ML19353D699

From kanterella
Jump to navigation Jump to search
Forwards Rev to Security Plan for Ei Hatch Nuclear Plant. Plan Withheld
ML19353D699
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/09/1995
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-5064, NUDOCS 9511150166
Download: ML19353D699 (2)


Text

4 Georce Power company

-; rterness Center Parrwa.

st O"o Box 1235 Ezrmonarr Alabama Js201
  • et e ent ;5 877-7279 J. T. Beckham. Jr.

m

. e r esioent - Octest Ggg7nj3b pggg7

  • Yr Pro!OCI *2IXM eucite syste.rrt November 9, 1995 Docket Nos. 50-321 HL-5064 50-366 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant Physical Security Plan Revision i

Gentlemen:

In accordance with the requirements of 10 CFR 50.54 (p)(2), Georgia Power Company submits a change to the Physical Security Plan for the Edwin I. Hatch Nuclear Plant. The enclosed rMsion reflects implementation of the NRC's Final Rule, " Access Control of Personnel and Materials at Primary Containment," published in the Federal Register September 7,1995. The change deletes the requirement for licensees to station security personnel at the primary containment during periods of high traffic.

Georgia Power Company has determined the enclosed change does not decrease the efTectiveness of the Physical Security Plan and follows the NRC stafi's position that impleme itation of the rule change through the 10 CFR 50.54 (p)(2) process is acceptable.

Therefore, ajustification for the determination of no decrease in safeguards effectiveness j is not provided. The enclosure contains revision insertion instmetions and the revised i

Physical Security Plan pages.

i The information contained in the enclosure is categorized as Safeguards Information, and l in accordance with 10 CFR 73.21, this document should be withheld from public I disclosure.

Should you have any questions in this regard, please contact this office.

Sincerely, 0' 0 h =!!

hJ. T. Beckham, Jr. {n '

I SRPe ,_  !

a du uv'i i Enclosure Attachments or enclosures sontain sofoguerds hiformation and,ones c: (See next nace T e closenho:L the owerlatestersene 9511150166 951109 ism PDR ADOCK 05000321 rg C F .. _ _ _ -

GeorgiaPower d U.S. Nuclear Regulatory Commission Page 2 November 9, 1995 cc: Georzia Power Companv (w/o enclosures)

Mr. H. L. Sumner, Nuclear Plant General Menager NORMS  :

U.S. Nuclear Reentatory Commission. Il'ashineton. D.C, (w/o enclosures)

Mr. K. Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Reentatorv Commission. il'ashington. D.C.

Mr. S. D. Ebneter, Regional Administrator (w/2 enclosures)

Mr. B. L. Holbrook, Senior Resident Inspector - Hatch (w/o enclosures) t i

1 l

l Attachments or enclosures contein safeguardsinformation end,once HL-5064 '""*""

is decontrolled.