ML20138G841

From kanterella
Jump to navigation Jump to search
Submits Supplementatl Info Re Emergency Power Engineered Safeguards Functional Test Amend Request
ML20138G841
Person / Time
Site: Oconee  Duke energy icon.png
Issue date: 12/26/1996
From: Hampton J
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9701030005
Download: ML20138G841 (4)


Text

-

il I thike,h>w Company J W Harna Oconce NuclearSite lice hesident PO.Ika H39 (&M)M5309 Office seneca, scws ts&b8ssmrax

DUKEPOWER l

J December 26, 1996 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Subject:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Supplemental Information Regarding Oconee Emergency Power Engineered Safeguards Functional Test Amendment Request j Cn December 11, 1996, Duke Power Company submitted an amendment to Facility Operating License Nos. DPR-38, DPR-47, and DPR-55 for Oconee Nuclear Station Units 1, 2, and 3, respectively. The amendment consists of proposed changes to the Updated Final Safety Analysis Report (UFSAR) regarding a one-time emergency power engineered safeguards (ES) functional test. Additional information regarding this proposed license amendment was also submitted to the NRC in  !

letters dated December 17, 1996, and December 19, 1996.

During a conference call on December 24, 1996, the staff requested additional information regarding a December 19, 1996, ENS notification associated with the Standby Shutdown Facility (SSF). Valvec LP-1 and LP-2 must be opened during l an Appendix R fire event in order to cool down a unit to l cold shutdown conditions. These valves are located in the decay heat drop line. During certain Appendix R fire scenarios, a portable control panel for each unit powered from the SSF is used to control selected valves. During recent valve maintenance, it was determined that the leads for valves 3LP-1 and 3LP-2 were reversed at both the valves and at the valve breakers. Subsequent investigation determined that the leads for valves 2LP-1 and 2LP-2 were OJ O/)O , also reversed. No other valves were affected. Since the

' N NI, 9701030005 961226 i 1(JLJf Q PDR ADOCK 05000269 /

p PDR I

~~%

0 l ,

l leads were reversed at both locations, the valves were still l functional and passed all surveillance tests from the main

! control rooms. However, if the portable control panel was used during an Appendix R event, the reversed leads would have caused the valves to be inoperable.

It should be noted that this issue is only related to an l Appendix R event for valves that are operated by the

! portable panels. This SSF issue has no relationship to the l

SSF Auxiliary Service Water System function which is being l credited as a backup source of feedwater during the emergency power ES functional test. The valves associated with operation of the SSF ASW System are operated from the SSF. Thus, they do not require the use of portable control panels and they are regularly tested by the Inservice Test (IST) program. Therefore, these valves are not susceptible to the failure mode identified in the December 19, 1996, ENS notification.

The equipment associated with the SSF ic regularly tested to ensure its operability as directed by our testing and  ;

maintenance programs. The SSF diesel generator is tested monthly, the ASW pump is tested quarterly, and the associated valves are tested as directed by the IST program.

The most recent test of the SSF diesel generator was on December 2, 1996 and the last quarterly test for the SSF ASW pump was on November 29, 1996. The SSF ASW valves needed to align feedwater to the Units 1 and 2 steam generators have also been tested since September 1996. As a conservative measure, Duke Power intends to stroke test these Units 1 and )

2 SSF ASW valves again prior to the emergency power ES l functional test.

In a?i t ' ion, a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test of the SSF was conducted in Septe .r of 1996. This test is described in the October 31, 1996, Duke Power submittal in response to the NRR and AEOD draft reports on the Oconee emergency power system.

1 In summary, there is no relationship between the December  !

19, 1996, ENS notification and operability of the SSF ASW System. Duke Power's testing of the SSF ASW System assures l it is in a state of operational readiness for the emergency i power ES functional test.

l l

1 l

. . . _ _ . . _ _ _ _ . _ - . . ,. _ . . ......_.._m. . - . _ . _ . _ . _ _ . _ _ _ . . _ _ _ . _ . . . _ . . . . . .. . . _ _ _ . _ . . .

l {

e 4 .- ,

.Please contact J. E. Burchfield at (864) 885-3292.if there i are any questions.  !

i 1

Very truly yours,

/  !

h i

.[

J. W. Hampton, Site Vice President {

Oconee Nuclear Station i i

t f

cc: S. D. Ebneter, Regional Administrator Region II t M. A. Scott, Senior Resident Inspector *

.Oconee Nuclear Site  !

D. E. LaBarge, Project Manager l NRR  !

i M. Batavia  !

DHEC i

4 l

1 1

1 l

r f J

l

bec:

J. M. Davis B. L. Peele W. W. Foster D. B. Coyle G. K. McAninch C. A. Little C. E. Curry M. E. Bailey H. T. Grant T. A. Ledford J. E. Stoner R. L. Gill P. R. Newton G. A. Copp ELL NSRB M. S. Kitlan J. E. Snyder R. D. Lingle T. D. Curtis File - Emergency Power