MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi 2024-02-01
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML19108A2352019-04-18018 April 2019 301 Exam Report IR 05000269/20183012018-07-13013 July 2018 NRC Operator License Examination Report 05000269/2018301, 05000270/2018301, and 05000287/2018301 IR 05000269/20163022017-01-27027 January 2017 NRC Operator License Examination Report 05000269/2016302, 05000270/2016302, and 05000287/2016302 IR 05000269/20153022016-02-0202 February 2016 NRC Operator License Examination Report 05000269/2015302, 05000270/2015302, and 05000287/2015302 IR 05000269/20153012015-07-21021 July 2015 Er 05000269/2015301, 05000270/2015301, and 05000287/2015301; June 8-11, 2015 & June 17, 2015; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations IR 05000269/20143022015-02-0909 February 2015 Er 05000269/2014302, 05000270/2014302, and 05000287/2014302; December 8-11, 2014 & December 17, 2014; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations ML15015A6942015-01-14014 January 2015 Notification of Licensed Operator Initial Examination, 05000269/2015301, 05000270/2015301 and 05000287/2015301 IR 05000269/20133012013-08-0101 August 2013 Er 05000269-13-301; 05000270-13-301; 05000287/2013301; Operating Test June 10 - 12, 2013 & Written Exam July 11, 2013; Oconee Nuclear Station, Units 1, 2, and 3; Operator License Examinations ML12221A3912012-08-0606 August 2012 Duke Energy - Response to NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations IR 05000269/20113022011-11-21021 November 2011 Er 05000269-11-302; 05000270-11-302; 05000287-11-302; Operating Test 10/17/2011 - 10/20/2011 & Written Exam 10/26/2011; Oconee Nuclear Station, Units 1, 2, and 3 Operator License Examinations IR 05000270/20103012010-05-13013 May 2010 Er 05000296/10-301, 05000270/10-301, 05000287/10-301 on 03/29/10 - 04/02/10 for Oconee, ML1013306092010-05-13013 May 2010 Er 05000296/10-301, 05000270/10-301, 05000287/10-301 on 03/29/10 - 04/02/10 for Oconee, IR 05000269/20083012008-04-22022 April 2008 Operator Licensing Initial Retake Examination Report 05000269-08-301, 05000270-08-301 and 05000287-08-301 on 03/20/08 for Oconee Nuclear Station - IR 05000269/20073012007-05-0101 May 2007 Operator Initial Examination - 05000269-07-301; 05000270-07-301 & 05000287-07-301 IR 05000269/20063012006-08-0202 August 2006 IR 05000269-06-301, 05000270-06-301 & 05000287-06-301; Duke Energy Corporation; 06/19-28-2006 & 06/30/2006; Oconee Nuclear Station ML0527602732005-09-21021 September 2005 Duke Power - Response to NRC Regulatory Issue Summary 2005-19 Preparation and Scheduling of Operator Licensing Examinations ML0220502652002-07-16016 July 2002 Response to NRC Regulatory Issue Summary 2002-09, Supplement Preparation and Scheduling of Operator Licensing Examinations 2021-07-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 18, 2019 Mr. Ed Burchfield, Jr.
Site Vice President, Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT:
OCONEE NUCLEAR STATION - NRC EXAMINATION REPORT 05000269/2019301, 05000270/2019301, AND 05000287/2019301
Dear Mr. Burchfield:
During the period February 26-27, 2017, the Nuclear Regulatory Commission (NRC) administered a retake operating test to an employee of your company who had applied for a license to operate the Oconee Nuclear Station. At the conclusion of the test, the examiner discussed preliminary findings related to the operating test with those members of your staff identified in the enclosed report.
One Reactor Operator (RO) applicant passed the simulator scenario portion of the retake operating test. The entire JPM portion of the operating test and written examination were excused. There were no post-examination comments. One applicant was issued a license commensurate with the level of examination administered. A Simulator Fidelity Report is included in this report as Enclosure 2.
All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
E. Burchfield 2 If you have any questions concerning this letter, please contact me at (404) 997-4528.
Sincerely,
/RA: Gerald J. McCoy for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
Enclosures:
- 1. Report Details
- 2. Simulator Fidelity Report cc: Distribution via Listserv
___ML19108A235_ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE AXG1 GJM1 for NAME AGOLDAU EGUTHRIE DATE 4/17/2019 4/ 18 /2019 E-MAIL COPY? YES NO YES NO
U.S. NUCLEAR REGULATORY COMMISSION Examination Report Docket No.: 50-269, 50-270, 50-287 License No.: DPR-38, DPR-47, DPR-55 Report No.: 05000269/2019301, 05000270/2019301, AND 05000287/2019301 Enterprise identifier: L-2019-OLL-0041 Licensee: Duke Energy Carolinas, LLC Facility: Oconee Nuclear Station, Units 1, 2 and 3 Location: Seneca, SC Dates: Operating Test - February 26-27, 2019 Examiners: Andreas Goldau, Chief Examiner, Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Enclosure 1
2
SUMMARY
ER 05000269/2019301, 05000270/2019301, AND 05000287/2019301; retake operating test February 26-27, 2019; Oconee Nuclear Station, Units 1, 2 and 3; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted a retake examination in accordance with the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
The operating test was developed by the licensee.
The NRC administered the simulator scenario portion of the operating test during the period February 26-27, 2019. One Reactor Operator (RO) applicant passed the simulator scenario portion of the operating test. The entire JPM portion of the operating test and the written examination were excused. One applicant was issued a license commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
3 REPORT DETAILS
- 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations
- a. Inspection Scope The NRC reviewed the licensees examination security measures while preparing and administering the examination in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the simulator scenario portion of the operating test during the period February 26-27, 2019. The NRC examiner evaluated one Reactor Operator (RO) applicant using the guidelines contained in NUREG-1021. Evaluation of the applicant and review of associated documentation was performed to determine if the applicant, who applied for a license to operate the Oconee Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance and fidelity of the simulation facility during the preparation and conduct of the operating test.
- b. Findings No findings were identified.
The licensee developed the operating test. All examination material was developed in accordance with the guidelines contained in Revision 11 of NUREG-1021. The NRC reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
One Reactor Operator (RO) applicant passed the simulator scenario portion of the operating test. The entire JPM portion of the operating test and the written examination were excused. One RO applicant was issued a license.
A copy of the individual examination report was sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee submitted no post-examination comments.
4OA6 Meetings, Including Exit Exit Meeting Summary On February 27, 2019, the NRC examination team discussed generic issues associated with the operating test with Mr. Ed Burchfield, Vice President-ONS, and members of the Oconee Nuclear Station staff. The examiners asked the licensee if any of the examination material was proprietary, or if any of the examination material received should be withheld from public disclosure. No proprietary information was identified.
4 KEY POINTS OF CONTACT Licensee personnel E. Burchfield, Vice President - ONS J. Steely, Training Manager P. Fisk, Plant Manager - ONS T. Doss, ILT Exam Team Supervisor D. George, ILT Class Supervisor R. Patterson, ILT Instructor S. Lark, NRC Exam Author NRC personnel A. Goldau, Chief Examiner
SIMULATOR FIDELITY REPORT Facility Licensee: Oconee Nuclear Station Facility Docket No.: 05000269, 05000270, AND 058000287 Operating Test Administered: February 26-27, 2019 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
No simulator fidelity or configuration issues were identified.