NPL-94-0137, Informs of Completion of Detailed Control Room Design Review Actions for Point Beach Nuclear Plant,Units 1 & 2

From kanterella
(Redirected from ML20065H563)
Jump to navigation Jump to search
Informs of Completion of Detailed Control Room Design Review Actions for Point Beach Nuclear Plant,Units 1 & 2
ML20065H563
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/05/1994
From: Kriesser G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-737 NPL-94-0137, NPL-94-137, NUDOCS 9404150049
Download: ML20065H563 (1)


Text

,

Wisconsin Electnc 1 POWER,COMf%NY 231 W Michgort Pd (ku 20W MMMon WI f>3201-2046 (414)221 2345  ;

I April 5, 1994 NPL 94-0137 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 COMPLETION OF DETAILED CONTROL ROOM DESIGN REVIEW ACTIONS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 By letter dated May 11, 1990, the Nuclear Regulatory Commission (NRC) provided Wisconsin Electric Power Company, the licensee for Point Beach Nuclear Plant (PBNP) , with the safety evaluation associated with the detailed control room design review for PBNP.

In this safety evaluation, the NRC stated that all requirements of Supplement 1 to NUREG-0737 had.been satisfied and that the detailed control room design review was acceptable. The NRC also requested that they be informed when all actions associated with the review, including the resolution of all safety-significant Human Engineering Discrepancies (HEDs), were completed.

This letter is being submitted to inform you that all of these actions have been completed. The last of the actions were completed on February 21, 1994 when post-installation testing was completed and the upgrade to the plant communications system was accepted by the operations group. The details of this system upgrade were initially discussed in a letter submitted to you on October 3, 1991. The completion of this system upgrade is also described in a letter submitted to you on March 8, 1994.

Please contact us if there are any questions.

Sincerely, i

[ 77 eW' Gary . Krieser Manag _r Industry and Regulatory Services cc: NRC Regional Administrator, Region III NRC Resident Inspector 9404150049 940405 1 g PDR ADDCK 05000266 D P PDR ,

d warWun onn:wmin EwwGuimtim

's