HL-4579, Responds to NRC Re Violations Noted in Insp Rept 50-366/94-05.Corrective Action:Operations Manager Met W/Staff Emphasizing Importance of Procedural Compliance

From kanterella
(Redirected from ML20070N485)
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-366/94-05.Corrective Action:Operations Manager Met W/Staff Emphasizing Importance of Procedural Compliance
ML20070N485
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/01/1994
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-4579, NUDOCS 9405060269
Download: ML20070N485 (5)


Text

_. _ _ _ _ _ _ - _ _ _

=. /

f Goorg+a Power Company )(

40 invomess Centor Parv waf Post Off<co Box 1295 namihgham, Alatama 35201 Tek,phorno 205 877-7279 J. T. Detkham, Jr.

m (jC()I 'L',iil l' owl'T Vito Puo&nt - Ncl ear H.:stch Prr@(t  % > ' > ' vu3. f r ,m' May 1, 1994 Docket No. 50-366 1!!-4579 U.S. Nuclear llegulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 lidwin I. Ilatch Nuclear Plant - Unit 2 RvPXKULNatice I of Violation Gentlemen:

i in response to your letter dated April 4,1994, and in accordance with the requirements of l

10 CFR 2.201, Georgia Power retrpany (GPC)is providing the enclosed response to the Notice of Violation associated with Inspection lleport 94-05. In the enclosure, a transcription of the NitC violation precedes GPC's response.

Sincerely, l 0 l <.-

J. T. Ileckham, Jr.

Yx JKil/cr finclosures:

1. Violation 94-05-01 and GPC's llesponse
2. Violation 94-05-02 and GPC's itesponse ec: GeurgicLEong.Cotnjyrty' Mr.11. L Sumner, General Manager - Nuclear Plant NOllMS

!)]. Nuclear RegulatvafonimlyionJDnhington, IAC Mr. K. Jabbour, l.icensing Project Manager - Ilatch l UERuclear Regulatory.Cotjujj!yio!!,.Begiv1Lll L

Mr. S D. Ebneter, llegional Administrator Mr. L D. Wert, Senior llesident inspector - llatch A

9405060269 940501 l PDR ADOCK 05000366 [ ; f, (

i Q PDR t

l t.

i Enclosure 1 Edwin I, llatch Nuclear Plant Unit 2 Violation 94-05-01 and GPC's Response YlQLATLQN 94-05-01 Criterion XVI of Appendix B of 10 CFR 50 requires that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected. In the case of significant conditions adverse to quality, the l measures shall assure that the cause of the condition is determined and corrective actions taken to preclude repetition.

Contrary to the above, conditions adverse to quality were not promptly identified and  ;

corrected involving a degraded condition of the Unit 2 High Pressure Coolant Injection System turbine thrust bearing. Significantly elevated bearing temperatures were indicated during surveillance testing on January 10, 1994 and February 4,1994. Control room 1 operators failed to identify the indications for resolution. On March 3,1994, it was )

determined that the thrust bearing had failed. j 1

This is a Severity Level IV violation.

BESPONSE TO VIOLATION 94-05-02 Admission or Denial of Violation:

The violation occurred as described in the Notice of Violation.

Esenon for the Violatigg The cause of this violation is personnel error. Specifically, personnel performing the liigh Pressure Coolant injection (HPCI) System surveillances failed to identify that excessive temperature conditions existed. In one case, personnel identified the anomaly but failed to take the appropriate actions to ensure that the condition was evaluated.

During surveillances in January and February, the turbine thrust bearing temperature exceeded 160 F. However, operations personnel did not identify the elevated temperatures for evaluation. Operators checked only the temperature data point indicated on the recorder at the time of data collection as opposed to checking the complete temperature data trace for the turbine bearing oil. Also, per the procedure, 004579 El-1

- . .- . .. - - .=. _ - . . . . - . - -. . -

Enclosure i Violation 94-05-01 and GPC's Response the thrust bearing temperature is checked near the end of the test and the bearing temperature had decreased to below 160 F bv ti e time the temperature was checked. As a consequence of the above, operators conduded that the procedural limit was not exceeded and that no further actions were necessary.

Regarding the instance in which the operator noted the out-of-spec temperature and did not take any actions, the operator believed that the indication was not valid. During the surveillance on March 1,1994, the turbine bearing oil temperature increased above the procedurallimit and then decreased rapidly. Although the temperature excursion was of a longer duration, the operator initially characterized the temperature excursion as a spike, that is, a spurious perturbation in the electronics. Additionally, other temperature indications were checked and were found to be normal which seemed to confirm that an actual high temperature condition did not exist. Consequently, the operator concluded that the spike was not indicative of the turbine bearing oil temperature, and no actions were needed. Therefore, the operator concluded that the procedural acceptance criterion was not violated.

. The system engineer does review the bearing oil temperature data following surveillance testing of the IIPCI system. Ilowever, in doing the review, he refers to the procedure data sheets as opposed to the chart recorder. Consequently, his review would not have i identified the out-of-spec parameter.

CorIqcjive r A_q1 ions Whigh llave Been Taken and the Results Achieved:

Operations management has discussed with operations personnel that the chart traces be reviewed for the highest temperatures attained during the surveillance when taking data in performing surveillances.

Operations management also discussed with operations personnel the need to initiate deficiency cards for anomalies, including spikes, such that the necessary evaluations can be performed.

l

-l Cartestive Actinns Which Will be Takertto Avoid Further Violations:

No further corrective actions are required.

i 004579 El-2 1

9 Enclosure 2 -

Edwin I. Hatch Nuclear Plant - Unit 2 Violation 94-05-02 and GPC's Response J

y_LQLATLQN 94-05-02 Hatch Unit 2 Technical Specifications (TS) 6.8.la, require that written procedures be ,

established, implemented, and maintained covering activities delineated in Appendix A of Regulatory Guide (RG) 1.33, Revision 2, February 1978.

RG 1.33, Appendix A, " Typical Procedures for Pressurized Water Reactors and Boiling Water Reactors," paragraph 8.bj., recommends specific procedures for surveillance .

testing of emergency core cooling systems.

Limitation 5.2.5 of Procedure 34SV-E41-002-2S: HPCI Pump Operability, states that the HPCI pump must be shut down if bearing oil temperature reaches 160 F l Contrary to the above, written procedures were not implemented in that on March 1, 1994, during performance of Procedure 34SV-E41-002-2S, bearing temperatures in u l

excess of 160 F were indicated and the turbine was not shut down.

This is a Severity Level IV violation (Supplement 1).

IE,SPONSE TO VIOLATION 94-05-02 Admission or Denial of Violation:

The violation occurred as described in the Notice of Violation.

Jhason for thg_ylp_lation; The cause of the failure to follow the procedure was personnel error on the part of the Shif1 Supervisor (SS) and the Superintendent of Shift (SOS). Prior to performing the surveillance, it was brought to the attention of the SS that during a previous surveillance of the HPCI System, one of the bearing oil temperatures had spiked. The SS discussed with the SOS the need to secure the system if the spike were to occur during this surveillance. The SOS directed the SS not to secure the system if the temperature only spiked, that is, a sustained high temperature condition did not occur. However, the procedure states that if bearing oil temperature reaches 160 F, the pump must be shut down. The surveillance was subsequently started. Following a manual start of the HPCI System, a licensed operator checked the IIPCI bearing oil temperatures on temperature 004579 E2-1

.- l Enclosure 2 '

Violation 94-05-02 and GPC's Response a

recorder 2E41-R605 and identified that the indicated turbine thrust bearing temperatures was approximately 405 F. He then notified the SS who- reviewed the temperature recorder chart. Since the only abnormally high temperature was that of the thrust bearing and other IIPCI System parameters gave no indication of problems, the SS questioned the validity of the indication.- Additionally, because of the indicated high temperature, the SS questioned-whether or not the indication was of oil temperature and not bearing metal temperature. He referred to plant drawings and verified that the indication was of oil and not bearing metal. Ile subsequently returned to the recorder and found that the temperature had decreased to approximately 200 F and was still decreasing. The SS was then informed that the system engineer was nearly completed with data collection for the surveillance. Considering the facts that the SS expected a spike, all other parameters were indicating nonnal, the temperature had decreased significantly and was continuing to decrease, and the system engineer needed only minutes to complete data collection, the SS decided to allow the system engineer to complete data collection before securing  :

the system .

Cnacclive Steps Whicil.Unre_Ileen Taken and the Restits Achievet The SS and the SOS have been disciplined in accordance with the Georgia Power Positive Discipline Program.

The Operations Manager met with each of the shift crews to discuss the event. In each of the meetings, the manager emphasized the importance of procedural compliance. ,

Co_rlecj ircJicps Which Will bs_TJkcn to AynliFurther Violations: ,

No further corrective actions have been deemed necessary at this time.