ML20065E949

From kanterella
Jump to navigation Jump to search
Forwards Public & Central Files Versions of Revised Epips, Including EPIP Form Index,Rev 16,EPIP-6.6c,EPIP-13,Rev 1, EPIP-22,Rev 11,EPIP-23,Rev 9,EPIP-25,Rev 10 & EPIP-26,Rev 9. Central Files Version of EPIPs Withheld
ML20065E949
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/30/1994
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19304B941 List:
References
PBL-94-0115, PBL-94-115, NUDOCS 9404110170
Download: ML20065E949 (1)


Text

.

s S

Wisconsin '

Electnc POWER COMPANY Polnf Beach Nucloor Plant 6610 Nuck >or Rd. Two Rwrs. WI 54241 (414) 755-2321 PBL 94-0115 March 30, 1994 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

DOCKET NOS. 50-266 & 50-301 gl4ERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT. UNITS 1 &2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.

Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and-stamped "ImMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents rooms.

Sincerely, s

/

G. J. Maxfield Manager sam Enclosure cc: NRC Resident Inspector (w/o/e)

Incident Response Center, Region III C$00C 0 Lg. f,g/, \ I 9404110170 940330 ADOCK 0500 ll

/j/ / g f D 6 l /N?'

/ - //U/77

{DR 6 0

/}h/C

~ A whsifwrofhvnsin &qs(kvin;ttin