NNNN
                                                                                                ////

1357) ePP r// ull 9 25311314Bo0000s G see 8 9 l B s e IIIIV NNNNA svvw eeeo w o 1 . r ((((( rLLl l _ n ) D 12P . P F F _ o. 2E / le /12 e _ ig /SO 11l eg e l##e T tr aa 1OT LU v e vn ea l p S e n n C vkki i _ O N rN pCA s e LR u C ennL L N A t o w L o E Laa O

                   . Le                n        .           o           wo                  Eee                c                 TTn o

n o _ Or el .lL cope ( eol k Rgte o Dwk N Ou vlF n Onag m Nonddi i nomv _ O Cs lF a Cain r Alaoot t ID RR Re s oceew a l T Rda e FTooc e c CbTLo Vna R er h P ll e AA NC Or . u l we h Oem T U p pF F j j x TPgcnS ..F yoS c Tcrr - uu n n E C vTo rr Vad n Cree e EeeeeI I - CE ASA/rSzzSRrtP e Autw r Kkkrr _ SU EC hoCrrCOpeC u Eono o AaaooP P C RRTTBRPPRPSLR - Q RSIP C MMNCCH L

f, p 1-EMERGENCY PLAN DRILL

.i1                                'AND 1XERCISX_IRQGBAM SCENARIO.NO.           1989 EXER                           TIME:-    0545 LCUE CARD NO..                                                  T:    1315-DAVIS-3 ESSE NUCLEAR POWER STATION L

1 EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS: COMPONENT: STATUS-l Reactor Coolant Pumps ~#1-1............................ ON'

                                                                 #1-2............................    .ON.
                                                                .#2-1............................ ON
                                                                 #2-2............................ OFF Makeup Pumps #1....................................... OFF~
                                                       #2....................................... -OFF
                                   , HPI Pumps #1.....'.....................................          OFF
                                                 .#2..........................................        OOS Decay Heat Pumps #1...-                         -   -

RUN.

                                                           #2...................................      STBY Decay. Heat Removal' Coolers #1.........................          AVAIL
                                                                      #2......................... AVAIL Containment. Spray Pumps #1...........'.................          AVAIL
                                                                   #2............................ AVAIL Containment H2 Dilution Blowers #1....................            OFF
                                                                           #2.................... OFF Containment < Recirculation Fans #1.....................          ON
                                                                          #2...................... ON Containment Air Cooler Units-#1.......................            RUN-SLOW
                                                                        #2....................... RUN-SLOW
                                                                        #3.......................

SPARE Component Cooling Water Pumps #1...................... RUN

                                                                         #2...................... RUN
                                                                         #3...................... SPARE Component Cooling Heat Exchanger #1...................            RUN
                                                                            #2.................... RUN
                                                                            #3................... SPARE Service Water. Pumps #1................................           RUN      I
                                                              #2................................      RUN
                                                              #3................................      SPARE Backup................................      DILUTION Auxiliary Feedwater Pumps #1..........................            ON
                                                                     #2.......................... ON Motor Driven Feedpump ................................           OFF

__mE.$._____.___________.____._.____________

e p p* Htg e f h 215 n 8 S . . . i0 . 899 h 20 0 at 444 p8 p 1/p 3m 30 tf 3 w

          /0                a           //         .-           M241 g                                        M 36                D      .            /g                  .

MMM 10 a 0 i 0//20 RkRP 0 ipr 5 s* nnns .t 3 . OOOI . p o5 iiip 0f0 0 NNNR 0

: t/ D / 2 ///T ET 9i5 2810E 03 . MMM/MMM M 6 .n. . . ..S . .1 . RRRNRRR I 6o0 1760O 044 w OOOUOOO)

T 94M4 2140L o NNNRNNNs 11 5 2236C l s n' P o o ) ) ) p r i) 2 2e2 G tR /e /r/ m . ( aW 1 r 1 u1 u nt i/ ( u ps s( P os r dl . . s ii e N eaa ss s Eoe d tD t O rRm Sss e Tor e u e I u r Ree.r alp e bC m T eteo OrrpP S(/ wP iA t

  • A n N o rV T

ST raeN urS( Tse( . TPPm.o A//e RllTri Ewe Dov l ln Fe t s5 t W a E Nsp l Eee dt Nle v L i2 RE Eemne NvvlHi OPLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP &PleF R/11/AA a PR A . .a M12Ci eL r TACD1VV .r R E Tttip A bV nnw .o C te E RT Naadm EGGGrI RitTxt ESSSG00sn H AE Ottau T///uS R aoSuo LUUUD85ne I EM CCCRS SSSSTM PMHCAM EBBBE42IG Q LA CR UA g NP s igg ps sii ET SN mm pp cp m pss pp SA gg 0a 0 000P EL . 65 . . . BP 00 41  % 0 . 000

      -                                         D            00g                31%                    367 S                                          E             ..i               1 -       0P               88).-))

I SD 00s 1E00* / 22290 p V A D OE LS CO 5

                                                                                /G 01000
                                                                                  .///.

mn //.12 pitt(

                                                                                                                   - - (

( h L )123 61002 g ff//7 p C L- - 51 .8 0 P p A22/ 1 002 0 0000780

  • M T t 1E 0 . ..3
                                .p m              e        O           f             0               0811000) 3v            T                         1
                                                                                                                  ))1##

g 9p .le ( 5 iP9 s* 26P* P 8av n2Vlmmpp9 mm. )))) 2468 ss11 ss- -) R p / .* i/ appgg - - - - ee121## E 088 2 2kVgg IIII rr((((( X 2 . 09 02c 00e NNNN ePP E 085 4 . .ok0000r //// r// 329 ,1907l c...u 1357) ull 9 15211214Bo0000s - - - - G see 8 l s IIIIV svvw eeeo 9 B e NNNNA 1 r ((((( rLLl l n ) D 12P P F F

o. 2E / le eg e
                                                                                                       /3 2 l##e ig         /SO              11l tr         1OT                        e         vn          l  S       e         n
             . T               aa             LU                    v         ea          p  C       vkki             i O      N               rM         pCA           s           e        LR           u  C       ennL             L N      A              t           o             w          L                      o  E      Laa wo                                   c
                . Le              n.         o                              Eee                   _

_ TTn O Or el .lL eol k Rgt e o DwX o N Ou cope ( vlP n Onag m Nonddi i O Cs nomv lF a Cain r Alaoot ID RR Re s oceew a l T R Rda er e h P FTooc ll e CbTLo Vna AA Or . u..l we h c Oem Tcrr T UppFFj j x

                                                                                                 - uu             n NC     TPgcnS                    P         yoS E      C      vTo           rr        Vad                   n    Cree             e  EeeeeI                   I CE     ASA/rSzzSRrtP                                        e    Autw             r  Kkkrr SU     EC         hoCrrCOpeC                                u    Eono             o  AaaooP                   P C  RRTTBRPPRPSLR                                       Q     RSIP             C  MMMCCH                   L
         .a .

4 s s u. EMERGENCY PLAN DRIEL AND EXERCISE PROGRAM l- SCENARIO NO. 1989 EXER TIME: 0600 L CUE CARD NO.. T: 1330 i !- DAVIS-BESSE NUCLEAR POWER STATION

                           - EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS t

COMPONENT: STATUS 1 Reactor Coolant Pumps #1-1............................ ON.

                                                #1-2............................ ON
                                                #2-1....-........................ ~ON.
                                               .#2-2............................               OFF Makeup Pumps #1.......................................                       OFF
                                    #2.......................................                  OFF HPI Pumps.#1..........................................                       OFF
                               #2..........................................                    OOS-       .

Decay HeatLPumps #1................................... 1RUN.

                                          #2...................................                STBY Decay Heat Removal Coolers #1.........................                       AVAIL
                                                           #2.........................         AVAIL Containment Spray Pumps #1............................                       AVAIL
                                                      #2............................           AVAIL Containment H2 Dilution Blowers #1....................                       OFF
                                                                    #2.................... OFF Containment-Recirculation Fans #1.....................                       ON
                                                                 #2.....................       ON Containment Air Cooler Units #1.......................                       RUN-SLOW
                                                              #2........................       RUN-SLOW
                                                              #3.......................        SPARE-Component Cooling Water Pumps #1......................                       RUN
                                                                #2......................       RUN
                                                                #3......................       SPARE Component Cooling Heat Exchanger #1...................                       RUN
                                                                     #2................... RUN
                                                                     #3.................-.. SPARE Service Water Pumps #1................................                       RUN
                                             #2.................................               RUN
                                              #3................................               SPARE Backup................................                DILUT 0N Auxiliary Feedwater Pumps #1..........................                       ON
                                                         #2........:.................          ON Motor Driven.Feedpump           ................................            OFF

_ Htg e f' . h 997 'n 6 S . . i0 . 887 h' 07 5 ai t 334 p8 2m 45 tf - 3 p .1/ p w

              /1                 a                //                  .

M240g M 36 D . /g . MMM 10 a 1 . i 0//90 RRRP 0 iFr5 s* c5 nnns iii p ~

                                                                                     .t'          2       .

OOOI . p 0f0 0 NNNR 0

: t/ '

D /.0 ///T ET 0i5 008OE 03 . MMM/MMM M 4 .n. . . ..S . 1 . RRRNRRR I 1 o0 0030O 044 w OOOUOOO) T 16M4 2240L o NNNRNNNs 21 5 2236C l l -

                                                                                                                                ~

s n F o

                               .o                              )                 )            )

p r i) 2 - 2e2 G tR /e /r/ m . ( aW 1 r 1u1 u nt i/ ( u s( P os r eaa dl . . ss s s ps ii .e N' Eoe d tD t O rRm Sss e Tor e u .e I u r Ree.r alp e bC n T eteo OrrpP S(/ wF iA .t ' A raeN n N o T ST urS( Tse( - TPPm.o A//e RllTri Ewe Dov l ln Fe rV t s5 t W a E Nsp l Eee dt Nle v L i2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel - s C eer C . CD . ./Co WS NPTie GLLeeo WlveD IB//2CCAt O I tL hnP &FleF R/11/AA a PR A . .a M12Si eL r TACD1VV .r R E Tttip A bV Dnw .o C te E RT Naadm EGGGrI EitTxt ESSSG00sn H AE Ottau T///uS EaoSuo LUUUD85ne T EM CCCRS SSSSTM FMHCAM EBBBE42IG O LA . _ CR UA g NP igg s sii ET SN mm pp sp pm pss

                                                                                                                                    - pp SA                                                                    gg                        ca                       0             000F; EL                                                                                                                            66         . . .

BP 00' 01  % 0 . 000'

          -                                                    D               00g                          1%                    366 S                                                     E                ..i                     2 -       0F                   88)))

I SD 00s 1E00* / _ 22210 V OE p 90 . . - - //- - (3 A D LS /1002 mn 1 2// CO 5 0/// . pitt(( '1/ h L )123 1004 g ff//1 p C L- - 01 . . 8 0 F p A22/ 9 001 0 0000030

  • M T t 8E -

0 . . .5 m e O f 0 0811000)

                                   .p                                       T                               1 g       9p-                        3.lv'e          (              5                                                    )) 1#

iF9 FFn8av . - mm. ) ))) ss11 s* 29*

  • i2 Vl m m p p9 2468 ss- -

R p / .

                                              ~
                                                            /       ayygg                                - - - -                       ee121##

E 0368772kVgg IIII rr((((( X 1 .1 ..2c . 00e NNNN ePP E 038988 .ok0000r //// r// 829 ,6777lc....u 1357) ull 9 75211234Bo0000s - - - - G see-8 l: s IIIIV svvw eeeo e NNNNA 9 B 1 r ( (((( rLLl n ) D 12P P F

o. 2E / le /12 ig /SO 11l eg e l##e tr 1OT e vn l S e n T aa v ea p LU C vkki O N rM pCA s e LR u C ennL o

N A t o w L E Laa _ O

                    . Le Or n.

el .lL o wo e o 'L k Eee Rgte c o Dwk TTn o N Ou cope ( n Nonddi vlP Onag m nomv a O Cain r Alaoot _ Cs lF ID RR Re s oceew CbTLo a l Vna T R Rda er h e P FTcoc ile we AA Or . u . l h Oem T UppFFj j _ NC TPgcnS .P yoS c Tcrr - uu n _ E C vTo rr Vad n Cree e EeeeeI CE ASA/rSzzSRrtP e Autw r Kkkrr _ SU EC hoCrrCOpeC u Eono o AaaooP _ - C RRTTBRPPRPSLR Q RSIP C MMMCCH

              .i .                                                                                .l EMERCENCY PLAN DRILL                                                               l AND EXERCISE PROGRAM SCENARIO NO.          1989 EXER                               TIME: 0615 CUE CARD NO.                                                      T:__1345 i

DAVIS-BESSE NUCLEAR POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS COMPONENT: STATUS: Reactor Coolant Pumps #1-1............................ ON

                                              #1-2............................         ON
                                              #2-1............................         ON           ,

i

                                              #2-2............................         OFF Makeup Pumps #1.......................................              OFF
                                   #2.......................................           OFF HPI Pumps #1..........................................              OFF
                                #2..........................................           OOS   .

Decay Heat Pumps #1................................... KUN

                                         #2...................................         STBY Decay' Heat Removal Coolers #1......................           .. AVAIL
                                                    #2.........................        AVAIL Containment Spray Pumps #1............................              AVAIL
                                                #2............................         AVAIL Containment H2 Dilution Blowers #1... ................              OFF
                                                         #2....................        OFF Containment Recirculation Fans #1.....................             ON
                                                        #2.....................        ON Containment Air Cooler Units #1.......................             RUN-SLOW
                                                      #2.......................        RUN-SLOW
                                                      #3......... .............        SPARE Component Cooling Water Pumps #1......................             RUN
                                                       #2......................        RUN
                                                       #3......................        SPARE Component Cooling Heat Exchanger #1...................             RUN
                                                          #2...................        RUN
                                                          #3...................        SPARE l                    Service Water Pumps #1................................             RUN l                                            #2.......... .....................         RUN
                                            #3................................         SPARE Eackup................................           DILUTION Auxiliary Feedwater Pumps #1..........................             ON          l
                                                   #2..........................        ON          !

Motor Driven Feedpump ................................ OFF

e - f _. h 448 n 4 S . . i0 . 115 h 5 - 0 at 334 p8 9. 2a . 00 tf 3 p.0/p w m /3 46 10 a2 Da. // _/g i M244g 0//60

                                                                                         . .         MMM RRRP M

0 iFr5 nnns .t 2 . OOOI . s* o5 i iip 0f0 0 NNNR 0

 ,              : :         p     t/                              D       / 9                        ///T                   '

ET 3i5 0030E 03 . MMM/MMM M 5 .n. . ...S . 0 . RRRNRRR - I 8o0 0010O 044 w OOOUOOO) T 4 2240L o NNNRNNNs 26 21 M. 5 2236C l s

 -                                 n-            -

F o o r

                                                        )                   )      -
                                                                                     )

i) 2 . 2e2 p G tR /e /r/ ( m . aW i/

                                                       .1 r

( u 1 u1 s( P u nt os r dl . . s ps i i e N eaa ss s Eoe d tD t O rRm Sss e Tor e u- e I .u r Ree.r alp e bC m T eteo OrrpP S(/ wF i A t A raeN TPPm n N l o rV t T urS( A//e.o Ewe ln t- . a ST Tse( RllTri Dov Fe _95 W E Nsp l Eee dt Nle - v L -

  • 2 RE Eemne NvvlHi OFLldi A 22 D1 r EH Mreov Eeel s C eer C CD /Co W NPTie GLLeeo WlveD IB//2CCAt O S. I tL hnP &FleF R/11/AA a PR A . .a M 1 2' Si eL r TACD1VV .r R E

Tttip A bV nnw .o C ESSSG00sn te E H RT Naadm EGGGrI aitTxt T AE Ottau T///uS R aoSuo LUUUD85ne M CCCRS SSSSTM PMHCAM EBBBE42IG O R. r A CR g UA igg NP s sii ET mm sp pm pss pp - SN SA EL pp gg ca 0 66 0. 0. .0 BP 00 01  % 0 . 000

           -                                            D              00g                     1%                     366 S                                             E               ..i                0 -       0F                    88)))

I SD 00s 4E00* / 22210 V OE p 50 . . //- - (3 A LS /1000 mn pitt(( 12//0 D CO 5 0/// . g h~ L )123 1003 ff//3 p C L- - 01 . 8 0 P p A22/ 4 001 0 0000530

  • M T t 5E 0 . ..3 e O f 0 0811000)
                                    .mp            5v               T                          1
                                                                                                                                      ))1##

g 9p - - .le ( 5 iF9 s* 2 FFn8av mm. )))) 2468 ss11 ss- -) R p / /~ . */ *i2Vlmmyp9 apygg - ee121## rr(( - E X E 3 229 0210904kVgg

                                 .5       ..5c 039360 .ok0000r 7787lc....u 00e IIII NNNN
                                                                                           ////

1357) ePP r// ull 9 85211234Bo0O00s G see 8 l s IIIIV svvw eeeo 9 B e NNNNA 1 r (( ((( rLLl n D P F

                                                   )                   12P
o. 2E / le eg e
                                                                                                                      /12 l##e ig           /SO                 11l tr           1OT                            e         vn            l     S      e ' n
                  .      T             aa               LU                       v          ea            p     C      vkki O        N            rM            pCA             's            e        LR             u     C      ennL N        A            t             o                w           L                        o     E      Laa
                     . Le           n.

lL o eol wo k Eee Rgte c o Dwk TTn o O Or el . N Ou cope ( vlF n Onag m Nonddi O Cs nomv lF a Cain r Al aoot ID s oceew a l T Rda e FTooc _ RR AA NC Re. Or TPgcnS CbTLo u rr

                                                .F l

Vna yoS we h c n R Oem Tcrr Cree er h T e P

                                                                                                                 - uu EeeeeI lle U p pF F j j n

E CE SU C vTo ASA/rSzzSRrtP EC hoCrrCOpeC Vad u e Autw Eono r o Kkkrr AaaooP - C RRTTBRPPRPSLR Q RSIP C MMMCCH

EMERGENCY PLAN DRILL AND EXERCIEE PROGRM4 5-SCENARIO NO.. 1989' EXER TIME: 0630

                . CUE CARD NO.                                                                                                                         T:_._1400 DAVIS-BESSE NUCLEAR' POWER STATION EMERGENCY PREPAREDNESS EXERCISE EQUIPMENT STATUS I/

COMPONENT: STATUS:

                ; Reactor Coolant Pumps #1-1............................                                                                                  ON
                                                      #1-2............................                                                                    ON
                                  ,                   #2-1............................                                                                    ON
                                                      #2-2............................                                                                    OFF Makeup. Pumps #1.......................................                                                                                 OFF
                                    #2.......................................                                                                             OFF HPI Pumps.#1...........................................                                                                                  OFF     .
                                #2..........................................                                                                              OOS '

Decay Heat Pumps #1................................... RUN.

                                               #2...................................                                                                      STBy Decay Heat. Removal Coolers #1'.........................                                                                                AVAIL-
                                                           #2.........................                                                                   ' AVAIL Containment Spray Pumps #1............................                                                                                  AVAIL
                                                        #2............................                                                                    AVAIL
                ~ Containment H2 Dilution Blowers #1....................                                                                                  OFF
                                                                #2....................                                                                    OFF Containment Recirculation Fans #1......................                                                                                 ON
                                                               #2.....................                                                                    ON Containment Air Cooler Units #1.......................                                                                                  RUN-SLOW
                                                             #2...............:.......                                                                    RUN-SLOW
                                                             #3.......................                                                                    SPARE Component Cooling Water Pumps #1......................

RUN

                                                              #2......................                                                                    RUN
                                                              #3......................                                                                    SPARE Component Cooling Heat Exchanger #1...................                                                                                  RUN
                                                                 #2...................                                                                    RUN
                                                                 #3...................                                                                    SPARE Service Water Pumps #1................................                                                                                  RUN
                                                   #2................................                                                                     RUN l-
                                                   #3................................                                                                     SPARE Backup................................                                                                      DILUTION Auxiliary Feedwater Pumps #1..........................                                                                                  ON         :
                                                          #2..........................                                                                    ON Motor Driven Feedpump ................................                                                                                  OFF        .

l l

j ,- EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER-AND__ EXERCISE . . PROGRAM TIME: 0700 RADIATION MONITOR DATA CONTAINMENT g  ; Failed Fuel-Detector (1998) .. ......:.. . . . . . . 200;000 cpm CTMT.:(Wide Range) ( 2 3 87 )... .(2389). 30 mR/hr ,

                                                                                                          . 30 mR/hr.

CTMT/(SFAS)! ~ (2004) . . . .. . .. . . . . . .. .. . .- . ~20 mR/hr

                        .(2005) . .. . . .. . . . . . . .. . . . .                                            20 mR/hr:
                        .(2006). . . . . ... . . . . .. . . . .                    . . ... .                  20'mR/hr
                        '(2007) .. . .. . . . . ..... . . . . . .                                             20 mR/hr.

c CTMTf At:nos - (Normal Range)' (4597AA' East) . L(4597BA West)

      '   .".'          Ch 1'(G)-            .. . . . .          6.71E-04 uCi/cc.                6.71E-04.uC1/cc Ch 2'(P),            . ... ..            9.92E-10 uC1/cc-                9.92E-10'uC1/cc' Ch.3!(I)             . . - . . . .

1;49E-09 uCi/cc 1.49E-09-uC1/cc

               . CTMT Atmos (Accident Range) - (4597AB East)                                         (4597BB West)

Ch 1-(G).MID . . . 1E-3 uCi/cc- 1E-3 uCi/cc

                       .Ch 2'(G) HI                  .. .                     O uC1/cc                                 0 uC1/cc; ch ' 3,'d ,5.     (P/I)         . .                  O mR/hr                                  0 mR/hr CTMT DomeT(High Range)                                         (4596A)            .                     (4596B)-
                             . . . . . . . . .. . .                       1.8 R/hr.                     . 1.8 R/hr GASEOUS EFFLUENT StationLVent.(' Normal Range)                            .., (459 8AA)                                  (4598BA)

Ch-1(G) . . . . . . 3.81E-07 uCi/cc 3.81E-07 uC1/cc. E Ch 2(P) . . . . . . 1.42E-10 uci/cc 1.42E-10 uCi/cc. Ch 3(I) . . .. . . . 4.16E~10 uC1/cc- 4.16E-10 uC1/cc

                ' Station' Vent (Accident Range)                              (4598AB).                           !(4598BB)

Ch 1.(G) MID . . . 1E-3 uCi/cc .1E-3.uC1/cc

                       'Ch 2 (G) HI ~                . . .                    O uci/cc                                0 uC1/cc Ch 3,4,5 (P/I)-                  . .                 O mR/hr                                 0 mR/hr CTMT Purge (5052)

Ch A!(P) . . . . . . . . . . . . . . .. . . 100 cpm

Ch B (I) . . . . . . . .. . . . . . . . . .. 20 cpm-
                       'Ch C (G)             . . . . . . ............                                        70 cpm.

Main Steam Line- -(609 #1). (600'#2)

                         - . . - . . . . . . . . .. .                       15 cpm                            10 cpm Condenser SJAE                                                 (1003A)                                           (1003B)
                        .Ch A _. ..           . . . . .                     60 cpm                            30 cpm
                ' Waste Gas Discharge                                           (1822A)                                           (1822B)
                          . . . .. . . . . . .                            400 cpm                        100 cpm b

t LL-- _ _ _ _ _ . . _ _ . _ _ _ _ _ _ _ _ _ _

a

                                                                                                                                       ]

l EMERGENCY PLAN DRTT TSrFNARIO NO: 1989 EXER .. AND EXERCISE PROGRAM TIME: 0700 1. RADIATION MONITOR DATA i IRadwaste Area Exhaust. (5405) l Ch A.(P)' . .. .

                                                     .. ... . . .. . . . . . . . .                     2,000 cpm

!~ Ch.B (I) . . . . . . . . . . . . . . . . .. 800 cpm. l Ch C'(G) . . . .. . . . . . . . . . . . . . 150 cpm l" Puel' Handling Area Exhaust . (8446) (8447)- i l- . . . . . . . . .. . . 0.2 mR/hr 0.2 mR/hr i H Fuel Handling Area Exhaust (5403). Ch A'(P)'

                              .   . , .      . . . . . . . . . . . . . . . . .                         2,000 cpm Ch B'(I) .           . . . . . . . . . . . . . . . . . . . .                                 20 cpm Ch C (G).        . . . . .. . . . . . . . . . . . . . . . .                                  30 cpm
            . Control Rm EVS-                                              (5327)                               (5328).

Ch A (P) . . . . . . 30 cpm 35 cpm i Ch B (I) .. . . . . . O cpm 10 cpm Ch.C (G). . . . . . . 15 cpm 30 cpm j LIOUID EFFLUENT . Station Inlet: Traveling Scfeens (8434) . . . . 60 cpm Station Effluent: Collection Box (8433) . . . . 80 cpm

            . Water Discharge:                     Cooling Tower            (8432)   . . . .             100 cpm Misc Liquid Waste Disch                                      (1878A)                           (1878B)'
                       . . . . .. . . . . . .                   20,000 cpm                           15,000 cpm                            ;

Clean. Liquid Waste Xfer Pumps (1770A) (1770B)

                       .. . . . . . . . . . .                       . 250 cpm                            300 cpm CCW. Return 1-1                                               (1412)                            '(1413)
                       . . .. . . . . .. .                       1,000 cpm                               700 cpm                           j y              AREA RADIATION (All readings in mR/hr)                                                                                       )

l Maint WK Area (8400) 3. Pent Rm 314 (8421) 1 i

             'Samp sys Area -(8401)                       1                        Hot Inst Shop (8422)                             0    l l-              CS/DS Pump Rm- (8402)                      3                        Hot Lab          .(8423)                         0       :

CS/DS Pump Rm (8403) 15 Personnel Lock (8424) 0.1 ') li ~OH Cooler Rm (8404) 3 Equip Hatch (8425)- 0.2 )

l. DH Cooler Rm (8405) 3 ~ Corridor 411 (8428)- 0.1-. J Misc Wst Evap (8406) 0.7 Corridor 411 (8429) 0.2 l Vah e ACC Rm -(8407) 0.2 CTRL Rm (8430) 0.1 i L Det Wst Drn Tk (8408) 2 CTRL Cab Rm (8431) 0.2  ;

l- Pent Rm 208 (8409) 3 Cond Demin'1/2 (8435) 0.1-  ! Corridor 209 (8410)- 0.4 Cond Demin 3/4 (8436) 0.3 ' Corridor.209 (8411) 0.4 Con Dem Hld Tk (8437) 0.1 I Valv Rm 212 (8412) 1 Bkwsh Rec Tk Rm(8438) 0  ; Pump Rm 224 (8413)= 15 Fuel Hand Area (8417) 0 ' Corridor 227 (8414) 0 Fuel Hand Area (8418) 1 f Corridor 227 (8415) 1 Drum Area Rm (8419) 10  ; L Pent Rm 236 (8416) 15 SFP Area South (8426) 0  ! Pent Rm 303 (8420) 0 SFP Area East (8427) 0  !

lQ ,, ~ EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 0730 p RADIATION MONITOR DATA CONTAINMENT Failed Fuel Detector (1998) .- . . .. . . - . . . . . 200,000 cpm CTMT-(Wide Range) (2387) (2389)

                   . . . . .. . .. .                                30 mR/hr                    30 mR/hr CTMT (SFAS):
                  '(2004)-        .. . . . . . . ... . . .. . . ...                             20 mR/hr (2005)         . . . . . . . . . . . .. . .. . . . . .. .                    20 mR/hr (2006)'         . . . . . .. . .. . .. . . . . . .                           20 mR/hr (2007)          . . . . . . . . . .. . . . . . . . .                         20 mR/hr CTMT Atmos (Normal Range)                        (4597AA East)                 (4597BA West)

Ch 1 (G)- . . . . . 6.71E-04 uCi/cc 6.71E-04 uC1/cc Ch 2 (P) . . . . . 9.92E-10 uC1/cc 9.92E-10 uC1/cc

                  .Ch 3 (I)'           .-...'.         . 1.49E-09 uCi/.c                1.49E-09 uC1/cc CTMT Atmos - (Accident - Range) . (4597AB Fast)                                (4597BB West).

Ch 1-(G).MID . . . 1E-3 uC1/cc. 1E-3 uCi/cc. Ch 2 (G) HI . . . O uC1/cc 0.uci/cc Ch 3,4,5 (P/I) . . . O mR/hr 0 mR/hr CTMT Dome (High Range) (4596A). (4596B)

                   . . . ... . . . .                              1.P R/hr                     1.8 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                               (4598AA)                  (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uC1/cc 1.4.2E-10 uC1/cc Ch 3(I) . . . . . . 4.163-10 uCi/cc 4.16E-10 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1E-3 uCi/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uCi/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A-(P) . . .. . . . . . . . . . . . . . . . . 100 cpm-Ch B-(I) . . . . . . .. . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . .. . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                   . . . . . . . . . . . .                          15 cpm                      10' cpm Condenser SJAE                                             (1003A)                    (1003B)

Ch A . . . . .. . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

                    . . . . . . . . . .                           400 cpm                      100 cpm

EMERGENCY. PLAN.DRILLSCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 0730 RADIATION MONITOR DATA 1

 '                                                                                                                            1 Radwaste Area Exhaust                                                                                (5405)

Ch A (P) . . . . . .. . . . . . . . . . . . 2,000 cpm Ch B (I) . . . . . . . .. . . . . . . . . . 800 cpm Ch C-(G) . . . . . . . . . . . . . . . . . . 150 cpm  ;

           ' Fuel Handling Area Exhaust                                        .(8446)                           (8447)
                                 . . . . . . . . . . .                     0.2 mR/hr                       0.2 mR/hr
           . Fuel Handling Area Exhaust                                                                          (5403)

Ch A (P) . . . . . . . . . . . . . . . . . . . . . 2,000 cpm (

           .Ch B (I)                    .. . . . . . . . . . . . . . . . . . . . .                           20 cpm           (

Ch C (G) . . . . . . . . . . . . . . . . . . . . . 30 cpm { Control Rm EVS- (5327) (5328) Ch A (P) 30 cpm l

                                                  . . . . . .                                                35 cpm Ch B (I)         . . . . . .                 O cpm                          10 cpm Ch C (G)         . . . . . .               15 cpm                           30 cpm            i LIOUID EFFLUENT                                                                                                    q Station Inlet: Traveling Screens                                    (8434)   . . . .           60 cpm Station Effluent: Collection Box                                    (8433)  . . . .            80 cpm Water Discharge:                               Cooling Tower        (8432)  . . . .           100 cpm Misc Liquid Waste Disch                                             (1878A)                        (1878B)          I
                                 . . . . . . . . . . .                20,000 cpm                        15,000 cpm Clean Liquid Waste Xfer Pumps                                      (1770A)                        (1770B)
                                 . . . . . . . . . . .                     250 cpm                         300 cpm CCW Return 1-1                                                      (1412)                         (1413)
                                 . . . . . . . . . . .                  1,000 cpm                          700 cpm AREA RADIATION (All readings in mR/hr)

Maint WK Area (8400) 3 Pent Rm 314 (8421) 1 Samp sys Area (8401) Hot Inst Shop (8422) 1 0 1 CS/0S Pump Rm (8402) 3 Hot Lab (8423) 0 CS/05 Pump Rm (8403) 15 Personne! Lock (8424) 0.1  ! DH Cooler Rm (8404) 3 Equip Hatch (8425) 0.2 OH Cooler Rm (8405) 3 Corridor 411 (8428) 0.1 Misc Wst Evap (8406) 0.7 Corridor 411 (8429) 0.2 Valve ACC Rm (84 M 0 . 2. CTRL Rm (8430) 0.1  ; Det Wst Orn Tk (844 , I CTRL Cab Rm (8431) 0.2 Pent Rm 208 (8409) 3 Cond Demin 1/2 (8435) 0.1 Corridor 209 (8410) 0.4 Cond Demin 3/4 (8436) 0.3 l Corridor 209 (8411) 0.4 Con Dem Hld Tk (8437) 0.1 Valv Rm 212 (8412) 1 8kwsh Rec Tk Rm(8438) 0 i Pump Rm 224 (8413) 15 Fuel Hand Area (8417) 0 Corridor 227 (8414) 0 Fuel Hand Area (8418) 1 Corridor 227 (8415) 1 Drum Area Rm (8419) 10 Pent Rm 236 (8416) 15 SFP Area South (8426) O Pent Rm 303 .(8420) 0 SFP Area East (8427) 0

y h EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER . AND EXERCISE PROGRAM TIME: 0745 l . RADIATION MONITOR DATA

                                                                                                                             'I

,, CONTAINMENT V Failed Fuel Detector (1998) . . . . . . . . . . . 200,000 cpm CTMT-(Wide Range) (2387) (2389)- I L 30 mR/hr 30 mR/hr CTMT (SFAS) (2004) . . . . . . . . . . . . . . . . . . 20 mR/hr

         ~(2005)        . . . . . . .. . . .. . . . . .. ..-                                20 mR/hr
         .(2006)        . . . . . . . . . . . . . . . . . .                                 20 mR/hr (2007)        . . . . . . . . . . . . . . . . . .                                 20 mR/hr CTMT Atmos (Normal Range)                       (4597AA East)                    (4597BA West)'

Ch-1 (G) . . . . . 6.71E-04 uC1/cc 6.71E-04 uC1/cc Ch 2--(P) . . . . . 9.92E-10 uCi/cc 9.92E-10 uC1/cc Ch 3-(I) . . . . . 1.49E-09 uCi/cc 1.49E-09 uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch l'(G).MID . . . 1E-3 uCi/cc 1E-3 uCi/cc Ch 2.(G) HI . . . O uC1/cc 0 uC1/cc _Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Dome (High Range) (4596A) (4596B)-

          . . . . . .. . . . .                          1.8 R/hr                           1.8 R/hr
  , GASEOUS EFFLUENT Station Vent (Normal' Range)                            (4598AA)                         (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc

         'Ch 2(P)       . . - . . . .          1.42E-10 uCi/cc                 1.42E-10 uC1/cc Ch 3(I)       . . . . . .            4.16E-10 uC1/cc                 4.16E-10 uC1/cc Station Vent (Accident Range)                            (4598AB)                         (4598BB)'

Ch 1 (G) MID . . . 1E-3 uCi/cc 1E-3 uCi/cc Ch 2 (G) HI . . . O uCi/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr E

                    ~
   .CTMT Purge (5052)

Ch A (P) . . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600.#2)

          . . .         . . . . . .                       15 cpm                            10 cpm Condenser SJAE                                            (1003A)                            (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

          . . . . . . . . . .                           400 cpm                        100 cpm

EMERGENCY PLAN DRILLSCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 0745 RADIATION MONITOR DATA Radwaste Area Exhaust (5405) Ch A.(P) . . .. . . . . . . . . . . . . . . 2,000 cpm Ch B (I) . .. . . . . . . . . .. . . . . . . 800 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 150 cpm Fuel Handling Area Exhaust (8446) (8447)

                             . . . . . . . . . . .                           0.2 mR/hr                         0.2 mR/hr Fuel Handling Area Exhaust                                                                      (5403)

Ch-A (P) . . . . . . . . . . . . . . . . . . . . . 2,000 cpm Ch B (I) . . . . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . .. . . . . . . . . . . . 30 cpm Control Rm EVS (5327) (5328) Ch A (P) . . . . . . '30 cpm 35 cpm Ch B (I) . . . . . . O cpm 10 cpm Ch C (G) . . . . . . 15 cpm 30 cpm LIOUID EFFLUENT Station Inlet: Traveling Screens (8434)'. . . . 60 cpm Station Effluent: Collection Box (8433) . . . . 80 cpm Water Discharge: Cooling Tower (8432) . . . . 100 cpm Misc Liquid Waste Disch (1878A) (1878B)

                             . . . . . . . . . . .                      20,000 cpm                         15,000 cpm Clean Liquid Waste Xfer Pumps                                (1770A)                          (1770B)
                             . . . . .. . . . . .                            250 cpm                           300 cpm CCW Return 1-1                                                 (1412)                          (1413)
                             . . . . . . . . . . .                        1,000 cpm                            700 cpm AREA RADIATION (All readings in mR/hr)

Maint WK Area (8400) 3 Pent Rm 314 * (8421) 1 Samp sys Area (8401) 1 Hot Inst Shop (8422) 0 CS/DS Pump Rm (8402) 3 Hot Lab (8423) 0 CS/DS Pump Rm (8403) 15 Personnel Lock (8424) 0.1 DH Cooler Rm (8404) 3 Equip Hatch (8425) 0.2 DH Cooler Rm (8405) 3 Corridor 411 (8428) 0.1 Misc'Wst Evan (8406) 0.7 Corridor 411 (8429) 0.2 Valve ACC Rm (8407) 0.2 CTRL Rm (8430) 0.1 Det Wst Drn Tk (8408) 2 CTRL Cab Rm (8431) 0.2 Pent Rm 208 (8409) 3 Cond Demin 1/2 (8435) 0.1 Corridor 209 (8410) 0.4 Cond Demin 3/d (8436) 0.3 Corridor 209 (8411) 0.4 J Con Dem H1d Tk (8437) C.1 l Valv Rm 212 (8412) 1 8kwsh Rec Tk Rm(8438) 0 4 Pump Rm 224 (8413) 15 Fuel Hand Area (8417) I 0 Corridor 227 (8414) 0 Fuel hand Area (8418) 1 I Corridor 227 (8415) 1 Drum Area Rm (8419) 10 ) Pent Rm 236 (8416) 15 SFP Area South (8426) 0 l Pent Rm 303 (8420) 0 SFP Area East (8427) 0

EMEitGENCY PLAN DRILL SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 0800 RADIATION MONITOR DATA CONTAINMENT Failed Fuel Detector (1998) . . . . . . . . . . . 200,000 cpm  ; CTMT (Wide Range) (2387) (2389)  ;

     . . . . . . . . . .                              30 mR/hr                 30 mR/hr            !

CTMT (SFAS) (2004) . . . . . . . . . . . . . . . . . . 20 mR/hr l (2005) . . . . . . . . . . . . . . . . . . 20 ER/hr (2006) . . . . . . . . . . . . . . . . . . 20 mh/hr (2007) . . . . . . . . . . . . . . . . . . 20 mR/nr CTMT Atmos (Normal Range) (4597AA East) (4597BA West) - Ch 1 (G) . . . . . 6.71E-04 uC1/cc 6.71E-04 uC1/cc~ Ch 2 (P) . . . . . 9.92E-10 uC1/cc 9.92E-10 uC1/cc Ch 3 (I) . . . . . 1.49E-09.uci/cc 1.49E-09 uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . 1E-3 uCi/cc 1E-3 uCi/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Dome (High Range) (4596A) (4596B)

     . . . . . . . . . .                             1.8 R/hr                 1.8 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                               (4598AA)               (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uCi/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uC1/cc 1.42E-10.uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uCi/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uCi/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

      . . . . . . . . . .                              15 cpm                  10 cpm Condenser SJAE                                             (1003A)                (1003B)

Ch A . . . . . . . 60 cpm - 30 cpm Waste Gas Discharge (1822A) (1822B)

      . . . . . . . . . .                            400 cpm                  100 cpm

EMERCENCY PLAN DRILLSCENARIO NO: 1989' EXER ) AND' EXERCISE PROGRAM TIME: 0800 j RADIATION MONITOR DATA - 1 11 Radwaste Area Exhaust (5405) j Ch A (P) . . . . . . . . . . . . . . . . . .- 2,000 cpm Ch B (I) . . . . .. . . . . . . . . . . . . 800 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 150 cpm Fuel Handling Area Exhaust -(8446) (8447)

                    . . . . . . . . . . .                                0.2 mR/hr                         0.2 mR/hr Fuel Handling Area Exhaust                                                                             (5403)     l Ch A-(P)           . . . . . . . . .. . . . . . . . . . . .                                     2,000 cpm         )
        -Ch B (I)           . . . . . . . . . . . . . . . . . . . . .                                       20' cpm        !
        'Ch C (G)           . . . . . . . . . . . . . . . . . . . . .                                       30 cpm i

Control Rm EVS (5327) (5328) . i Ch A (P) . . . . . . 30 cpm 35 cpm. ) Ch B (I) . . . . . . _0 cpm 10 cpm i

                  -.Ch C (G)             . . . . . .                       15 cpm                           30 cpm         i LIOUID EFFLUENT                                                                                                   l Station Inlet: Traveling Screens                                       (8434)  . . . .             60 cpm          !

Station Effluent: Collection Box (8433) . . . . 80 cpm l Water Discharge: Cooling Tower (8432) . . . . 100 cpm 1 l Misc Liquid Waste Disch (1878A) (1878B) l

                    . . . . . . . . . . .                             20,000 cpm                       15,000 cpm Clean Liquid Waste Xfer Pumps                                        (1770A)                       .(1770B)
                    . . . .- . . . . . . .                               250 cpm                           300 cpm CCW Return 1-1                                                         (1412)                          (1413)     !
                    . . . . . . . . . . .                              1,000 cpm                           700 cpm AREA RADIATION (All readings in mR/hr)

Maint WK Area (8400) 3 Pent Pa 314 (8421) 1 Samp sys Area (8401) 1 Hot Inst Shop (8422) 0 . i-CS/DS Pump Rm- (8402) 3 , Hot Lab (8423) 0 i CS/DS Pump Rm (8403) 15 Personnel Lock (8424) 0.1 DH Cooler Rm (8404) 3 Equip Hatch (8425) 0.2 I DH Cooler Rm (8405) 3 Corridor 411 (8428) 0.1

         -Misc Wst Evan (8406)                           0.7                           Corridor 411     (8429)       0.2 L          Valve ACC Rm               (8407)              0.2                           CTRL Rm          (8430)       0.1 Det Wst Orn Tk (8408)                             2                          CTRL Cab Rm * (8431)          0.2 Pent Rm 208                (8409)                 3                          Cond Demin 1/2 (8435)         0.1 Corridor 209               (8410)              0.4                           Cond Demin 3/4 (8436)         0.3 Corridor 209               (8411)              0.4                           Con Dem Hld Tk (8437)         0.1 Valv Rm 212                (8412)                  1                         Bkwsh Rec Tk Rm(8438)           0 Pump Rm 224                (8413)                15                          Fuel Hand Area (8417)           O Corridor 227               (8414)                  0                         Fuel Hand Area (8418)           1 Corridor 227               (8415)                  1                         Drum Area Rm     (8419)        10 Pent Rm 236                (8416)                15                          SFP Area South (8426)           0 L          Pent Rm 303                (8420)                  O                         SFP Area East (8427)            0 L_ ___ _

EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 0815 RADIATION MONITOR DATA CONTAINMENT Failed Fuel Detector (1998) . . . . . . . . . . . 200,000 cpm CTMT (Wide Range) (2387) (2389)

       . . . . . . . . . .                                      30 mR/hr                 30 mR/hr CTMT (SFAS)

(2004) . . . . . . . . . . . . . . . . . . 20 mR/hr (2005) . . . . . . . . . . . . . . . . . . 20 mR/hr-(2006) . . , . . . . . . . . . . . . . . . . 20 mR/hr (2007) . . . . . . . . . . . . . . . . . . 20 mR/hr CTMT Atmos (Normal Range) (4597AA East) (4597BA West) Ch 1 (G) . . . . . 6.71E-04 uC1/cc 6.71E-04 uC1/cc Ch 2 (P) . . . . . 9.92E-10 uC1/cc 9.92E-10 uCi/cc Ch 3 (I) . . . . . 1.49E-09 uC1/cc 1.49E-09 uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . 1E-3 uCi/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uCi/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Dome (High Range) (4596A) (4596B)

       . . . . . . . . . .                                     1.8 R/hr                 1.8 R/hr GASEOUS EFFLUENT' Station Vent (Normal Range)                                       (4598AA)               (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uCi/cc 1.42E-10 uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A-(P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

       . . . . . . . . . .                                      15 cpm                   10 cpm Condenser SJAE                                                      (1003A)               (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

       . . . . . . . . . .                                    400 cpm                   100 cpm

3 1

                                                                                                                           )

EMERGENCY PLAN DRILLSCENARIO NO: 1989 EXER - ANp EXERCISE PROGRAM TIME: 0815 RADIATION MONITOR JATA l 1 Radwaste Area Exhaust (5405) Ch A-(P) . . . .. . . . . . . . . .. . . . 2,000 cpm 4 Ch B.(I) ... . .. . . . . . .. . . . . . 800 cpm i Ch C (G) . . . . . . . . . . . . . . . . . . 150 cpm I 1 Fuel Handling Area Exhaust (8446) - (8447)

             . . . . . . . . . ..                              0.2 mR/hr                             0.2 mR/hr Fuel Handling Area Exhaust                                                                            (5403)

Ch A-(P) . . . . . . . . . . . . . . . . . . . . . 2,000 cpm Ch B (I) . . . . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . . . . 30' cpm , 1 Control Rm EVS (5327) (5328) ] Ch A (P) . . . . . . 30 cpm .35 cpm . Ch B (I) . . . . .. O cpm 10 cpm i Ch C (G) . . . . . . 15 cpm 30 cpm I i LIOUID EFFLUENT I Station Inlet: Traveling Screens (8434) . . . . 60 cpm Station Effluent: Collection Box .(8433) . . . . 80 cpm Water Discharge: Cooling Tower (8432) . . . . 100 cpm Misc Liquid Waste Disch (1878A) (1878B)

             . . . . . . . . . . .                        20,000 cpm                             15,000 cpm Clean Liquid Waste Xfer Pumps                                   (1770A)                             (1770B)
             . . . . . . . . . . .                             250 cpm                               300 cpm              j CCW Return 1-1                                                    (1412)                             (1413)
             . . . . . . . . . . .                          1,000 cpm                                700 cpm               4 AREA RADIATION (All readings in mR/hr)                                                                                i Maint WK Area (8400)                         3                             Pent Rm 314      (8421)          1 Samo sys Area (8401)                         1                            Hot Inst Shop     (8422)          O CS/DS Pump Rm (8402)                         3                            Hot Lab          (8423)           0 CS/DS Pump Rm (8403)                       15                              Personnel Lock (8424)         0.1 DH Cooler Rm             (8404)              3                             Equip Hatch     (8425)        0.2 DH Cooler Rm             (8405)              3                            Corridor 411     (8428)        0.1         .

Misc Wst Evan (8406) 0.7 Corridor 411 (8429) 0.2 i Valve ACC Rm (8407) 0.2 CTRL Rm (8430) 0.1 Det Wst Orn Tk (8408) 2 CTRL Cab Rm (8431) 0.2 l Pent Rm 208 (8409) 3 Cond Demin 1/2 (8435) 0.1 Corridor 209 (8410) 0.4 Cond Demin 3/4 (8436) 0.3 Corridor 209 (8411) 0.4 Con Dem Hld Tk (8437) 0.1 Valv Rm 212 - (8412) 1 Bkwsh Rec Tk Rm(8438) 0 Pump Rm 224 (8413) 15 Fuel Hand Area (8417) 'O Corridor 227 (8414) 0 Fuel Hand Area (8418) 1

     -Corridor 227             (8415)              1                             Drum Area Rm ,(8419)           10 Pent Rm 236              (8416)            15                              SFP Area South (8426)            O Pent Rm 303              (8420)              0                            SFP Area East (8427)              0 w_ _ _ _ __-                  _           _

f' j EMERGENCY PLAN DRTLL SCENARIO NO: 1989 EXER-AND EXERCISE PROGRAM TIME: 0830 1 RADIATION MONITOR DATA j i'

                                                                                                                                                     ]

CONTAINMENT Failed Fuel Detector.(1998) . . . . . . . . . . . 200,000 cpm ) CTMT (Wide Range) (2387) (2389)

                         . . .: .. . . . . .                                       30 mR/hr                30 mR/hr CTMT (SFAS)-

(2004) . . . . . . . . . . . . . . . . . . 20 mR/hr 3 (2005)< . . . . . . . . . . . . . . . . . . 20 mR/hr c (2006). . . . . . . . . . . . . . . . . . 20 mR/hr

                        .(2007)           .. . . . . . . . . . . . . . . . .                               20 mR/hr-
                 .CTMT' Atmos (Normal Range)                               (4597AA East)               (4597BA West)

Ch 1 (G) . . . . . 6.71E-04 uCi/cc 6.71E-04 uC1/cc Ch 2 (P). . . . . . 9.92E-10 uCi/cc 9.92E-10 uC1/cc Ch 3 (I) . . . . . 1.49E-09 uC1/cc~ 1.49E-09 uCi/cc CTMT Atmos (Accident Range) (4597AB East) .(4597BB West) Ch 1 (G) MID- . . . 1E-3 uC1/cc IE-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc

                       .Ch 3,4,5 (P/I)                      . .                      O mR/hr                0 mR/hr CTMT Dome (High Range)                                               (4596A)               (4596B)
                         . . . .. . . . . .                                     1.8 R/hr                  1.8 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                        (4598AA)               (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uC1/cc 1.42E-10 uC1/cc {. Ch 3 (I) . ... . . . 4.16E-10 uCi/cc 4.16E-10 uC1/cc 1 l Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc

                       -Ch 3,4,5 (P/I)                      . .                     O mR/hr                 0 mR/hr CTMT Purge (5052)

Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . 70 cpm Main Steam.Line (609 #1) (600 #2)

                         . . . . . . . . . .                                      15 cpm                   10 cpm h                  Condenser SJAE                                                       (1003A)                (1003B) i                        Ch A- . . . . . . .                                       60 cpm                   30 cpm Waste Gas Discharge                                                  (1822A)                (1822B)
                         . . . . . . . . . .                                    400 cpm                   100 cpm I

ERJLGENCX_2LAN_DEILLSCENARIO NO: 1989 EXER AND= EXERCISE PROGRAM TIME: 0830 RADIATION MONITOR DATA Radwaste Area Exhaust- (5405) Ch A.(P) . . . . . . . . . . . . . . . . . . . 2,000 cpm Ch B - (I) . ._. . . . . . . . . . . . . . . . . . . 800 cpm Ch C-(G) . . .. . . . . '... . . .. . . . . . 150 cpm Fuel Handling Area Exhaust (8446) . (8447)

                                  . . . . . . . . . . .                        0.2 mR/hr                            0.2 mR/hr'
    . Fuel Handling Area Exhaust                                                                                        (5403)

Ch A (P) . .. . . . . . . . . . . . . . . . . . . 2,000 cpm Ch.B'(I) . . . . . . . . . . . . . . . . . . . . . 20 cpm-Ch C (G) . . . . . . . . . . . . . . . . . . . . . 30 cpm 1

                                                                                                            ~

Control Rm EVS (5327) '(5328)- Ch.A (P). .. . . . . 30 cpm 35 cpm Ch-B (I) . . . . . . O cpm 10 cpm

                                 'Ch C (G)           . . . . . .                 15 cpm                              30 cpm-LIOUID EFFLUENT Station Inlet: Traveling Screens                                                (8434)    . . . .               60 cpm Station Effluent:                                                              (8433)    . . . .               80 cpm Water Discharge: . Collection                                        Box Cooling Tower         (8432)    . . . .              100 cpm J-Misc-Liquid Waste Disch                                                        (1878A)                           (1878B)
                                  . . . . . . . . . . .                    20,000 cpm                         15,000 cpm
                                                                                                                                  .i Clean Liquid Waste Xfer' Pumps                                                (1770A)                           (1770B)
                                  . . . . .. . . . . .                         250 cpm                              300 cpm        {i CCW Return 1-1                                                                 (1412)                             (1413)
                                  . . . . . . . . . . .                      1,000 cpm                              700 cpm
    ' AREA RADIATION (All readings in mR/hr)
     .Maint WK Area (8400)                                           3                        Pent Rm 314      (8421)           1  1 Samp sys Area (8401)                                           1                       Hot Inst Shop (8422)              O CS/DS Pump Rm (8402)                                           3                       Hot Lab           (8423)          O CS/DS Pump Rm -(8403)                                         15                        Personnel Lock (8424)          0.1   ,

DH Cooler Rm (8404) 3 Equip Hatch (8425) 0.2 i DH Cooler Rm (8405) 3 Corridor 411 (8428) 0.1

     ~Hisc Wst Evan (8406)                                         0.7                        Corridor 411     (8429)        0.2 Valve ACC Rm                               (8407)            0.2                        CTRL Rm          (8430)        0.1 Det Wst Orn Tk (8408)                                          2                        CTRL Cab Rm      (8431)       0.2    j Pent Rm 208                               (8409)              3                        Cond Demin 1/2 (8435)          0.1 Corridor 209                              (8410)            0.4                        Cond Demin 3/4 (8436)          0.3 Corridor 209                              (8411)            0.4                        Con Dem Hld Tk (8437)          0.1 Valv Rm 212                               (8412)              1                        Bkwsh Rec Tk Rm(8438)            0    i Pump Rm 224                               (8413)             15                        Fuel Hand Area (8417)            0

, Corridor 227 (8414) 0 Fuel Hand Area (8418) 1 Corridor 227 (8415) 1 Drum Area Rm (8419) 10 Pent Rm 236 (8416) 15 SFP Area South (8426) O Pent Rm 303 (B420) 0 SFP Area East (8427) 0 l _ _ _ - _ - _ _ _ - _ _ . 1

n .-

g p EMERGENCY PLAN DRILL , SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 0845 RADIATION MONITOR DATA CON'1 AINMENT

       . Failed Fue1 0etector (1998)                            . . .. . . . . . . . .. 200,000 cpm L        CTMT (Wide Range)                                                  (2387)                    (2389)
                . . . . . .... . .                                   30 mR/hr                    30 mR/hr.
       .CTMT (SFAS)-

(2004): . . . . . . . . . . . . . . . . . . 20'mR/hr-(2005) .. . . . .- . . . . . . . . . . . . 20,mR/hr

               .(2006)           . . . . . . . . . .. . . . . . . . .                            20 mR/hr (2007).          . . . . . . . . . . . . . . . . . .                             20 mR/hr CTMT Atmos (Normal Range)                             (4597AA East)                  (4597BA West)

Ch 1 (G) . . ..- . . 6~.71E-04 uC1/cc 6.71E-04 uC1/cc *

              'Ch 2 (P)-             . . .. .             9.92E-10 uC1/cc                9.92E-10 uci/cc Ch 3 (I)             . . . . .            1.49E-09 uC1/cc                1.49E-09 uC1/cc CTMT Atmos'(Accident Range) (4597AB East)                                            (4597BB West)

Ch.1 (G) MID . . . 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5'(P/I) . . O mR/hr 0 mR/hr CTMT Dome (High Range) . (4596A) (4596B)

                . . . . . . . . . .                                 1.8 R/hr                    1.8 R/hr GASEOUS EFFLUENT                                                                   .

Station' Vent (Normal Rangel (4598AA) (4598BA) Ch 1(G) . . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uC1/cc 1.42E-10 uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1E-3 uCi/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc. 0.uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main' Steam Line (609 #1) (600 #2)

                . . .. . . . . . .                                   15 cpm                      10 cpm Condenser SJAE                                                   (1003A)                   (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

                 . . . . . . . . . .                                400 cpm                     100 cpm

E  % I 'l ft

                 -EMERGENCY PLAN DRILLSCENARIO NO:                                                                                    1989-EXER AND EXERCISE PROGRAM                                                                                                                                TIME:         0845 RADIATION MONITOR DATA
                    - Radwaste" Area = Exhaust-                                                                                                                                     (5405)

Ch-A (P) . . . . . . . . . . > . ' . . . . . .. .. . . 2,000 cpm

Ch B~(I)' . . . .. . . .. . . . . . . . . . 800 cpm. '

Ch:C (G) ... . . .. . . . . . . . . . . .

                                                                                                                                                                              ~150' cpm-Fuel-Handling Area-Exhaust'                                                                                        (8446)                                  (8447)       "q
                                                                         .. . . . . .. ...                                          0.2 mR/hr                                  0.2 mR/hr
                  < Fuel Handling. Area' Exhaust                                                                                                                         .

(5403) Ch A (PJ :. . . . . . . . . . . . . . . . . . . . . . . . 2,000 cpm ._ 1

                    - Ch B.(I)a.'. .. . . . . . . . . . . . . - . . . . . .                                                                                                     20. cpm
                    ' Ch C (G)                                                   , .. . .... . . . . . . . . . . . . . . . .                                                    30 cpm Control Rm EVS'                                                                                                 .- ( 5 3 27 )                              (5328).      o Ch A-(P)                    . . . . .. .                      30 cpm                                     35 cpm
Ch B r (I).- .. . . . .

O cpm 10_ cpm Ch C.(G) . . . . - . . . 15 cpm. 30 cpm LIOUID EFFLUENT Station. Inlet: Traveling Screens (8434) . _ . . . . 60 cpm Station Effluent: Collection Box (8433) . .. . 80 cpm Water' Discharge: . Cooling Tower (8432) . . . . 100 cpm Misc _ Liquid Waste Disch (1878A)' (1878B)

                                                                          . . . . . . . . . . . .                              20,000 cpm                                15,000 cpm-
                    . Clean Liquid Waste Xfer Pumps                                                                                        (1770A)                                (1770B)
                                                                          . . . . . . . . . . .                                     250 cpm                                    300 cpm CCW' Return 1                                                                                                    (1412)                             _ (1413)         i
                                                                          .:-. . . .. . . . . .                                  1,000 cpm                                    700 cpm              '

i AREA RADIATION (All readings in mR/hr) , Maint WK Area (8400) 3 Pent Rm 314 (8421) 1 I Samp sys Area (8401) 1 Hot Inst Shop (8422) 0 l CS/DS Pump Rm (8402) 3 Hot Lab (8423) 0 H CS/DS Pump Rm (8403)- 15 Personnel Lock (8424) 0.1 DH Cooler Rm- (8404) 3 Equip Hatch (8425) 0.2

                       ' DH Cooler Rm                                                     (8405)-                    3                                 Corridor 411        (8428)       . 0.1        -

Misc.Wst Evan '(8406)- 0.7 Corridor 411 (8429) 0.2 i L Valve ACC Rm' (8407) 0.2 CTRL Rm (8430) 0.1 l Det Wst Drn Tk (8408) 2 CTRL Cab Rm (8431) 0.2 i L Pent Rm 208 . (8409) 3 Cond Demin 1/2 (8435) 0.1 Corridor 209 (8410) 0.4 Cond Demin 3/4 (8436) .0.3 Corridor 209 (8411) 0.4 Con Dem Hld Tk (8437) 0.1 j Valv Rm 212 (8412) 1 8kwsh Rec Tk Rm(8438) 0

                         . Pump Rm 224                                                   . (8413)                   15                                 Fuel Hand Area (8417)                0        I Corridor 227                                                (8414)                    0                                 Fuel Hand Area (8418)                1        ;

Corridor 227 (8415) 1 Drum Area Rm -(8419) 10 1 Pent Rm 236 (8416) 15 SFP Area South (8426) 0  ! Pent Rm 303 (8420) 0 SFP Area East (8427) 0 j

 -ma-._.            _ . - - - - . _ _ _ . _ _ _ _ . . - - - - - - - - - - - -                - - -            --                                                     -

1;.. .s. 6 F > EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIMER 0900 RADIATION MONITOR DATA L CONTAINMENT Failed Fuel Detector-(1998)- . . . - . . ... .. . . 200,000 cpm. lCTMT.(Wide Range) (2387) . (2389)' .j

                                   . ... . . . . .- ..                                            ~30 mR/hr                                                              30 mR/hr CTMT.(SFAS)?

(2004). .- . . . . . . .. . . . . . . . . . . 20 mR/hr (2005) . . ... . . . . . . . . . .. .. 20 mR/hr

                                  .(2006)        . . . .. . . . . . .. . .. . . . . . .                                                                                  20 mR/hr L.                                  (2007)        . . . . . .. . . . . . . . .                                                        .- , .                              20 mR/hr y

CTMT. Atmos (Normal Range). (4597AA East) (4597BA' West)~ Ch 1 (G) .. . . .: 6.71E-04 uCi/cc. 6.71E-04:uC1/cc Ch.2-(P) . . .. . 9.92E-10 uC1/cc 9.92E-10'uC1/cc Ch 3 (I) . . .. .- l'49E-09 uC1/cc

                                                                                .                                                                            1.49E-09.uC1/cc CTMT: Atmos-(Accident Range) (4597AB East)                                                                                          (4597BB West)

Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uC1/cc-Ch 2-(G) HI- .

                                                               .     .                               O uC1/cc                                                             0'uC1/cc' Ch 3,4,5.-(P/I)               . ..                                O mR/hr                                                              0 mR/hr CTMT Dome .(High Range)                                                    (4596A).                                                           (4596B)
                                   . . . - . . . . . . .                                          1.8 R/hr                                                             1.8 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                              (4598AA)                                                         ..  (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc- 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uC1/cc 1.42E-10 uC1/cc

                    -              Ch 3(I)        . . . . . .             4.16E-10.uC1/cc                                                         .          4.16E-10 uC1/cc Station Vent (Accident' Range)                                           (4598AB)                                                             (4598BB)
                                 'Ch 1.(G) MID               . . .                              1E-3 uC1/cc                                                   -

1E-3 uCi/cc Ch 2:(G) HI . . . O uC1/cc 0'uC1/cc-Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge ~(5052) lCh A~(P) ..

                                                         . . . . . . . . . . . . . . , . .                                                                             100 cpm Ch B'(I) .           . . . . . . . . . . . . . .. . . .                                                                               20 cpm.

Ch'C (G) . . . . - . . . . . . . . . . . . . . 70 cpm

                        ' Main Steam Line                                                             (609 #1)                                                            (600 #2)
                                    . . . . - . . . . . . .                                         15 cpm                                                               10-cpm Condenser SJAE                                                           .(1003A)                                                               (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

                                    . . . . . . . . . .                                           400 cpm                                                               100 cpm
                                                                                                                                                                - _-          -_    __-_____a
                                                                                                                                                                                                 )

EMERCENCY PLAN DRILLSCENARIO NO: 1989 EXER AND EXERCISE PROGRAM' TIME: 0900

g. RADIATION MONITOR DATA Radwaste Area-Exhaust  :(5405)

Ch A (F) . . . . . . . . . . . .. . . . . . 2,000 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 800 cpm

                      .Ch C (G)            , . . . . . . . . . . . . . . . . .                                150 cpm Fuel Handling Area Exhaust                                         (8446)                            (8447)
                        . . . . . . . . . . .-                                0.2 mR/hr                       0.2 mR/hr Fuel' Handling Area Exhaust                                                                         -(5403)

Ch A (P) . . . . .. . . . . . . . . . . . . . . . 2,000 cpm Ch B (I) . . . .. . . . .. . . . . . . . . . . . 20 cpm Ch C'(G) . . . .. . . . . . . . . . . . . . . . . . 30 cpm Control Rm EVS (5327) (5328) - Ch A.(P) . . . . . . 30 cpm 35 cpm Ch B.(I) . . . . . . O cpm 10 cpm Ch C (G) . . . . . . 15 cpm 30 cpm LIOUID EFFLUENT Station' Inlet: Traveling Screens (8434) . . . . 60 cpm Station Effluent: Collection Box (8433) . . . . 80 cpm Water: Discharge: Cooling Tower (8432) . . . . 100 cpm. , Misc Liquid Waste Disch (1878A) (1878B)

                        . . . . .. . . . . .                            20,000 cpm                        15,000 cpm Clean I Aquid Waste Xfer Pumps                                     (1770A)                         (1770B)
                        . . . . . . . . . . .                                 250 cpm'                  -

300 cpm CCW Return 1-1 (1412) (1413)

                        . . . . .         '.- .    . . . .                1,000 cpm                           700 cpm           -

AREA RADIATION (All readings in mR/hr) Maint WK Area (8400) 3 Pent Rm 314 (8421) 1 I

               'Samo sys Area (8401)                          1                           Hot Inst Shop (8422)             0    i CS/DS Pump Rm. (8402)                        3                           Hot Lab          (8423)          0 CS/DS Pump Rm (8403)                        15                           Personnel Lock (8424)          0.1      i DH Cooler Rm          (8404)                 3                           Equip Hatch      (8425)        0.2    1 DH Cooler Rm          (8405)                 3                           Corridor 411     (8428)        0.1      ;

Misc Wst Evap (8406) 0.7 Corridor 411 (8429) 0.2  ; I Valve ACC Rm (8407) 75- CTRL Rm (8430) 0.1 i Det Wst Drn Tk (8408) .2 CTRL Cab Rm (8431) 0.2 , Pent Rm 208 (8409) 3 Cond Demin 1/2 (8435) 0.1 l' Corridor 209 (8410) 0.4 Cond Demin 3/4 (8436) 0.3 Corridor 209 (8411) 0.4 Con Dem Hld Tk (8437) 0.1

               .Valv Rm 212            (8412)                 1                           Bkwsh Rec Tk Rm(8438)            0
                . Pump Rm 224          (8413)                15 fuel Hand Area (8417)            0 Corridor 227          (8414)                 0                           Fuel Hand Area (8418)            1
               ' Corridor 227          (8415)                  1                          Drum Area Rm     (8419)         10 Pent Rm 236           (8416)                15                           SFP Area South (8426)            0 Pent Rm 303           (8420)                 0                           SFP Area East (8427)             0 I.

__w-.. _

EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 0915 RADIATION MONITOR DATA . CONTAINMENT Failed Fuel Detector (1998) . . . . . . . . . . .. 200,000 cpm CTMT (Wide Range) (2387) (2389)

                                    . . . . . . . . . .                                  30 mR/hr                30 mR/hr            l CTMT (SFAS)

(2004) . . . . . . . . . . . . . . . . . . 20 mR/hr (2005) . . . . . . . . . . . . . . . . . . 20 mR/hr (2006) . . . . . . . . . . . . . . . . . . 20 mR/hr (2007) . . . . . . . . . . . . . . . . . . 20 mR/hr CTMT Atmos (Nonnal Range) (4597AA East) (4597BA West) . Ch 1 (G) . . . . . 6.71E-04 uCi/cc 6.71E-04 uC1/cc Ch 2 (P) . . . . . 9.92E-10 uC1/cc 9.92E-10 uCi/cc Ch 3 (I) . . . . . 1.49E-09 uC1/cc 1.49E-09 uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Dome (High Range) (4596A) (4596B)

                                    . . . . . . . . . .                                1.8 R/hr                 1.8 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                           (4598AA)               (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch.2(P) . . . . . . 1.42E-10 uC1/cc 1.42E-10 uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID , . . 1E-3 uC1/cc 1E-3 uCi/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                                     . . . . . . . . . .                                 15 cpm                  10 cpm Condenser SJAE                                                         (1003A)                (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

                                     . . . . . . . . . .                               400 cpm                  100 cpm

EMERGENCY PLAN DRILLSCENARIO NO: 1989 2XER AND EXERCISE PROGRAM TIME: 0915 l RADIATION MONITOR DATA l Radwaste Area Exhaust (5405) . Ch A (P) . . . . .. . . . . . . . . . . . . 2,000-cpm Ch B (I) . . . . . . . . . . . . . . . . . . 800 cpm Ch C (G) . .. . . . . . . . . . . . . . . . . 150 cpm Fuel Handling Area Exhaust (8446) , (8447)

                           . . . . . . . . . . . .                            0.2 mR/hr                           0.2 mR/hr Fuel Handling' Area Exhaust                                                                               (5403)-

Ch A (P) . . .. .. . . . . . . . . . . . . . . . 2,000 cpm

l. Ch B (I)'. . . . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . . . . 30 cpm Control.Rm EVS (5327) (5328) .

Ch A (P'i . . . . . . 30 cpm 35 cpq

                          .Ch B.(I)           . . . . . .                         O cpm                            10 cpm Ch C (G)           . . . . . .                        15 cpm                            30 cpm LIOUID EFFLUENT
            . Station Inlet:                    Traveling Screens-                   (8434)   . . . .              60 cpm i             Station Effluent: Collection Box                                        (8433)   . . . .              80 cpm

!' Water Discharge:- Cooling Tower (8432) . . . . 100 cpm Misc Liquid Waste Disch (1878A) (1878B) l

                           . .. . . . . . . . . .                        20,000 cpm                         15,000 cpm Clean Liquid Waste Xfer Pumps                                         (1770A)                          (1770B)
                           . . . . . . . . . . .                              250 cpm                             300 cpm CCW Return 1-1                                                          (1412)                           (1413)
                           . . . . . . . . . . .                           1,000 cpm                              700 cpm AREA RADIATION (All readings in mR/hr)                                                                                      ,

Maint WK Area (8400) 3 Pent Rm 314 (8421) 1 l Samp sys Area (8401) 1 Hot. Inst Shop (8422) O CS/DS Pump Rm (8402) 3 Hot Lab - (8423) 0 1 CS/DS Pump Rm (8403) 15 Personnel Lock (8424) 0.1

            .DH Cooler Rm                 (8404)                3                           Equip Hatch      (8425)       0.2 DH Cooler Rm                 (8405)                3                           Corridor 411     (8428)       0.1 Misc Wst Evap (8406)                            0.7                            Corridor 411     (8429)       0.2              j u             Valve ACC Rm                 (8407)               75                           CTRL Rm          (8430)       0.1             1 L

Det Wst Orn Tk (8408) 2 CTRL Cab Rm (8431) 0.2 1 l Pent Rm 208 (8409) 3 Cond Demin 1/2 (8435) 0.1 Corridor 209 (8410) 0.4 Cond Demin 3/4 (8436) 0.3 Corridor 209 (8411) 0.4 Con Dem Hld Tk (8437) 0.1 Vaiv Rm 212- (8412) 1 Bkwsh Rec Tk Rm(8438) 0 Pump Rm 224 (8413) 15 fuel Hand Area (8417) 0 Corridor 227 (8414) 0 Fuel Hand Area (8418) 1 L. Corridor 227 (8415) 1 Orum Area Rm (8419) 10 Pent Rm 236 (8416) 15 SFP Area South (8426) O Pent Rm 303 (8420) 0 SFP Area East (8427) 0 1 l l L_ _ _ _ _ - - _.

7-  ;

l. i

[ t l [ _ EMERGENCY' PLAN DRTLL" SCENARIO NO: 1989 EXER j AND EXERCISE PAOGRAM. TIME: 0930 g RADIATION MONITOR DATA l CONTAINMENT Failed Fuel Detector (1998) . . . .. . . . . . . . 200,000 cpm i CTMT (Wide Range) (2387) .(2389)

                  . . . . . . . . . . . .                             30 mR/hr            .

30 mR/hr CTMT-(SFAS)- (2004) . . . . . . . . . . . . . . . . . . 20 mR/hr (2005) . . . . . . . . . . . . . . . .. . . 20 mR/hr 1 (2006) .. . . . . . . . .. . . . . . . . 20 mR/hr (2007) . . . . . . . . . . . . . . . . . . . 20 mR/hr CTMT Atmos (Normal Range) (4597AA East) (4597BA West) Ch 1 (G) . . . . . 6.71E-04 uCi/cc 6.71E-04 uCi/cc ~

  ,               Ch:2 (P)            . . . . .            9.92E-10 uC1/cc              9.92E-10 uC1/cc Ch 3-(I)            . . . . .            1.49E-09 uC1/cc              1.49E-09 uCi/cc CTMT Atmos (Accident Range) (4597AB East)                                       (4597BB West)

Ch 1 (G) MID . . .- 1E-3 uCi/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uCi/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Dome (High Range) (4596A) (4596B)

                  . . . . . . . . . .                               1.8 R/hr                        1.8 R/hr GASEOUS EEFLUENT Station Vent (Normal Range)                                  (4598AA)                                  (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uci/cc 1.42E-10 uCi/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uC1/cc Station Vent (Accident Range) (4598AB) (459BBB) Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uCi/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm C h .B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                  . . . . . . . .                     .               15 cpm                              10 cpm Condenser SJAE                                                 (1003A)                                      (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) * (1822B)

                  . . . . . . . . . .                               400 cpm                         100 cpm
                'EMERCL'_(CY PLAN DRILLSCENARIO NO:                                 1989 EXER AND EXERCISE PROGRAM                                         s                                                                         TIME:     0930 RADIATION MONITOR DATA Radwaste Area Exhaust                                                                                                                        (5405)

Ch A (P) . . . . . .. . . . . . . . . . . . 2,000 cpm Ch B (I) . . ..... . . . . . . . . . . . 800 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 150 cpm Fuel Handling Area Exhaust (8446) (8447)

                         . . .. . . . . . . .                                     0.2 mR/hr                                                               0.2 mR/hr Fuel Handling Area Exhaust                                                                                                                   (5403)

Ch A (P) . . . . . . . . .. . . . . . . . . . . . 2,000 cpm Ch B (I) . . . . . . . . . . . . , , . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . . . . 30 cpm Control Rm EVS (5327) (5328) Ch A (P) . . . . . . 30 cpm '35 cpm' , Ch B (I) . . .. . . O epm 10 cpm l Ch C (G) . . . . . . 15 cpm 30 cpm l [ LIOUID EFFLUENT Station Inlet: Traveling Screens (8434) . . . . 60 cpm i Station Effluent: Collection Box (8433) . . . . 80 cpm l Water Discharge: Cooling Tower (8432) . . . . 100 cpm Misc Ljquid Waste Disch (1878A) (1878B)

                         . . . . . . . .. . .                              20,000 cpm                                                          15,000 cpm
                 ' Clean Liquid Waste Xfer Pumps                                      (1770A)                                                               (1770B)

, . . . . . . . ... . 250 cpm 300 cpm CCW Return 1-1 (1412) (1413) j . . . . . . . .... 1,000 cpm 700 cpm I. AREA RADIATION (All readings in mR/hr) Maint WK Area (8400) 3 Pent Rm 314 (8421) 1 l- Samp sys Area (8401) 1 Hot Inst Shop (8422) 0 l CS/DS Pump Rm (8402) 3 Hot Lab (8423) 0 ' CS/DS Pump Rm (8403) 15 Personnel Lock (8424) 0.1 DH Cooler Rm (8404) 3 Equip Hatch (8425) 0.2 DH Cooler Rm (8405) 3 Corridor 411 (8428) 0.1 l Misc Wst Evan (8406) 0.7 Corridor 411 (8429) 0.2 Valve ACC Rm (8407) 75 CTRL Rm (8430) 0.1 l Det Wst Drn Tk (8408) 2 CTRL Cab Rm (8431) 0.2 i Pent Rm 208 (8409) 3 Cond Demin 1/2 (8435) 0.1 l Corridor 209 (8410) 0.4 Cond Demin 3/4 (8436) 0.3 Corridor 209 (8411) 0.4 Con Dem Hld Tk (8437) 0.1 Valv Rm 212 (8412) 1 Bkwsh Rec Tk Rm(8432) 0 Pump Rm 224 (8413) 15 Fuel Hand Area (8417) O Ccrridor 227 (8414) 0 Fuel Hand Area (8418) 1 Corridor 227 (8415) 1 Drum Area Rm (8419) 10 Pent Rm 236 (8416) 15 SFP Area South (8426) O Pent Rm 303 (8420) 0 SFP Area East (8427) 0 L__ _ _ - - - - - _ _ . - - - . - _ _ _ - - - _------- _ _ _ _

EMERGENCY PLAN DRT7_1 SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 0945' . RADIATION MONITOR DATA d CONTAINMENT Failed Fuel Detector-(1998) . . . . . . . . . . . 200,000 cpm CTMT (Wide Range) . (2387) (2389)

                . . . . . . .. . .                                  30 mR/hr                30 mR/hr CTMT (SFAS)

(2004) . . .. . . . . . . . . . . . . . . 20 mR/hr (2005) . . . . . . . . . . . . . . . . . . 20 mR/hr (2006) . . . . . . . . . . . . . .. . . . 20 mR/hr (2007) . . . . . . , . . . . . . . . . . . . . 20 mR/hr CTMT Atmos (Normal Range) (4597AA East) -(4597BA West)

               -Ch 1 (G)            . . . . .            6.71E-04 uC1/cc             6.71E-04 uC1/cc.

Ch 2 (P) . . . . . 9.92E-10 uC1/cc 9.92E-10 uCi/cc Ch 3 (I) . . . . . . 1.49E-09 uC1/cc 1.49E-09 uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID. . . . 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Dome ~(High Range) (4596A) (4596B)

                . . . . . . . . . .                               1.8 R/hr                 1.8 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                  (4598AA)              (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uCi/cc 1.42E-10 uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uCi/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4.5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . .. . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm

        . Main Steam Line                                              (609 #1)              (600 #2)
                . . . . . . . . . .                                 15 cpm                  10 cpm Condenser SJAE                                                 (1003A)              (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

                . . . . . . . . . .                               400 cpm                  100 cpm

k EMERGENCY PLAN DRILLSCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 0945 _ q RADIATION MONITOR DATA ~ 1 ' 1 l Radwaste Area Exhaust (5405) Ch A (P) . . . . . . . . . . . . . . .. . 2,000 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 800 cpm

                                  ' Ch C (G)          . . . . . .. . . . . . . . . . . . .                            150 cpm Fuel Handling Area Exhaust                                    (8446)                            (8447)
                                    . . . . . . - . . . . .                          0.2 mR/hr                        0.2 mR/hr Fuel Handling Area Exhau?t                                                                      (5403)

Ch A (P) . . . . . . .. . .. . . . . . . . . . . . 2,000 cpm Ch B (I) . . . . . . . . . . . . . . . . . . . . . 20 cpm Ch C (C) . . . . . . . . . . . . . . . , . . . . . 30 cpm Control Rm EVS (5327) (5328) Ch A (P) . . . . . . 30 cpm 35 cpm Ch B (I) . . . . . . O cpm 10 cpm Cn C (G) . . . . . . 15 cpm 30 cpm LIOUID EFFLUENT l Station Inlet: Traveling Screens (8434) . . . . 60 cpm

                          ' Station Effluent:                 Collection Box              (8433)   . . ..              80 cpm Water Discharge:                     Cooling Tower             (8432)   . . . .           100 cpm 1

Misc Liquid Waste Disch (1878A) (1878B) i

                                    .. . . . . . . . . .                       20,000 cpm                        15,000 cpm Clean Liquid Waste Xfer Pumps                                 (1770A)                         (1770B)
                                    . . . . .. . . . . .                             250 cpm                         300 cpm
                                                                                                                                    -]

CCW Return 1-1 (1412) (1413) .

                                    . . . . . . . . . . .                        1,000 cpm                           700 cpm          !

AREA RADIATION (All readings in mR/hr)

                          'Maint WK Area (8400)                        3                         Pent Rm 314      (8421)          1 Samp sys Area (8401)                       1                         Hot Inst Shop (8422)             O CS/DS Pump Rm (8402)                       3                         Hot Lab         (8423)           O CS/DS Pump Rm- (8403)                    15                          Personnel Lock (8424)         0.1    j DH Cooler Rn          (8404)               3                         Equip Hatch     (8425)        0.2 DH Cooler Rm          (8405)               3                         Corridor 411    (8428)        0.1 W,sc Wst Evan (8406)                    0.7                          Corridor 411    (8429)        0.2 Valve ACC Pm          (8407)             75                          CTRL Rm         (8430)        0.1
                          .Det Wst Drn Tk-(8408)                       ?                         CTRL Cab Rm     (8431)        0.2 Pent Rm 208           (840?                5                         Cond Demin 1/2 (8435)         0.1      i Corridor 209          (841c             0.4                          Cond Demin 3/4 (8436)         0.3      !
                           . Corridor 209         (8411-            0.4                          Con Dem Hld Tk (8437)         0.1      !

Valv Rm 212 (841D 1 Bkwsh Rec Tk Rm(8438) 0 Pump Rm 224 (8413) 15 Fuel Hand Area (8417) 0 Corridor 227 (8414) 0 Fuel Hand Area (8418) 1 Corridor 227 (8415) 1 Drum Area Rm (8419) 10 Pent Rm 236 (8416) 15 SFP Area South (8426) 0 Pent Rm 303 (8420) O SFP Area East,(8427) 0  :

   - _ _ _ m__                               _

EMERGENCY PLAN. DRILL . SCENARIO'NO: 1989 EXER AND EXERCISE PROGRAM TIME: 1000 RADIATION' MONITOR DATA CONTAINMENT Failed Fuel Detector (1998) .. . . . .. . . . .. 200,000 cpm CTMT (Wide Range) '(2387) (2389)

                      . . . . .. . . . .                                   30 mR/hr                      30 mR/hr CTMT (SFAS).

(2004) . . .. . .. . . . . . . . . . . . . .. 20 mR/hr (2005) . . . . . . . . . . . . . . . . . . 20 mR/hr

                     -(2006)          . . . .. . . . . . . . . . . . . .                                 20 mR/hr (2007)          . . . . . . .          .   . . . . . . . . . . .                   20 mR/hr CTMT Atmos (Normal Range)                        . (4597AA East)                     (4597BA West)

Ch 1.(G) . . . . . 6.71E-04 uC1/cc 6.71E-04 uC1/cc Ch~2 (P) . ... . . 9.92E-10 uC1/cc 9.92E-10 uCi/cc Ch'3 (I) . . . . . 1.49E-09 uC1/cc 1.49E-09 uci/cc CTMT Atmos ~(Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . .- 1E-3 uC1/cc 1E-3 uCi/cc Ch 2-(G)-HI . . . O uC1/cc ~

                                                                                                          ~0 uCi/cc Ch 3,4,5 (P/I)                    . .                   O mR/hr                       0 mR/hr CTMT Dome (High Range)                                          (4596A)                     (4596B)
                      . . . . . . . . . .                                l'.8 R/hr                      1.8 R/hr GASEOUS EFFLUENT =

Station Vent (Normal Range) (4598AA) (4598BA) Ch 1(G) . . . . . . 3.81E-07 uCi/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uCi/cc 1.42E-10 uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uCi/cc l-Station Vent (Accident Range) (4598AB) (4598BB) l Ch 1 (G) MID . . . 1E-3'uC1/cc '1E-3 uCi/cc Ch 2 (G) HI . . . O uCi/cc 0 uCi/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A (.?) . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . .. . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm j Main Steam Line (609 #1) (600 #2)

j. . . . . . . . . . . 15 cpm 10 cpm 1
l. ' Condenser SJAE (1003A) (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B) j' . . .. . . . . . . 400 cpm 100 cpm l

7 l y l; EMERGENCY. PLAN DRILLSCENAAIO NO: 1989 EXER l AND EXERCISE PROGRAM TIME: 1000 p' l RADIATION MONITOR DATA l Radwaste Area Exhaust . (5405) y' Ch A.(P) . . ....... . . . . . . . .. '2,000 cpm L Ch B (I) . . .... . . . . . . . . . . . .. 800. cpm

                        .Ch C (G)'          . . ... . . . . . . .. . . .. ..                                         150 cpm o,

Fnel. Handling. Area Exhaust (8446) '(8447).

                         . . . . . .. . . . . . .                        0.2 mR/hr                                  0.2 mR/hr N       Fuel Handling Area Exhaust                                                                                                                           (5403)

Ch A-(P).. ... . . . . . . .. . . . . . . . . . . . 2,000 cpm Ch B-(I) . . . .. .. . . . . . . . . . . . . . . 20 cpm Ch C (G) .. . . . ... . . . . . . . . . . .. .. 30 cpm Control Rm EVS (5327) (5328) Ch A (P) . . . . . . 30 cpm 35 cpm LCh B (I) . .. . . .. O cpm

  • 10 cpm
                        .Ch C (G)           . .. . . .                     15 cpm                                                30 cpm LIOUID EFFLUENT Station Inlet: Traveling Screens                                          (8434)   .. . .                         .60 cpm Station. Effluent:- Collection Box:                                      (8433)   . . . .                               80 cpm p       Water Discharge:-                            ' Cooling Tower              (8432)   . . . .                   100 cpm; i       Misc Liquid Wasta..Disch                                                 (1878A)                                                       (1878B)-
                         . . . . . _. .... .                        20,000 cpm                          15,000-epm-Clean Liquid-Waste Xfer Pumps                                           (1770A)                                                       (1770B)                   j
                         . . . . . .. . .. ..                            250 cpm                                   300 cpm                                            _{

1 CCW Return 1-1 (1412) (1413) l

                         .... . . . . . ....                          1,000 cpm                                   700 cpm AREA RADIATION (All readings in mR/hr)

Maint WK Area--(8400) 3 Pent Rm 314 (8421) 1

       .Samp sys Area (8401)                                1                           Hot Inst Shop (8422)                                                       O CS/DS Pump Rm (8402)                               3                           Hot Lab          (8423)                                                    0 CS/DS Pump'Rm.'(8403)                             15                           Personnel Lock (8424)                                                   0.1
       ~DH Cooler Rm                    (8404)              3                           Equip Hatch      (8425)                                                 0.2 DH Cooler Rm                   (8405)              3                           Corridor 411     (8428)                                                 0.1 Misc Wst Evap (8406)                            0.7                            Corridor 411     (8429)                                                 0.2  . l Valve ACC Rm                   (8407)             75                           CTRL Rm          (8430)                                                 0.1    "

t

      .Det-Wst Drn Tk (8408)                                2                           CTRL Cab Rm      (8431)                                                 0.2
       -Pent Rm.208                     (8409)              3                           Cond Demin 1/2 (8435)                                                   0.1
       . Corridor 209                   (8410)           0.4                            Cond Demin 3/4 (8436)                                                   0.3     !

Corridor 209 (8411) 0.4 Con Dem Hld Tk (8437) 0.1 i Valv Rm 212 (8412) 1 8kwsh Rec Tk Rm(8438) 0  : , Pump Rm 224 (8413) 15 , Fuel Hand Area (8417) 0 I L Corridor 227 (8414) 0 Fuel Hand Area (8418) 1 l Corridor 227 (8415) 1 Drum Area Rm (8419) 10 l- Pent Rm 236' (8416) 15 SFP Area South (8426) 0  ! l . Pent Rm 303 (8420) 15 SFP Area East (8427) 0 1

. I

\s l

p k . [" : EMERGENCY PLAN DRILt.

                                                                                          ' SCENARIO NO:     1989 EXER

{ AND EXERCISE PROGRAM TIME: 1015 RADIATION MONITOR DATA CONTAINMENT Failed Fuel Detector (1998) . .. . . . . . . . . . 200,000 cpm CTMT (Wide Range) (2387) (2309)

           . .. . . . . . ..                               40 mR/hr                                40 mR/hr CTMT (SPAS) l           (2004)        .: . . . . . . . . . . . . . . . . .                                      30 mR/hr (2005).       .. . . . . . . . . . . . . . . . .                                        30 mR/hr (2006)'       . . . . . . . . . . . . . . . . . .                                       30 mR/hr L           (2007)        . . . . . . . . . . . . . . . .                         ' . .             30 mR/hr-l CTMT Atmos-(Normal Range)                          (4597AA East)                           (4597BA West)

Ch 1 (G) . . . . . 3.00E-03 uC1/cc 3.20E-03 uC1/cc Ch 2 (P) . . . . . 7.60E-08 uC1/cc 7.60E-08 uC1/cc Ch 3 (I) . . . . . 2.70E-07 uci/cc 2.70E-07 uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID- . . . 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) "I . . . O uC1/cc 0 uCi/cc Ch 3,4,5 ;P/I) . . 4 mR/hr 4 mR/hr CTMT Dome (High Range) (4596A) (4596B)

          . . . .... . . . . .                           1.8 R/hr                                1.9 R/hr-GASEOUS EFFLUENT Station. Vent:(Normal Range)                              (4598AA)                    .. .       (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc. Ch 2(P) . . . . . . 1.42E-10 uC1/cc 1.42E-10 uC1/cc Ch 3(I) . . . . .. 4.16E-10 uC1/cc . 4.16E-10 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . ~1E-3 uC1/cc IE-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hi CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm

         'Ch C (G)           .-   . . . . . . . . .                . . . . . . .                  70 cpm Main Steam Line                                          (609 #1)                                (600 #2)
          . .. . . . . . . .                               15 cpm                                 10 cpm Condenser SJAE                                             (1003A)                                (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

          . . . . . . . . . .                            400 cpm                                 100 cpm

EMERGENCY PLAN DRTLTSCENARIO NO: 1989 EXER ANDSXERCISE_PROGEAM TIME: 1015 RADIATION MONITOR LATA Radwaste'Aret Exhaust (5405) Ch A:(P)- . . . . . . . . ... . . . . . . . . 2,000 cpm Ch B (I) . . .. . . . . . . . . . . . . - . . 800. cpm Ch C: (G) . . . . . . . . . . . . . . . . . . 150 cpm Fuci Handling Area Exhaust (8446) (8447).

             . . . . . . . . . . .                          0.2 mR/hr                          0.2 mR/hr-Fuel Handlihg Ares Exhaust                                                                      (5403)

Ch A'(P) . . . . . . . . . . . . . . . . . . . . . 2,000 cpm-Ch B'(I) . . . . . . . . . . . . . . . . . . . . . 20 cpm Ch.C-(G) . .. . . . . . . .- . . . . . . . . . . . . . . 30 cpm Control Rm EVS (5327) (5328) Ch A (P) . . . . . . 30 cpm 35 cpm Ch Bf(I) . . . . . . O cpr. 10 cpm Ch (" (G) . . . . . 15 cpm 30 cpm LIOUID EFFLUENT Station Inlet: Traveling Screens (8434) . . . . 60 cpm Station Effluent: Collection Box (8433) . . . . 80 cpm Water Discharge: Cooling Tower (8432) .. . . 100 cpm Misc Liquid Waste Disch (1878A) (1878B)

             . . . . . . . . .. . .                   .20,000 cpm                          15,000 cpm
    ' Clean Liquid Waste Xfer Pumps                              (1770A)                           (1770B)
             . . . . .. . . . . .                           250 cpm                            300 cpm CCW Return 1-1                                                (1412)                           (1413)
             . . . . . . . . . . .                       1,000 cpm                             700 cpm AREA RADIATION (All readings in mR/hr)

Maint WK Area (8400) 3 bnt Rm 314 (8421) 1 Samp sys Area (8401) 1 Hot Inst Shop (8422) 0.2 CS/DS Pump Rm- (8402) 3 Hot Lab (8423) O CS/DS Pump Rm (8403) 15 Personnel Lock (8424) 0.2 DH Cooler Rm' (8404) 3 Equip Hatch (8425) 0.2 DH Cooler Rm ~(8405) 3 Corridor 411 (8428) 0.1 LMisc Wst Evap (8406) 0.7 Corridor 411 (8429) 0.2 Valve ACC~Rm (8407) 75 CTRL Rm (8430) 0.1 Det Wst Drn Tk-(8408) 2 CTRL Cab Rm (8431) 0.2 Pent Rm 208 (8409) 3 Cond Demin 1/2 (8435) 0.1

    ~ Corridor 209          (8410)             0.4                         Cond Demin 3/4 (8436)         0.3 Corridor 209          (8411)             0.4                         Con Dem Hld Tk (8437)         0.1 Valv M 212            (8412)                1                        8kwsh Rec Tk Rm(8438)            0 i

Pump a 224 (8413) 15 Fuel Hand Area.(8417) 0 Corricor 227 (8414) 0 Fuel Hand Area (8418) 1 l Corridor 227 (8415) 1 Drum Area Rm (8419) 10 Pent-Ra 236 (8416)' 20 SFP Area South (8426) O Pent Rm 303 (8420) 20 SFP Area East (8427) 0 I L

EMERGENCY PLAN DRTtt SCENARIO NO:_._1989 EXER AND EXERCISE PROGRAM TIME: 1030 RADIATION MONITOR DATA- , CONTAINMENT Failed Fuel Detector (1998) . . . . . . . . . . . 200,000 cpm CTMT (Wide Range) (2387) (2389)

           . . . . . . . . . .                                 50 mR/hr                 50 mR/hr CTMT (SFAS)

(2004) . . . . . . .. . . . . . . . . . 40 mR/hr (2005) . . . . . . . . . . . . . . . . . . 40 mR/hr (2006) . . . . . . . . . . . . . . . . . _ . 40 mR/hr (2007) . . . . . . . . . . . . . . . . . . 40 mR/hr

 ~

CTMT Atmos-(Normal Range) (4597AA East) (4597BA West) .

          ~ Ch 1 (G)           . .. . .              6.00E-03 uCi/cc.           6.00E-03 uC1/cc Ch 2 (P)            . . . . .             1.50E-07 uC1/cc            1.50E-07 uC1/cc Ch 3 (I)            . . . . .             5.00E-07 uci/cc            5.00E-07 uci/cc CTMT Atmos.(Accident Range) (4597AB East)                                      (4597BB West)

Ch,1 (G) MID . . . 1E-3 uCi/cc 1E-3 uCi/cc Ch 2 (G) HI . . . O uC1/cc 0 uCi/cc Ch 3,4,5 (P/I) . . 5 mR/hr 5 mR/hr CTMT Dome (High Range) (4596A) (4596B)

           . . . . . .. . . . .                              1.8 R/hr                  1.8 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                 (4598AA)                (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 VC1/cc Ch 2(P) . . . . . . 1.42E-10 uCi/cc 1.42E-10 uCi/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.15E-10 uCi/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G).MID . . . 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr . O mR/hr CTMT Purge (5052) Ch A (P) . . . . . . ............ 100 cpm Ch B (I) . . . . . . ............ 20 cpm Ch C (G) . . . . . . ............ 70 cpm Main Steam Line (609 #1) (600 #2)

           . . . . . . . . . .                                 15 cpm                   10 cpm Condenser SJAE                                               (1003A)                 (10w3B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

           . . . . . . . . . .                               400 cpm                   100 cpm
 +                       ,
                                                 .J f

EMERGENCY PLAN DRILLSCENARIO NO:- 1989 EXEn AND EXERCISE PROGRAM TIME:- 1030 P@IATION MONITOR DATA Radwaste-Area Exhaust (5405) Ch A (P): . .. .. ..... . . . . . . .. . 2,000. cpm .J Ch B (I) .- . . .. . - . . . . . . . . .:. .- . 800 cpm , Ch C (G) . ;..... .

                                                                        . . . ... . . . . .. . .                   .150 cpm Fuel' Handling Area Exhaust                                                 (6446)                                (8447)
                           . -. . . . . . . . . . . .                           0.2 mR/hr                           0.2 mR/hr.            i
                                                                                                                                       -1 Fuel Handling Area Exhaust                                                                                        (5403)

Ch.A: (P)~ .- .. . .. . .. . . .. . . . . . . .- . 2,000 cpm

     ~ Ch B (I)~ .                    .. . .. . . . . . . .. . .: . . . . -.                                          20 cpm
    , Ch C:-(G)..                      . . . ... . . . . . . . . . . . . . .-
                                                          .                                                           30 cpm-Control Rm EVS                                                             -(5327)                                (5328)

Ch A '(P) . ..: . .. 30 cpm -35 cpm-  ! Ch-B: (I) . .. . . . O cpm- 10 cpm '!

                       .Ch'C (G)                    . . . .. . .                 15 cpm                               30 cpm-LIOUID EFFLUENT
     .' Station Inlet: ~ Traveling. Screens

( (8434) . . . . 60 cpm _ l Station Effluent: Collection Bcx (8433) . . . . 80 cpm )

Water-Discharge::
                                                            ' Cooling Tower           (8432) .    .. .    .-       .100 cpm               )
                                                                                                                                        .l
     . Misc Liquid Waste Disch                                                      (18*1::A)                          -(1878B)           !
                           . . . . . . .. . ..                            20,000 c'/m                          15,000 cpm                 j l

Clean Liquid. Waste Xfer Pumps (1770A) -(1770B) 250 cpm {

                           . . .. : . . . .....                                                                     300 cpm               i CCW Return 1                                                             -(1412)                 .           (1413)
                           . . . ... .. .. .                                  1,000 cpm                             700 cpm               ;

AREA RADIATION (All. readings in mR/hr) Maint WK Area (8400) 3 Pent Rm 314 (8421) 1 Samp sys Area (8401) l 1 . Hot Inst Shop (8422) 0.2  :

        ,CS/DS Pump Rm (8402)                                      3                          Hot Lab          (8423)            0 iCS/DS Pump Rm (8403)                                     15                          Personnel Lock (8424)           0.2
DH Cooler 'Rm : (8404) 3- Equip Hatch (8425) 0.2 DH Cooler Rm '

(8405) 3 Corridor 411 (8428)- 0.1

        . Misc Wst'Evan- (8406)'                                 O.7                          Corridor _411    (8429)         0.2 Valve ACC Rm                       (8407)                75                          CTRL Rm           (8430)        0.1 Det Wst Orn Tk (8408)                                    2                          CTRL Cab Rm       (8431)        0.2.        1 Pent Rm'208                       (8409)                 3                          Cond Demin 1/2 (8435)           0.1 Corridor.209                      (8410)               0.4                          Cond Demin 3/4 (8436)           0.3=

L . Corridor ~209 '(8411) 0.4 Con Dem Hid Tk (8437) 0.1 [ . Valv Rm 212' Pump Rm 224' (8412) 1 Bkwsh Rec Tk Rm(8438) 0 (8413) 15 Fuel Hand Area (8417) 0 Corridor - 227 - (8414) 0 Fuel Hand Area (8418) 1 L l' Corridor 227 (8415) 1 Drum Area Rm (8419) 10 Pent Rm 236 (8416) 20 SFP' Area South (8426) 0 Pent.Rm 303 (8420) 20 SFP Area East (8427) 0

EMERGENCY PLAN'DRTEL SCENARIO NO: 1989 EXER r , AND EXERCISE PROGRAM TIME: 1045 RADIATION MONITOR RATA CONTAINMENT Failed Fuel.. Detector (1998) . . . . . . . .. . . . 200,000 cpm CTMT (Wide Range) (2387) (2389)

            . . . . .. . . . . .                            60 mR/hr                                                    60 mR/hr CTMT (SFAS)

(2004) . . . . . ........... . 50 mR/hr

           -(2005)         . . . . . - . ............           .                                                       50 mR/hr (2006)         . . . . . . . . . . . . . . . - . . .                                                        50 mR/hr
           -(2007)         . . . . . ........ . . . . .                                                                 50 mR/hr CTMT Atmos (Normal Range)                         (4597AA East)                 (4597BA West)

Ch 1 (G) . . . . . 2.00E-02 uC1/cc 2.00E-02 uC1/cc - Ch 2 (P) . . . . . '4.50E-07 uci/cc 4.50E-07 uC1/cc Ch 3 (I) .. .. . OSH uC1/cc OSH uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West)

          .. Ch 1 (G)' MID             . . .             1E-3 uC1/cc                                   1E-3 uC1/cc Ch 2 (G) HI                 . . .                 O uCi/cc                                                    0 uCi/cc Ch 3,4,5 (P/I)                  . .               6 mR/hr                                                     6 mR/hr CTMT Dome (High Range)                                    (4596A)                                                   (45963)
            . . . .. .. . . . . .                         1.8 R/hr                                                1.8 R/hr GASEOUS EFFLUENT Stction Vent (Normal Range)                             (4598AA)                                                    (4598BA)

Ch 1(G) . . . . .. . 3.B1E-07 uCi/cc 3.b2E-07 uCi/cc. Ch 2(P) . . - . . . . 1.42E-10 uC1/cc 1.42E-10 uC1/cc Ch 3(I) . . . . - . . . 4.16E-10 uC1/cc 4.16E-10 uci/cc Station Vent (Accident Range) (4598AB) (4598BB)

          -Ch 1 (G) MID                . . .             1E-3 uCi/cc                                 1E-3 uCi/cc Ch 2 (G) HI                . . .                 O uC1/cc                                                    0 uC1/cc Ch 3,4,5 (P/I)                 . .               O mR/hr                                                     0 mR/hr 1

CTMT Purge (5052)

          .Ch A (P)            . . . . ..............                                                            100 cpm Ch B (I)           . . . . ..............                                                                   20 cpm Ch C (G)           . . . . ..............                                                                   70 cpm Main Steam Line                                         (609 #1)                                                    (600 #2)
            . . . . . . . . . .                             15 cpm                .                                     10 cpm Condenser SJAE                                            (1003A)                                                    (1003B)

Ch A . . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

            . . . . . . . . . .                           400 cpm                                               100 cpm i

Hf J l-l f. y .~: L ' C 6 SCENARIO NO:

                                                                                  -1989 EXER AND EXERCISE PROGRAM
                                                                                                                          ~ TIME:                  1045 LM              '

RADIATION MONITOR DATA Radwaste Area' Exhaust. (5405) Ch A-(P) . . - - . . < . . .. . . . . . . .. . . . . ?2,000 cpm

                     .ChiBL(I)              . . . . . . - . . . . . . . . .. . ..                                                     800. cpm.

Ch C (G). . .. .. .

                                              .                        ... .. . . .. .                      .; .-                     150-cpm-l Fuel Handling Area' Exhaust                                                 (8446)                                               (8447)~

,s

                       . . . .        .:. .      .. . - . .                     0.2 mR/hr                                             0.2 mR/hr' Fuel-Handling Area Exhaust                                                                                             .

(5403) i E - Ch!A (P) . . .y.... . . - . ... . . . . . . .- . . .. .- 2,000. cpm.

          'Ch'B (I) .               .. . .. . . .. . . . . . . . . . . . . .                                                            20 cpm Ch C'(G)_.            .. . .. . . . . . . . . . . . . .. . .                                                               30 cpm:-          ,
                                                                                                                                                        ~

Control.Rm EVS .(5327) (532p)

                     . Ch ' A ' (P) ,       ... .. .                             30 cpm                                                ,35 cpm
                     'Ch B-(I)             . . - . . . .                              O cpm'                                            10 cpm Ch C-(G)-             .: . -. . . .                        15 cpm                                                .30 cpm b             LIOUID EFFLUENT j'            Station' Inlet:" Traveling Screens                                          -(8434)    .. . .                              60 cpm-
          ' Station Effluent:                       Collection Box'                       (8433)
                                                                                                    .. . .-                             80 cpm LWater: Discharge:.                         Cooling Tower                       (8432)'.      . ..                          100 cpm p

l .. Misc Liquid Waste Disch (1878A) . (1878B) lL .. . .. . . . .c, . 20,000 cpm 15,000 cpm

          . Clean Liquid Waste Xfer Pumps                                             .(1770A)                                           '(1770B)
                       . . ....: .:... ..                    .-    .            250 cpm                                               300 cpm i-            CCW Return 1-1                                                       .

(1412) (1413)

                       . . . . . .- . . .: . . .                              1,000 cpm                                               700 cpm i

AREA RADIATION'(All readings in mR/hr) Maint WK Area (8400) 3 Pent Rm 314 (8421) 1

      <       Samp sys; Area (8401)                             1                                Hot Inst Shop (8422)                              0.2 CS/DS' Pump Rm (8402)                             3                                Hot Lab-          -(8423)                           0 CS/DS Pump Rm :(8403)-                           15                                Personnel Lock (8424)                             0.2
            'DH. Cooler Rm             (8404)                   3                                Equip Hatch . (8425)                              0.2
            .DH Cooler Rm ~(8405)                               3                                Corridor 411             (8428)                   0.1' L:             Misc Wst Evao..(8406)                         0.7                                  Corridor 411             (8429)                 -0.2 L              Valve ACC Rm             (8407)                 75                               ' CTRL Rm                  (8430)                   0.1 l              Det Wst Drn Tk'(8408)                             2                                CTRL Cab Rm-             (8431)                   0.2 l            ' Pent Rm 208.             (8409).                  3                                Cond Demin 1/2 (8435)                             0.1-E:             Corridor 209             (8410)               0.4                                  Cond Demin 3/4 (8436)                             0.3 Corridor 209-            (8411)               0.4                                  Con Dem Hld Tk (8437)                            '0.1      '4 Valv Rm 212-             (8412)                   1                                Bkwsh Rec Tk Rm(8438)                               0         !

Pump Rm 224 (8413) 15 Fuel Hand Area (8417) 0

             -Corridor 227             (8414)                   0                                Fuel Hand Area (8418)                               1         i Corridor 227            -(8415)                   1                                Drum Area Rm       -(8419)                         10         l Pent Rm 236
                                      -(8416)                 20                                 SFP Area South (8426)                               0 L              Pent-Rm 303-             (8420)'                 20                                SFP Area East (8427)                                0         i

_ __.____.._______ _ _ _ _._ _ _ _ b

p 1 EMERGENCY PLAN DRILZ.- SCENARIO NO: 7989 EXER AND EXERCISE PROGRAM TIME: 1100 RADIATION MONITOR DATA CONTAINMENT Failed Fuel Detector-(1998) . . . . . . . . . . . 200,000 cpm

                    . CTMT (Wide Range)                                                   (2387)               (2389)
                           . .. . . . . . . .                                       60 mR/hr               60 mR/hr CTMT (SFAS)                                                                     .

(2004) . . . . . . . . . . . . . . . . . . 50 mR/hr (2005) . . . . . . . . . . . . . . . . . . 50 mR/hr (20063 . . . . . . . . . . . . . . . . . . 50 mR/hr (2007) . . . . . . . . . . . . . . . . . . 50 mR/hr CTMT Atmos (Normal Range) (4597AA East) (4597BA West) Ch 1 (G) . . . . . 4.00E-02 uC1/cc 4.00E-02 uC1/cc' Ch 2 (P) . . . . . 8.90E-07 uC1/cc 8.90E-07 uC1/cc Ch 3 (I) . . . . . OSH uC1/cc OSH uCi/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . '1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uCi/cc 0 uC1/cc

                          'Ch 3,4,5 (P/I)                     . .                    7 mR/hr                7 mR/hr CTMT Dome (High Range)                                             (4596A)             (4596B)
                           . . . . . . . . . .                                    1.8 R/hr                1.8 R/hr GASEOUS EFFLUENT Station' Vent (Normal Range)                                     (4598AA)              (4598BA)

Ch 1(G) . .. . . . 3.81E-07 uCi/cc 3.81E-07 uCi/cc Ch 2(P) . . . . . . 1.42E-10 uC1/cc 1.42E-10 uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uCi/cc

                    - Station Vent (Accident Range)                                   (4598AB)              (4598BB)

Ch 1 (G) MID . . . 1E-3 uCi/cc 1E-3 uci/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                           . . . . . . . . . .                                      15 cpm                 10 cpm Condenser SJAE                                                    (1003A)              (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B) . . . . . . . . .. . . 400 cpm 100 cpm l. \ _________________L

\ x EMERGENCY PLAN DRILLSCENARIO NO: 1989 EXER-AN1J EXERCISE PROGRAM TIME: 1100 RADIATION MONITOR DATA Radwaste Area Exhaust: (5405)- Ch A (P)- . .. .. . . .. . . . . . . . .- , 2,000 cpm

         'Ch'B (I)            . . . . . . . . . . . . . . . . . .                            800 cpm Ch C (G)           .. . .. . . . . . . . . . . . . . . .                            150 cpm
 - Fuel Handling Area Exhaust-                                 (8446)                                  '(8447)
           .. . . . . . . . . .                           0.2 mR/hr.                         0.2 mR/hr Fuel Hand 11ng' Area Exhaust                                                                          (5403)
 ' Ch A (P)         . . . . . .. . . . . . . . . . . . . . .                              2,000 cpm Ch B (I)         . . . . . . . . . . . . . . . . . . . . .                                        20 cpm i Ch C (G)..          . . . ... . . . . . . . . . . . . . . .                                       30 cpm Control Rm EVS                                              (5327)                                    (5328)

Ch.A (P) . . . . . . 30 cpm 35 cpm Ch B (I) . . . . . . O cpm 10 cpm Ch.C (G) . . . . . . 15. cpm 30 cpm LIOUID EFFLUENT

 ~ Station Inlet:               Traveling Screens                (8434) .- . . ..                    60 cpm Station Effluent: Collection Box.                            (8433)   . . . .            . 80 cpm Water' Discharge:                    Cooling Tower-          (8432)    . . . .            100 cpm Misc Liquid' Waste Disch                                    (1878A)                                (1878B)
           . . . . . .. . . . .                      20,000 cpm                         15,000 epm Clean Liquid Waste Xfer Pumps                               (1770A)                                (1770B)
           . . . . .. . . . . .                           250 cpm                            300 cpm-
  . CCW Return 1-1                                              (1412)                                  (1413)
           . . .. . . . . . . .                        1,000 cpm                             700 cpm AREA RADIATION (All' readings in mR/hr)

Maint WK Area -(8400) 3 Pent Rm 314 (8421) 1 Samp'sys Area (8401) 1 Hot Inst Shop (8422) 0.2 CS/DS Pump Rm (8402) 3 Hot Lab -(8423) O CS/DS Pump Rm (8403)- 15 Personnel Lock (8470 0.2 DH Cooler Rm (8404) 3 Equip Hatch (8425) 0.2 DH Cooler Rm (8405) 3 Corridor 411 (8428) 0.1-Misc.Wst Evap (8406) 0.7 Corridor 411 (8429) 0.2 Valve ACC Rm -(8407) .75 CTRL Rm (8430) 0.1 Det Wst Drn Tk (8408) 2 CTRL Cab Rm (8431) 0.2 Pent Rm 208 (8409) 3 Cond Demin 1/2 (8435) 0.1 1 Corridor ~209 (8410) 0.4 Cond Demin 3/4 (8436) 0.3 1

   ~ Corridor 209          (8411)          0.4'                         Con Dem H1d Tk (8437)                      0.1                             j Valv Rm 212           '(8412)             1                         8kwsh Rec Tk Rm(8438)                                 5 Pump Rm 224            (8413)            15                         Fuel Hand Area (8417)-                          30 Corridor 227           (8414)            15                         Fuel Hand Area (8418)                                 1 Corridor 227.          (8415)             1                         Drum Area Rm     (8419)                          10 Pent Rm 236            (8416)            20.                        SFP Area South (8426)                                 0 Pent Rm 303            (8420)            20                         SFP Area East (8427)                                  0

lf : EMERGENCY-PLAN DRILL SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 1110 RADIATION MONITOR DATA CONTAINMENT Failed Fuel Detector (1998) . . . . . . . . . . . 200,0f)0 cpm

                   ~CTMT (Wide Range)                                              (2387)                   (2389)
                               . . . . . . . . . .                          630 mR/hr                 630 mR/hr CTMT (SFAS)

(2004) . . . . . . . . . . . . . . . . . . 620 mR/hr (2005) . . . . . . . . . . . . . . . . . . 620 mR/hr (2006) . . . . . . . . . . . . . . . . . . 620 mR/hr (2007) . . . . . . . . . . . . . . . . . . 320 mR/hr CTMT Atmos (Normal Range) (4597AA East) (4597BA West) Ch 1 (G) . . . . . OSH uCi/cc OSH uCi/cc Ch 2 (P) . . . . . OSH uCi/cc . 9.7 uC1/cc Ch.3 (I) . . . . . OSH uCi/cc OSH uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4S97BB West) Ch 1-(G) MID . . . OSH uC1/cc OSH uC1/cc Ch 2 (G) HI . . . 0.00 uC1/cc 0.00 uC1/cc Ch 3,4,5 (P/I) . . 100 mR/hr 100 mR/hr

                   -CTMT Dome (High Range)                                       (4596A)                 (4596B)
                               . . . . . . . . . .                          1.8 R/hr                  1.8 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                (4598AA)                 (4598BA)

Ch 1(G) . . .. . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uC1/cc 1.42E-10 uCi/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.1CE-10 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1E-3 uCi/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                               . . . . . . . . . .                         150 cpm                    100 cpm Condenser SJAE                                              (1003A)                   (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Wests Gas Discharge (1822A) (1822B)

                               . . . . . . . . . .                         400 cpm                    100 cpm

N I, EMERGENCY PLAN DRILLSCENARIO NO: 1989 EXER A1(D EXERCISE PROGRAM TIME: 1110

                                          ~

RADIATION MONITOR DATA

          ~ Radwaste Area Exhaust                                                                 -(5405)

Ch A'(P) . . . . . . . . . . . . . . . . . . 2,000 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 800 cpm Ch C- (G) . . . . . . . . . . . . . . . . . . 150 cpm Fuel Handling Area Exhaust (8446) (8447)

                  . . . . . . . . . . .                    0.2 mR/hr                         0.2 mR/hr Fuel Handling. Area Exhaust                                                              (5403)

Ch A (P) .. . . . . . . . . . . . . . . . . . . . . 2,000 cpm-Ch B (I) . . . . . . . . . . . . . . . . . . . . . 20 cpm Ch C'(G) .. . . . . . . . . . . . . . . . . . . . 30 cpm Control Rm EVS. (5327) (5328) Ch A (P) . . . . . . 30 cpm 35 cpm Ch B (I) . . . . . . O cpm 10 cpm Ch C (G) . . . . . . 15 cpm 30 cpm LIOUID EFFLUENT Station Inlet: Traveling Screens (8434) . . . . 60 cpm Station Effluent: Collection Box (8433) . . . . 80 cpm Water Discharge: Cooling Tower (8432) . . . .. 100 cpm Misc Liquid Waste Disch (1878A) (1878B)

                  . . . . . . . . . . .                20,000 cpm                        15,000 cpm Clean Liquid Waste Xfer Pumps                        (1770A)                           (17708)
                  . . . . . . . . . . .                    250 cpm                           300 cpm CCW Return 1-1                                        (1412)                           (1413)
                  ... . . . . . . . .                   1,000 cpm                            700 cpm AREA RADIATTON (All readings in mR/hr)

Maint WK Area (8400) 3 Pent Rm 314 (8421) 1 Samp sys Area (8401) 1 Hot Inst Shop (8422) 0.2 CS/DS Pump Rm (8402) 3 Hot Lab (8423) 0 CS/DS Pump Rm (84l,3) 15 Personnel Lock (8424) 0.2 DH Cooler Rm (8404) 3 Equip Hatch (8425) 0.2 DH Cooler Rm (8405) 3 Corridor 411 (8428) 0.1 Misc Wst Evap (8406) 0.7 Corridor 411 (8429) 0.2 Valve ACC Rm (8407) 75 CTRL Rm (8430) 0.1 Det Wst Drn Tk (8408) 2 CTRL Cab Rm (8431) 0.2 Pent Rm 208 (8409) 3 Cond Demin 1/2 (8435) 0.1 Corridor 209 (8410) 0.4 Cond Demin 3/4 (8436) 0.3 Corridor 209 (8411) 0.4 Con Dem Hld Tk (8437) 0.1 Valv'Rm 212- (8412) 1 Bkwsh Rec Tk Rm(8438) 25 Pump Rm 224 (8413) 15 Fuel Hand Area (8417) 30 Corridor 227 (8414) 15 Fuel Hand Area (8418) 1 Corridor 227 (8415) 1 Drum Area Rm (8419) 10 Pent Rm 236 (8416) 20 SFP Area South (8426) 0 Pent Rm 303 (8420) 20 SFP Area East (8427) 6,000 _._m____

EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER _ AND EXERCISE PROGRAM TIME: 1115 RADIATION MONITOR DATA CONTAINMENT Failed Fuel Detector (1998) . . . . . .. . . . .. 200,000 cpm CTMT (Wide Range) (2387) (2389)

                          . . . . . . . . . .                                                                                                                                 180,000 mR/hr             180,000 mR/hr CTMT (SFAS)

(2004) . . . . . . . . . . . . . . . . . . 1.75E+05 mR/hr (2005) . . . . . . . . . . . . . . . . . . 1.75E+05 mR/hr (2006) . . . . . . . . . . . . . . . . . . 1.75E+05 mR/hr (2007) . . . . . . . . . . . . . . . . . . 6.00E+05 mR/hr CTMT Atmos (Normal Range) (4597AA East) (4597BA West) Ch 1 (G) . . . . . OSH uC1/cc OSH uC1/cc Ch 2 (P) . . . . . OSH uC1/cc 9.70 uC1/cc Ch 3 (I) . . . . . OSH uC1/cc OSH uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . OSH uC1/cc OSH uC1/cc Ch 2 (G) HI . . . 280 uC1/cc 280 uC1/cc Ch 3,4,5 (P/I) . . 190 mR/hr 190 mR/hr CTMT r we (High Range) (4596A) . (4596B)

                          . . . . . . . . . .                                                                                                                                   2,000 R/hr                 2,000 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                                                                                                                         (4598AA)                 (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uCi/cc 1.42E-10 uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uC1/cc Sthtion Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uCi/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                           . . . . . . . . . .                                                                                                                                      150 cpm                  100 cpm Condenser SJAE                                                                                                                                                       (1003A)                  (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

                           . . . . . . . . . .                                                                                                                                      400 cpm                  100 cpm L----- -- __ - _ _ _         _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ ________-______ ________________________ _                                          _          .      .

I EMERGENCY PLAN DRILLSCENARIO NO:- 1989 EXER AND EXERCISE PROGEM TIME: 1115 RADIATION MONITOR DATA Radwaste' Area Exhaust (5405) Ch A (P) . . . . . . . . . . . . . . . . . . 2,000 cpm l Ch B (I)' . .. . . . . . . . . . . . . . . .. 800 cpm i Ch C (G) . . . . . . .. . . . . . .. . .. . . 150 cpm l k Fuel Handling Area Exhaust (8446) (8447)

                      . .. . .. . . .. . .                            0.2 mR/hr                        0.2 mR/hr Fuel Handling Area Exhaust                                                                      (5403)       -1 Ch A (P)          . . . . . . . . . . . . . . . . . . . . .                              2,000 cpm Ch B (I)'         . . . . . . . . . . . . . . . . . . . . .                                 20 cpm           jl Ch C (G)          . . . . . . . . . . . . . . . . . . . . .                                 30 cpm Control Rm EVS                                                (5327)                             (5328)    -

Ch A'(P) . . . . . . 30 cpm 35 cpm Ch B'(I): . . . . . . O cpm 10 cpm Ch C (G) . . . . . . 15 cpm 30 cpm i LIOUID EFFLUENT Station Inlet: Traveling Screens (8434) . . . . 60 cpm Station Effluent: Collection Box- (8433) . . . . 80 cpm Water Discharge: Cooling Tower (8432) . . . . 100 cpm { i

Misc Liquid Waste Disch (1878A) (1878B) 1
                       ... . . . . . . . . .                     20,000 cpm                        15,000 cpm            R Clean' Liquid Waste Xfer Pumps                                (1770A)                          (1770B)
                       . . .        1
                                         . . . . . .                   250 cpm                         300 cpm CCW Return 1-1                                                 (1412)                          (1413)
                       . . . . . . . . . . .                       1,000 cpm                           700 cpm             ;

AREA RADIATION (All readings in mR/hr) Maint WK Area (8400) 50 Pent Rm 314 (8421) 7000 Samp sys Area (8401) 2,000 Hot Inst Shop (8422) 8,000 CS/DS Pump Rm (8402) OSH Hot Lab (8423) 800 CS/DS Pump Rm (8403) OSH Personnel Lock (8424) OSH

            .DH Cooler Rm             (8404)           OSH                         Equip Hatch      (8425)        OSH OH Cooler Rm            (8405)           OSH                         Corridor 411     (8428)        200      ,

Misc Wst Evap (8406) OSH Corridor 411- (8429) 100 Valve ACC Rm . (8407) 75 CTRL Rm (8430) 15 Det Wst Drn Tk (8408) 1000 CTRL Cab-Rm (8431) 20.0 Pent Rm 208 (8409) 6000 Cond Demin 1/2 (8435) 0.1 L Corridor 209 (8410) 5000 Cond Demin 3/4 (8436) 0.3

            ; Corridor 209            (8411)          3000

[ Con Dem H1d Tk (8437) 0.1 l ifalv Rm 212 (8412) 100 8kwsh Rec Tk Rm(8438) 25 Pump Rm 224 (8413)- 6000 Fuel Hand Area (8417) 6,000 Corridor 227 (8414) 650 Fuel Hand Area (8418) 800 Corridor 227 (8415) 400 Drum Area Rm (8419) 25 Pent Rm 236 (8416) 6000 SFP Area South (8426) 200 l' . Pent Rm 303 (8420) 7000 SFP Area East (8427) 6,000 i C -_

1 EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 1130 RADIATION MONITOR DATA 4 CONTAINMENT j l Failed Fuel Detector (1998) . . . . . . . . . . . 200,000 cpm j CTMT (Wide Range) (2387) (2389)

                     . . . . . . . . . .                         3,100,000 mR/hr              3,100,000 mR/hr CTMT (SFAS)                                                                                              j (2004)            . . . . . . . . . . . . . . . . . .                   2.80E+06 mR/hr

,.- (2005) . . . . . . . . .. . . . . . . . . 2.80E+06 mR/hr (2006) . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr (2007) . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr CTMT Atmos (Normal Range) (4597AA East) (4597BA West) , Ch .1 (G) . . . . . OSH uCi/cc OSH uC1/cc Ch 2 (P) . . . . . OSH uC1/cc 9.70 uC1/cc Ch 3 (I) . . . . . OSH uC1/cc OSH uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . OSH uC1/cc OSH uC1/cc Ch 2 (G) HI . . . 327 uC1/cc 327 uC1/cc Ch 3,4,5 (P/I) . . 200 mR/hr 200 mR/hr CTMT Dome (High Range) (4596A) (4596B)

                     . . . . . . . . . .                               5.200 R/hr                5,200 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                     (4598AA)              (4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . .. 1.42E-10 uC1/cc 1.42E-10 uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4:16E-10 uC1/cc

    =          Station Vent (Accident Range)                                   (4598AB)              (4598BB)

Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uCi/cc Ch 2 (G) HI . . . O uCi/cc 0 uCi/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge.(5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                     . . . . . . . . . .                                   150 cpm                 100 cpm Condenser SJAE                                                    (1003A)               (1003B)

Ch A . . . . . , . 60 cpm 30 cpm Waste das Discharge (1822A) (1822B)

                      . . . . . . . . . .                                  400 cpm                 100 cpm

C I E J b l

             'RMERGENCY PLAN DRILLSCENARIO NO:                                                                    1989 EXER ~                                     ]

AND-EXERCISE PROGRAM- TIME: 1130 J RADIATION MONITOR DATA 1 i

             -Radwaste Area Exhaust.                                                                                                            .

(5405) Ch A'(P) . . . ... . . . . . . . . ... . . 2,000 cpm l Ch B (I) . .. .. . .. . . . . . . . . . . 800 cpm Ch C (G) . . . . . . . . . . . . . . . .. . 150 cpm

Fuel Handling Area Exhaust (8446) (8447)
                                                    . . . . ,. . . .. . .                                     0.2 mR/hr-                          0.2 mR/hr Fuel Handling Area Exhaust                                                                                                                       I
                                                                                                                                                     .(5403)

Ch A (P) . . . . . . . . . . . . . . . . . . . . . . _ . 2,000 cpm Ch B (I) . . . . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . .. . . . . . . . . . . 30 cpm Control Rm EVS (5327) (5328) Ch A (P) . . . . . . _30 cpm 35 cpm Ch B (I) . . . . . . O cpm 10 cpm Ch C (G) . . . . . . 15 cpm 30 cpm LIOUID EFFLUENT Station Inlet: Traveling Screens (8434) . . . . 60 cpm Station Effluent: Collection Box (8433) . . . . 80 cpm Water Discharge: Cooling Tower- (8432) . .. . . 100 cpm Misc Liquid Waste-Disch. (187BA) (1878B)

                                                    . . . .. . . . ...                                    20,000 cpm                        15,000 cpm Clean. Liquid Waste Xfer Pumps                                                                  .(1770A)                         (1770B)
                                                    . . . . . . . . ...                                       250 cpm                             300 cpm CCW Return 1-1                                                                                    (1412)                          (1413)
                                                     . . . . . . . . ...                                   1,000 cpm                              700 cpm AREA RADIATION (All readings in mR/hr)

Maint WK Area (8400) 50 Pent Rm 314 (8421) 7000

              'Samp sys Area (8401)                                                           2,000                          Hot Inst Shop   (8422)      8,000 CS/DS Pump Rm (8402)                                                      OSH                          Hot Lab         (8423)         800 CS/DS Pump Rm (8403)                                                      OSH                          Personnel Lock (8424)         .0SH DH Cooler Rm                                     (8404)                   OSH                          Equip flatch    (8425)         OSH
                 .DH Cooler Rm                                         (8405)                   OSH                          Corridor 411    (8428)         200 Misc Wst'Evap (8406)                                                      OSH                          Corridor 411    (8429)         100 Valve ACC Rm                                     (8407)                    75                          CTRL Rm         (8430)          15 Det Wst Drn Tk (8408)                                                    1000                          CTRL Cab Rm     (8431)       20.0 Pent Rm 208                                      (8409)                  6000                          Cond Demin 1/2 (8435)          0.1 Corridor 209                                     (8410)                  5000                          Cond Demin 3/4 (8436)          0.3 Corridor 209                                    -(8411)                  3000                          Con Oem Hld Tk (8437)          0.1
                -Valv Rm 212                                           (8412)                   100                          8kwsh Rec Tk Rm(8438)           25 Pump Rm 224                                      (8413)                  6000                          Fuel Hand Area (8417)       6,000 Corridor 227                                     (8414)                   650                          Fuel Hand Area (8418)          800 Corridor 227                                     (8415)                   400                          Drum Area Rm    (8419)          25 Pent Rm 236                                      (8416)                  6000                          SFP Area South (8426)          200 Pent Rm 303                                      (8420)                  7000                          SFP Area East (8427)        6,000
                                                                                                                           .)
             '_4MERGENCY' PLAN DRILL                                                        SCENARIO NO:       1989 EXER AND EXERCISE PROGRAM                                                                       TIME:      1145 RADIATION MONITOR DATA C_OtD'AIMEEE                                                                                                    j i
             ~ Failed Fuel Detector (1998)                            . .. . . .. . . . . . 200,000 cpm
                                                                                                                           ]

CTMT (Wide Range) (2387) (2389)

                    . .. . . . . . . .                          3,100,000 mR/hr              3,100,000 mR/hr i'

CTMT'(SFAS) (2004) . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr (2005) . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr (2006). . . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr (2007) . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr CTMT Atmos (Normal' Range) (4597AA East) (4597BA West) Ch 1 (G)- . . . . . OSH uC1/cc OSH uC1/cc - Ch 2 (P) . . . . . OSH uC1/cc 9.70 uC1/cc Ch 3 (I) .. . . . OSH uC1/cc OSH uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . OSH uCi/cc OSH uCi/cc Ch 2 (G) HI . . . 327 uC1/cc 327 uci/cc Ch 3,4,5 (P/I) . . 200 mR/hr 200 mR/hr-CTMT Dome (High Range) (4596A) (4596B)

                    . . . . . . .. . .                                5,200 R/hr                5,200 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                    (4598AA)               '(4598BA)

Ch 1(G) . . . . . . 3.81E-07 uC1/cc 3.81E-07 uC1/cc Ch 2(P) . . . . . . 1.42E-10 uC1/cc 1.42E-10 uC1/cc Ch 3(I) . . . . . . 4.16E-10 uC1/cc 4.16E-10 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uci/cc 0 uC1/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr CTMT Purge (5052) , Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm , Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                     . . . . . . . . . .                                   150 cpm                100 cpm Condenser SJAE                                                   (1003A)                 (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste = Gas Discharge (1822A) (1822B)

                     . . . . . . . . . .                                   400 cpm                100 cpm I

1

n-1 EMERGENCY PLAN DRILLSCENARIO'NO: 1989 EXER

E EXERCISE PROGRAM TIME: 1145 RADIATION MONITOR DATA Radwaste Area Exhaust ~(5405)

Ch A (P) . . . . . . . . . . . . . . . . . . 2,000 cpm Ch B -- (I) . . . . . . . . . . . . . . . . . . 800 cpm Ch Cl(G). . . . . . . . . . . . . . . . . . . 150 cpm Fuel Handling Area Exhaust (8446) . (8447)

               . . . . .. . . .. . .                                0.2 mR/hr                           0.2 mR/hr-Fuel Handling Area Exhaust                                                                            (5403)

Ch A (P) . .. . . . . . . . . . . . . . . . . . . . 2,000 cpm

     .Ch B.(I) .           . . . . . . . . . . . . . . . . . . . .                                       20 cpm Ch C (G), .            . . . . . . .. ... . . . . . . . . .                                        30 cpm Control Rm EVS                                                      (5327)                            (5328)                      -

Ch A (P) . . . . . . 30 cpm 35 cpm. Ch B (I) . . . . . . -0 cpm 10 cpm Ch C_(G) . . . . . . 15 cpm 30 cpm LIOUID EFFLUENT Station Inlet: Traveling Screens (8434) . . . . 60 cpm Station Effluent: . Collection Box (8433) . . . . 80 cpm Water Discharge: Cooling Tower (8432) . . . . 100 cpm Misc Liquid Waste.Disch (1878A) (1878B) i

               . .. . . . . . . . . .                          20,000 cpm                         15,000 cpm

{ Clean Liquid Waste Xfer Pumps (1770A) (1770B)

               . ., . . . . . . . . .                               250 cpm                             300 cpm CCW Return 1-1                                                      (1412)                           (1413)                        !
               . . .- . . . . . .. .                             1,000 cpm                              700 cpm                           :

AREA RADIATION (All readings in mR/hr) - l Maint WK Area (8400) 50 Pent Rm 314 (8421) 7000 Samp sys Area- (8401) 2,000 Hot Inst Shop (8422) 8,000 l CS/DS Pump Rm (8402) OSH Hot Lab (8423) 800 CS/DS Pump Rm (8403) OSH Personnel Lock (8424) OSH DH Cooler Rm (8404) OSH Equip Hatch (8425) OSH

      -DH Cooler Rm               (8405)            OSH                           Corridor 411     (8428)                200              t Misc Wst.Evap (8406)                        OSH                           Corridor 411     (8429)                100 Valve ACC Rm              (8407)             75                           CTRL Rm          (8430)                           15    '
      .Det Wst Orn Tk (8408)                       1000                           CTRL Cab Rm      (8431)       20.0 Pent.Rm 208               (8409)           6000                           Cond Demin 1/2 (8435)                 0.1 Corridor 209              (8410)           5000                           Cond Demin 3/4 (8436)                  0.3 r        Corridor-209              (8411)           3000                           Con Dem Hld Tk (8437)                 0.1 l-      .Valv Rm 212               (8412)            100                           Bkwsh Rec TK Rm(8438)                            25 l       Pump Rm 224               (8413)           6000                           Fuel Hand Area (8417)        6,000                      ;

Corridor 227 (8414) 650 Fuel Hand Area (8418) 800 Corridor 227 (8415) 400 Drum Area Rm (8419) -25 Pent Rm 236 (8416) 6000 SFF Area South (8426) 200 Pent.Rm 303 (8420) 7000 SFP 4rea East (8427) 6,000 l

1 1

                                                                                                                                        .q EMERCENCY' PLAN DRILL AMD EXERCISE PROGRAM                                                                         SCENARIO NO:       1999 EXER TIME:. 1200 RADIATION MONITOR DATA                                                ;

r  : p CONTAINMENT Failed Fuel Detector (1998)- . . . .. . . . ... . . . . 200,000 cpm CTMT.(Wide Range) (2387)

                                    .. . .. .. . . . - . ..              3,100,000 mR/hr                                (2389).

3,100,000'mR/hr CTMTL(SFAS)

                                   -(2004)      '

(2005) 2.80E+06 mR/hr-'

                                             . . . . . . . . . . . . . . . . . .                         2.80E+06 mR/hr (2006)   . . . .. . . . . . . . . . . . . . .

(2007) .. . .. .. . . 2.80E+06 mR/hr

                                                                             ..........                  2.80E+06 mR/hr CTMT Atmos (Normal Range)                                     (4597AA East)

Ch 1.(G) (4597BA West) ,

                                                  . . . . .                    OSH uC1/cc                         OSH uC1/cc Ch.2.(P)       . . . . - . .                OSH uCi/cc Ch 3;(I)                                                                      9.70 uC1/cc OSH uCi/cc OSH uC1/cc
          - CTMT Atmos (Accident Range) (4597AB East)
                                 -Ch-1-(G).MID                                                                (4597BB West)

OSH uCi/cc OSH uC1/cc Ch; 2. .(G) HI . . . 320 uC1/cc Ch 3,4,5 (P/I) 320 uC1/cc

                                                                . .            190 mR/hr                          190 mR/hr CTMT Dome-(High Range)                                                   (4596A)
                                   ... .. ... . . .                         5,200 R/hr (4596B) 5,'200 R/hr-
            ' GASEOUS EFFLi g Station Vent (Normal Range)                                            (4598AA)

Ch"1(G) . . . . . . (4598BA) 3.81E-07 uC1/cc Ch 2(P) . . . .. . 3.81E-07 uCi/cc 1.42E-10 uC1/cc

                                 'Ch 3(I) . . . . . .                                                   1.42E-10 uC1/cc 4.16E-10 uC1/cc                 4.16E-10 uC1/cc Station Vent-(Accident Range)                                          (4598AB)

Ch 1 (G) MID . . . (4598BB) 1E-3 uC1/cc 1E-3 uC1/cc Ch 2 (G) HI . . . O uC1/cc 0 uci/cc Ch 3,4,5 (P/I) . . O mR/hr 0 mR/hr

         -CTMT Purge (5052)

Ch A'(P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm-Main Steam Line (609 #1)

                                  . . . . . . . . . .                         150 cpm                              (600 #2)-

100 cpm Condenser SJAE (1003A) Ch A . . . . . . . 60 cpm (1003B) 30 cpm Waste Gas Discharge (1822A)

                                  . . . . . . . .. . .                        400 cpm                                (1822B) 100 cpm L-______-                                                                                                                                  .

K ,

, 4
- +

W - 1 EMERGENCY PLAN DRILLSCENARIO'NO: '1989' EXER

                , AND EXERCIEE PROGRAli                                                                                TIME:        1200 RADIATION MONITOR DATA h

iRadwaste Area Exhaust . (5405) Ch A':(P) .. ... . . .- . . . . . . . ... 2,000 cpm "Ch1B-(I) .... . . . .. . .. . . . . .- 800 cpm Ch C..(G) . . . . . - . . .. . . . . . . . . . . .-. 150 cpm

                 ; Fuel' Handling Area Exhaust 1 (8446)                                 (8447)
                             .-. .; . . .. . . . . ..                             0.2 mR/hr                               0.2 mR/hr V.     ,
                 -Fuel 1 Handling Area Exhaust-                                                                                (5403)

{ Ch AL(P) . . .. . . . . . . . . . . . . . . . . . . 2,000 cpm Ch B (I) '.. .- . . . .. ..... . . . . . . . . 20 cpm

                 ~Ch'C-'(G) .          . . .... . . . . - . . . . . .. . .. .

30 cpm Control ~Rm EVS (5327) (5328) Ch A (P)- . .. . ' . . 30' cpm 35 cpm-Ch B'(I) . .. . . . O cpm 10. cpm

Ch C (G)' . .. . .. 15 cpm 30 cpm _ j i LIOUID EFFLUENT Station' Inlet: Traveling. Screens (8434).. . . . 60 cpm iStation. Effluent: Collection' Box ~ (8433) . .. . 80:(pm
Water 1 Discharge:. Cooling Tower: (8432) . . . . 100 cpm ,

t Misc' Liquid Waste Disch (1878A) .(1878B)

                             . . .' . . . ... .. . .                        20,000 cpm                             15,000 cpm C1f n Liquid. Waste Xfer Pumps                                       (1770A)                              (1770B) q                            7..     . .. . . . . . . ..                           250 cpm                                 300. cpm
                 .CCW Return 1-l'                                                         (1412)                               (1413)
                             . . . . . . .. . ..                               1,000 cpm                                  700 cpm f ra RADIATION (All readings in mR/hr)                                                        .

1 daint WK Area- (8400) 50 Pent Rm 314 (8421) .7000 -! Samp sys Area. (8401) 2,000 Hot Inst Shop- (8422) 8,000  ; CS/DS Pump Rm '(8402) OSH Hot Lab (8423) 800 l CS/DS Pump Rm (8403) ' OSH- Personnel Lock (8424) OSH < DH Cooler Rm. (8404) .0SH- Equip Hatch (6425) OSH

                  .DHlCocler Rm '(8405)                               OSH                          Corridor:411      (8428)         200     ,

Misc Wst Evan (8406) OSH Corridor 411 (8429) 100 , ).s

  ;                Valve ACC.Rm                  (8407)                75                          CTE', Rm      - (8430)             15 1 Det'Wst'Drn Tk (8408)                          1000                            CTRL Cab Rm       (8431)        20.0  -l Pent Rm 208 .                (8409)            6000                            Cond Demin 1/2 (8435)            0.1  0 Corridor 209-                (8410)            5000                            Cond Demin 3/4 (8436)            0.3     ;
                  -Corridor 209              .(8411)-              3000                            Con Dem Hid Tk (8437)            0.1 Valv Rm' 212                 (8412)               100                          Skwsh Rec Tk Rm(8438)'            .25 Pump.Rm 224                  (8413)            6000                           . Fuel Hand Area (8417)         6,000     ,

Corridor 227 (8414)- 650 Fuel Hand Area (8418) 800 ", Corridor 227 (8415) 400 Drum Area Rm (8419) 25 Pent Rm 236 (8416) 6000 SFP Area South (8426) 200-Pent Rm 303 (8420) 7000 SFP Area East (8427) 6,000 1 i L-_m:._.L__--.__. - _ . -

1 0 EMERGENCY PLAN DRILL = SCENARIO NO: 1989 EXER-1 AND EXERCISE PROGRAM TIME: 1215 l 3 RADIATION MONITOR DATA i i CONTAINMENT Failed Fuel Detector (1998) . . . . . . . ... . 200,000 cpm:' CTMT'(Wide Range) (2387) (2389). 1

                . , . . . . . . . . . . .                 3,100,000 mR/hr                       3,100,000 mR/hr CTMT'(SFAS)                                                                                                                                                                      ;

(2004) . . . . . . . . . . . . . . . . . . 2.60E+06 mR/hr' (2005) . . .. . . . . . .. . . . . . . . . 2,60E+06 mR/hr (2006) . . . . . . . . . . . . . . . . .. 2.60E+06 mR/hr

             ~(2007)           . . . . . . . . . . . . . . . . . .                             2.60E&O6 mR/hr
     .CTMT Atmos.(Normal Range)                               (4597AA East)                              (4597BA West)                                                                ;

Ch l'(G) . . . . . . LOSH uCi/cc OSH uC1/cc. I Ch 2 (P) . . . . . 9.80.uci/cc 9.70 uC1/cc Ch 3'(I) . . . . . OSH uC1/cc OSH uC1/cc-CTMT Atmos (Accident Range) (4597AB Fast) (4597BB West) Ch 1 (G) MID' . . . OSH uC1/cc 'OSH uC1/cc Ch 2 (G)JHI . . . 320 uC1/cc 320.uC1/cc

             .Ch 3,4,5 (P/I)                    . .                 190 mR/hr                                                       190 mR/hr CTMT Dome (High Range)-                                              (4596A)                                                     (4596B).
             ..: .. .      .-  . . . . . .                      5 200 R/hr
                                                                  ,                                            5,200 R/hr.

GASEOUS EFFLUENT Station Vent-(Normal Range) (4598AA) (4598BA) Ch#1(G) . . . . . . OSH uC1/cc- OSH uCi/cc Ch 2(P) . .. . . . 2.30E-10 uC1/cc 2.30E-10 uC1/cc Ch 3(I) . . . . . . 1.00E-03 uC1/cc . 1.00E-03 uCi/cc Station Vent'(Accident' Range). (4598AB) (4598BB) Ch 1 (G) MID . . . 1.65E+01 uci/cc 1.65E+01 uC1/cc

             .Ch 2-(G) HI                  . . .          1.65E+01 uC1/cc                     1.65E+01 uC1/cc Ch 3,4,5 (P/I)                  . .                 200 mR/hr                                                      200 mR/hr CTMT Purge-(5052)

Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm

           ~

Main' Steam Line (609 #1) (600 #2)

                . . . . . . . . . .                                 150 cpm                                                         100 cpm Condenser SJAE                                                       (1003A)                                                      (1003B)

Ch'A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

                . . . . . . . . . .                                 400 cpm                                                        100 cpm

b !.7 EMERGENCY PLAN DRILLSCENARIO-NO: 1999 EXER AND EXERCISE PROGRAM TIME: '1215 b . RADIATION MONITOR DATA [ ?.m Radwaste Area Exhauct. (5405) Ch:A (P) . . . . ... . . . . . . . ' . .:. . 2,000 cpm

                     -Ch B-.(I)- .. .. . ..... . . . .                   . . . .-                            800 cpm F                      Ch C'(G) . . .. . . .. .. .                        . . . . . . . . .                    150 cpm Fuel Handling Area ~ Exhaust                                            (8446)                            (8447)
                      . . . .. . . . . . .                                  0.2 mR/hr                        0.2 mR/hr Fuel Handling Area. Exhaust                                                                               (5403)

Ch A'(P) . . .. . .. . . . .. . . . . . . . . . . . 2,000 cpm

     -Ch B'(I)                . . . . . . . . . .. . . . . . . . . . . .                                       20 cpm Ch C (G)             . . . . . . , . . . . . . . . . . . . . .. .                                     30 cpm Control'Rm EVS.                                                         (5327)                            (5328)

Ch A'-(P) . . . . . . 30 cpm 35 cpm

                     ~Ch B (I)           . . .. . .                           O cpm                            10 cpm
                     .Ch C (G)           . . . . ..                          15 cpm                            30 cpm LIOUID EFFLUENT Station' inlet:                   Traveling Screens                      (8434)   . . . .             60 cpm Station Effluent: Collection' Box                                        (8433)   . . ..              80 cpm
       . Water Discharge:                         ' Cooling Tower                 (8432)   . . . .           100 cpm Misc Liquid Waste'Disch                                                 (1878A)'                        '(1878B)
                      .. .: . . . . .. . . .                        20,000 cpm                           15,0u0 cpm Clean Liquid Waste Xfer Pumps                                           (1770A)-                        (1770B)
                      . . . . . . . . ... .                                 250 cpm                          300' cpm CCW Return 1-1                                                   .

(1412) (1413)

                      . . .. . . . ... ..                             1,000 cpm                              700 cpm AREA RADIATION (All readings in mR/hr)
        'Maint'WK Area (8400)                             50                            -Pent Rm 314      (8421)       7000 Samp sys Area (8401)                        2,000                               Hot Inst Shop    (8422)      8,000   I CS/DS Pump Rm .(8402)                          OSH                              Hot. Lab-        (8423)         800 CS/DS Pump Rm (8403)                           OSH                              Personnel Lock (8424)           OSH DH Cooler Rm                (8404)             OSH                              Equip Hatch      (8425)         OSH DH Cooler Rm                (8405)-            OSH                              Corridor 411    (8428)          200  <

Misc Wst Evap (8406) . OSH . Corridor 411 (8429) 100 i Valve--ACC Rm (8407) 75 CTRL Rm (8430) 15 Det Wst Drn Tk (8408) 1000 { CTRL Cab Rm (8431) 20.0 < Pent Rm 208 (8409) 6000 Cond Demin 1/2 (8435) 0.1 Corridor 209. (8410) 5000 Cond Demin 3/4 (8436) 0.3 Corridor 209 (8411) 3000 con Dem Hld Tk (8437) 0.1 Valv Rm 212. (8412) 100 8'Kwsh Rec Tk Rm(8438) 25 Pump Rm 224 (8413) 6000 Fuel Hand Area (8417) 6,000 , Corridor 227 (8414) 650 Fuel Hrnd Area (8418) 800 ' Corridor 227 (8415) 400 Drum 4rea Rm * (8419) 25 Pent Rm 236- (8416) 6000 SFP /rea South (8426) 200 Pent Rm 303 (8420) 7000 SFP /rea East (8427) 6,000 4 1

EMERGENCY PLAN DRILL SCENARIO WO: 1989 EXER AND EXEROISE PROGRAM TIME: 1230 RADIATION MONITOR DATA CONTAINMENT Failed Fuel Detector (1998) . . . . . . . . . . . . 200,000 cpm CTMT (Wide Range) (2387) (2389)

        . . . . . . . . . .                         3,100,000 mR/hr                    3,100,000 mR/hr CTMT. (SFAS)

(2004) . . . . . . . . . . . . . . . . . . 2.60E+06 mR/hr (2005) . . . . . . . . . . . . . . . . . . 2.60E+06 mR/hr (2006) . . . . . . . . . . . . . . . . . . 2.60E+06 mR/hr (2007) . . . . . . . .. . . . . . . . . . 2.60E+06 mR/hr CTMT Atmos (.ormal N Range) (4597AA East) (4597BA West) Ch 1 (G) . . . . . OSH uC1/cc OSH uC1/cc Ch 2 (P) . . . . . 9.80 uC1/cc 9.70 uC1/cc Ch 3 (I) . . . . . OSH uC1/cc OSH uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . OSH uC1/cc OSH uC1/cc Ch 2 (G) HI . . . 310 uC1/cc 310 uC1/cc Ch 3,4,5 (P/I) . . 180 mR/hr 180 mR/hr CTMT Dome (High Range) (4596A) (4596B)

        . . . . . . . . . .                               3,200 R/hr                      3,200 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                      (4598AA)                                           (4598BA)

Ch 1(G) . . . . . . OSH uC1/cc OSH uC1/cc Ch 2(P) . . . . . . 2.30E-10 uC1/cc 2.30E-10 uC1/cc Ch 3(I) . . . . . . 1.23E-03 uC1/cc -1.23E-03 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 1.50E+01 uCi/cc 1.50E+01 uC1/cc Ch 2 (G) HI . . . 1.50E+01 uCi/cc 1.50E+01 uC1/cc Ch 3,4,5 (P/I) . . 200 mR/hr 200 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

        .        . . . . . . . .                               150 cpm                                      100 cpm Condenser SJAE                                                     (1003A)                                           (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

         . . . . . . . . . .                                   400 cpm                                      100 cpm
l. _ _ _ - _ _ . -_______- _ - -

EMERGENCY PLAN DRILLSCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 1230 RADIATION MONITOR DATA Radwaste Area Exhaust (5405) Ch A (P) . . . . . .. . . . . . . . . . . . 2,000 cpm Ch B (I) . . . . . .. . . . . . . . . . . .- 800' cpm Ch C (G)- . . . . . . . . . . . . . . . .. . 150 cpm Fuel Handling Area Exhaust (8446) (8447)

            . . . . .. . . . . . .                            0.2 mR/hr                        0.2 mR/hr Fuel Handling Area Exhaust                                                                    . (5403)

Ch A (P) . . . . . . . . . .. . . . . . . . . . . 2,000 cpm Ch B (I)- . . . . . . . . .. . . . . . . . . . . . 20_ cpm Ch C-(G) . . . . . . . . . . . . . . . . . . . . . 30 cpm Control Rm EVS (5327) (5328) - Ch A (P) . . . . . . 30 cpm 35 cpm Ch B (I) . . . . . . O cpm 10 cpm i Ch C (G) .. . . . . . 15 cpm 30 cpm i l LIOUID EFFLUENT

   ' Station Inlet:              Traveling Screens                  (8434)  . . . .             60 cpm Station Effluent: Collection. Box-                              (8433)  . . . .             80 cpm-Water Discharge:                      Cooling Tower             (8432)  . . . .            100 cpm l    Misc Liquid Waste Disch                                        (1878A)                         (1878B)
            . . . .. . . . . . . .                       20,000 cpm                        15,000 cpm l    Clean Liquid Waste Xfer Pumps                                  (1770A)                         (1770B)
            . . . . . .. . . . .                              250 cpm                          300 cpm CCW Return 1-1                                                  (1412)                           (1413)
            . . . . . . . . . . .                           1,000 cpm                          700 cpm ARET RADIATION (All readings in mR/hr)

Maint WK Area. (8400) 50 Pent Rm 314 (8421) 7000 Samp sys Area (8401) 2,000 Hot Inst Shop (8422) 8,000 CS/DS Pump Rm (8402) OSH Hot Lab (8423) 800 CS/DS Pump Rm (8403) OSH Personnel Lock (8424) OSH DH Cooler Rm -(8404) OSH Equip Hatch (8425) OSH DH. Cooler Rm (8405) OSH Corridor 411 (8428) 200 Misc Wst Evap (8406) OSH Corrider 411 (8429) 100 Valve ACC Rm (8407) 75 CTRL Rm (8430) 15 Det Wst Drn Tk'(8408) 1000 CTRL Cab Rm (8431) 20.0 Pent Rm 208 (8409) 6000 Cond Demin 1/2 (8435) 0.1 Corridor 209 (8410) 5000 Cond Demin 3/4 (8436) 0.3 Corridor 209 (8411) 3000 Con Dem Hld Tk (8437) 0.1 Valv Rm 212 (8412) 100 8kwsh Rec Tk Rm(8438) 25 Pump Rm 224 (8413) 6000 Fuel Hand Area (8417) 6,000 Corridor 227 (8414) 650 Fuel Hand Area (8418) 800 Corridor 227 (8415) 400 Drum Area Rm (8419) 25 Pent Rm 236 (8416) 6000 SFP Area South (8426) 200 l Pent Rm 303 (8420) 7000 SFP Area East (8427) 6,000 t -------- .--------- -- _ _ _ _

g __ , y , b.I .. d I EMERGENCY PLAN DRILL SCENARIO NO: 1989-EXER r AND EXERCIEE PROGRAM TIME: 1245 l,f EADIATI.QN_.MONI. TOR DATA CONTAIN!g3[I

                   - Failed Fuel Detector (1998)                           . ., . . .,. . . . .                      200,000 cpm
                   - CTMT (Wide Range)-                                        .

(2387) . (2389) 3,100,000 mR/hr 3,100,000 mR/hr CTMT: (SPAS) (2004) . . . . . . . .. . . . . . . . . . 2.60E+06 mR/hr (2005) .. . . . . . . . . . . . . . .. . . 2.60E+06 mR/hr (2006) . . . . . . . . . ..... . . . . 2.60E+06 mR/hr' (2007). .. . .. .. c . . . .. . . . . . . . 2.60E+06 mR/hr-CTMT Atmos (Normal Range) (4597AA East) (4597BA West). ' Ch.1. (G)- .. . .- . . OSH uCi/cc OSH uC1/cc Ch 2-(P)  ;.

                                                    , , . - . .              9.80 uC1/cc                                 9.70 uC1/cc Ch 3 - (I) .          . . . . = .                   OSH uCi/cc                                 .OSH uCi/cc CTMT Atmos _(Accident Range) (4597AB East)                                                         (4597BB-West)
                         .Ch 1 (G)'MID . . .                                 _OSH uC1/cc                                   OSH uC1/cc Ch 2. (G) H"I
                                     -         .        . . .                  310 uC1/cc                                  310 uci/cc-Ch 3, d',5 -(P/I).                . .                 180 mR/hr                                  180 mR/hr-CTMT Dome-(High Range)
                                                                                    '(4596A)                             . . (4596B)
                          . . . . .... . . . . .                           3.200 R/hr                                   3,200.R/hr p                                                                                                                   .
 ;_                 GASEOUS EFFLUENT Station Vent (Normal Range)                                   -(4598AA)                                     (4598BA)

Ch 1(G) . .. .. . OSH-uci/cc OSH uCi/cc

                         'Ch 2(P)         . . . . . . . .            2.30E-10 uC1/cc-                               2.30E-10 uci/cc h                        Ch 3(I) .            . .. ..               1.17E-03 uci/cc                                1.17E-03 uC1/cc Station Vent (Accident Range)                                  (4598AS)                                     (4598BB)

Ch 1~(G)'MID . . . 1.33E+01 uC1/cc 1.33E+01 uCi/cc Ch 2 (G) HI . . . 1.33E+01 uci/cc 1.33E+01 uCi/cc Ch 3,4,5 (P/I) . . ~200 mR/hr 200 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                          . . . . . . . . . ..                                 150 cpm                                     100 cpm Condenser SJAE                                                  (1003A)                                      (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste' Gas. Dis. charge (1822A) (1822B)

                           . . . . . . . . . .                                 400 cpm                                     100 cpm

EMERCEMCY PLAN DRILLSCENARIO NO: 1989 EXER l AND EXERCISE PROGRAM TIME: 1245 RADIATION MONITOR DATA

 )    Radwaste Area Exhaust                                                                                   (5405)~

Ch A (P) . . . . . .......... . . . 2,000 cpm Ch B (I) . . . . . . . . . . . . . . . . . . . 800 cpm , Ch.C (G) . . . . . .. . . . . . . . . . . . 150 cpm Fuel Handling Area Exhaust (8446) (8447)

                      . . . . . . . .. . .                              0.2 mR/hr                        0.2 mR/hr

! Fuel Handling Area Exhaust (5403) i Ch A (P) . . . . . . . . .. . . . . . . . . . . . 2,000 cpm L Ch B (I) . . . . . . . . .. . . . . . . . . . . . 20 cpm l Ch C (G) . . . . .. . . ... . . . . . . .. . . . 30 epm l L Control Rm EVS (5327) (5328) - l

                    'Ch A (P)            . . . . . .                     30 cpm                           35 cpm Ch B (I)            . . . . . .                       O cpm                          10 cpm Ch C (G)            . .. . . .                      15 cpm                           30 cpm LIOUID EFFLUENT Station Inlet: Traveling Screens                                        (8434)  . . . .

60 cpm Station Effluent: Collection Box (8433) . . . . 80 cpm Water Discharge: Cooling. Tower (8432) . . . . 100 cpm f Misc Liquid Waste Disch (1878A) (1878B)

                      .-  . . . . . . . . . .                      20,000 cpm                        15,000 cpm l'     Clean Liquid Waste Xfer Pumps                                         (1770A)                          (1770B)

I

                     .. .. . . . . . . . . .                            250 cpm                          300 cpm CCW Return 1-1                                                          (1412)                          (1413)
                      . . . . . . . . . . .                           1,000 cpm                          700 cpm AggA RADIATION (All readings in mR/hr)

Maint WK Area (8400) 50 Pent Rm 314 (8421) '7000 Samp sys Area (8401) 2,000 Hot Inst Shop (8422) 8,000 CS/DS Pump Rm (8402) OSH Hot Lab (8423) 800 CS/DS Pump Rm (8403) OSH Personnel Lock (8424) OSH DH Cooler Rm (8404) OSH Equip Hatch (B425) OSH DH Cooler Rm (8405) OSH Corridor 411 (8428) 200 Misc Wst Evap (8406) OSH Corridor 411 (8429) 100

    ' Valve ACC Rm . (8407)                               75                         CTRL Rm          (8430)         15 Det Wst Drn Tk (8408)                            1000                         CTRL Cab Rm      (8431)       20.0 m

Pent Rm 208 (8409) 6000 Cond Demin 1/2 (8435) 0.1 Cerridor 209 (8410) 5000 Cond Demin 3/4 (8436) 0.3 Corridor 209 (8411) 3000 Con Dem Hld Tk (8437) 0.1 Valv Rm 212 (8412) 100 Bkwsh Rec Tk Rm(8438) 25 Pump Rm 224 (8413) 6000 Fuel Hand Area (8417) 6,000 Corridor 227 (8414) 650 Fuel Hand Area (8418) 800 Corridor 227 (8415) 400 Drum Area Rm (8419) 25 Pent Rm 236 (8416) 6000 SFP Area South (8426) 200 Pent Rm'303 (8420) 7000 SFP Area East (8427) 6.000 Y-_______-_-___________.

E15EE g CY PLAN DRILL SCENARIO NO __1989 EXER , AND EXERCISE PROGRAM TIME: 1300 l RADIATION MONITOR DATA i CONTAINMENT Failed Fuel Detector-(1998) .. . . . . . . . . . 200,000 cpm CTMT (Wide Range) (2387) (2389)

               . . . . . . . . . .                 3,100,000 mR/hr          3,100,000 mR/hr CTMT (SFAS)

(2004) . . . . . . . . . . . . . . . . . . . 2.60E+06 mR/hr-(2005) . . . . . . . . . . . . . . . . . . 2.60E+06 mR/hr < (2006) . . . . . . . . . . . . .. . . . . . 2.60E+06 mR/hr (2007) . . . .. . . . . . . . . . . . . . . 2.60E+06 mR/hr CTMT Atmos (Normal Range) (4597M East) (4597BA West) Ch 1 (G) . . . . . . OSE uC1/cc OSH uC1/cc Ch 2 (P) . . . . . 9.80 uC1/cc 9.70 uC1/cc Ch 3 (I) . . . . . OSH uC1/cc OSH uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . OSH uC1/cc OSH uC1/cc. Cn 2 (G) HI . . . 310 uC1/cc 310 uC1/cc Ch 3.4,5 (P/I) . . 180 mR/hr 180 mR/hr CTMT Dome (High Range) (4596A) (4596B)

               . . . . . . . . . .                    3,200 R/hr               3,200 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                       (4598AA)                (4598BA)

Ch 1(G) . . . . . . OSH uC1/cc OSH uC1/cc Ch 2(P) . . . . .. . 2.30E-10 uC1/cc 2.30E-10 uC1/cc Ch 3(I) . . . . . . 1.15E-03 uC1/cc 1.15E-03 uC1/cc Station Vent (Accident Range) (4598AB) . (4598BB) Ch 1 (G) MID . . . 1.25E+01 uC1/cc 1.25E+01 uCi/cc Ch 2 (G) HI . . . 1.25E+01 uci/cc 1.25E+01 uC1/cc Ch 3,4,5-(P/I) . . 200 mR/hr 200 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G: . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

              . . . . . . . . . .                       150 cpm                  100 cpm Condenser SJAE                                      (1003A)                 (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

               . . . . . . . . . .                      400 cpm                  100 cpm

c i i

   . EMERGENCY PLAN DRILLSCENARIO NO:                               1989 EXER a4TD EXERCISE PROGRAM                                                                    TIME:         1300 RADIATION MONITOR DATA Radwaste Area Exhaust                                                                        .    (5405)

Ch A (P). . . . ............... 2,000 cpm. Ch B (I)- . .. ... .... , . . . . . . . . - 800 cpm Ch C (G) . . . ............... 150 cpm Fuel' Handling Area' Exhaust- (8446) (8447)

               . . . . . . . . ...                              0.2 mR/hr                          0.2 mR/hr Fuel Handling Area Exhaust                                                                        (5403)

Ch A"(P).. . . - . . . . . . . . - . . . . . . . . . . . 2,000 cpm

     -Ch'B (I)         . . . . . . ...............               .

20 cpm Ch C (G) . . . . . . .............. . 30 cpm . Control Rm EVS (5327) (5328) Ch A;(P) . . .. . . . 30 cpm 35 cpm

              .Ch B (I)            . . . ...                        O cpm                          '10 cpm Ch C-(G)            . . . ...                       15 cpm                             30 cpm LIOUID EFPLUENT Station Inlet: . Traveling Screens                              (8434)   . . . .            .60 cpm Station Effluent: Collection Box                                (8433)   . . . .               80 cpm
      . Water Discharge:                     Cooling Tower             (8432)  . . . .            100 cpm Misc Liquid Waste Disch                                        (1878A)                          (1878B)
               . . . . . . . . . . . .                     20,000 cpm                         15,000 cpm Clean Liquid Waste Xfer Pumps                                  (1770A)               *

(1770B)

               . . . . . . . . ...                              250 cpm                           300 cpm CCW Return 1-1                                                  (1412)                           (1413)
               . . . . . . . . . . . .                      1,000 cpm                             700 cpm AREA RADIATION (All readings in mR/hr)

Maint WK Area (8400) 50 Pent Rm 314 (8421) 7000 Samp sys Area (8401) 2,000 Hot Inst Shop (8422) 8,000 CS/05 Pump Rm (8402) OSH m Lab- (8423) 800 CS/05 Pump Rm (8403) OSH M sonnel Lock (8424) OSH DH Cooler km (8404) OSH Equip Hatch (8425) OSH OH Cooler Rm (8405) OSH Corridor 411 (8428) 200 Misc Wst Evap' (8406) OSH Corridor 411 (8429) 100

      .Vaive ACC Rm           (8407)-             75                          CTRL Rm          (8430)          15 Det Wst Orn Tk (8408)                  1000                           CTRL Cab Rm      (8431)        20.0 Pent- On 208          (8409)           6000                           Cond Demin 1/2 (8435)           0.1 Corridor 209          (8410)           5000                           Cond Demin 3/4 (8436)           0.3
      ' Corridor 209          (8411)           3000                           Con Dem H1d Tk (8437)           0.1      h Valv Rm 212           (8412)            100                           8kwsh Rec Tk Rm(8438)            25      j
      ~ Pump Rm 224           (8413)           5000                           Fuel Hand Area (8417)         6,000
      . Corridor.227          (8414)            650                           Fuel Hand Area (8418)           800
      -Corridor 227           (8415)            I,00                          Orum Area Rm     (8419)          25       '

Pent Rm 236 (8416) 6000 SFP Area South (8426) 200

      -Pent Rm 303            (8420)           7000                           SFP Area East' (8427)         6,000      ,

1 __----_______________a

t i. EMEv:ENCY PLAN DRTLL SCENARIO NO:_,,1989 EXER AND EXERCISE PROGRAM . TIME: 1315 RADIATION MONITOR DATA CONTAINMENT Failed Fuel Detector (1998) .. . . . . . . . . . 200,000 cpm CTMT (Wide Range) (2387)- (2389)

                       . . . . . . . . . . .                           3,100,000 mR/hr               3,100,000 mR/hr CTMT'(SFAS)

(2004) . . . . .. . . . . . . . . . . . 2.60E+06 mR/hr (2005) . . . . . . . . . . . . . . . . . . . 2.60E+06 mR/hr (2006) . . . . . . . . . . . . . . . . . . 2.60E+06 mR/hr (200?) . . . . . . . . . . . . .. . . . . . 2.60E+06 mR/hr CTMT Atmos (Normal Range) (4597AA East) (4597BA West).

        .             -Ch 1 (G)              . . . . .                        OSH uC1/cc                   OSH uCi/cc Ch 2 (P)-             .  '. . . .                     9.80 uC1/cc                  9.70 udi/cc Ch:3 lI)'             . . . . .                        OSH uCi/cc                   OSH uCi/cc CTMT Atmos (Accident Range) -(4597AS East)                                                    (4597BB West)

Ch 1 (G) MID . . . OSH uC1/cc OSH uC1/cc Ch 2 (G) HI . . . 300 uC1/cc 300 uci/cc Ch 3,4,5 (P/I) . . 180 mR/hr 180 mR/hr CTMT. Dome (High Range) (4596A) (4596B)

                       . . . . . . . . . . .                               3,200 R/hr                    3,200 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                              (4598AA)                  (4598BA)

Ch 1(G) . . . . . . OSH uC1/cc OSH uC1/cc Ch 2(P) . . . . . . 2.30E-10 uC1/cc 2.30E-10 uC1/cc

                      'Ch.3(I)          . . . . . .                    1.15E-03 uci/cc              1.15E-03 uCi/cc Station Vent (Accident Range)                                            (4598AB)                  (4598BB)

Ch 1 (G) MID . . . 1.17E+01 uC1/cc 1.17E+01 uC1/cc Ch 2 (G) HI' . . . . 1.17E+01 uC1/cc 1.17E+01 uC1/cc Ch 3,4,5-(P/I) . . 150 mR/hr 150 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . .. . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) .- . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

                       . . . .. . . . . .                                      150 cpm                     100 cpm Condenser SJAE                                                             (1003A)                  (1003B)

Ch A -, . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

                       . . . . . . . . . .                                     400 cpm                     100 cpm

x

         )                                      1     I Ti      <

EMERGENCY PLAN DRILLSCENARIO NO:- 1989 EXER AND EXERCISE PROGRAM -TIME: 1315 RADIATION MONITOR DATA

                 ~Radwaste Area Exhaust                                                                                                                                                                       .    .(5405)

Ch A-(P) :.. . ... ..... . . . . . . . . . L2,000 cpm l

                         ~Ch B.l(I): .. . . . . . . - .                    . . . . . . . . . . . . -                                                                                                            800 cpm l

Ch C-(G) . . . . .. ... . .

                                                                           . . .- . . . .                                                                                                                       150 cpr.

Fuel HandlingiArea Exhaust (8446) (8447)

                          .. . . . - . .                 1 . . .                   0.2 mR/hr                                                                                                                    0.2 mR/hrI
                . Fuel Handling Area Exhaust                                                                                                                                                                .       (5403)

Ch A.(P) ....;. . .. . -. . .... . . . . . . . .. . 2,000 cpm Ch B"(I) . . . .. . .. . . . . . .. . . . .. . . 20 cpm Ch C-(G) . . .,:.. . .. . . .. . . . . . . . 30 cpm

Control Rm EVS (5327) (5328)

Ch ' A'- (P) . . . . . . . 30 cpn 35 cpm L Ch B~(I) . . . .. . . O cpm 10 cpm

Ch C-(G) . . . . . . 15 cpm _ 30 cpm-LIOUID EFFLUENT
                 . Station Inlet:- Traveling Screens                                                (8434)         . . . .                                                                                       60 cpm Station Effluent:. Collection Box                                                 (8433)         . . .. .                                                                                      80 cpm Water Discharge:                      . Cooling Tower                             (8432)         . . . .                                                                                  =100 cpm Misc Liquid Waste Disch                                                          (1878A)                                                                                                        (1878B)
                          . . . .: . .. .... -                           20,000 cpm                                                                                                                 15,000 cpm Clean' Liquid Waste Xfer Pumps                                                   (1770A)                                                                                                        (1770B)
                          .- . . .. . . ....                                       250 cpm                                                                                                                      100 cpm CCW Return'1-l'                                                                   (1412)                                                                                                          (1413)
                          . . . . . . . ....                                1,000 cpm                                                                                                                         700 cpm AREA RADIATION (All readings in mR/hr)

Maint WK Area (840)) 50 Pent Rn 314 (8421) 7000 Samp sys Area. (8401). .2,000- Hot _ Inst Shop (8422) 8,000 CS/DS Pump Rm (8402) OSH Hot Lab (8423) 800

                  -CS/DS Pump Rm (8403)                       OSH                                                Personnel Lock (8424)                                                                                   OSH DH Cooler Rm' (8404)                       OSH                                                Equip Hatch                                                                      '(8425)                OSH DH Cooler Rm           (8405)              OSH                                                Corridor 411                                                                            (8428)          200
                 -Misc Wst Evap (8406)                        OSH                                                Corridor 411                                                                            (8429)           100-Valve ACC Rm           (8407)-            . 75                                                CTRL Rm                                                                                 (8430)            15-Det Wst Drn Tk,(8408)-                   1000 CTRL Cab Rm                                                                             (8431)         20.0 Pent Rm 208            (8409)-           6000                                                 Cond Demin.1/2 (8435)                                                                                   0.1 Corridor 209           (8410)            5000                                                 Cond Demin 3/4 (8436)                                                                                   0.3 Corridor 209~          (8411)            3000                                                 Con Dem Hld Tk (8437)                                                                                   0.1
Valv Rm 212 (8412)- 100 Bkwsh Rec Tk Rm(8438) 25 L _ Pump Rm 224 '(8413) 6000 Fuel Hand Area (8-417) 6,000 Corridor 227 (8414) 650 Fuel Hand Area (8418) 800 Corridor 227 ' (8415)- 400 Drum Area Rm (8419) 25 Pent Rm 236 (8416) 6000 SFP Area South (8426) 200 Pent;Rm 303 '(8420) 7000 SFP Area East (8427) 6,000 5

___m_ . . . _ . . _ _ _ _ _ . _ . . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . _ _ _ ______.____w

EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER ANQ EXERCISE PROGRAM TIME: 1330 EA,DIATION MONITOR' DATA CollTAINMENT

  - Failed Fuel Detector (1998)                          . . . .          . . . . . . 200,000 cpm
  - CTMT (Wide Range)                                               -(2387)               .         (2389)
          . . . .. . . . . .                       3,100,000 mR/hr                       3,100,000 mR/hr CTMT.(SFAS)

(2004) . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr. (2005) .. . . . . .. . . . . . . . . . . . 2.80E+06 mR/hr (2006) . . - . . . . . . . . . . . . . .. . 2.80E+06 mR/hr (2007) . . . . . . . . . . . . . . . .. . 2.80E+06 mR/hr. CTMT Atmos (Normal Range) (4597AA East) (4597BA West) Ch 1 (G)- . . . . . OSH uC1/cc OSH uCi/cc Ch 2 (P) . . . . . 9.80 uC1/cc 9.70 uC1/cc Ch 3 (I) . . . . . OSH uCi/cc OSH uC1/cc CTMT. Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . 053 uCi/cc OSH uC1/cc Ch 3 (G) HI . . . 300 uci/cc 300'uci/cc Ch 3,4,5 (P/I) . . 180 mR/hr 180 mR/hr CTMT Dome.(Hf.gh Range) (4596A) (4596B)

          . . . . . . . . . .                           3,200 R/hr                           3,200 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                   (4598AA)                        (4598BA)

Ch 1(G) . . . . . . OSH uCi/cc OSH uC1/cc Ch 2(P) . . . . . . 2.30E-10 uC1/cc 2.30E-10 uC1/cc Ch 3(I) . . . . . . 1.12E-04 uC1/cc 1.12E-04 uCi/cc Station Vent (Accident Range) (4598AB) (4598BB). i Ch 1 (G) MID . . . 1.09E+01 uci/cc 1.09E+01 uC1/cc L Ch 2 (G) HI. . . . 1.09E+01 uC1/cc 1.09E+01 uC1/cc Ch 3,4,5 (P/I) . . 150 mR/hr 150 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm

Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Lirie (609 #1) (600 #2)
          . . . . . . . . . .                               150 cpm                            100 cpm Condenser SJAE                                                 (1003A)                        (1003B) l          Ch A . . . . . . .                                  60 cpm                            30 cpm Waste Gas Discharge                                             (1822A)

(1822B)

          . . . . . . . . . .                               400 cpm                            100 cpm T

ls

m. .

i fL-

   ,    EMERGENCY PLAN.DRILLSCENARIO NO:                                          1989 EXER AND EXERCISE PROGRAM                                                                                 TIME:         1330 RADIATION MONITOR DATA Radwaste Area Exhaust                                                                                     . (5405)

Ch A '(P) . . . . . . . . . . . . . . . . . . . 2,000 cpm i Ch B (I) . . .. . .. . . . . . . . . . . . . 800 cpm ' Ch CL(G) . .. . . . . . . . . . .. . . . . . . . 150 cpm. Fuel Handling Area Exhaust (8446) (8447)

                                . . . . . . . . . . .                          0.2 mR/hr                        0.2 mR/hr       j Fuel Handling Area Exhaust                                                                                   (5403)

Ch A (P) . . . . . . . . . . . . . . . . . . . . . 2,000 cpm Ch B (I) .. . . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . . . .- 30 cpm Control Rm EVS (5327) (53M) Ch A (P) . . . . . . 30 cpm 35 cpm Ch B (I). . . . . . . O cpm 10 cpm Ch C (G)- . . . . . . 15 cpm 30 cpm LIOUID PFFLUENT 1 Station Inlet: Traveling Screens (8434) . . . . 60 cpm j

       . Station Effluent:                                 Collection Box            (8433)   . . . .            80 cpm           i Water Discharge:                                     Cooling Tower           (8432)   . . . .          100 cpm Misc Liquid Waste Disch                                                    (1878A)                         (1878B)
                               . . . . . - . . . . . . . .                20,000-cpm                       15,000 cpm           j i

Clean Liquid Waste Xfer Pumps (1770A) (1770B) j

                               . . . . . . . . . . .                          250 cpm                          300 cpm CCW Return 1-1                                                               (1412)                         (1413)
                              . .. . . . . . . . .                          1,000 cpm                          700 cpm AREA RADIATION (All readings in mR/hr)                                                        .

Maint WK Area (8400) 50 ' Pent Rm 314 (8421) -7000 Samp sys Area (8401) 2,000 Hot Inst Shop (8422) 8,000 CS/DS Pump Rm (8402) .OSH Hot Lab (8423) 800

       -CS/DS Pump Rm (8403)                                     OSH                        Personnel Lock (8424)         OSH DH Cooler Rm                           (8404)           OSH                        Equip Hatch     (8425)        OSH DH Cooler Rm                          (8405)            OSH                        Corridor 411    (8428)        200
       -Misc Wst Evap (8406)                                     OSH-                       Corridor 411    (8429)        100 Valve ACC Rm                           (8407)            75                        CTRL Rm         (8430)          15 L-Det Wst Drn Tk (8408)                                  1000                        CTRL Cab Rm     (8431)       20.0   i Pent Rm 208                            (8409)          6000                        Cond Demin 1/2 (8435)         0.1    !

Corridor 209 (8410) 5000 Cond Demin 3/4 (8436) 0.3 i Corridor 209 .(8411) 3000 Con Dem Hld Tk (8437) 0.1  !

       ' Valv Rm 212                            (8412)           100                        Bkwsh Rec Tk Rm(8438)           25 Pump Rm 224                            (8413)          6000                        Fuel Hand Area (8417)      6.000
       --Corridor 227                           (8414)           650                        Fuel Hand Area (8418)         800 Corridor 227                           (8415)           400                        Drum Area Rm    (8419)          25 i

i Pent Rm 236 (8416) 6000 SFP Area South (8426) 200 I Pent Rm 303 (8420) 7000 SFP Area East (8427) 6,000 i i l

         ~_.m _.- - - - - - . -            -

EMERGENCY PLAN DRILL SCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME: 1345 RADIATION MONITOR DATA CONTAINMENT 3 Failed Fuel Detector (1998) . . . . . . . . . . . 200,000 cpm CTMT (Wide Range) (2387) (2389)

         . . . . . . . . . .                       3,100,000 mR/hr               3,100,000 mR/hr CTMT (SFAS)

(2004) . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr (2005) . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr (2006) . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr (2007) . . . . . . . . . . . . . . . . . . 2.80E+06 mR/hr CTMT Atmos (Normal Range) -(4597AA East) (4597BA West) Ch 1 (G) . . . . . OSH uCi/cc OSH uC1/cc Ch 2 (P) . . . . . 9.80 uC1/cc 9.70 uCi/cc Ch 3 (I) . . . . . OSH uC1/cc OSH uC1/cc CTMT Atmos (Accident Range) (4597AB East) (4597BB West) Ch 1 (G) MID . . . OSH uC1/cc OSH uCi/cc Ch 2 (G) HI . . . 310 uC1/cc 300 uC1/cc Ch 3,4,5 (P/I) . . 180 mR/hr 180 mR/hr CTMT Dome (High Range) (4596A) (4596B)

         . . . . . . . . . .                            3,200 R/hr                  3,200 R/hr GASEOUS EFFLUENT Station Vent (Normal Range)                                  (4598AA)                (4598BA)

Ch 1(G) . . . . . . OSH uC1/cc OSH uC1/cc Ch 2(P) . . . . . . 2.30E-10 uC1/cc 2.30E-10 uC1/cc Ch 3(I) . . . . . . 5.00E-04 uC1/cc 5.00E-04 uC1/cc Station Vent (Accident Range) (4598AB) (4598BB) Ch 1 (G) MID . . . 7.20E+00 uCi/cc 7.20E+00 uC1/cc Ch 2 (G) HI . . . 7.20E+00 uC1/cc 7.20E+00 uC1/cc Ch 3,4,5 (P/I) . . 150 mR/hr 150 mR/hr CTMT Purge (5052) Ch A (P) . . . . . . . . . . . . . . . . . . 100 cpm Ch B (I) . . . . . . . . . . . . . . . . . . 20 cpm Ch C (G) . . . . . . . . . . . . . . . . . . 70 cpm Main Steam Line (609 #1) (600 #2)

         . . . . . . . . . .                                150 cpm                   100 cpm Condenser SJAE                                                 (1003A)                 (1003B)

Ch A . . . . . . . 60 cpm 30 cpm Waste Gas Discharge (1822A) (1822B)

          . . . . . . . . . .                               400 cpm                   100 cpm

EMERGENCY PLAN DRILLSCENARIO NO: 1989 EXER AND EXERCISE PROGRAM TIME:- 1345 RADIATION MONITOR DATA

         -Radwaste Area Exhaust                                                                                                (5405)

Ch A (P) . ' . ... .. . . . . . . . . . . . . 2,000 cpm Ch B (I). . . . . . .. . . . . . . . . . . . 800-cpm l Ch C-(G) ,. . . . . . . . . . . . . . . . . . 150 cpm-FuelDHandling Area Exhaust (8446) (8447)

                     . . . . . .. . . . . . .                          0.2 mR/hr                    _

0.2 mR/hr Fuel Handling Area Exhaust (5403)- L LCh A (P)'. . . . . . . . . . . . . . . . . . . .. 2.000 cpm

l. Ch B (I).. . . . . . . . . . . . . . . . . . . . . 20 cpm Ch C;(G) .. . . . . . . . . . . . . . . . . . . . 30 cpm Control Rm EVS (5327) (5328)

Ch'A:(P) .. . . .. . 30 cpm 35 cpm Ch B (I) . . . . . .. O cpm 10 cpm Ch C (G) . . . . . . 15 cpm .30 cpm LIQMID EFFLUENT Stat. ion Inlet: Traveling' Screens (8434) . . . . 60 cpm Station Effluent:, Collection Box (8433) . . . . 80 cpm Water Discharge: Cooling Tower (8432) . . . . 100. cpm Misc Liquid Waste Disch (1878A) (1878B)

                     . . . . . . . . . . . .                     20,000 cpm                           15,000 cpm Clean Liquid Waste Xfer Pumps                                      (1770A)                              . (1770B)
                     . . . . . . . . . . .                            250, cpm                               300 cpm CCW' Return 1-1                                                     (1412)'                                         (1413)
                     . .      . = . .    . . . . . .               1,000 cpm                                 700 cpm-AREA RADIATION (All readings in mR/hr)

Maint WK Area (8400) 50 Pent Rm 314 (8421) ,000 Samp sys Area (8401) 2,000 Hot Inst Shop (8422) 8,000 CS/05 Pump Rm. (8402) OSH Hot Lab (8423) 800 CS/05 Pump Pm (8403) OSH Personnel Lock (8424) OSH l DH Cooler Rm (8404) OSH . Equip Hatch (8425) OSH o OH Cooler Rm (8405) OSH Corridor 411 (8428)- 200 l-  : Misc Wst'Evan (8406) 'OSH Corridor 411 (8429) 100 Vaive ACC Rm: (8407) 75 CTRL Rm (8430) 15

         .0et Wst Orn Tk (8408)-                      1000                           CTRL Cab Rm      (8431)                       20.0 Pent Rm 208}}